This document outlines Good Manufacturing Practices (GMP) for the production of phytomedicines according to Ayurveda, Siddha, and Unani systems of medicine in India. It discusses requirements for facilities, equipment, personnel, documentation, raw materials storage, and quality control. The key points are:
- Facilities must be designed and maintained to allow hygienic production and prevent contamination. Equipment must be suitable for operations and cleaned regularly.
- Personnel involved in production and quality control must be qualified and receive training. Sanitary practices like health checks and protective clothing are required.
- Comprehensive documentation includes specifications, manufacturing processes, training records, and methods to investigate defective
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Ā
GMP for phytomedicine
1. GMP FOR PRODUCTION OF
PHYTOMEDICINE
Zahera N. Khan
M. Pharm (Pharmaceutics)
2. GENERAL REQUIREMENT:
ā¢ Raw materials used in the manufacture of drugs are
authentic, of prescribed quality and are free from
contamination;
ā¢ The manufacturing process is as has been prescribed to
maintain the standards;
ā¢ Adequate quality control measures are adopted;
ā¢ The manufactured drug which is released for sale is
acceptable quality;
3. ā¢ To achieve the objectives listed above, each licensee
shall evolve methodology and procedures for
following the prescribed process of manufacture of
drugs which should be documented as a manual and
kept for reference and inspection.
ā¢ However, under IMCC Act 1970 registered Vaidyas,
Siddhas and Hakeems who prepare medicines on
their own to dispense to their patients and not selling
such drugs in the market are exempted from the
purview of Good Manufacturing Practices (GMP).
4. PERSONNEL:
ā¢ The manufacture shall be conducted under the direct
supervision of competent technical staff with prescribed
qualifications and practical experience in the relevant
dosage form of Ayurveda, Siddha and Unani drugs.
ā¢ The head of the Quality Control Laboratory shall be
independent of the manufacturing unit. The testing shall
be conducted under the direct supervision of competent
technical staff who shall be whole time employees of the
licensee.
ā¢ Personnel for Quality Assurance and Quality Control
operations shall be suitably qualified and experienced.
5. ā¢ Written duties of technical and Quality Control
personnel shall be laid and followed strictly.
ā¢ Number of personnel employed shall be
adequate and in direct proportion to the
workload.
ā¢ The licensee shall ensure in accordance with a
written instruction that all personnel in
production area or into Quality Control
Laboratories shall receive training appropriate
to the duties and responsibility assigned to
them. They shall be provided with regular in
service training.
6. Location and Surroundings:-
ā¢ The factory building for manufacture of Ayurveda,
Siddha and Unani medicines shall be so situated and
shall have such construction as to avoid
contamination from open sewrage, drain, public
lavatory or any factory which produces disagreeable
or obnoxious odour or fumes or excessive soot, dust
or smoke
7. Buildings:
ā¢ The building used for factory shall be such as to permit
production of Ayurveda, Siddha and Unani drugs under
hygienic conditions and should be free from cobwebs and
insects/rodents. It should have adequate provision of light
and ventilation. the floor and the walls should not be damp
or moist. The premises used for manufacturing, processing,
packaging and labeling will be in conformity with the
provisions of the Factory Act. It shall be located so as to be:
I. Compatible with other manufacturing operations that may
be carried out in the same or adjacent premises.
8. II. Adequately provided with working space to allow
orderly and logical placement of equipment and materials
to avoid the risk of mix up between different drugs or
components thereof and control the possibility of cross
contamination by other drugs or substances and avoid the
risk of omission of any manufacturing or control step.
III. Designed, constructed and maintained to prevent entry
of insects and rodents. Interior surface (walls, floors and
ceilings) shall be smooth and free from cracks and permit
easy cleaning and dis-infection. The walls of the room in
which the manufacturing operations are carried out shall
be impervious to and be capable of being kept clean. The
flooring shall be smooth and even and shall be such as
not to permit retention or accumulation of dust of waste
products.
9. IV. Provided with proper drainage system in the processing
area. The sanitary fitting and electrical fixtures in the
manufacturing area shall be proper and safe.
V. Furnace/ Bhatti section could be covered with tin roof
and proper ventilation, but sufficient care should be taken
to prevent flies and dust.
VI. There should be fire safety measures and proper exits
should be there.
VII. Drying space: There should be separate space for
drying of raw material, in process medicine or medicines
require drying before packing. This space will be
protected from flies/ insects/dusts etc., by proper
flooring, wire mesh window, glass pans or other material.
10. Other Facilities:
Water System:
ā¢ There shall be validated system for treatment of water
drawn from own or any other source to render it potable in
accordance with standards specified by the Bureau of
nature of the operation.
ā¢ These shall also be suitable to the comforts of the Indian
Standards or Local Municipality, as the case may be, so as
to produce Purified Water conforming to Ayurveda, Siddha
and Unani Pharmacopoeial specification.
ā¢ Purified Water so produced shall only be used for all the
operations except washing and cleaning operations where
potable water may be used Water shall be stored in tanks,
which do not adversely affect quality of water and ensure
freedom from microbiological growth.
ā¢ The tank shall be cleaned periodically and records
maintained by the licensee in this behalf.
11. Disposal of Waste:
ā¢ The disposal of sewage and effluents (solid, liquid
and gas) from the factory shall be in conformity
with the requirements of Environment Pollution
Control Board.
ā¢ All bio-medical waste shall be destroyed as per the
provisions of the Bio-Medical Waste (Management
and Handling) Rules, 1996.
ā¢ Additional precautions shall be taken for the
storage and disposal of rejected drugs. Records
shall be maintained for all disposal of waste.
ā¢ Provisions shall be made for the proper and safe
storage of waste materials awaiting disposal.
Hazardous, toxic substance and flammable
materials shall be stored in suitably designed and
segregated, enclosed areas in conformity with
Central and State Legislations.
12. Health, Clothing And Sanitation Of
Workers:
ā¢ All workers employed in the Factory shall be free from contagious
diseases. The clothing of the workers shall consist of proper uniform
suitable to the nature of work and the climate and shall be clean. The
uniform shall also include cloth or synthetic covering for hands, feet
and head wherever required. Adequate facilities for personal cleanliness
such as clean towels, soap and scrubbing brushes shall be provided.
Separate provision shall be made for lavatories to be used by men and
women and such lavatories shall be located at places separated from the
processing rooms. Workers will also be provided facilities for changing
their clothes and to keep their personal belongings.
13. ā¢ Prior to employment, all personnel, shall undergo
medical examination including eye examination, and
shall be free from Tuberculosis, skin and other
communicable or contagious diseases. Thereafter, they
should be medically examined periodically, at least
once a year. Records shall be maintained thereof. The
licnesee shall provide the services of a qualified
physician for assessing the health status of personnel
involved in different activities.
ā¢ All persons, prior to and during employment, shall be
trained in practices which ensure personal hygiene. A
high level of personal hygiene shall be observed by all
those engaged in the manufacturing processes.
Instructions to this effect shall be displayed in change
rooms and other strategic locations
14. ā¢ No person showing, at any time, apparent illness or open
lesions which may adversely affect the quality of
products, shall be allowed to handle starting materials,
packaging materials, in-process materials, and drug
products until his condition is no longer judged to be a
risk.
ā¢ All employees shall be instructed to report about their
illness or abnormal health condition to their immediate
supervisor so that appropriate action can be taken.
ā¢ Direct contact shall be avoided between the unprotected
hands of personnel and raw materials, intermediate or
finished, unpacked products.
15. ā¢ All personnel shall wear clean body coverings appropriate
to their duties. Before entry into the manufacturing area,
there shall be change rooms separate for each sex with
adequate facilities for personal cleanliness such as wash
basin with running water, [clean towels or hand dryers],
soaps, disinfectants etc. The change rooms shall be
provided with cabinets for the storage of personal
belongings of the personnel.
ā¢ Smoking, eating, drinking, chewing or keeping plants,
food, drink and personal medicines shall not be permitted
in production, laboratory, storage and other areas where
they might adversely influence the product quality.
16. Sanitation In The Manufacturing
Premises:
ā¢ The manufacturing premises shall be cleaned and
maintained in an orderly manner, so that it is free from
accumulated waste, dust, debris and other similar material.
A validated cleaning procedure shall be maintained.
ā¢ The manufacturing areas shall not be used for storage of
materials, except for the material being processed. It shall
not be used as a general thoroughfare.
ā¢ A routine sanitation program shall be drawn up and
observed, which shall be properly recorded and which shall
indicateā
(a) specific areas to be cleaned and cleaning intervals
17. (b) cleaning procedure to be followed, including
equipment and materials to be used for cleaning; and
(c) personnel assigned to and responsible for the
cleaning operation.
ā¢ The adequacy of the working and in-process storage
space shall permit the orderly and logical positioning
of equipment and materials so as to minimise the risk
of mix-up between different Ayurveda, Siddha and
Unani products to avoid cross-contamination, and to
minimise the risk of omission or wrong application of
any of the manufacturing or control steps.
ā¢ Production areas shall be well lit, particularly where
visual on-line controls are carried out.
18. Equipments:
ā¢ Equipment shall be located, designed, constructed,
adapted and maintained to suit the operations to be
carried out. The layout and design of the equipment
shall aim to minimise the risk of errors and permit
effective cleaning and maintenance in order to avoid
cross-contamination, build-up of dust or dirt and, in
general, any adverse effect on the quality of products.
Each equipment shall be provided with a log book,
wherever necessary.
19. ā¢ Balances and other me Ayurveda, Siddha and
Unani ring equipment of an appropriate range,
accuracy and precision shall be available in the
raw-material stores, production and in-process
control operations and these shall be calibrated
and checked on a scheduled basis in accordance
with Standard Operating Procedures and records
maintained.
ā¢ The parts of the production equipment that come
into contact with the product shall not be
reactive, additive or adsorptive to an extent that
would affect the quality of the product.
20. ā¢ To avoid accidental contamination, wherever
possible, non-toxic/edible grade lubricants shall be
used and the equipment shall be maintained in a way
that lubricants do not contaminate the Ayurveda,
Siddha and Unani product being produced.
ā¢ Defective equipment shall be removed from
production and Quality Control areas or appropriately
labeled.
ā¢ For carrying out manufacturing depending on the size
of operation and the nature of product manufactured,
suitable equipment either manually operated or
operated semiautomatically (Electrical or steam
based) or fully automatic machinery shall be made
available.
21. ā¢ These may include machines for use in the process of
manufacture such as crushing, grinding, powdering,
boiling, mashing, burning, roasting, filtering, drying,
filling, labeling and packing etc.
ā¢ To ensure ease in movement of workers and orderliness
in operations a suitably adequate space will be ensured
between two machines or rows of machines. These
machinery and equipments have to be properly installed
and maintained with proper cleaning.
ā¢ List of equipments and machinery recommended is
indicated in Part II A. Proper Standard Operational
Procedures (SOPs) for cleaning, maintaining and
performance of every machine should be laid down
22. Documentation And Records:
ā¢ Documentation is an essential part of the Quality
assurance system and, as such, shall be related to all
aspects of Good Manufacturing Practices (GMP). Its
aim is to define the specifications for all materials,
method of manufacture and control, to ensure that all
personnel concerned with manufacture know the
information necessary to decide whether or not to
release a batch of a drug for sale and to provide an audit
trail that shall permit investigation of the history of any
suspected defective batch.
ā¢ Documents designed, prepared, reviewed and
controlled, wherever applicable, shall comply with these
rules.
23. ā¢ Documents shall be approved, signed and dated by
appropriate and authorized persons.
ā¢ Documents shall specify the title, nature and purpose.
They shall be laid out in an orderly fashion and be
easy to check. Reproduced documents shall be clear
and legible. Documents shall be regularly reviewed
and kept up to date. Any alteration made in the entry
of a document shall be signed and dated.
ā¢ The records shall be made or completed at the time of
each operation in such a way that all significant
activities concerning the manufacture of
pharmaceutical products are traceable. Records and
associated SOP shall be retained for at least one year
after the expiry date of the finished products.
24. ā¢ Data may be recorded by electronic data processing
systems or other reliable means, but Master Formulae
and detailed operating procedures relating to the
system in use shall also be available in a hard copy to
facilitate checking of the accuracy of the records.
Wherever documentation is handled by electronic data
processing methods, authorized persons shall enter or
modify data in the computer. There shall be record of
changes and deletions. Access, shall be restricted by
āpasswordsā or other means and the result of entry of
critical data shall be independently checked. Batch
records electronically stored shall be protected by a
suitable back-up. During the period of retention, all
relevant data shall be readily available.
25. Warehousing Area:
ā¢ Adequate areas shall be designed to allow sufficient
and orderly warehousing of various categories of
materials and products like starting and packaging
materials, intermediates bulk and finished products,
products in quarantine, released, rejected, returned or
recalled, machine and equipment spare parts and
change items.
26. ā¢ Warehousing areas shall be designed and adapted to
ensure good storage conditions. They shall be clean,
dry and maintained within acceptable temperature
limits. Where special storage conditions are required
(e.g., temperature humidity), these shall be provided,
monitored and recorded. Storage areas shall have
appropriate house-keeping and rodents, pests and
vermin control procedures and records maintained.
Proper racks, bins and platforms shall be provided for
the storage of materials.
ā¢ Receiving and dispatch bays shall protect materials
and products from adverse weather conditions.
27. ā¢ Where quarantine status is ensured by warehousing in
separate earmarked areas in the same warehouse or store,
these areas shall be clearly demarcated. Any system
replacing the physical quarantine, shall give equivalent
assurance of segregation. Access to these areas shall be
restricted to authorized persons.
ā¢ The finished goods transferred from the production area
after proper packaging shall be stored in the finished goods
stores within an area marked āQuarantineā. After the quality
control laboratory and the experts have checked the
correctness of finished goods with reference to its
packing/labeling as well as the finished product quality as
prescribed, then it will be moved to āApproved Finished
Goods Stockā area. Only approved finished goods shall be
dispatched as per marketing requirements. Distribution
records shall be maintained as required.
28. ā¢ If any Ayurvedic, Siddha and Unani drug needs a special
storage conditions, finished goods store shall provide
necessary environmental requirements.
ā¢ There shall be a separate sampling area in the warehousing
area for active raw materials and excipients. If sampling is
performed in any other area, it shall be conducted in such a
way as to prevent contamination, cross-contamination and
mix-up.
ā¢ All packaging materials such as bottles, jars, capsules etc. shall
be stored properly. All containers and closure shall be
adequately cleaned and dried before packing the products.
Segregation shall be provided for the storage of rejected,
recalled or returned materials or products. Such areas,
materials or products shall be suitably marked and secured.
Access to these areas and materials shall be restricted.
29. ā¢ Poisonous substances should be kept in safe
storage condition. Adequate fire protection
measures shall be provided in conformity with
the rules of the concerned civic authority.
ā¢ Printed packaging materials shall be stored in
safe, separate and secure areas.
ā¢ Sampling and dispensing of sterile materials shall be
conducted under aseptic conditions, which can also
be performed in a dedicated area within the
manufacturing facility.
ā¢ Regular checks shall be made to ensure adequate
steps are taken against spillage, breakage and leakage
of containers.
30. ā¢ Raw Materials: All raw materials procured for
manufacturing will be stored in the raw materials store.
The manufacture based on the experience and the
characteristics of the particular raw material used in
Ayurveda, Siddha and Unani system shall decide the use
of appropriate containers which would protect quality of
the raw material as well as prevent it from damage due to
dampness, microbiological contamination or rodent insect
infestation, etc. If certain raw materials require such
controlled environmental conditions, the raw materials
stores may be sub-divided with proper enclosures to
provide such conditions by suitable cabinization.
31. ā¢ While designing such containers, cupboard or areas
in the raw materials store, care may be taken to
handle the following different categories of raw
material:-
(1) Raw material of metallic origin.
(2) Raw material of mineral origin.
(3) Raw material from animal source
(4) Fresh Herbs.
(5) Dry Herbs or plant parts.
(6) Excipients etc.
(7) Volatile oils/perfumes & flavours.
(8) Plant concentrates/extracts and exudates/resins.
32. ā¢ Each containers used for raw material storage shall be
properly identified with the label which indicates
name of the raw material, source of supply and will
also clearly state the status of raw material such as
āUNDER TESTā or āAPPROVEDā or āREJECTEDā.
The labels shall further indicate the identity of the
particular supply in the form of batch no. or lot no.
and the date of receipt of the consignment.
ā¢ All the raw materials shall be sampled and got tested
either by the in house Ayurvedic, Siddha and Unani
experts (Quality control technical person) or by the
NABL or AYUSH approved laboratories and shall be
used only on approval after verifying.
33. ā¢ The rejected raw material should be removed from
other raw material store and should be kept in
separate room. Procedure of āFirst in First outā should
be adopted for raw materials wherever necessary.
Records of the receipt, testing and approval or
rejection and use of raw material shall be maintained.
ā¢ The licensee shall keep inventory of all raw materials
to be used at any steps of manufacturing of drugs and
maintain records as per schedule T-A.
34. Quality Control Area:
ā¢ Quality Control Laboratories shall be independent of the
production areas. Separate areas shall be provided each
for pharmacognostical, chemical, microbiological
analysis. Separate instrument room with adequate area
shall be provided for sensitive and sophisticated
instruments employed for analysis.
ā¢ Quality Control Laboratories shall be designed
appropriately for the operations to be carried out in
them. Adequate space shall be provided to avoid mix-
ups and crosscontamination. Sufficient and suitable
storage space shall be provided for test samples, retained
samples, reference standards, reagents and records.
35. ā¢ The design of the laboratory shall take into account
the suitability of construction materials and
ventilation. Separate air handling units and other
requirements shall be provided for
pharmacognostical, chemical, microbiological and
testing areas. The laboratory shall be provided with
regular supply of water of appropriate quality for
cleaning and testing purposes,
ā¢ Quality Control Laboratory shall be divided into
separate sections i.e. for pharmacognostical, chemical
and microbiological wherever required. These shall
have adequate area for basic installation and for
ancillary purposes. The microbiology section shall
have arrangements such as airlocks and laminar air
flow work station, wherever considered necessary.
36. ā¢ Every licensee is required to provide facility for quality control
section in his own premises. The test shall be as per the
Ayurveda, Siddha and Unani pharmacopoeial standard. Where
the tests are not available, the test should be performed
according to the manufacturers specification or other
information available. The quality control section shall verify all
the raw materials, monitor in process, quality checks and control
the quality of finished product being released to finished goods
store/ware house. Preferably for such quality control there will
be a separate expert. The quality control section shall have the
following facilities:
1) There should be adequate area for quality control section.
2) For identification of raw drugs, reference books such as
Ayurveda, Siddha and Unani Pharmacopoeias Formularies and
other scientific books and reference samples should be
maintained.
37. 3) Manufacturing record should be maintained for the
various processes.
4) To verify the finished products, controlled samples
of finished products of each batch will be kept for till
the expiry date of product.
5) To supervise and monitor adequacy of conditions
under which raw materials, semifinished products
and finished products are stored.
6) Keep record in establishing shelf life and storage
requirements for the drugs.
7) Manufacturers who are manufacturing Patent
Proprietary Ayurveda, Siddha, and Unani medicines
shall provide their own specification and control
reference in respect of such formulated drugs.
38. 8) The record of specific method and procedure of
preparation, that is, āBhavanaā, āMardanaā and āPutaā
and the record of every process carried out by the
manufacturer shall be maintained.
9) The standards for identity, purity and strength as
given in respective pharmacopoeias of Ayurveda,
Siddha and Unani systems of medicines published by
Government of India shall be complied with.
10) All raw materials will be monitored for fungal,
bacterial contamination with a view to minimise such
contamination.
39. 11) Quality control section will have a minimum of ā
(i) (a) Expert in Ayurveda or Sidha or Unani medicine
who possesses a degree qualification recognized
under Schedule II of Indian Medicine Central Council
Act 1970;
(b) Chemist, who shall possess at least Master Degree
in Science or Pharmacy or Pharmacy (Ayurveda),
awarded by a recognized University; and
(c) Botanist (Pharmacognosist), who shall possess at
least Bachelor Degree in Science (Medical) or
Pharmacy or Pharmacy (Ayurveda) awarded by a
recognized University.]
(d) Microbiologist who shall process at least master
degree in microbiology awarded by a recognized
university.
40. (ii) The manufacturing unit shall have a quality control
section as explained under Section 35 (ii). The
manufacturing company will maintain all the record
of various tests got done from outside recognised
laboratory.
(iii) List of equipments recommended is indicated in
Part II-C.
41. Site Master Files:
The licensee shall prepare a succinct document in the form
of āSite Master Fileā containing specific and factual
Good Manufacturing Practices about the production
and/or control of Ayurveda, Siddha and Unani
manufacturing preparations carried out at the licensed
premises. It shall contain the following :-
ā¢ General information.-
(a) brief information of the firm;
(b) Ayurveda, Siddha and Unani Drugs manufacturing
activities as permitted by the State licensing authority
(AYUSH);
42. (c) Other manufacturing activities, if any, carried out on the
premises;
(d) Type of Ayurveda, Siddha and Unani products and all
categories of Ayurveda, Siddha and Unani products
licensed for manufacture with flowcharts mentioning
procedures and process flow;
(e) Number of employees engaged in the production, quality
control, storage and distribution;
(f) Use of outside scientific, analytical or other technical
assistance in relation to manufacture and analysis;
(g) Short description of the Quality Management system of
the firm;
(h) Ayurveda, Siddha and Unani products details registered
with foreign countries.
43. ā¢ Personnel :
(a) organisational chart showing the arrangement for
quality assurance including production and quality
control;
(b) qualification, experience and responsibilities of key
personnel;
(c) outline for arrangements for basic and in-service
training and how the records are maintained;
(d) health requirements for personnel engaged in
production;
(e) personnel hygiene requirements, including clothing.
44. ā¢ Premises :
(a) simple plan or description of manufacturing areas drawn
to scale;
(b) nature of construction and fixtures / fittings;
(c) brief description of ventilation systems. More details
should be given for critical areas with potential risk of
airborne contamination (schematic drawing of systems).
Classification of the rooms used for the manufacture of
Ayurveda, Siddha and Unani products should be
mentioned;
(d) special areas for the handling of the poisonous , materials;
(e) brief description of water systems (schematic drawing of
systems), including sanitation;
(f) description of planned preventive maintenance programs
for premises and of the recording system.
45. ā¢ Equipment :
(a) brief description of major equipment used in
production and quality control laboratories (a list of
equipment required);
(b) description of planned preventive maintenance
programs for equipment and of the recording systems;
(c) qualification, including the recording systems and
arrangements for computerized systems validation.
ā¢ Sanitation :
(a) availability of written specifications and procedures
for cleaning manufacturing areas and equipment.
46. ā¢ Documentation :
(a) arrangements for the preparation, revision and distribution
(b) necessary documentation for the manufacture;
(c) any other documentation related to product quality that is not
mentioned elsewhere (e.g. microbiological controls about air
and water)
ā¢ Production :
(a) brief description of production operations using, wherever
possible, flow sheets and charts specifying important
parameters;
(b) arrangements for the handling of starting materials,
packaging materials, bulk and finished products, including
sampling, quarantine, release and storage;
(c) arrangements for the handling of rejected materials and
products;
(d) brief description of general policy for process validation.
47. ā¢ Quality control :
(a) description of the quality control system and of the
activities of the quality control department.
Procedures for the release of the finished Ayurveda,
Siddha and Unani products.
ā¢ Loan licence manufacture :
(a) description of the way in which compliance of
Good Manufacturing Practices by the loan licensee
shall be assessed.
ā¢ Distribution, complaints and product recall :
(a) arrangements and recording systems for
distribution;
(b) arrangements for the handling of complaints and
product recalls. and licensee-
48. ā¢ Quality control :
(a) description of the quality control system and of the
activities of the quality control department.
Procedures for the release of the finished Ayurveda,
Siddha and Unani products.
ā¢ Loan licence manufacture and licensee :
(a) description of the way in which compliance of Good
Manufacturing Practices by the loan licensee shall
be assessed.
ā¢ Distribution, complaints and product recall :
(a) arrangements and recording systems for distribution;
(b) arrangements for the handling of complaints and
product recalls.
49. ā¢ Self-Inspection :
(a) short description of the self-inspection system
indicating whether an outside, independent and
experienced external expert was involved in
evaluating the manufacturer ās compliance with Good
Manufacturing Practices in all aspects of production.
ā¢ Export of drugs :
(a) Ayurveda, Siddha and Unani products exported to
different countries;
(b) complaints and product recall, if any.