Most Common Causes of Commercial Fires
• Cooking Equipment
• Because of high cooking temperatures, flammable oils and grease,
and the hectic nature of commercial kitchens, this is the single most
common cause.
• 65% of fires in healthcare facilities
• 61% of fires in restaurants
• 38% of fires in educational institutions
• 29% of fires in office properties
• 13% of fires in stores and mercantile properties
Heating Equipment
• Depending on the climate, commercial buildings require heat to stay
comfortable for several months of the year. As with other mechanical
equipment, furnaces, boilers, and radiators are at risk of overheating.
This, in turn, can lead to a fire.
• Heating equipment is responsible for:
• 14% of fires in industrial or manufacturing properties
• 11% of fires in office properties
• 9% of fires in restaurants
• 5% of fires in healthcare facilities
Electrical & Lighting Equipment
• All modern buildings feature electrical wiring behind the wall for light
and power. Unfortunately, electricity carries an inherent fire risk. Old
or defective wiring, overloaded circuits, loose connections, faulty
fuses, imbalanced electrical loads, and many other problems can
develop that lead to overheating or sparks that ignite a fire.
• Electrical problems are responsible for:
• 12% of fires in office properties
• 10% of fires in stores and mercantile properties
• 9% of fires in restaurants
• 5% of fires in healthcare facilities
Smoking Materials
• Lighted cigars, cigarettes, and other smoking materials can start fires
if disposed of improperly. Fortunately, the rate of fires caused by
smoking materials has decreased in recent years as a result of
declining popularity and the introduction of “fire safe” cigarettes with
reduced ignition strength. Still, smoking materials remain one of the
top five most common causes of commercial fires. They are
responsible for:
• 9% of fires in office properties
• 7% of fires in restaurants
• 5% of fires in healthcare facilities
Intentional
• An intentional fire is one that occurs as the result of the deliberate
misuse of a heat source. Arson fits into this category, though to be
considered arson, the fire starter must have malicious, criminal
intent.
• 36% of fires in educational institutions
• 10% of fires in office properties
• 6% of fires in healthcare facilities
• 4% of fires in restaurants
NBC (2005) regulation for non-combusting
materials
• The combustible/flammable material shall not be used for partitioning,
wall paneling, false ceiling etc.
• Any material giving out toxic gases/smoke if involved in the fire shall not be
used for partitioning of a floor or wall paneling or a false ceiling etc.
• The use of LPG shall not be permitted in the high-rise building except
residential/hotel/hostel/kitchen/pantry (if any) and shall be located at the
periphery of the building on the ground level.
• The framework of the entire false ceiling would be provided with metallic
sections and no wooden framework shall be allowed for paneling/false
ceiling.
• lining material shall conform to class-I of the standard specification
STAIRCASES
As per section 12.18 of part III
• Every high rise building Have minimum 2 number of Staircases.
• Width of staircases varies from 1 m. to 2 m
STAIRCASES
As per section 12.18 of part III
• For residential building width of staircases should be 1 mtr.
• Out of 2 staircases, 1 can be used as a fire escape staircase.
• Width of fire escape should be minimum 0.75 meter.
• Number of staircases shall be given as per the travel distances
• Staircase shall not be extended to basement to prevent smoke , heat
& gases. From the basement smoke, heat gases can be travel to upper
floors.
• Access to the basement from the ground should be through a
separate staircase, which is not connected to main staircase (i.e. It
should be remote to each other.)
STAIRCASES
As per section 12.18 of part III
• Staircase shall be of enclosed type to prevent entry of smoke & fire to
the staircase & vice versa.
• Spiral staircase shall be provided up to 9 mtr height.
• External staircase normally shall not be allowed.
Stairs
• Internal stairs shall be constructed of non-combustible materials
throughout.
• . A staircase shall not be arranged round a lift shaft.
• No gas piping, or electrical panels shall be allowed in the stairway.
Ducting in the stairway may be permitted if it is of 1hr. fire resistance
rating.
• The minimum width of tread without nosing shall be 250 mm for
internal staircase of residential buildings. This shall be 300 mm for
assembly, hotels, educational, institutional, business and other
buildings. The treads shall be constructed and maintained in a
manner to prevent slipping
Stairs
• The maximum height of riser shall be 190mm for residential buildings,
and 150mm for other buildings, and the number shall be limited to 15
per flight.
• Handrails shall be provided at a height of 1000 mm to be measured
from the base of the middle of the treads to the top of the handrails
• The minimum headroom in a passage under the landing of a staircase
and the staircase shall be 2.2m.
• No electrical shafts /AC ducts or gas pipes, etc, shall pass through or
open in the staircases.
• Lifts shall not open in staircase.
Fire fighting shafts (Buildings more than 18m in
height, or with a basement of more than 10m
below grade, should be provided with a fire
fighting shaft. )
Lift Enclosure/lift
• Provision of the lifts shall be made for all multi-storeyed building
having a height of 15.0 m. and above.
• All the floors shall be accessible for 24 hrs. by the lift. The lift
provided in the buildings shall not be considered as a means of
escape in case of emergency.
• Grounding switch at ground floor level to enable the fire service to
ground the lift car in case of emergency shall also be provided.
• The lift machine room shall be separate and no other machinery be
installed in it.
Lift Enclosure/lift
• Walls of lift enclosures shall have a fire rating of two hours. Lift shafts
shall have a vent at the top of area not less than 0.2 sq m.
• Lift motor room shall be located preferably on top of the shaft and
separated from the shaft by the floor of the room.
• Landing doors in lift enclosures shall have fire resistance of not less
than 1h
• The number of lifts in one row for a lift bank shall not exceed 4 and
the total number of lifts in the bank shall not exceed 8.
• Lift car door shall have a fire resistance rating of 1 hour
Lift Enclosure/lift
• Collapsible gates shall not be permitted for lifts and solid doors with
fire resistance of at least one hour shall be provided.
• If the lift shaft and lobby is in the core of the building, a positive
pressure between 25 and 30 Pa shall be maintained in the lobby, and
a positive pressure of 50 Pa shall be maintained in the shaft.
• Exit from the lift lobby, if located in the core of the building , shall be
through a self-closing smoke stop door of half an hour fire resistance;
• Lifts shall not normally communicate with the basement; if, however,
lifts are in communication, the lift lobby of the basements shall be
pressurised as in (g), with self closing door as in (h);
Lift Enclosure/lift
• Telephone or other communication facilities shall be provided in lift
cars for buildings of 30m in height and above. Communication system
for lifts shall be connected to fire control room for the building;
• Suitable arrangements such as providing slope in the floor of lift
lobby, shall be made to prevent water used during fire fighting etc,
from entering the lift shafts.
• A sign shall be posted and maintained on every floor at or near the lift
indicating that in case of fire, occupants shall use the stairs unless
instructed otherwise
Fire Lifts
• Where applicable, fire lifts shall be provided with a minimum capacity
for 8 passengers and fully automated with emergency switch on
ground.
• In case of fire, only firemen or any member of fire service shall
operate the fire lift. In normal course, lifts may be used by other
persons.
Fire Escapes (external stairs)
Fire Escapes (external stairs)
• External stairs shall always be kept in sound operable conditions.
• All external stairs shall be directly connected to the ground.
• Entrance to the external stairs shall be separate and remote from the
internal staircase.
• Care shall be taken to ensure that no wall opening or window opens
on to or close to an external stairs.
• No external staircase, used as a fire escape, shall be inclined at an
angle greater than 45 degrees from the horizontal

More Related Content

What's hot

Fire Fighting systems - Advanced Services
Fire Fighting systems - Advanced ServicesFire Fighting systems - Advanced Services
Fire Fighting systems - Advanced ServicesPratibha Mohan
 
Fire Fighting and Solution for Globus Shopping Mall (bandra)
Fire Fighting and Solution for Globus Shopping  Mall (bandra)Fire Fighting and Solution for Globus Shopping  Mall (bandra)
Fire Fighting and Solution for Globus Shopping Mall (bandra)Esa Shaikh
 
Building Services (Fire)
Building Services (Fire)Building Services (Fire)
Building Services (Fire)Mehul Hotwani
 
Fire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case studyFire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case studyIrene Devakirubai
 
Fire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildingsFire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildingsFerit Fazliu
 
Lifts and escalators
Lifts and escalatorsLifts and escalators
Lifts and escalatorsShubham Arora
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building ShrushtiAhirrao1
 
Elevators and its types
Elevators and its typesElevators and its types
Elevators and its typesRajat Nainwal
 
Compartmentation and Fire Doors
Compartmentation and Fire DoorsCompartmentation and Fire Doors
Compartmentation and Fire DoorsAaron Johnson
 
Vertical Transportation Systems in Buildings by Ramesh Nayaka
Vertical Transportation Systems in Buildings by Ramesh NayakaVertical Transportation Systems in Buildings by Ramesh Nayaka
Vertical Transportation Systems in Buildings by Ramesh NayakaMr. Ramesh Nayaka
 
Active fire protection system
Active fire protection systemActive fire protection system
Active fire protection systemgauravashist
 

What's hot (20)

Fire Fighting systems - Advanced Services
Fire Fighting systems - Advanced ServicesFire Fighting systems - Advanced Services
Fire Fighting systems - Advanced Services
 
Building Code - Egress
Building Code - EgressBuilding Code - Egress
Building Code - Egress
 
Elevators & Escalators
Elevators & EscalatorsElevators & Escalators
Elevators & Escalators
 
Fire Fighting and Solution for Globus Shopping Mall (bandra)
Fire Fighting and Solution for Globus Shopping  Mall (bandra)Fire Fighting and Solution for Globus Shopping  Mall (bandra)
Fire Fighting and Solution for Globus Shopping Mall (bandra)
 
Building Services (Fire)
Building Services (Fire)Building Services (Fire)
Building Services (Fire)
 
Lifts
LiftsLifts
Lifts
 
1 Fire safety design principles
1  Fire safety design principles1  Fire safety design principles
1 Fire safety design principles
 
Fire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case studyFire safety in Office building Literature, net and live case study
Fire safety in Office building Literature, net and live case study
 
Fire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildingsFire safety-in-high-rise-apartment-buildings
Fire safety-in-high-rise-apartment-buildings
 
Dry & Wet Riser Systems
Dry & Wet Riser SystemsDry & Wet Riser Systems
Dry & Wet Riser Systems
 
Fire protection
Fire protectionFire protection
Fire protection
 
Lifts and escalators
Lifts and escalatorsLifts and escalators
Lifts and escalators
 
Services in High Rise Building
Services in High Rise Building  Services in High Rise Building
Services in High Rise Building
 
Elevators and its types
Elevators and its typesElevators and its types
Elevators and its types
 
Compartmentation and Fire Doors
Compartmentation and Fire DoorsCompartmentation and Fire Doors
Compartmentation and Fire Doors
 
Building services
Building servicesBuilding services
Building services
 
Vertical Transportation Systems in Buildings by Ramesh Nayaka
Vertical Transportation Systems in Buildings by Ramesh NayakaVertical Transportation Systems in Buildings by Ramesh Nayaka
Vertical Transportation Systems in Buildings by Ramesh Nayaka
 
Active fire protection system
Active fire protection systemActive fire protection system
Active fire protection system
 
Refuse chute
Refuse chuteRefuse chute
Refuse chute
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 

Similar to Fire safety in building

General Requirments Of Fire Resisting Building.pptx
General Requirments Of Fire Resisting Building.pptxGeneral Requirments Of Fire Resisting Building.pptx
General Requirments Of Fire Resisting Building.pptxAfroz Saiyad
 
Fire safety system of Building.
Fire safety system of Building.Fire safety system of Building.
Fire safety system of Building.Integrated Design
 
Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016Anil Kumar R
 
FireSafetyMeasuresforSchools.ppt
FireSafetyMeasuresforSchools.pptFireSafetyMeasuresforSchools.ppt
FireSafetyMeasuresforSchools.pptdhesinghraja2
 
CPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsCPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsColt UK
 
disaster management
 disaster management disaster management
disaster managementSurpal Zala
 
Fire Prevention Presentation-a
Fire Prevention Presentation-aFire Prevention Presentation-a
Fire Prevention Presentation-aAmb Steve Mbugua
 
CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...Colt UK
 
Service core
Service coreService core
Service coreaduiti
 
FIRE SAFETY - Anoushka Aggarwal
FIRE SAFETY - Anoushka AggarwalFIRE SAFETY - Anoushka Aggarwal
FIRE SAFETY - Anoushka AggarwalANOUSHKAAggarwal
 
Case study: Presentation Slides
Case study: Presentation SlidesCase study: Presentation Slides
Case study: Presentation Slides마 이환
 
Fire safety in hospitals
Fire safety in hospitalsFire safety in hospitals
Fire safety in hospitalsKomal Gupta
 
Library study on hospital
Library study on hospital Library study on hospital
Library study on hospital manjul gambhir
 
Bs ii-presentation
Bs ii-presentationBs ii-presentation
Bs ii-presentationLee Chun Yee
 

Similar to Fire safety in building (20)

General Requirments Of Fire Resisting Building.pptx
General Requirments Of Fire Resisting Building.pptxGeneral Requirments Of Fire Resisting Building.pptx
General Requirments Of Fire Resisting Building.pptx
 
Fire safety system of Building.
Fire safety system of Building.Fire safety system of Building.
Fire safety system of Building.
 
Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016Presentation Highlighting Implication of NBC, Part-IV 2016
Presentation Highlighting Implication of NBC, Part-IV 2016
 
FireSafetyMeasuresforSchools.ppt
FireSafetyMeasuresforSchools.pptFireSafetyMeasuresforSchools.ppt
FireSafetyMeasuresforSchools.ppt
 
CPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using ShaftsCPD Presentation: Smoke Ventilation using Shafts
CPD Presentation: Smoke Ventilation using Shafts
 
Unit iii (3.1)
Unit iii (3.1)Unit iii (3.1)
Unit iii (3.1)
 
disaster management
 disaster management disaster management
disaster management
 
Fire Prevention Presentation-a
Fire Prevention Presentation-aFire Prevention Presentation-a
Fire Prevention Presentation-a
 
Fire Fighting system
Fire Fighting systemFire Fighting system
Fire Fighting system
 
Firefighting & HVAC.pdf
Firefighting & HVAC.pdfFirefighting & HVAC.pdf
Firefighting & HVAC.pdf
 
CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...CPD Presentation - Smoke control and environmental ventilation in residential...
CPD Presentation - Smoke control and environmental ventilation in residential...
 
Service core
Service coreService core
Service core
 
Fire fighting
Fire fightingFire fighting
Fire fighting
 
FIRE SAFETY - Anoushka Aggarwal
FIRE SAFETY - Anoushka AggarwalFIRE SAFETY - Anoushka Aggarwal
FIRE SAFETY - Anoushka Aggarwal
 
Case study: Presentation Slides
Case study: Presentation SlidesCase study: Presentation Slides
Case study: Presentation Slides
 
Fire safety in hospitals
Fire safety in hospitalsFire safety in hospitals
Fire safety in hospitals
 
Fire safety
Fire safety Fire safety
Fire safety
 
Library study on hospital
Library study on hospital Library study on hospital
Library study on hospital
 
Bs ii-presentation
Bs ii-presentationBs ii-presentation
Bs ii-presentation
 
By laws Gujrat
By laws GujratBy laws Gujrat
By laws Gujrat
 

More from wasim shaikh

Permeability of Soils & Seepage Analysis
Permeability of Soils & Seepage AnalysisPermeability of Soils & Seepage Analysis
Permeability of Soils & Seepage Analysiswasim shaikh
 
Particle Size Distribution & Classification of Soil
Particle Size Distribution & Classification of SoilParticle Size Distribution & Classification of Soil
Particle Size Distribution & Classification of Soilwasim shaikh
 
Geotechnical engineering numerical
Geotechnical engineering numerical Geotechnical engineering numerical
Geotechnical engineering numerical wasim shaikh
 
Clay Mineralogy & Plasticity Characteristics of Soil
Clay Mineralogy & Plasticity Characteristics of Soil Clay Mineralogy & Plasticity Characteristics of Soil
Clay Mineralogy & Plasticity Characteristics of Soil wasim shaikh
 
Heat and smoke detectors
Heat and smoke detectors Heat and smoke detectors
Heat and smoke detectors wasim shaikh
 
Types of wires, three phase system earthing
Types of wires, three phase system earthing Types of wires, three phase system earthing
Types of wires, three phase system earthing wasim shaikh
 
Condition Survey, Evaluation & Damage Assessment
Condition Survey, Evaluation & Damage AssessmentCondition Survey, Evaluation & Damage Assessment
Condition Survey, Evaluation & Damage Assessmentwasim shaikh
 
Plumbing system updated ppt
Plumbing system updated pptPlumbing system updated ppt
Plumbing system updated pptwasim shaikh
 
Principle of lumination design
Principle of lumination designPrinciple of lumination design
Principle of lumination designwasim shaikh
 
Building services and repairs mumbai university introduction
Building services and repairs mumbai university introductionBuilding services and repairs mumbai university introduction
Building services and repairs mumbai university introductionwasim shaikh
 
Deterioration of concrete ppt
Deterioration of concrete pptDeterioration of concrete ppt
Deterioration of concrete pptwasim shaikh
 

More from wasim shaikh (11)

Permeability of Soils & Seepage Analysis
Permeability of Soils & Seepage AnalysisPermeability of Soils & Seepage Analysis
Permeability of Soils & Seepage Analysis
 
Particle Size Distribution & Classification of Soil
Particle Size Distribution & Classification of SoilParticle Size Distribution & Classification of Soil
Particle Size Distribution & Classification of Soil
 
Geotechnical engineering numerical
Geotechnical engineering numerical Geotechnical engineering numerical
Geotechnical engineering numerical
 
Clay Mineralogy & Plasticity Characteristics of Soil
Clay Mineralogy & Plasticity Characteristics of Soil Clay Mineralogy & Plasticity Characteristics of Soil
Clay Mineralogy & Plasticity Characteristics of Soil
 
Heat and smoke detectors
Heat and smoke detectors Heat and smoke detectors
Heat and smoke detectors
 
Types of wires, three phase system earthing
Types of wires, three phase system earthing Types of wires, three phase system earthing
Types of wires, three phase system earthing
 
Condition Survey, Evaluation & Damage Assessment
Condition Survey, Evaluation & Damage AssessmentCondition Survey, Evaluation & Damage Assessment
Condition Survey, Evaluation & Damage Assessment
 
Plumbing system updated ppt
Plumbing system updated pptPlumbing system updated ppt
Plumbing system updated ppt
 
Principle of lumination design
Principle of lumination designPrinciple of lumination design
Principle of lumination design
 
Building services and repairs mumbai university introduction
Building services and repairs mumbai university introductionBuilding services and repairs mumbai university introduction
Building services and repairs mumbai university introduction
 
Deterioration of concrete ppt
Deterioration of concrete pptDeterioration of concrete ppt
Deterioration of concrete ppt
 

Recently uploaded

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 

Recently uploaded (20)

🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 

Fire safety in building

  • 1. Fire safety in Building
  • 2. Most Common Causes of Commercial Fires • Cooking Equipment • Because of high cooking temperatures, flammable oils and grease, and the hectic nature of commercial kitchens, this is the single most common cause. • 65% of fires in healthcare facilities • 61% of fires in restaurants • 38% of fires in educational institutions • 29% of fires in office properties • 13% of fires in stores and mercantile properties
  • 3. Heating Equipment • Depending on the climate, commercial buildings require heat to stay comfortable for several months of the year. As with other mechanical equipment, furnaces, boilers, and radiators are at risk of overheating. This, in turn, can lead to a fire. • Heating equipment is responsible for: • 14% of fires in industrial or manufacturing properties • 11% of fires in office properties • 9% of fires in restaurants • 5% of fires in healthcare facilities
  • 4. Electrical & Lighting Equipment • All modern buildings feature electrical wiring behind the wall for light and power. Unfortunately, electricity carries an inherent fire risk. Old or defective wiring, overloaded circuits, loose connections, faulty fuses, imbalanced electrical loads, and many other problems can develop that lead to overheating or sparks that ignite a fire. • Electrical problems are responsible for: • 12% of fires in office properties • 10% of fires in stores and mercantile properties • 9% of fires in restaurants • 5% of fires in healthcare facilities
  • 5. Smoking Materials • Lighted cigars, cigarettes, and other smoking materials can start fires if disposed of improperly. Fortunately, the rate of fires caused by smoking materials has decreased in recent years as a result of declining popularity and the introduction of “fire safe” cigarettes with reduced ignition strength. Still, smoking materials remain one of the top five most common causes of commercial fires. They are responsible for: • 9% of fires in office properties • 7% of fires in restaurants • 5% of fires in healthcare facilities
  • 6. Intentional • An intentional fire is one that occurs as the result of the deliberate misuse of a heat source. Arson fits into this category, though to be considered arson, the fire starter must have malicious, criminal intent. • 36% of fires in educational institutions • 10% of fires in office properties • 6% of fires in healthcare facilities • 4% of fires in restaurants
  • 7. NBC (2005) regulation for non-combusting materials • The combustible/flammable material shall not be used for partitioning, wall paneling, false ceiling etc. • Any material giving out toxic gases/smoke if involved in the fire shall not be used for partitioning of a floor or wall paneling or a false ceiling etc. • The use of LPG shall not be permitted in the high-rise building except residential/hotel/hostel/kitchen/pantry (if any) and shall be located at the periphery of the building on the ground level. • The framework of the entire false ceiling would be provided with metallic sections and no wooden framework shall be allowed for paneling/false ceiling. • lining material shall conform to class-I of the standard specification
  • 8. STAIRCASES As per section 12.18 of part III • Every high rise building Have minimum 2 number of Staircases. • Width of staircases varies from 1 m. to 2 m
  • 9. STAIRCASES As per section 12.18 of part III • For residential building width of staircases should be 1 mtr. • Out of 2 staircases, 1 can be used as a fire escape staircase. • Width of fire escape should be minimum 0.75 meter. • Number of staircases shall be given as per the travel distances • Staircase shall not be extended to basement to prevent smoke , heat & gases. From the basement smoke, heat gases can be travel to upper floors. • Access to the basement from the ground should be through a separate staircase, which is not connected to main staircase (i.e. It should be remote to each other.)
  • 10. STAIRCASES As per section 12.18 of part III • Staircase shall be of enclosed type to prevent entry of smoke & fire to the staircase & vice versa. • Spiral staircase shall be provided up to 9 mtr height. • External staircase normally shall not be allowed.
  • 11. Stairs • Internal stairs shall be constructed of non-combustible materials throughout. • . A staircase shall not be arranged round a lift shaft. • No gas piping, or electrical panels shall be allowed in the stairway. Ducting in the stairway may be permitted if it is of 1hr. fire resistance rating. • The minimum width of tread without nosing shall be 250 mm for internal staircase of residential buildings. This shall be 300 mm for assembly, hotels, educational, institutional, business and other buildings. The treads shall be constructed and maintained in a manner to prevent slipping
  • 12. Stairs • The maximum height of riser shall be 190mm for residential buildings, and 150mm for other buildings, and the number shall be limited to 15 per flight. • Handrails shall be provided at a height of 1000 mm to be measured from the base of the middle of the treads to the top of the handrails • The minimum headroom in a passage under the landing of a staircase and the staircase shall be 2.2m. • No electrical shafts /AC ducts or gas pipes, etc, shall pass through or open in the staircases. • Lifts shall not open in staircase.
  • 13. Fire fighting shafts (Buildings more than 18m in height, or with a basement of more than 10m below grade, should be provided with a fire fighting shaft. )
  • 14. Lift Enclosure/lift • Provision of the lifts shall be made for all multi-storeyed building having a height of 15.0 m. and above. • All the floors shall be accessible for 24 hrs. by the lift. The lift provided in the buildings shall not be considered as a means of escape in case of emergency. • Grounding switch at ground floor level to enable the fire service to ground the lift car in case of emergency shall also be provided. • The lift machine room shall be separate and no other machinery be installed in it.
  • 15. Lift Enclosure/lift • Walls of lift enclosures shall have a fire rating of two hours. Lift shafts shall have a vent at the top of area not less than 0.2 sq m. • Lift motor room shall be located preferably on top of the shaft and separated from the shaft by the floor of the room. • Landing doors in lift enclosures shall have fire resistance of not less than 1h • The number of lifts in one row for a lift bank shall not exceed 4 and the total number of lifts in the bank shall not exceed 8. • Lift car door shall have a fire resistance rating of 1 hour
  • 16. Lift Enclosure/lift • Collapsible gates shall not be permitted for lifts and solid doors with fire resistance of at least one hour shall be provided. • If the lift shaft and lobby is in the core of the building, a positive pressure between 25 and 30 Pa shall be maintained in the lobby, and a positive pressure of 50 Pa shall be maintained in the shaft. • Exit from the lift lobby, if located in the core of the building , shall be through a self-closing smoke stop door of half an hour fire resistance; • Lifts shall not normally communicate with the basement; if, however, lifts are in communication, the lift lobby of the basements shall be pressurised as in (g), with self closing door as in (h);
  • 17. Lift Enclosure/lift • Telephone or other communication facilities shall be provided in lift cars for buildings of 30m in height and above. Communication system for lifts shall be connected to fire control room for the building; • Suitable arrangements such as providing slope in the floor of lift lobby, shall be made to prevent water used during fire fighting etc, from entering the lift shafts. • A sign shall be posted and maintained on every floor at or near the lift indicating that in case of fire, occupants shall use the stairs unless instructed otherwise
  • 18. Fire Lifts • Where applicable, fire lifts shall be provided with a minimum capacity for 8 passengers and fully automated with emergency switch on ground. • In case of fire, only firemen or any member of fire service shall operate the fire lift. In normal course, lifts may be used by other persons.
  • 20. Fire Escapes (external stairs) • External stairs shall always be kept in sound operable conditions. • All external stairs shall be directly connected to the ground. • Entrance to the external stairs shall be separate and remote from the internal staircase. • Care shall be taken to ensure that no wall opening or window opens on to or close to an external stairs. • No external staircase, used as a fire escape, shall be inclined at an angle greater than 45 degrees from the horizontal