Environmental Guidelines for Major
Construction Sites
• Construction practices that fail to control pollution can
cause damage to waterways and wetlands, kill fish,
upset aquatic ecological systems and wildlife
communities, and result in contamination of land and
groundwater.
• The risk to the environment is particularly high when
work is done near coastal areas, streams and creeks, or
along a river valley.
• When construction occurs near built-up areas, poor
practices may result in air and noise pollution which
may cause annoyance and affect the health of
neighbouring communities.
CONTENTS:
1. Purpose and application
2. Pre-construction planning and design
3. Environmental management plan
4. Land disturbance
5. Noise and vibration
6. Waste minimisation
7. Contaminated material and wastes
8. Other environmental issues
9. Inspections, monitoring and audits
1.Purpose and application
• minimising environmental impact-cost benefit
• guidelines for undertaking risk assessment
and management
• Assessment - impact of construction activities
on the environment.
• suggested best practice environmental
measures to meet the performance objectives
based on available experience.
• The Guidelines are not universal.
2. Pre-construction planning and
design
• Integrating environment protection at
planning stage ensures minimal pollution.
• more cost-effective than establishing controls
• Risk assessment :Probability, frequency, time
frame.
• Risk assessment: endangered flora and fauna,
aquatic plant and animals, ground water
recharge areas....
3. ENVIRONMENTAL MANAGEMENT
PLAN
• Objective: to minimize adverse impact of construction activities on the
environment.
• The environmental management system establishes quality systems to
ensure consistently high environment outcomes for the project as a
whole. British Standard 7750, which has gained wide international
acceptance, or the soon to be adopted ISO 14000 series should be used.
• A large construction area is divided into many.
• Work scheduling
• Land disturbance
• Storm water management
• Special operational precautions and Contingency plans
• Rehabilitation
• Maintenance, inspections and surveillance
• Ongoing risk assessment and management
• Updating the plan
4. LAND DISTURBANCE
• Objective: To minimise the quantity of soil lost
during construction due to land-clearing.
• Schedule well while Design stage.
• Control measures: a separate division
required.
• Keep vehicles on specified path...
• Rehabilitate: Grow some grass.
STORMWATER MANAGEMENT
• Objective: To minimise the generation of
contaminated storm water.
• Minimise the quantity of entering.
• Establish intercept drains.
• Reduce water velocity.
• Study-History of soil, rainfall.
DE-WATERING WORK SITES
• Objective: To ensure that de-watering
operations do not result in turbid water
entering natural waterways.
• Treat contaminated water pumped into the a
natural waterway to remove sediment if the
turbidity exceeds 30 NTU.
• Supervise and Monitor.
DUST CONTROL
• Objective: To ensure there is no health risk or
loss of amenity due to emission of dust to the
environment.
• Dust prevention strategy: at the project
planning stage.
• dust suppression measures: water sprying
and intall wind fences...
MANAGEMENT OF STOCKPILES.
• Objective: To manage soil stockpiles so that
dust and sediment in run-off are minimised.
• Don’t go for too much stock.
• Maintain dust & flood free environment.
• Stabilise stocks if they are stored for longer.
5. NOISE AND VIBRATION
• Objective: To ensure nuisance from noise and vibration
does not occur.
• Study it and minimize it.
• Fit and maintain appropriate mufflers on earth-moving
and other vehicles on the site.
• Enclose noisy equipment
• Provide noise attenuation screens, where appropriate.
• Maintain timings and respect ur neighbours.
• Plan for no traffic.
6. WASTE MINIMISATION
• Objective: To minimise the waste load
discharged to the environment.
• Study it and minimize it.
• Prioritise them and neutralize it.
• Have some target and maintain it.
7. CONTAMINATED MATERIAL AND
WASTES
• Objective: To ensure that all contaminated
material uncovered on a construction site are
excavated and disposed of in an environmentally
responsible manner.
• Excavate material in a manner which avoids off-
site environmental problems.
• Seal contaminated material to ensure that there
is no off-site effect now or in the future.
• Transport odorous wastes in covered vehicles
• Dispose of contaminated material in a licensed
landfill.
8 OTHER ENVIRONMENTAL ISSUES
• AIR QUALITY:
• Objective: To ensure there is no health risk or
loss of amenity due to emission of exhaust
gases to the environment.
• Well serviced emission controlled, smoke
shouldn’t visible >10 sec.
8. OTHER ENVIRONMENTAL ISSUES
COTINUE………
• LITTER:
• Objective: To ensure that all litter is disposed
of in a responsible manner, and is not released
into the environment.
• Maintain a high quality of housekeeping.
• Provide bins for construction workers and
staff at locations where they consume food.
• Conduct ongoing awareness with staff of the
need to avoid littering.
8. OTHER ENVIRONMENTAL ISSUES
COTINUE………
• STORING FUELS AND CHEMICALS:
• Objective: To ensure that fuel and chemical
storage is safe, and that any materials that
escape do not cause environmental damage.
• Minimise fuels and chemicals stored on- site.
• Install bunds and take other precautions to
reduce the risk of spills.
• Implement a contingency plan to handle spills.
8. OTHER ENVIRONMENTAL ISSUES
COTINUE………
• KEEPING ROADS CLEAN:
• Objective: To ensure that roads are kept clean of
soil.
• Ensure that the roads are swept at least once a
day on uncontrolled road crossings when
construction vehicles are travelling off the site.
• Install litter traps lined with filter cloth in all side-
entry pits .
• Cover all loads of soil being taken off site for
disposal.
8 OTHER ENVIRONMENTAL ISSUES
COTINUE………
• Protecting infrastructure:
• In built-up areas, care needs to be taken in
working near existing infrastructure services
such as drainage and sewerage pipes.
• Appropriate machinery must be used within
concrete channels to avoid damage to
structures.
8. OTHER ENVIRONMENTAL ISSUES
COTINUE………
• Concrete batching plants:
• Sometimes very large construction projects
will establish on-site concrete batching plants.
• Plants need to be designed in accordance with
EPA guidelines13.
• Constructing a plant which is designed to have
a throughput of greater than 100 tonnes per
week will need an EPA works approval.
•
INSPECTIONS, MONITORING AND
AUDITING
• Objective: Conduct checks on significant environmental risks to
ensure that they are adequately managed and control systems are
operating effectively.
• • Establish a baseline monitoring program before construction
commences.
• • Prepare an inspection, monitoring and auditing program,
designed to match the environmental risks.
• • Ensure that remedial action is taken promptly when monitoring,,
inspections or audit results reveal a problem in environment
management.
• • Ensure that all monitoring is conducted by a NATA registered
laboratory, either directly, or under supervision.
• • Arrange for regular independent audits of environmental
performance and the environmental management system
THANK YOU

More Related Content

What's hot

Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management Rajat Nainwal
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONAr Naveen Naveen
 
Construction accidents and safety management
Construction accidents and safety managementConstruction accidents and safety management
Construction accidents and safety managementSwarna Rajan
 
Construction technology presentation
Construction technology presentationConstruction technology presentation
Construction technology presentationSze Ting Kuek
 
Quality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONQuality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONSANJEEV Wazir
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projectsSandeep Kumar
 
Building code implementation
Building code implementationBuilding code implementation
Building code implementationPrabinDhakhwa
 
Civil Engineering Measurment
Civil Engineering MeasurmentCivil Engineering Measurment
Civil Engineering MeasurmentSultan M Muzahir
 
Low Cost Housing Concept
Low Cost Housing ConceptLow Cost Housing Concept
Low Cost Housing ConceptDr K M SONI
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & managementManit Agarwal
 
9. introduction to site preparation
9. introduction to site preparation9. introduction to site preparation
9. introduction to site preparationNoshad Ahmed Wahocho
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...A Makwana
 
Construction contract
Construction contract Construction contract
Construction contract Rakshith Reddy
 
Defects and remedies of building
Defects and remedies of buildingDefects and remedies of building
Defects and remedies of buildingtoshi gupta
 
Waste management on construction sites
Waste management on construction sitesWaste management on construction sites
Waste management on construction sitesAli Hasan
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
BUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORTBUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORTemily9199
 

What's hot (20)

Construction process
Construction processConstruction process
Construction process
 
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
Module 3 - Construction quality and safety by Dr.Vinay Kumar B M
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
SPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATIONSPECIFICATION AND ESTIMATION
SPECIFICATION AND ESTIMATION
 
Construction accidents and safety management
Construction accidents and safety managementConstruction accidents and safety management
Construction accidents and safety management
 
Construction technology presentation
Construction technology presentationConstruction technology presentation
Construction technology presentation
 
Quality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONQuality control IN CONSTRUCTION
Quality control IN CONSTRUCTION
 
Eia of township and area development projects
Eia of township and area development projectsEia of township and area development projects
Eia of township and area development projects
 
Building code implementation
Building code implementationBuilding code implementation
Building code implementation
 
Civil Engineering Measurment
Civil Engineering MeasurmentCivil Engineering Measurment
Civil Engineering Measurment
 
Low Cost Housing Concept
Low Cost Housing ConceptLow Cost Housing Concept
Low Cost Housing Concept
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 
9. introduction to site preparation
9. introduction to site preparation9. introduction to site preparation
9. introduction to site preparation
 
Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...Introduction-construction management_Construction Management (2180611) (Semes...
Introduction-construction management_Construction Management (2180611) (Semes...
 
Construction contract
Construction contract Construction contract
Construction contract
 
Defects and remedies of building
Defects and remedies of buildingDefects and remedies of building
Defects and remedies of building
 
Waste management on construction sites
Waste management on construction sitesWaste management on construction sites
Waste management on construction sites
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
BUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORTBUILDING CONSTRUCTION REPORT
BUILDING CONSTRUCTION REPORT
 
Valuation part of Building
Valuation part of Building Valuation part of Building
Valuation part of Building
 

Viewers also liked

Environmental Issues Related to Construction Projects
Environmental Issues Related to Construction ProjectsEnvironmental Issues Related to Construction Projects
Environmental Issues Related to Construction Projectsbuckje123
 
Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011Blake, Cassels & Graydon LLP
 
Environmental Concerns in Construction Projects- KSPCB Simha
Environmental Concerns in Construction Projects-   KSPCB SimhaEnvironmental Concerns in Construction Projects-   KSPCB Simha
Environmental Concerns in Construction Projects- KSPCB SimhaADDA
 
Macro Environmental impact on Construction industry
Macro Environmental impact on Construction industryMacro Environmental impact on Construction industry
Macro Environmental impact on Construction industryNadeesha273
 
Green building construction for sustainable future
Green building construction for sustainable futureGreen building construction for sustainable future
Green building construction for sustainable futureAlexander Decker
 
Descriptive analysis of awareness about land pollution, water pollution, air ...
Descriptive analysis of awareness about land pollution, water pollution, air ...Descriptive analysis of awareness about land pollution, water pollution, air ...
Descriptive analysis of awareness about land pollution, water pollution, air ...Poonam Sankhe
 
Environmental problems and solutions
Environmental problems and solutionsEnvironmental problems and solutions
Environmental problems and solutionsLogos Academy
 
Environmental Awareness Presentation
Environmental Awareness PresentationEnvironmental Awareness Presentation
Environmental Awareness Presentationrfelters
 
Powerpoint on environmental issues
Powerpoint on environmental issuesPowerpoint on environmental issues
Powerpoint on environmental issuesMonika Uppal
 
Construction and construction practices and their effects on the environment
Construction and construction practices and their effects on the environmentConstruction and construction practices and their effects on the environment
Construction and construction practices and their effects on the environmentCaryl Jane Veriña
 
The environmental considerations and barriers involved with developing wind e...
The environmental considerations and barriers involved with developing wind e...The environmental considerations and barriers involved with developing wind e...
The environmental considerations and barriers involved with developing wind e...MacDarragh Fitzpatrick
 
Environmental Consideration
Environmental Consideration Environmental Consideration
Environmental Consideration haroldtaylor1113
 
Environmental Considerations Affecting Investment Decisions
Environmental Considerations Affecting Investment DecisionsEnvironmental Considerations Affecting Investment Decisions
Environmental Considerations Affecting Investment DecisionsEric Fornell
 
Environmental considerations and technical port design are intertwined
Environmental considerations and technical port design are intertwinedEnvironmental considerations and technical port design are intertwined
Environmental considerations and technical port design are intertwinedWendy Mah
 
Xmas dust presentation
Xmas dust presentationXmas dust presentation
Xmas dust presentationMCSAROY
 

Viewers also liked (20)

Environmental Issues Related to Construction Projects
Environmental Issues Related to Construction ProjectsEnvironmental Issues Related to Construction Projects
Environmental Issues Related to Construction Projects
 
Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011Dealing with Environmental Issues on the Construction Project, November 16, 2011
Dealing with Environmental Issues on the Construction Project, November 16, 2011
 
Environmental Concerns in Construction Projects- KSPCB Simha
Environmental Concerns in Construction Projects-   KSPCB SimhaEnvironmental Concerns in Construction Projects-   KSPCB Simha
Environmental Concerns in Construction Projects- KSPCB Simha
 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
 
Macro Environmental impact on Construction industry
Macro Environmental impact on Construction industryMacro Environmental impact on Construction industry
Macro Environmental impact on Construction industry
 
Green building construction for sustainable future
Green building construction for sustainable futureGreen building construction for sustainable future
Green building construction for sustainable future
 
Sustainable Development
Sustainable DevelopmentSustainable Development
Sustainable Development
 
Descriptive analysis of awareness about land pollution, water pollution, air ...
Descriptive analysis of awareness about land pollution, water pollution, air ...Descriptive analysis of awareness about land pollution, water pollution, air ...
Descriptive analysis of awareness about land pollution, water pollution, air ...
 
Environmental problems and solutions
Environmental problems and solutionsEnvironmental problems and solutions
Environmental problems and solutions
 
Environmental Awareness Presentation
Environmental Awareness PresentationEnvironmental Awareness Presentation
Environmental Awareness Presentation
 
Powerpoint on environmental issues
Powerpoint on environmental issuesPowerpoint on environmental issues
Powerpoint on environmental issues
 
Save Environment PPT
Save Environment PPTSave Environment PPT
Save Environment PPT
 
Construction and construction practices and their effects on the environment
Construction and construction practices and their effects on the environmentConstruction and construction practices and their effects on the environment
Construction and construction practices and their effects on the environment
 
The environmental considerations and barriers involved with developing wind e...
The environmental considerations and barriers involved with developing wind e...The environmental considerations and barriers involved with developing wind e...
The environmental considerations and barriers involved with developing wind e...
 
Environmental Consideration
Environmental Consideration Environmental Consideration
Environmental Consideration
 
Record of Environmental Consideration for the PCAPP Demilitarization Activi...
Record of Environmental Consideration for the PCAPP Demilitarization Activi...Record of Environmental Consideration for the PCAPP Demilitarization Activi...
Record of Environmental Consideration for the PCAPP Demilitarization Activi...
 
Environmental Considerations Affecting Investment Decisions
Environmental Considerations Affecting Investment DecisionsEnvironmental Considerations Affecting Investment Decisions
Environmental Considerations Affecting Investment Decisions
 
Environmental considerations and technical port design are intertwined
Environmental considerations and technical port design are intertwinedEnvironmental considerations and technical port design are intertwined
Environmental considerations and technical port design are intertwined
 
Env training ppt rev01
Env training ppt rev01Env training ppt rev01
Env training ppt rev01
 
Xmas dust presentation
Xmas dust presentationXmas dust presentation
Xmas dust presentation
 

Similar to Environmental Considerations in Construction

Impact of desalination plant
Impact of desalination plantImpact of desalination plant
Impact of desalination plantLincy Jancy
 
Active landfill
Active landfillActive landfill
Active landfillMOHIT JAIN
 
CET 415 Module IV.pptx
CET 415 Module IV.pptxCET 415 Module IV.pptx
CET 415 Module IV.pptxFARSANA26
 
Secure landfilling.pptx
Secure landfilling.pptxSecure landfilling.pptx
Secure landfilling.pptxDrSr6
 
EPSC Module 2 Unit 1
EPSC Module 2 Unit 1EPSC Module 2 Unit 1
EPSC Module 2 Unit 1ejve22
 
EIA of offshore drilling and dredging
EIA of  offshore drilling and dredgingEIA of  offshore drilling and dredging
EIA of offshore drilling and dredgingbivin ebenezer
 
Landfill design and operation
Landfill design and operationLandfill design and operation
Landfill design and operationarushe143
 
17. environmental and safety consideration and choice of materials
17. environmental and safety consideration and choice of materials17. environmental and safety consideration and choice of materials
17. environmental and safety consideration and choice of materialsNoshad Ahmed Wahocho
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016Travis Both
 
Solid Waste Disposal into Land
Solid Waste Disposal into LandSolid Waste Disposal into Land
Solid Waste Disposal into LandSaleh Sayem
 
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxUnit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxssuser65cc68
 
Mitigational measures for Mines
Mitigational measures for MinesMitigational measures for Mines
Mitigational measures for MinesSachin Kumar Sinha
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projectsAnchal Garg
 
NSTP-2-Solid-Waste-Management-Act-of-2000.ppt
NSTP-2-Solid-Waste-Management-Act-of-2000.pptNSTP-2-Solid-Waste-Management-Act-of-2000.ppt
NSTP-2-Solid-Waste-Management-Act-of-2000.pptlala resie
 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1Theodore McNeal
 
Road development projects.
Road development projects.Road development projects.
Road development projects.Abhishek Rajput
 
Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tankkalyanmaji
 

Similar to Environmental Considerations in Construction (20)

Impact of desalination plant
Impact of desalination plantImpact of desalination plant
Impact of desalination plant
 
Active landfill
Active landfillActive landfill
Active landfill
 
Iee
IeeIee
Iee
 
CET 415 Module IV.pptx
CET 415 Module IV.pptxCET 415 Module IV.pptx
CET 415 Module IV.pptx
 
Secure landfilling.pptx
Secure landfilling.pptxSecure landfilling.pptx
Secure landfilling.pptx
 
EPSC Module 2 Unit 1
EPSC Module 2 Unit 1EPSC Module 2 Unit 1
EPSC Module 2 Unit 1
 
EIA of offshore drilling and dredging
EIA of  offshore drilling and dredgingEIA of  offshore drilling and dredging
EIA of offshore drilling and dredging
 
Landfill design and operation
Landfill design and operationLandfill design and operation
Landfill design and operation
 
17. environmental and safety consideration and choice of materials
17. environmental and safety consideration and choice of materials17. environmental and safety consideration and choice of materials
17. environmental and safety consideration and choice of materials
 
TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016TBoth_Resume_09.23.2016
TBoth_Resume_09.23.2016
 
Solid Waste Disposal into Land
Solid Waste Disposal into LandSolid Waste Disposal into Land
Solid Waste Disposal into Land
 
Green building
Green buildingGreen building
Green building
 
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptxUnit V - EIA case studies pertaining to Infrastructure Projects.pptx
Unit V - EIA case studies pertaining to Infrastructure Projects.pptx
 
Mitigational measures for Mines
Mitigational measures for MinesMitigational measures for Mines
Mitigational measures for Mines
 
EIA for development projects
EIA for development projectsEIA for development projects
EIA for development projects
 
NSTP-2-Solid-Waste-Management-Act-of-2000.ppt
NSTP-2-Solid-Waste-Management-Act-of-2000.pptNSTP-2-Solid-Waste-Management-Act-of-2000.ppt
NSTP-2-Solid-Waste-Management-Act-of-2000.ppt
 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1
 
Road development projects.
Road development projects.Road development projects.
Road development projects.
 
Natural gas
Natural gasNatural gas
Natural gas
 
Presentation for safegard septic tank
Presentation for safegard septic tankPresentation for safegard septic tank
Presentation for safegard septic tank
 

Recently uploaded

High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsMonica Sydney
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理zubnm
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxEdgar Hertwich
 
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your AreaVip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Areameghakumariji156
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterNisqually River Council
 
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...kumargunjan9515
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptxJIT KUMAR GUPTA
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetkajal
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...BrixsonLajara
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxNazmusSakibNS
 
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...Sareena Khatun
 
Dubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in DubaiDubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in DubaiMonica Sydney
 
Delivery in 20 Mins Call Girls Dungarpur 9332606886Call Girls Advance Cash O...
Delivery in 20 Mins Call Girls Dungarpur  9332606886Call Girls Advance Cash O...Delivery in 20 Mins Call Girls Dungarpur  9332606886Call Girls Advance Cash O...
Delivery in 20 Mins Call Girls Dungarpur 9332606886Call Girls Advance Cash O...kumargunjan9515
 
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Hyderabad Escorts Agency
 
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServicePriya Reddy
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsMonica Sydney
 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotelkumargunjan9515
 

Recently uploaded (20)

High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your AreaVip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
Vip Salem Call Girls 8250092165 Low Price Escorts Service in Your Area
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
 
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
Call Girls in Dattatreya Nagar / 8250092165 Genuine Call girls with real Phot...
 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Brigade Road ( 8250092165 ) Cheap rates call girls | Get low budget
 
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
Disaster risk reduction management Module 4: Preparedness, Prevention and Mit...
 
Introduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptxIntroduction to heat waves and Heatwaves in Bangladesh.pptx
Introduction to heat waves and Heatwaves in Bangladesh.pptx
 
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...Low Rate Call Girls Boudh  9332606886 HOT & SEXY Models beautiful and charmin...
Low Rate Call Girls Boudh 9332606886 HOT & SEXY Models beautiful and charmin...
 
Dubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in DubaiDubai Escorts Service 0508644382 Escorts in Dubai
Dubai Escorts Service 0508644382 Escorts in Dubai
 
Delivery in 20 Mins Call Girls Dungarpur 9332606886Call Girls Advance Cash O...
Delivery in 20 Mins Call Girls Dungarpur  9332606886Call Girls Advance Cash O...Delivery in 20 Mins Call Girls Dungarpur  9332606886Call Girls Advance Cash O...
Delivery in 20 Mins Call Girls Dungarpur 9332606886Call Girls Advance Cash O...
 
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
Faridabad Call Girl ₹7.5k Pick Up & Drop With Cash Payment 8168257667 Badarpu...
 
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls ServiceMira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
Mira Road Reasonable Call Girls ,09167354423,Kashimira Call Girls Service
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girls
 
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star HotelTop Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
Top Call Girls in Dholpur { 9332606886 } VVIP NISHA Call Girls Near 5 Star Hotel
 
Jumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptxJumping Scales and Producing peripheries.pptx
Jumping Scales and Producing peripheries.pptx
 

Environmental Considerations in Construction

  • 1. Environmental Consideration in Mechanisation of Construction Projects. BY: AKSHAY R MANOHAR M.Tech(Construction Technology) CIVIL ENGINEERING DEPT. NMAMIT-NITTE.
  • 2. Environmental Guidelines for Major Construction Sites • Construction practices that fail to control pollution can cause damage to waterways and wetlands, kill fish, upset aquatic ecological systems and wildlife communities, and result in contamination of land and groundwater. • The risk to the environment is particularly high when work is done near coastal areas, streams and creeks, or along a river valley. • When construction occurs near built-up areas, poor practices may result in air and noise pollution which may cause annoyance and affect the health of neighbouring communities.
  • 3. CONTENTS: 1. Purpose and application 2. Pre-construction planning and design 3. Environmental management plan 4. Land disturbance 5. Noise and vibration 6. Waste minimisation 7. Contaminated material and wastes 8. Other environmental issues 9. Inspections, monitoring and audits
  • 4. 1.Purpose and application • minimising environmental impact-cost benefit • guidelines for undertaking risk assessment and management • Assessment - impact of construction activities on the environment. • suggested best practice environmental measures to meet the performance objectives based on available experience. • The Guidelines are not universal.
  • 5. 2. Pre-construction planning and design • Integrating environment protection at planning stage ensures minimal pollution. • more cost-effective than establishing controls • Risk assessment :Probability, frequency, time frame. • Risk assessment: endangered flora and fauna, aquatic plant and animals, ground water recharge areas....
  • 6. 3. ENVIRONMENTAL MANAGEMENT PLAN • Objective: to minimize adverse impact of construction activities on the environment. • The environmental management system establishes quality systems to ensure consistently high environment outcomes for the project as a whole. British Standard 7750, which has gained wide international acceptance, or the soon to be adopted ISO 14000 series should be used. • A large construction area is divided into many. • Work scheduling • Land disturbance • Storm water management • Special operational precautions and Contingency plans • Rehabilitation • Maintenance, inspections and surveillance • Ongoing risk assessment and management • Updating the plan
  • 7. 4. LAND DISTURBANCE • Objective: To minimise the quantity of soil lost during construction due to land-clearing. • Schedule well while Design stage. • Control measures: a separate division required. • Keep vehicles on specified path... • Rehabilitate: Grow some grass.
  • 8. STORMWATER MANAGEMENT • Objective: To minimise the generation of contaminated storm water. • Minimise the quantity of entering. • Establish intercept drains. • Reduce water velocity. • Study-History of soil, rainfall.
  • 9. DE-WATERING WORK SITES • Objective: To ensure that de-watering operations do not result in turbid water entering natural waterways. • Treat contaminated water pumped into the a natural waterway to remove sediment if the turbidity exceeds 30 NTU. • Supervise and Monitor.
  • 10. DUST CONTROL • Objective: To ensure there is no health risk or loss of amenity due to emission of dust to the environment. • Dust prevention strategy: at the project planning stage. • dust suppression measures: water sprying and intall wind fences...
  • 11. MANAGEMENT OF STOCKPILES. • Objective: To manage soil stockpiles so that dust and sediment in run-off are minimised. • Don’t go for too much stock. • Maintain dust & flood free environment. • Stabilise stocks if they are stored for longer.
  • 12. 5. NOISE AND VIBRATION • Objective: To ensure nuisance from noise and vibration does not occur. • Study it and minimize it. • Fit and maintain appropriate mufflers on earth-moving and other vehicles on the site. • Enclose noisy equipment • Provide noise attenuation screens, where appropriate. • Maintain timings and respect ur neighbours. • Plan for no traffic.
  • 13. 6. WASTE MINIMISATION • Objective: To minimise the waste load discharged to the environment. • Study it and minimize it. • Prioritise them and neutralize it. • Have some target and maintain it.
  • 14. 7. CONTAMINATED MATERIAL AND WASTES • Objective: To ensure that all contaminated material uncovered on a construction site are excavated and disposed of in an environmentally responsible manner. • Excavate material in a manner which avoids off- site environmental problems. • Seal contaminated material to ensure that there is no off-site effect now or in the future. • Transport odorous wastes in covered vehicles • Dispose of contaminated material in a licensed landfill.
  • 15. 8 OTHER ENVIRONMENTAL ISSUES • AIR QUALITY: • Objective: To ensure there is no health risk or loss of amenity due to emission of exhaust gases to the environment. • Well serviced emission controlled, smoke shouldn’t visible >10 sec.
  • 16. 8. OTHER ENVIRONMENTAL ISSUES COTINUE……… • LITTER: • Objective: To ensure that all litter is disposed of in a responsible manner, and is not released into the environment. • Maintain a high quality of housekeeping. • Provide bins for construction workers and staff at locations where they consume food. • Conduct ongoing awareness with staff of the need to avoid littering.
  • 17. 8. OTHER ENVIRONMENTAL ISSUES COTINUE……… • STORING FUELS AND CHEMICALS: • Objective: To ensure that fuel and chemical storage is safe, and that any materials that escape do not cause environmental damage. • Minimise fuels and chemicals stored on- site. • Install bunds and take other precautions to reduce the risk of spills. • Implement a contingency plan to handle spills.
  • 18. 8. OTHER ENVIRONMENTAL ISSUES COTINUE……… • KEEPING ROADS CLEAN: • Objective: To ensure that roads are kept clean of soil. • Ensure that the roads are swept at least once a day on uncontrolled road crossings when construction vehicles are travelling off the site. • Install litter traps lined with filter cloth in all side- entry pits . • Cover all loads of soil being taken off site for disposal.
  • 19. 8 OTHER ENVIRONMENTAL ISSUES COTINUE……… • Protecting infrastructure: • In built-up areas, care needs to be taken in working near existing infrastructure services such as drainage and sewerage pipes. • Appropriate machinery must be used within concrete channels to avoid damage to structures.
  • 20. 8. OTHER ENVIRONMENTAL ISSUES COTINUE……… • Concrete batching plants: • Sometimes very large construction projects will establish on-site concrete batching plants. • Plants need to be designed in accordance with EPA guidelines13. • Constructing a plant which is designed to have a throughput of greater than 100 tonnes per week will need an EPA works approval. •
  • 21. INSPECTIONS, MONITORING AND AUDITING • Objective: Conduct checks on significant environmental risks to ensure that they are adequately managed and control systems are operating effectively. • • Establish a baseline monitoring program before construction commences. • • Prepare an inspection, monitoring and auditing program, designed to match the environmental risks. • • Ensure that remedial action is taken promptly when monitoring,, inspections or audit results reveal a problem in environment management. • • Ensure that all monitoring is conducted by a NATA registered laboratory, either directly, or under supervision. • • Arrange for regular independent audits of environmental performance and the environmental management system

Editor's Notes

  1. Nephelomeric turbidity unit-NTU
  2. Environmental protection agency- EPA
  3. AUDIT- systematic examination of books, account, documents of organization to check whether they fairly maintained or not……… NATA- national air toxics assement.