SlideShare a Scribd company logo
1 of 6
Download to read offline
Approval Standard

                        for




                                                         om
Water Motor Gong

                                             .c
       Class Number 1055         a         se
                              gb
                       in
           in
        tra




                        July 1970
    re
    .fi
 w
w
w




     ©2002 FM Global Technologies LLC. All rights reserved.
Foreword


FM Approvals are intended to verify that the products and services described will meet stated conditions of
performance, safety and quality useful to the ends of property conservation. The purpose of FM Approval
Standards is to present the criteria for FM Approval of various types of products and services, as guidance for
FM Approvals personnel, manufacturers, users and authorities having jurisdiction.

Products submitted for Approval shall demonstrate that they meet the intent of the Approval Standard, and that
quality control in manufacturing and/or applications shall ensure a consistently uniform and reliable product or
service. FM Approval Standards strive to be performance-oriented and to facilitate technological development.




                                                                     om
For examining equipment, materials and services, FM Approval Standards:




                                                            .c
      a) must be useful to the ends of property conservation by preventing, limiting or not causing damage
         under the conditions stated by the Approval listing; and




                                                          se
      b) must be readily identifiable.

                                                   a
Continuance of Approval and Listing depends on compliance with the Approval agreement, satisfactory
                                                gb
performance in the field, on successful re-examinations of equipment, materials, and services as appropriate, and
on periodic follow-up audits of the manufacturing facility or service/application.
                                           in

FM Global Technologies LLC reserves the right in its sole judgement to change or revise its standards, criteria,
                                  in


methods, or procedures.
                               tra
                          re
                     .fi
             w
            w
        w
TABLE OF CONTENTS

INTRODUCTION .......................................................................................................................................................................... 1
REQUIREMENTS ........................................................................................................................................................................... 1
   Durability ................................................................................................................................................................................... 1
   Audibility ................................................................................................................................................................................... 1
   Sensitivity .................................................................................................................................................................................. 1
   Port Sizes ................................................................................................................................................................................... 2
   Inlet and Outlet .......................................................................................................................................................................... 2
   Moving Parts .............................................................................................................................................................................. 2
   Water Motor Housing ................................................................................................................................................................ 2
   Accessibility for Service ........................................................................................................................................................... 2
   Protective Cover ........................................................................................................................................................................ 2




                                                                                                                           om
   Materials .................................................................................................................................................................................... 3
   Markings .................................................................................................................................................................................... 3




                                                                                                          .c
                                                                                          a             se
                                                                                       gb
                                                                               in
                                                              in
                                                           tra
                                                  re
                                          .fi
                             w
                            w
                    w
July 1970                                                                                                    1055


INTRODUCTION
    A water motor gong is used to give a locally audible alarm signal when a fire protection sprinkler system
    operates. Such a device should be highly reliable and durable.

    FM Approval is based on examination and test of production samples, inspection of the manufacturing and/or
    quality control facilities, and use experience. Particularly considered are functional suitability, adequacy of
    design and workmanship, uniformity and dependability of production, effectiveness of quality control, and
    assurance of service and of replacement parts.

    Minimum physical requirements given below are guides. Mere conformity does not assure Approval since other
    considerations may control. Nor is strict conformity necessary; devices having different characteristics may be
    considered and Approved, if shown to be essentially equivalent or superior in performance.




                                                                          om
                                                                 .c
REQUIREMENTS

Durability                                             a       se
                                                    gb
    The water motor gong shall be designed to operate reliably without excessive maintenance. It will be subjected
                                               in

    to a 60-hour continuous endurance run with an average operating pressure of 50 psi at the inlet to the device.
    No lubrication or adjustment will be made during this test. There shall be no evidence of any excessive wear at
                                      in


    the completion of the test.
                                   tra




Audibility
                              re




    The water motor gong shall produce an audible signal sufficient to alert a nearby plant employee during working
                         .fi




    hours or a guard or other person during idle hours. The sound should be loud enough and of such a pitch as to
                 w




    be clearly heard, above the average factory noise levels, at a distance of several hundred feet.
                w




    It shall generate sound waves having a minimum sound-pressure level of 90 decibels (referred to a 0.0002
              w




    microbar base) using the ‘‘C’’ weighting, when tested in a room having a background noise level within the
    approximate range of 50 to 55 decibels and using 30 lb operating pressure at the inlet to the gong. Sound pressure
    level measurements will be made at a point 10 ft in front of the gong with the protective cover in place.


Sensitivity

    Operation shall commence at a maximum pressure of 5.0 psig measured at the inlet to the device, upstream of
    the strainer, when the pressure is increased from zero.




                                                                                           FM APPROVALS             1
1055                                                                                                        July 1970



Port Sizes

    Operating ports such as nozzles shall have a diameter of not less than 1⁄8 in. and be protected by a suitable strainer
    of corrosion-resistant material. The total area of all openings in the strainer screen shall be at least ten times the
    port area.

    The strainer, which shall be furnished by the gong manufacturer, may be located at the waterflow detecting
    device.


Inlet and Outlet

    The inlet opening shall be suitable for connection to 3⁄4 in. IPS supply piping.

    The outlet opening shall be of ample size to facilitate the removal of waste water. A connecting pipe in the order




                                                                                         om
    of 1 to 11⁄2 in. IPS will be acceptable.




                                                                               .c
Moving Parts




                                                                             se
    Shafts and other moving parts shall be designed to prevent binding and protected against mechanical injury.

                                                                      a
    Bearings shall be self lubricating or have means for lubrication. The lubricant must be suitable for use over the
                                                                   gb
    range of temperatures between -60°F and 110°F.
                                                              in

Water Motor Housing
                                                    in


    The water motor housing shall be able to withstand a hydrostatic pressure of 200 psig for 5 minutes.
                                                 tra
                                           re




Accessibility for Service
                                      .fi




    Design must permit disassembly for inspection, lubrication, adjustment or repair without removal from the
    supporting wall or structure.
                              w
                             w




    Suitable means shall be provided so that nozzle and strainer can be readily cleaned.
                         w




Protective Cover

    An outer shield or protective cover shall be provided to protect the gong from deteriorating effects of rain and
    snow and to prevent nesting of birds, vermin, etc.

    A combination gong-cover shall be able to withstand six (6) blows from a 101⁄2 lb. steel ball, swinging as a 101⁄2
    ft. long pendulum, hung directly over the gong from a height of five (5) feet. Point of contact between ball and
    gong-cover will be halfway between center of gong-cover and its periphery on a horizontal plane.

    Following this test, the operating water motor gong shall still sound an audible alarm.




2     FM APPROVALS
July 1970                                                                                                  1055


Materials

   All materials used shall be suitable for the intended application.


Markings

   The shield shall carry the words ‘‘SPRINKLER ALARM’’ having a minimum letter height of 1 in. The lettering
   may be cast on the shield or may be on a separate plate which shall be substantially fastened to the shield. Cast
   letters shall be raised approximately 3⁄32 in.

   The body of the device (motor housing) shall be marked with the manufacturer’s name or trade mark, and a
   distinctive model or figure number.




                                                                        om
                                                               .c
                                                      a      se
                                                   gb
                                              in
                                     in
                                  tra
                             re
                        .fi
                w
               w
            w




                                                                                          FM APPROVALS            3

More Related Content

Similar to Nfpa 1055

3 m acoustical ac 300 user manual (053-591 rev a)
3 m acoustical ac 300 user manual (053-591 rev a)3 m acoustical ac 300 user manual (053-591 rev a)
3 m acoustical ac 300 user manual (053-591 rev a)Home
 
6 cu-ft-contractor
6 cu-ft-contractor6 cu-ft-contractor
6 cu-ft-contractorJane Smith
 
Yamaha outboard l250 beto, l250tr service repair manual x 101047
Yamaha outboard l250 beto, l250tr service repair manual x 101047  Yamaha outboard l250 beto, l250tr service repair manual x 101047
Yamaha outboard l250 beto, l250tr service repair manual x 101047 fjskefksemer
 
Yamaha outboard l225 feto, l225tr service repair manual u 200132
Yamaha outboard l225 feto, l225tr service repair manual u 200132  Yamaha outboard l225 feto, l225tr service repair manual u 200132
Yamaha outboard l225 feto, l225tr service repair manual u 200132 fujsefkskemm
 
Galvanizing Inspection of Structure
Galvanizing Inspection of StructureGalvanizing Inspection of Structure
Galvanizing Inspection of StructureNarendra Chhaba
 
Inspection and assembly of Open web Girder
Inspection and assembly of Open web GirderInspection and assembly of Open web Girder
Inspection and assembly of Open web GirderAshish Kumar Yadav
 
Engineering & Piping design
Engineering & Piping designEngineering & Piping design
Engineering & Piping designMusa Sabri
 
Daewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manualDaewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manualudfjjsjekkeme
 
Daewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manualDaewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manualhfhjskedme
 

Similar to Nfpa 1055 (20)

Nfpa 1032
Nfpa 1032Nfpa 1032
Nfpa 1032
 
Nfpa 1045
Nfpa 1045Nfpa 1045
Nfpa 1045
 
Nfpa 1021
Nfpa 1021Nfpa 1021
Nfpa 1021
 
Nfpa 1041
Nfpa 1041Nfpa 1041
Nfpa 1041
 
Nfpa 1110
Nfpa 1110Nfpa 1110
Nfpa 1110
 
Nfpa 1111
Nfpa 1111Nfpa 1111
Nfpa 1111
 
Nfpa 1210
Nfpa 1210Nfpa 1210
Nfpa 1210
 
Nfpa 1046
Nfpa 1046Nfpa 1046
Nfpa 1046
 
Zone techbook en
Zone techbook enZone techbook en
Zone techbook en
 
Nfpa 1051
Nfpa 1051Nfpa 1051
Nfpa 1051
 
3 m acoustical ac 300 user manual (053-591 rev a)
3 m acoustical ac 300 user manual (053-591 rev a)3 m acoustical ac 300 user manual (053-591 rev a)
3 m acoustical ac 300 user manual (053-591 rev a)
 
Nfpa 1221
Nfpa 1221Nfpa 1221
Nfpa 1221
 
6 cu-ft-contractor
6 cu-ft-contractor6 cu-ft-contractor
6 cu-ft-contractor
 
Yamaha outboard l250 beto, l250tr service repair manual x 101047
Yamaha outboard l250 beto, l250tr service repair manual x 101047  Yamaha outboard l250 beto, l250tr service repair manual x 101047
Yamaha outboard l250 beto, l250tr service repair manual x 101047
 
Yamaha outboard l225 feto, l225tr service repair manual u 200132
Yamaha outboard l225 feto, l225tr service repair manual u 200132  Yamaha outboard l225 feto, l225tr service repair manual u 200132
Yamaha outboard l225 feto, l225tr service repair manual u 200132
 
Galvanizing Inspection of Structure
Galvanizing Inspection of StructureGalvanizing Inspection of Structure
Galvanizing Inspection of Structure
 
Inspection and assembly of Open web Girder
Inspection and assembly of Open web GirderInspection and assembly of Open web Girder
Inspection and assembly of Open web Girder
 
Engineering & Piping design
Engineering & Piping designEngineering & Piping design
Engineering & Piping design
 
Daewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manualDaewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manual
 
Daewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manualDaewoo doosan solar 010 excavator service repair manual
Daewoo doosan solar 010 excavator service repair manual
 

More from Jianping Wong

Nyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platformNyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platformJianping Wong
 
Seamless transitions are_they_possible
Seamless transitions are_they_possibleSeamless transitions are_they_possible
Seamless transitions are_they_possibleJianping Wong
 
521 announcement 29102013 interim financial report q3 2013
521  announcement 29102013  interim financial report q3 2013521  announcement 29102013  interim financial report q3 2013
521 announcement 29102013 interim financial report q3 2013Jianping Wong
 
Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72Jianping Wong
 
Estes express lines announces general rate increase
Estes express lines announces general rate increaseEstes express lines announces general rate increase
Estes express lines announces general rate increaseJianping Wong
 
Top 10 popular express companies in us
Top 10 popular express companies in usTop 10 popular express companies in us
Top 10 popular express companies in usJianping Wong
 

More from Jianping Wong (10)

Nyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platformNyk and yang ming reuse containers thanks to apcs platform
Nyk and yang ming reuse containers thanks to apcs platform
 
Seamless transitions are_they_possible
Seamless transitions are_they_possibleSeamless transitions are_they_possible
Seamless transitions are_they_possible
 
521 announcement 29102013 interim financial report q3 2013
521  announcement 29102013  interim financial report q3 2013521  announcement 29102013  interim financial report q3 2013
521 announcement 29102013 interim financial report q3 2013
 
Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72Saia reports second quarter earnings per share of $0.72
Saia reports second quarter earnings per share of $0.72
 
Estes express lines announces general rate increase
Estes express lines announces general rate increaseEstes express lines announces general rate increase
Estes express lines announces general rate increase
 
Top 10 popular express companies in us
Top 10 popular express companies in usTop 10 popular express companies in us
Top 10 popular express companies in us
 
Nfpa 1031
Nfpa 1031Nfpa 1031
Nfpa 1031
 
Nfpa 1020
Nfpa 1020Nfpa 1020
Nfpa 1020
 
Nfpa 557
Nfpa 557Nfpa 557
Nfpa 557
 
Nfpa 1140
Nfpa 1140Nfpa 1140
Nfpa 1140
 

Recently uploaded

Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxsqpmdrvczh
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........LeaCamillePacle
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 

Recently uploaded (20)

Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
Romantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptxRomantic Opera MUSIC FOR GRADE NINE pptx
Romantic Opera MUSIC FOR GRADE NINE pptx
 
ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 

Nfpa 1055

  • 1. Approval Standard for om Water Motor Gong .c Class Number 1055 a se gb in in tra July 1970 re .fi w w w ©2002 FM Global Technologies LLC. All rights reserved.
  • 2. Foreword FM Approvals are intended to verify that the products and services described will meet stated conditions of performance, safety and quality useful to the ends of property conservation. The purpose of FM Approval Standards is to present the criteria for FM Approval of various types of products and services, as guidance for FM Approvals personnel, manufacturers, users and authorities having jurisdiction. Products submitted for Approval shall demonstrate that they meet the intent of the Approval Standard, and that quality control in manufacturing and/or applications shall ensure a consistently uniform and reliable product or service. FM Approval Standards strive to be performance-oriented and to facilitate technological development. om For examining equipment, materials and services, FM Approval Standards: .c a) must be useful to the ends of property conservation by preventing, limiting or not causing damage under the conditions stated by the Approval listing; and se b) must be readily identifiable. a Continuance of Approval and Listing depends on compliance with the Approval agreement, satisfactory gb performance in the field, on successful re-examinations of equipment, materials, and services as appropriate, and on periodic follow-up audits of the manufacturing facility or service/application. in FM Global Technologies LLC reserves the right in its sole judgement to change or revise its standards, criteria, in methods, or procedures. tra re .fi w w w
  • 3. TABLE OF CONTENTS INTRODUCTION .......................................................................................................................................................................... 1 REQUIREMENTS ........................................................................................................................................................................... 1 Durability ................................................................................................................................................................................... 1 Audibility ................................................................................................................................................................................... 1 Sensitivity .................................................................................................................................................................................. 1 Port Sizes ................................................................................................................................................................................... 2 Inlet and Outlet .......................................................................................................................................................................... 2 Moving Parts .............................................................................................................................................................................. 2 Water Motor Housing ................................................................................................................................................................ 2 Accessibility for Service ........................................................................................................................................................... 2 Protective Cover ........................................................................................................................................................................ 2 om Materials .................................................................................................................................................................................... 3 Markings .................................................................................................................................................................................... 3 .c a se gb in in tra re .fi w w w
  • 4. July 1970 1055 INTRODUCTION A water motor gong is used to give a locally audible alarm signal when a fire protection sprinkler system operates. Such a device should be highly reliable and durable. FM Approval is based on examination and test of production samples, inspection of the manufacturing and/or quality control facilities, and use experience. Particularly considered are functional suitability, adequacy of design and workmanship, uniformity and dependability of production, effectiveness of quality control, and assurance of service and of replacement parts. Minimum physical requirements given below are guides. Mere conformity does not assure Approval since other considerations may control. Nor is strict conformity necessary; devices having different characteristics may be considered and Approved, if shown to be essentially equivalent or superior in performance. om .c REQUIREMENTS Durability a se gb The water motor gong shall be designed to operate reliably without excessive maintenance. It will be subjected in to a 60-hour continuous endurance run with an average operating pressure of 50 psi at the inlet to the device. No lubrication or adjustment will be made during this test. There shall be no evidence of any excessive wear at in the completion of the test. tra Audibility re The water motor gong shall produce an audible signal sufficient to alert a nearby plant employee during working .fi hours or a guard or other person during idle hours. The sound should be loud enough and of such a pitch as to w be clearly heard, above the average factory noise levels, at a distance of several hundred feet. w It shall generate sound waves having a minimum sound-pressure level of 90 decibels (referred to a 0.0002 w microbar base) using the ‘‘C’’ weighting, when tested in a room having a background noise level within the approximate range of 50 to 55 decibels and using 30 lb operating pressure at the inlet to the gong. Sound pressure level measurements will be made at a point 10 ft in front of the gong with the protective cover in place. Sensitivity Operation shall commence at a maximum pressure of 5.0 psig measured at the inlet to the device, upstream of the strainer, when the pressure is increased from zero. FM APPROVALS 1
  • 5. 1055 July 1970 Port Sizes Operating ports such as nozzles shall have a diameter of not less than 1⁄8 in. and be protected by a suitable strainer of corrosion-resistant material. The total area of all openings in the strainer screen shall be at least ten times the port area. The strainer, which shall be furnished by the gong manufacturer, may be located at the waterflow detecting device. Inlet and Outlet The inlet opening shall be suitable for connection to 3⁄4 in. IPS supply piping. The outlet opening shall be of ample size to facilitate the removal of waste water. A connecting pipe in the order om of 1 to 11⁄2 in. IPS will be acceptable. .c Moving Parts se Shafts and other moving parts shall be designed to prevent binding and protected against mechanical injury. a Bearings shall be self lubricating or have means for lubrication. The lubricant must be suitable for use over the gb range of temperatures between -60°F and 110°F. in Water Motor Housing in The water motor housing shall be able to withstand a hydrostatic pressure of 200 psig for 5 minutes. tra re Accessibility for Service .fi Design must permit disassembly for inspection, lubrication, adjustment or repair without removal from the supporting wall or structure. w w Suitable means shall be provided so that nozzle and strainer can be readily cleaned. w Protective Cover An outer shield or protective cover shall be provided to protect the gong from deteriorating effects of rain and snow and to prevent nesting of birds, vermin, etc. A combination gong-cover shall be able to withstand six (6) blows from a 101⁄2 lb. steel ball, swinging as a 101⁄2 ft. long pendulum, hung directly over the gong from a height of five (5) feet. Point of contact between ball and gong-cover will be halfway between center of gong-cover and its periphery on a horizontal plane. Following this test, the operating water motor gong shall still sound an audible alarm. 2 FM APPROVALS
  • 6. July 1970 1055 Materials All materials used shall be suitable for the intended application. Markings The shield shall carry the words ‘‘SPRINKLER ALARM’’ having a minimum letter height of 1 in. The lettering may be cast on the shield or may be on a separate plate which shall be substantially fastened to the shield. Cast letters shall be raised approximately 3⁄32 in. The body of the device (motor housing) shall be marked with the manufacturer’s name or trade mark, and a distinctive model or figure number. om .c a se gb in in tra re .fi w w w FM APPROVALS 3