SlideShare a Scribd company logo
1 of 5
1OFFICE FOR METROPOLITAN ARCHITECTURE
ST. LAWRENCE HALL
DAVID CROMBIE PARK
MILL STREET BREWERY
DISTILLERY DISTRICT
YOUNG CENTER FOR THE
PERFORMING ARTS
ST. LAWRENCE CENTER
FOR THE ARTS
SONY PERFORMING
ARTS CENTER
DOMINION
PUBLIC
COMMERCE
COURT
HOCKEY
HALL OF
FAME
ST. LAWRENCE
NORTH MARKET
ST. LAWRENCE
MARKET
CANADA’S
SUGAR BEACH
(FUTURE)
DON RIVER
PARK / PAN
AM GAMES
(FUTURE)
WETLANDS
(FUTURE)
SHERBOURNE
PARK
(FUTURE)
BAY ADELAIDE
CENTRE
CITY OF
TORONTO
ARCHIVES
CHURCH OF THE
HOLY TRINITY
OLD CITY HALL
CANADIAN OPERA
COMPANY
ROY THOMPSON HALL
UNION STATION
AIR CANADA CENTER
TORONTO
ISLAND
FERRY
REDPATH SUGAR
MUSEUM
DUNDAS SQUARE
ST. MICHAEL’S
HOSPITAL
CITY HALL
T.O. 2036Innovative Design Options for the Gardiner
Expressway and Lake Shore Boulevard
Reconfiguration Environmental Assessment
Toronto’s quality of life and economic development, even post crisis, have kept pace with or out-
stripped its neighbors. Its economic successes are matched by its environmental successes, includ-
ing the extensive green belt surrounding the city.
Like many North American cities, Toronto has grown away from its urban center and waterfront. A
dense core and suburban periphery form a collection of nodes linked through a road network and to
a lesser degree by subway and commuter rail. Despite its competitive mix of auto and public trans-
port, Toronto suffers from the worst commute times in North America. At the junction of the down-
town, the periphery and the waterfront, the areas to the east and west of downtown are missing
links within the city’s network.
Could the key to unlocking the potential of Toronto’s waterfront be to create a new, more potent link
between the core and the periphery? Can reducing the Gardiner’s footprint simultaneously remove
an impediment to the development of its surroundings and INCREASE downtown’s connection its
periphery?
Removing the Gardiner as an obstacle is an important first step towards reorienting Toronto’s
growth, but only a first step...Of the available options to lessen the Gardiner’s impact, removing the
upper deck offers both the best integration of the New Gardiner with its surroundings and the great-
est number of opportunities for navigating across it. The resulting reduction in road capacity—a
reduction that will exacerbate an already congested road network—begs the question of what can
step in to fill the void.
Understanding Toronto Site Potential
GARDINER EXPRESSWAY
LAKESHORE
BOULEVARD
5760 per hour
TOTAL CAPACITY
(12 Lanes)
3600 per hour
CAPACITY
(8 Lanes)
Streecar
Subway
Train
GARDINER EXPRESSWAY
LAKESHORE
BOULEVARD
5760 per hour
TOTAL CAPACITY
(12 Lanes)
3600 per hour
CAPACITY
(8 Lanes)
2160 per hour
CAPACITY
?
Removing the Gardiner How to fill the void?
Reimagining the Gardiner creates opportunities for new north-south connections between the neigh-
borhoods north of the highway and the waterfront, but these connections, while necessary, will not be
sufficient to support the growth of the area surrounding the Gardiner. Our proposal looks not only at
crossing the Gardiner, but at the potential new transit modes along it.
By harnessing the potential of new east-west links between downtown and the rest of Toronto, and
providing a new intermodal link between them (the transferium), it unlocks the untapped promise of
Toronto’s waterfront not only as an environmental amenity but as a new ground for Toronto’s future
growth in an age that has learned the limits of growth through sprawl.
Our proposal uses the opportunity of the Gardiner’s alteration to imagine a new “smart growth” strat-
egy for the city. This strategy offers the city a new dynamic between the old and new, development
and the environment, focusing development adjacent to the city’s core.
Smart Growth
BATHHURSTSTREET
BATHHURSTSTREET
BATHHURSTSTREET
SPADINAAVENUE
JOHNSTREET/REESSTREET
UNIVERSITYAVE/YORKSTREET
BAYSTREET
YONGESTREET
JARVISSTREET
SHERBOURNESTREET
PARLIAMENTSTREET
CHERRYSTREET
DONPARKWAY
CARLAWAVENUE
LESLIESTREET
DONVALLEY
GARDINER EXPRESSWAY
North-South Connections
East-West Connections
T T
T
T
UNION STATION
LAKESHORE BLVD
GARDINER
DONRIVERPARKWAY
STOUFFVILLELINE
LAKESHOREEASTLINE
RICHMONDLINE
Connection
Districts
ELEVATED GARDINER EXPRESSWAY
RAILWAY
RAILWAY
WATERFRONT
WATERFRONT
+ -
VALUE
$$$ $
SUBWAY
TDOWNTOWN
T
DOWNTOWN
TRANSFERIUM
Land Value
BEFORE: The elevated Gardiner suppressed land values
around it...
AFTER: The new multi-nodal transit corridor acts as an attractor
for new development.
HERITAGE MARKET
LAKE-
SHORE BLVD/
METRO
PARK STRIP
ARTS DISTRICT
TRANSFERIUM
ICT BAR
CONFERENCE
GATE
Districts
LAKESHORE BLVD
QUEENS QUAY BLVDGARDINER
CHEERYST
CARLAWST
LESLIEST
PARLIAMENTST
SHERBOURNEST
JARVISST
YOUNGEST
DONRIVERPARKWAY
LAKESHORE BLVD
QUEENS QUAY BLVDGARDINER
CHEERYST
CARLAWST
LESLIEST
PARLIAMENTST
SHERBOURNEST
JARVISST
YOUNGEST
DONRIVERPARKWAY
LAKESHORE BLVD
QUEENS QUAY BLVDGARDINER
CHEERYST
CARLAWST
LESLIEST
PARLIAMENTST
SHERBOURNEST
JARVISST
YOUNGEST
DONRIVERPARKWAY
T T
T
T
T
The east end of the site is a crossroads of two highways, the future relief subway
line, commuter rail, etc. By creating a new transit hub at their conjunction, these
various transport modes can be reorganized and amplified.
Street Car Line Bus Route
Subway Road Network
The removal of the Gardiner allows for the development of the
space of land between rail tracks and road structure, creating a
new spine that links elements of the city.
Lakeshore Boulevard
1. Before 2. After
Existing View Potential
0 50 100 200
Section through Lakeshore Boulevard
OFFICE FOR METROPOLITAN ARCHITECTURE
T
LAKESHORE BLVD
DONRIVERPARKWAY
STOUFFVILLELINE
LAKESHOREEASTLINE
RICHMONDLINE
Residential
Mix
Leisure
Culture/Education
Commercial
Office
Hotel
Industry
Program Distribution
1
2
Reorganize Infrastructue
The park strip connects the
David Crombie parks which
run East West along Front
St, to the proposed Sher-
bourne Park. A fragment of
the Gardiner is kept, provid-
ing an elevated pedestrian
platform.
The Heritage Market, links two
the St. Lawrence market and
the Redpath Sugar Factory
located on the waterfront still
operates, period in Toronto’s
history. A series of outdoor
markets, organic in their growth
provide a continuous link be-
tween the two buildings.
ICAE
SILO PARK AND
SLIPHEAD
VICTORY SOYA
MILLS SILO
DAVID CROMBIE PARK
TRINITY STREET
BRIDGE
CHERRY STREET
BRIDGE
DON RIVER PARK
EXISTING
DISTILLERY
The transferium clarifies the cur-
rent infrastructure network, facili-
tating the removal of the Gardiner
by increasing modal use, provid-
ing connections to Subway, GO
Trains (Richmond, Stouffville and
Lakeshore East lines), Street car
(along Queens Quay Boulevard)
aswell as regular bus.
View from the Transferium
P
Don River Valley
Below the Transferium
Transportation Hub View from CN Tower
mum tower height of 120m. In order to encourage a mix development, the tower has
been developed specifically to accomodate office, residential.
Historically, the Distillery District
stands in the location of the first
settlements of Toronto. A complex
of different Distillers, during the
1860’s it was one of the largest
Whiskey distillerys in the world.
Now the area has been converted
into an arts district. With a mix of
cultural arts, galleries and
Transferium
The ICA&E museum located on the Waterfront, provides a clear counter-
point to the Distillery District in the North of the zone. Access to these two
destinations creates a series of clearly defined routes through the site.
ICA&E - Institute of Contemporary Arts and
The Environment
Gathering Space Embedded within the Railway Berm
Section through the Arts District
Connective Trajectories
0 50 100 200
0 50 100 200
Creative city provides a link between
the downtown creative city and the
waterfront, while encouraging inno-
vation in Toronto.
Parking
Ground
Subway
F7
F8
Tower
TRAIN CONNECTION
TRAMWAY
TRAIN
CONVENTION
CENTER
GYM
TOBUSINESSCENTER
TO PAN AM STATION
VISITOR
FACILITIES
CONCOURSE
WATER
PARK&FER
RY
CONVENTION
CENTER
CONVENTION
CENTER
CONVENTION
CENTER
CONVENTION
CENTER
RETAIL
UP
DOW
N
DOWN
UP
OFFICE
SKY LOBBY
CONFERENCE
RETAIL
PARKINGPARKING
CONCOURSECONCOURSE
RETAIL
HOTEL
SUBWAY
GO
TRAIN
STREET
CAR
OFFICE
Program
0 50 100 2000 50 100 2000 50 100 200
Section through Sherbourne Park
Section through Heritage Park
3OFFICE FOR METROPOLITAN ARCHITECTURE
Waterfront Area
Grid Layout
Transportation
Green
Program Distribution
Proposed Buildings
TRANSPORTATION INFRASTRUCTURE
GRID LAYOUT
WATERFRONT AREA
GREEN INFRASTRUCTURE
PROGRAM DISTRIBUTION
BUILDINGS PROPOSED
T
T
T
T
0 50 100 200
The Gardiner has long been acknowledged as a barrier between Toronto and its waterfront, sequestering the city from one of its key ecological assets
and limiting development along its path. Removing the upper deck of the Gardiner offers both the best integration of the roadway with its surroundings
and the greatest number of opportunities for navigating across it.
Reimagining the Gardiner as a grade-level boulevard—Lakeshore Boulevard—we have elaborated several key connections across it. Each of these
navigates the new Lakeshore Boulevard in a different way, passing over, under or across it to create links between key cultural and urban points and
the waterfront.
These connections, while necessary, will not be sufficient to support the growth of the area. Our proposal looks not only at crossing the Gardiner, but
at potential new transit modes along it. The east end of the site is a crossroads of the highway, the future relief subway line, and the commuter rail. By
creating a new transit hub at their conjunction—a Transferium that combines 6,000 parking spaces with stations for various modes of public transit—
transportation to and from downtown can be reorganized and amplified, unlocking the untapped promise of Toronto’s waterfront as not only an environ-
mental amenity but as a new ground for Toronto’s future growth.
In an age that has learned the limits of growth through sprawl, our proposal uses the opportunity of the Gardiner’s alteration to imagine a new “smart
growth” strategy for the city. This strategy offers a new dynamic between the past and the future, development and the environment, focusing develop-
ment adjacent to the city’s core and linking it with the city as a whole.
T.O. 2036
OFFICE FOR METROPOLITAN ARCHITECTURE
5OFFICE FOR METROPOLITAN ARCHITECTURE
SIDEWALK SIDEWALK
4.5 1.5 3.1 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5
BIKE
WAY
BIKE
WAY
SWALE LANE LANE LANE LANE LANE LANE LANE LANE LANE LANE
SUBWAY RIGHT OF WAY
TYPICAL CONDITION
ALONG BOULEVARD
PLATFORMPLATFORM
Section through Lakeshore Boulevard

More Related Content

What's hot

Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardinerEast
 
Public Forum 2 - Display Boards
Public Forum 2 - Display BoardsPublic Forum 2 - Display Boards
Public Forum 2 - Display BoardsGardinerEast
 
Improve kpmb+big boards
Improve kpmb+big boardsImprove kpmb+big boards
Improve kpmb+big boardsGardinerEast
 
Remove jcfo booklet
Remove jcfo bookletRemove jcfo booklet
Remove jcfo bookletGardinerEast
 
Improve dsr+aa booklet
Improve dsr+aa bookletImprove dsr+aa booklet
Improve dsr+aa bookletGardinerEast
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayToronto Public Consultation Unit
 
Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?William Riggs
 
King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017City of Toronto Planning
 
Jasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draftJasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draftMatthew Crane
 
Kuching waterfront-tales-of-three-cities1
Kuching waterfront-tales-of-three-cities1Kuching waterfront-tales-of-three-cities1
Kuching waterfront-tales-of-three-cities1Andrew Law
 
Isle of Dogs: A New Waterside Heart for East London
Isle of Dogs: A New Waterside Heart for East LondonIsle of Dogs: A New Waterside Heart for East London
Isle of Dogs: A New Waterside Heart for East Londongjhall
 
Edinburgh Harbour Forth Ports Planning Application
Edinburgh Harbour Forth Ports Planning ApplicationEdinburgh Harbour Forth Ports Planning Application
Edinburgh Harbour Forth Ports Planning ApplicationGreener Leith
 
Sabarmati riverfront
Sabarmati riverfrontSabarmati riverfront
Sabarmati riverfrontshiv404
 
Sabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectSabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectFabiha Rahman
 
An introduction to radnor bridge
An introduction to radnor bridgeAn introduction to radnor bridge
An introduction to radnor bridgeInterrelated
 

What's hot (20)

Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panels
 
Public Forum 2 - Display Boards
Public Forum 2 - Display BoardsPublic Forum 2 - Display Boards
Public Forum 2 - Display Boards
 
Improve kpmb+big boards
Improve kpmb+big boardsImprove kpmb+big boards
Improve kpmb+big boards
 
Remove jcfo booklet
Remove jcfo bookletRemove jcfo booklet
Remove jcfo booklet
 
Improve dsr+aa booklet
Improve dsr+aa bookletImprove dsr+aa booklet
Improve dsr+aa booklet
 
Removing Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a TimeRemoving Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a Time
 
Delivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner ExpresswayDelivering the Rehabilitation of the F.G. Gardiner Expressway
Delivering the Rehabilitation of the F.G. Gardiner Expressway
 
Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?
 
King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017King Street Pilot Public Meeting - Feb 13 2017
King Street Pilot Public Meeting - Feb 13 2017
 
New York's Next Great Waterfront Park - Urban Design
New York's Next Great Waterfront Park - Urban DesignNew York's Next Great Waterfront Park - Urban Design
New York's Next Great Waterfront Park - Urban Design
 
Jasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draftJasper Downtown Riverfront Master Plan draft
Jasper Downtown Riverfront Master Plan draft
 
Kuching waterfront-tales-of-three-cities1
Kuching waterfront-tales-of-three-cities1Kuching waterfront-tales-of-three-cities1
Kuching waterfront-tales-of-three-cities1
 
Ahmedabad srfdcl
Ahmedabad srfdclAhmedabad srfdcl
Ahmedabad srfdcl
 
Isle of Dogs: A New Waterside Heart for East London
Isle of Dogs: A New Waterside Heart for East LondonIsle of Dogs: A New Waterside Heart for East London
Isle of Dogs: A New Waterside Heart for East London
 
Edinburgh Harbour Forth Ports Planning Application
Edinburgh Harbour Forth Ports Planning ApplicationEdinburgh Harbour Forth Ports Planning Application
Edinburgh Harbour Forth Ports Planning Application
 
What if 280 came down
What if 280 came downWhat if 280 came down
What if 280 came down
 
Sabarmati riverfront
Sabarmati riverfrontSabarmati riverfront
Sabarmati riverfront
 
Sabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectSabarmati Riverfront Development Project
Sabarmati Riverfront Development Project
 
Transforming the Character of St. Mary's Way
Transforming the Character of St. Mary's WayTransforming the Character of St. Mary's Way
Transforming the Character of St. Mary's Way
 
An introduction to radnor bridge
An introduction to radnor bridgeAn introduction to radnor bridge
An introduction to radnor bridge
 

Viewers also liked

Improve Plan Gardiner Expressway East
Improve Plan Gardiner Expressway EastImprove Plan Gardiner Expressway East
Improve Plan Gardiner Expressway EastGardinerEast
 
GE Replace Elevated Plan Lake Shore Boulevard
GE Replace Elevated Plan Lake Shore BoulevardGE Replace Elevated Plan Lake Shore Boulevard
GE Replace Elevated Plan Lake Shore BoulevardGardinerEast
 
GE Replace Plan Elevated
GE Replace Plan ElevatedGE Replace Plan Elevated
GE Replace Plan ElevatedGardinerEast
 
GE Improve Plan Lake Shore Boulevard
GE Improve Plan Lake Shore BoulevardGE Improve Plan Lake Shore Boulevard
GE Improve Plan Lake Shore BoulevardGardinerEast
 
Gardiner East Contaminated Soil Monitoring and Review Committee Terms of Refe...
Gardiner East Contaminated Soil Monitoring and Review Committee Terms of Refe...Gardiner East Contaminated Soil Monitoring and Review Committee Terms of Refe...
Gardiner East Contaminated Soil Monitoring and Review Committee Terms of Refe...Toronto Public Consultation Unit
 

Viewers also liked (10)

Improve Plan Gardiner Expressway East
Improve Plan Gardiner Expressway EastImprove Plan Gardiner Expressway East
Improve Plan Gardiner Expressway East
 
Remove Plan
Remove PlanRemove Plan
Remove Plan
 
Remove Plan
Remove PlanRemove Plan
Remove Plan
 
Replace Plan
Replace PlanReplace Plan
Replace Plan
 
GE Replace Elevated Plan Lake Shore Boulevard
GE Replace Elevated Plan Lake Shore BoulevardGE Replace Elevated Plan Lake Shore Boulevard
GE Replace Elevated Plan Lake Shore Boulevard
 
Improve Plan
Improve PlanImprove Plan
Improve Plan
 
GE Replace Plan Elevated
GE Replace Plan ElevatedGE Replace Plan Elevated
GE Replace Plan Elevated
 
GE Improve Plan Lake Shore Boulevard
GE Improve Plan Lake Shore BoulevardGE Improve Plan Lake Shore Boulevard
GE Improve Plan Lake Shore Boulevard
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
Gardiner East Contaminated Soil Monitoring and Review Committee Terms of Refe...
Gardiner East Contaminated Soil Monitoring and Review Committee Terms of Refe...Gardiner East Contaminated Soil Monitoring and Review Committee Terms of Refe...
Gardiner East Contaminated Soil Monitoring and Review Committee Terms of Refe...
 

Similar to Remove oma+amo boards

Downie district framework plan (final)
Downie district framework plan (final)Downie district framework plan (final)
Downie district framework plan (final)Paul Veldman
 
Wing genesis of-footbridge_design@2c_from_a_community_perspective-1065_c
Wing genesis of-footbridge_design@2c_from_a_community_perspective-1065_cWing genesis of-footbridge_design@2c_from_a_community_perspective-1065_c
Wing genesis of-footbridge_design@2c_from_a_community_perspective-1065_cInterrelated
 
1065. genesis of footbridge design, from a community perspective radnor bri...
1065. genesis of footbridge design, from a community perspective   radnor bri...1065. genesis of footbridge design, from a community perspective   radnor bri...
1065. genesis of footbridge design, from a community perspective radnor bri...Interrelated
 
Miller Park District Presentation
Miller Park District PresentationMiller Park District Presentation
Miller Park District PresentationTyler Yount
 
In 21st Century Toronto, There is Momentum | Charles A. Birnbaum
In 21st Century Toronto, There is Momentum | Charles A. BirnbaumIn 21st Century Toronto, There is Momentum | Charles A. Birnbaum
In 21st Century Toronto, There is Momentum | Charles A. Birnbaumvalenzuelalfaazdamkz
 
Fp radnor bridge wing_9481
Fp radnor bridge wing_9481Fp radnor bridge wing_9481
Fp radnor bridge wing_9481Interrelated
 
Ontario Place for All - Presentation by Ken Greenberg
Ontario Place for All - Presentation by Ken GreenbergOntario Place for All - Presentation by Ken Greenberg
Ontario Place for All - Presentation by Ken GreenbergWaterfront for All
 
Finalontarioplaceslides 190113190136
Finalontarioplaceslides 190113190136Finalontarioplaceslides 190113190136
Finalontarioplaceslides 190113190136StefanPodgrabinski
 
Vinh_Le_Work_Samples
Vinh_Le_Work_SamplesVinh_Le_Work_Samples
Vinh_Le_Work_SamplesVinh Le
 
Roundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township NewsRoundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township NewsAndy Duerr
 
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...Waterfront for All
 
Take Me to the River Executive Summary
Take Me to the River Executive SummaryTake Me to the River Executive Summary
Take Me to the River Executive SummaryWest Harlem Art Fund
 
Las vegas preferred plan presentation boards
Las vegas preferred plan presentation boards Las vegas preferred plan presentation boards
Las vegas preferred plan presentation boards Darin Dinsmore
 
Old shore precinct
Old shore precinctOld shore precinct
Old shore precinctJohn Latham
 

Similar to Remove oma+amo boards (20)

Downie district framework plan (final)
Downie district framework plan (final)Downie district framework plan (final)
Downie district framework plan (final)
 
Wing genesis of-footbridge_design@2c_from_a_community_perspective-1065_c
Wing genesis of-footbridge_design@2c_from_a_community_perspective-1065_cWing genesis of-footbridge_design@2c_from_a_community_perspective-1065_c
Wing genesis of-footbridge_design@2c_from_a_community_perspective-1065_c
 
1065. genesis of footbridge design, from a community perspective radnor bri...
1065. genesis of footbridge design, from a community perspective   radnor bri...1065. genesis of footbridge design, from a community perspective   radnor bri...
1065. genesis of footbridge design, from a community perspective radnor bri...
 
Why and How Providence is Developing a Robust Transit System
Why and How Providence is Developing a Robust Transit SystemWhy and How Providence is Developing a Robust Transit System
Why and How Providence is Developing a Robust Transit System
 
Miller Park District Presentation
Miller Park District PresentationMiller Park District Presentation
Miller Park District Presentation
 
Portfolio_Project
Portfolio_ProjectPortfolio_Project
Portfolio_Project
 
In 21st Century Toronto, There is Momentum | Charles A. Birnbaum
In 21st Century Toronto, There is Momentum | Charles A. BirnbaumIn 21st Century Toronto, There is Momentum | Charles A. Birnbaum
In 21st Century Toronto, There is Momentum | Charles A. Birnbaum
 
Fp radnor bridge wing_9481
Fp radnor bridge wing_9481Fp radnor bridge wing_9481
Fp radnor bridge wing_9481
 
Ontario Place for All - Presentation by Ken Greenberg
Ontario Place for All - Presentation by Ken GreenbergOntario Place for All - Presentation by Ken Greenberg
Ontario Place for All - Presentation by Ken Greenberg
 
Finalontarioplaceslides 190113190136
Finalontarioplaceslides 190113190136Finalontarioplaceslides 190113190136
Finalontarioplaceslides 190113190136
 
Upgrade rhodes city
Upgrade  rhodes cityUpgrade  rhodes city
Upgrade rhodes city
 
Vinh_Le_Work_Samples
Vinh_Le_Work_SamplesVinh_Le_Work_Samples
Vinh_Le_Work_Samples
 
Roundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township NewsRoundabouts - May14 -PA Township News
Roundabouts - May14 -PA Township News
 
AndersonBomarFeb15
AndersonBomarFeb15AndersonBomarFeb15
AndersonBomarFeb15
 
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...
Waterfront for All Summit Workshop #5: Who’s in charge: silos vs. coordinatio...
 
Take Me to the River Executive Summary
Take Me to the River Executive SummaryTake Me to the River Executive Summary
Take Me to the River Executive Summary
 
Vridian writing sample
Vridian writing sampleVridian writing sample
Vridian writing sample
 
Las vegas preferred plan presentation boards
Las vegas preferred plan presentation boards Las vegas preferred plan presentation boards
Las vegas preferred plan presentation boards
 
Ulx April09
Ulx April09Ulx April09
Ulx April09
 
Old shore precinct
Old shore precinctOld shore precinct
Old shore precinct
 

Remove oma+amo boards

  • 1. 1OFFICE FOR METROPOLITAN ARCHITECTURE ST. LAWRENCE HALL DAVID CROMBIE PARK MILL STREET BREWERY DISTILLERY DISTRICT YOUNG CENTER FOR THE PERFORMING ARTS ST. LAWRENCE CENTER FOR THE ARTS SONY PERFORMING ARTS CENTER DOMINION PUBLIC COMMERCE COURT HOCKEY HALL OF FAME ST. LAWRENCE NORTH MARKET ST. LAWRENCE MARKET CANADA’S SUGAR BEACH (FUTURE) DON RIVER PARK / PAN AM GAMES (FUTURE) WETLANDS (FUTURE) SHERBOURNE PARK (FUTURE) BAY ADELAIDE CENTRE CITY OF TORONTO ARCHIVES CHURCH OF THE HOLY TRINITY OLD CITY HALL CANADIAN OPERA COMPANY ROY THOMPSON HALL UNION STATION AIR CANADA CENTER TORONTO ISLAND FERRY REDPATH SUGAR MUSEUM DUNDAS SQUARE ST. MICHAEL’S HOSPITAL CITY HALL T.O. 2036Innovative Design Options for the Gardiner Expressway and Lake Shore Boulevard Reconfiguration Environmental Assessment Toronto’s quality of life and economic development, even post crisis, have kept pace with or out- stripped its neighbors. Its economic successes are matched by its environmental successes, includ- ing the extensive green belt surrounding the city. Like many North American cities, Toronto has grown away from its urban center and waterfront. A dense core and suburban periphery form a collection of nodes linked through a road network and to a lesser degree by subway and commuter rail. Despite its competitive mix of auto and public trans- port, Toronto suffers from the worst commute times in North America. At the junction of the down- town, the periphery and the waterfront, the areas to the east and west of downtown are missing links within the city’s network. Could the key to unlocking the potential of Toronto’s waterfront be to create a new, more potent link between the core and the periphery? Can reducing the Gardiner’s footprint simultaneously remove an impediment to the development of its surroundings and INCREASE downtown’s connection its periphery? Removing the Gardiner as an obstacle is an important first step towards reorienting Toronto’s growth, but only a first step...Of the available options to lessen the Gardiner’s impact, removing the upper deck offers both the best integration of the New Gardiner with its surroundings and the great- est number of opportunities for navigating across it. The resulting reduction in road capacity—a reduction that will exacerbate an already congested road network—begs the question of what can step in to fill the void. Understanding Toronto Site Potential GARDINER EXPRESSWAY LAKESHORE BOULEVARD 5760 per hour TOTAL CAPACITY (12 Lanes) 3600 per hour CAPACITY (8 Lanes) Streecar Subway Train GARDINER EXPRESSWAY LAKESHORE BOULEVARD 5760 per hour TOTAL CAPACITY (12 Lanes) 3600 per hour CAPACITY (8 Lanes) 2160 per hour CAPACITY ? Removing the Gardiner How to fill the void? Reimagining the Gardiner creates opportunities for new north-south connections between the neigh- borhoods north of the highway and the waterfront, but these connections, while necessary, will not be sufficient to support the growth of the area surrounding the Gardiner. Our proposal looks not only at crossing the Gardiner, but at the potential new transit modes along it. By harnessing the potential of new east-west links between downtown and the rest of Toronto, and providing a new intermodal link between them (the transferium), it unlocks the untapped promise of Toronto’s waterfront not only as an environmental amenity but as a new ground for Toronto’s future growth in an age that has learned the limits of growth through sprawl. Our proposal uses the opportunity of the Gardiner’s alteration to imagine a new “smart growth” strat- egy for the city. This strategy offers the city a new dynamic between the old and new, development and the environment, focusing development adjacent to the city’s core. Smart Growth BATHHURSTSTREET BATHHURSTSTREET BATHHURSTSTREET SPADINAAVENUE JOHNSTREET/REESSTREET UNIVERSITYAVE/YORKSTREET BAYSTREET YONGESTREET JARVISSTREET SHERBOURNESTREET PARLIAMENTSTREET CHERRYSTREET DONPARKWAY CARLAWAVENUE LESLIESTREET DONVALLEY GARDINER EXPRESSWAY North-South Connections East-West Connections T T T T UNION STATION LAKESHORE BLVD GARDINER DONRIVERPARKWAY STOUFFVILLELINE LAKESHOREEASTLINE RICHMONDLINE Connection Districts ELEVATED GARDINER EXPRESSWAY RAILWAY RAILWAY WATERFRONT WATERFRONT + - VALUE $$$ $ SUBWAY TDOWNTOWN T DOWNTOWN TRANSFERIUM Land Value BEFORE: The elevated Gardiner suppressed land values around it... AFTER: The new multi-nodal transit corridor acts as an attractor for new development. HERITAGE MARKET LAKE- SHORE BLVD/ METRO PARK STRIP ARTS DISTRICT TRANSFERIUM ICT BAR CONFERENCE GATE Districts LAKESHORE BLVD QUEENS QUAY BLVDGARDINER CHEERYST CARLAWST LESLIEST PARLIAMENTST SHERBOURNEST JARVISST YOUNGEST DONRIVERPARKWAY LAKESHORE BLVD QUEENS QUAY BLVDGARDINER CHEERYST CARLAWST LESLIEST PARLIAMENTST SHERBOURNEST JARVISST YOUNGEST DONRIVERPARKWAY LAKESHORE BLVD QUEENS QUAY BLVDGARDINER CHEERYST CARLAWST LESLIEST PARLIAMENTST SHERBOURNEST JARVISST YOUNGEST DONRIVERPARKWAY T T T T T The east end of the site is a crossroads of two highways, the future relief subway line, commuter rail, etc. By creating a new transit hub at their conjunction, these various transport modes can be reorganized and amplified. Street Car Line Bus Route Subway Road Network The removal of the Gardiner allows for the development of the space of land between rail tracks and road structure, creating a new spine that links elements of the city. Lakeshore Boulevard 1. Before 2. After Existing View Potential 0 50 100 200 Section through Lakeshore Boulevard
  • 2. OFFICE FOR METROPOLITAN ARCHITECTURE T LAKESHORE BLVD DONRIVERPARKWAY STOUFFVILLELINE LAKESHOREEASTLINE RICHMONDLINE Residential Mix Leisure Culture/Education Commercial Office Hotel Industry Program Distribution 1 2 Reorganize Infrastructue The park strip connects the David Crombie parks which run East West along Front St, to the proposed Sher- bourne Park. A fragment of the Gardiner is kept, provid- ing an elevated pedestrian platform. The Heritage Market, links two the St. Lawrence market and the Redpath Sugar Factory located on the waterfront still operates, period in Toronto’s history. A series of outdoor markets, organic in their growth provide a continuous link be- tween the two buildings. ICAE SILO PARK AND SLIPHEAD VICTORY SOYA MILLS SILO DAVID CROMBIE PARK TRINITY STREET BRIDGE CHERRY STREET BRIDGE DON RIVER PARK EXISTING DISTILLERY The transferium clarifies the cur- rent infrastructure network, facili- tating the removal of the Gardiner by increasing modal use, provid- ing connections to Subway, GO Trains (Richmond, Stouffville and Lakeshore East lines), Street car (along Queens Quay Boulevard) aswell as regular bus. View from the Transferium P Don River Valley Below the Transferium Transportation Hub View from CN Tower mum tower height of 120m. In order to encourage a mix development, the tower has been developed specifically to accomodate office, residential. Historically, the Distillery District stands in the location of the first settlements of Toronto. A complex of different Distillers, during the 1860’s it was one of the largest Whiskey distillerys in the world. Now the area has been converted into an arts district. With a mix of cultural arts, galleries and Transferium The ICA&E museum located on the Waterfront, provides a clear counter- point to the Distillery District in the North of the zone. Access to these two destinations creates a series of clearly defined routes through the site. ICA&E - Institute of Contemporary Arts and The Environment Gathering Space Embedded within the Railway Berm Section through the Arts District Connective Trajectories 0 50 100 200 0 50 100 200 Creative city provides a link between the downtown creative city and the waterfront, while encouraging inno- vation in Toronto. Parking Ground Subway F7 F8 Tower TRAIN CONNECTION TRAMWAY TRAIN CONVENTION CENTER GYM TOBUSINESSCENTER TO PAN AM STATION VISITOR FACILITIES CONCOURSE WATER PARK&FER RY CONVENTION CENTER CONVENTION CENTER CONVENTION CENTER CONVENTION CENTER RETAIL UP DOW N DOWN UP OFFICE SKY LOBBY CONFERENCE RETAIL PARKINGPARKING CONCOURSECONCOURSE RETAIL HOTEL SUBWAY GO TRAIN STREET CAR OFFICE Program 0 50 100 2000 50 100 2000 50 100 200 Section through Sherbourne Park Section through Heritage Park
  • 3. 3OFFICE FOR METROPOLITAN ARCHITECTURE Waterfront Area Grid Layout Transportation Green Program Distribution Proposed Buildings TRANSPORTATION INFRASTRUCTURE GRID LAYOUT WATERFRONT AREA GREEN INFRASTRUCTURE PROGRAM DISTRIBUTION BUILDINGS PROPOSED T T T T 0 50 100 200 The Gardiner has long been acknowledged as a barrier between Toronto and its waterfront, sequestering the city from one of its key ecological assets and limiting development along its path. Removing the upper deck of the Gardiner offers both the best integration of the roadway with its surroundings and the greatest number of opportunities for navigating across it. Reimagining the Gardiner as a grade-level boulevard—Lakeshore Boulevard—we have elaborated several key connections across it. Each of these navigates the new Lakeshore Boulevard in a different way, passing over, under or across it to create links between key cultural and urban points and the waterfront. These connections, while necessary, will not be sufficient to support the growth of the area. Our proposal looks not only at crossing the Gardiner, but at potential new transit modes along it. The east end of the site is a crossroads of the highway, the future relief subway line, and the commuter rail. By creating a new transit hub at their conjunction—a Transferium that combines 6,000 parking spaces with stations for various modes of public transit— transportation to and from downtown can be reorganized and amplified, unlocking the untapped promise of Toronto’s waterfront as not only an environ- mental amenity but as a new ground for Toronto’s future growth. In an age that has learned the limits of growth through sprawl, our proposal uses the opportunity of the Gardiner’s alteration to imagine a new “smart growth” strategy for the city. This strategy offers a new dynamic between the past and the future, development and the environment, focusing develop- ment adjacent to the city’s core and linking it with the city as a whole. T.O. 2036
  • 4. OFFICE FOR METROPOLITAN ARCHITECTURE
  • 5. 5OFFICE FOR METROPOLITAN ARCHITECTURE SIDEWALK SIDEWALK 4.5 1.5 3.1 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 BIKE WAY BIKE WAY SWALE LANE LANE LANE LANE LANE LANE LANE LANE LANE LANE SUBWAY RIGHT OF WAY TYPICAL CONDITION ALONG BOULEVARD PLATFORMPLATFORM Section through Lakeshore Boulevard