1 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD
Chapter 1:
Introduction
1.1 Definition of doubling.
A new railway line is required to be constructed normally in a new area
for one or more of the following considerations:
 Strategic and political considerations.
 Development of backward area.
 Connecting new trade centres.
 To shorten the existing rail lines.
Doubling of existing single railway line is also done in few cases to cope
up with the additional requirement to traffic.
Doubling of railway line means construction of an additional line. It is
normally done when single line is not a position to carry the number of
trains required to pass on the section.
1.2 Main steps involved in doubling of railway line.
i. Engineering cum traffic survey: engineering cum traffics survey is
firstcarried out to examine the traffic prospects of the section and
to roughly estimate the quantum of work involved and cost aspect
of the same.
ii. Specifications of work:while executing the work, it is necessary to
clearly understand the standard of construction and specifications
to be followed.
iii. Land acquisition: extra land, if necessary, for the double line
station yard, bridges, etc. Is acquired, if not already done.
iv. Earthwork: it is done for double line, by widening the existing
formations the suit the double line. Earthwork is divided in
different zones and the contract is awarded for each separately.
v. Bridges: the existing bridges are extended to suit the double lines.
The extension is done with proper planning so that there is
minimum dislocation to traffic.
2 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD
vi. Plate lying: rails, sleepers and fastenings are collected in track
depots established for the projects.
vii. Opening for goods traffic and ballasting: as soon as construction
work is completed, the line is opened for goods traffic at
restricted speed.
viii. Opening line for passenger traffic: the speed restrictions are
slowly relaxed and speed is brought to maximum permissible
speed of the section.
1.3 Prominence of this project.
The importance of this project lies in the fact that it forms a vital link in a
sequential chain of rail sections which together constitutes the trunk "b"
route of northern railway. This trunk "b" route extends from
Mughalsarai at one end, to Amritsar at the other end, and passes
through Varanasi - Lucknow - Bareilly- Moradabad- Saharanpur- Ambala
and beyond up to Amritsar.
The other trunk route i.e. the "a" route of northern railway also
originates from Mughalsarai and, after passing through Allahabad -
Kanpur- Ghaziabad - Delhi - Panipat, it merges with the "b" route at
Ambala.
The rail traffic originating from eastern / south eastern parts of the
country , and bound for Punjab and other adjoining areas in the
northern part of the country , has traditionally been moving mainly via
this "a" route .
The "a" route is a broad gauge , double line , completely electrified
route .but, during the recent years the "a" rout is beginning to feel the
strain of having to movevery large quantum of traffic, so much so that in
several sections of the route , the density of rail traffic exceeded the
saturated limits of line capacity and by the end of this century , the
pressure of "a" route is only destined to increase , thereby inducing
important need for introducing a new line i.e. Doubling.
3 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD
Chapter 2:
Problem definition
Object of proposed work is illustrated below:
With this mounting pressure of rail traffic on "a" route, the need for diverting
some of the rail traffic to the "b" route is increasingly being felt. In fact, all the
freight traffic from eastern /south eastern railways bound for destinations
beyond Ambala, which is presently moving via the "a" route, is actually
identified as freighttraffic which should rationally move through the "b" route.
However, the existing line capacity of the "b" route is not commensurate with
the requirement of handling any diversion of rail traffic from "a" route. Besides
the fact that it is non - electrified, one major operational constraint of the "b"
route is that the Utraitia - Sultanpur - Zafrabad section is single line section
which severely restricts the smooth flow of traffic. Some sort of route
rationalism is being followed by Lucknow division by utilizing the two adjoining
section of Varanasi- Zafrabad- Sultanpur- Utraitia and Varanasi -Janghai -
Pratapgarh- Utraitia as a double line section for the purpose of freight traffic.
The down goods traffic (i.e., Mughalsarai) is moved via Sultanpur, while the
goods traffic in UP direction is routed via the adjoining Varanasi- Janghai -
Pratapgarh - Rai Bareilly -Utraitia section. But, the line capacity utilization of
this adjoining section (i.e. Via Pratapgarh) has also reached a saturation point,
and as such, it will not be able to shoulder any further burden of rail traffic. In
the circumstances, one viable option is to make Utraitia - Zafrabad a
double line section so that the resultant increasing line capacity of this
section would enable it to handle the anticipated increase in traffic on this
route.
The need for diverting some rail traffic from "a" route to "b" route is not only
visualised from the point of view of existing line capacity constraints of the
former , but is also felt for several other reasons. With the modernisation of
track maintenance procedure, the requirement of traffic blocks of longer
duration has been recognised so as to get the optimum benefit from the
modern maintenance machines. Proper maintenance of track in strict
conformity with the specified safety standards /parameters is absolutely
4 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD
essential for important rail routes like the "a" route that handles heavy freight
loads and prestigious. Superfast trains like the Rajdhani and Shatabdi trains.
With the growing emphasis on safety in trains operations, there is a constant
pressure on the traffic department to sanction appropriate traffic blocks at
frequent intervals for the maintenance of "a" route. This in turn, necessitates
diversion of some trains from "a" route to "b" route.
5 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD
Figure 1 this map shows the route proposed for doubling work.
6 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD
Chapter 3:
Project description
3.1 Introduction.
Utraitia - Sultanpur- Zafrabad is a broad gauge, single line rail section, 219.6
kms in length under the administrative jurisdiction of Lucknow division of
northern railway. Territorially, the entire section lies in the state of Uttar
Pradesh and its alignment traverses through Lucknow, Sultanpur and Varanasi
districts of the state.
3.2 Backgrounds.
The need for diverting some rail traffic from "a" route to "b" route is not only
visualized from view of existing line capacity constraints of the former, but is
also felt for several other reasons. With the modernisation of the track
maintenance procedure, the requirement of traffic blocks of longer duration
has been recognised so as to get the optimum benefit from the modern
maintenance machines. With the growing emphasis on safety in trains
operations, there is a constant pressure on the traffic department to sanction
appropriate traffic blocks at frequent intervals for the maintenance of "a"
route. This in turn, necessitates diversion of some from "a" route t "b" route.
Besides, the need to divert rail traffic from "a" route to "b" route is also
actually felt whenever there is dislocation / stoppage of traffic on "a" route
due to accident /mishap, or any other unforeseen reason.
Heavy pressure of running mail/express trains and freight train on "a" route ,
an electrified section, correspondingly increases the need for diversion of
some of the freight traffic of "a" to its proper route i.e. The "b" route , even
though the latter is not electrified . The existing situation is adversely affecting
the maintenance aspect of "a" route as well as leading to the over utilization
of its provided line capacity, thereby, increasingly heavy detention to freight
traffic. Zafrabad section has been selected for development as a nodal freight
station for unloading and distribution of bulk commodities such as fertilizers
in eastern U.P.
7 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD
3.3 Justification of the Proposed Doubling Of the Project Section.
At present, on average, about 40 trains are being received from eastern
railway at Mughalsarai, out of which about 30 to 31 trains run via "a" route
and the balance 9 to 10 trains are run via route "b" route. Some of the traffic
meant for destinations of "b" route e.g. Ropar power house, N.F.L., N.L.D.M.
etc. is being moved over "a" route to take advantag3 of the electrified traction
and to avoid line capacity constraints on the single line portion of route "b".
Since "a" is expected to reach the limiting values of 60 g.m.t. traffic per annum
by 1997-98, allincrement traffic from e. Rly after that period would have to be
moved per force via "b" route . By the turn of the century, the "a" route would
be expected to move about 38 to through goods trains.
In addition, there will be about 4% increase in passenger trains also. Doubling
of Lucknow –Sultanpur -Zafrabad section is therefore, inescapable. Between
Lucknow - Mughalsarai on this route, the section between Zafrabad -
Mughalsarai i.e. 82 kms, is already doubled. Between Utraitia and Amritsar,
double line has already been completed.
Hence, doubling of the project section which is a leftover portion for doubling
is absolutely necessary to complete the entire doubling of the "b" route.
3.4 Existing Line Capacity of the Project Section.
As per practice on the Lucknow division, freight traffic is being moved
between Lucknow - Mughalsarai by adopting route rationalisation. The DN
traffic toward Mughalsarai is being carried via Sultanpur, whereas up traffic
for Lucknow is being carried out via Pratapgarh.
The capacity utilisation of
 Utraitia - Sultanpur -Zafrabad section at present is 80%
 BSB -JNH-PBH-RBL-LKO 92%
 BSB-JNH 92.7%
 JNH-PBH 55.5%
 PBH -CIL 82.7%
 CIL -RBL 63.6%
8 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD
 RBL-BCN 81.8%
 BCN -UTR 86.4%
From the above values it is clear that sections adjacent to the project
section are also either already saturated with traffic density, or fast
approaching saturation.
3.5 Route Selection.
3.5.1 Various Alternative Routes Examined and Reasons For
The Route Adopted.
The doubling of Utraitia - Sultanpur-Zafrabad project is for diverting
freight traffic from Mughalsarai - Allahabad - New Delhi Rajdhani route
so as to provide room for additional coaching traffic to be introduced in
near future . The project alignment shall be able to accommodate traffic
destined For Uttar Pradesh, Haryana, Himachal Pradesh, Punjab and J& K
states. There are three alternatives routes available between
Mughalsarai and Lucknow namely via Varanasi - Pratapgarh -Rae Bareilly
-Lucknow, via Sultanpur and via Faizabad Loop. Out Of These, The
Zafrabad- Sultanpur -Utraitia route is shortest. The route will also cater to
the local freight traffic generated from Jagdishpur industrial area having
industries viz. Indogulf fertilizer limited and Malvika Steel.
3.5.2 General Description of the Alignment
1. Out of the three alternative routes available for doubling from
Varanasi to Lucknow, railway board have sanctioned doubling of
Zafrabad - Sultanpur -Utraitia section leaving no room for further
examination. However, construction of the new line as up or down
line was the main consideration. Following considerations
influenced this selection :-
 Site of existing stations,
 Availability of railway land along the existing alignment.
 Existence of religious monuments and other places of worship.
9 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD
 Any obligatory location which may hinder acquisition of private
land.
2. For a length of 52 kms. From Varanasi to Zafrabad, the section is
already a double line section. Zafrabad is a small junction station from
where traffic gets diverted to Sultanpur - Utraitia section and also to
Faizabad loop. Both of these loop goes to Lucknow.
3. Out of 28 nos. Crossing station en -route, only Jaunpur city, Sultanpur
and Sindhurwa stations are important.
10 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD
Chapter 4:
Span/ Advantage/ limitation
Span or scope of this project would be:
 Soil report may be used as a reference for other civil project near the
site of project.
 Topographical survey data can be used for similar projects near the site
for design of any other structure.
 The traffic survey cab help in proper maintenance and future
developments in the concerned area.
 The continuation of this project will help in understanding the use of
new technologies employed for this purpose.
Advantages are illustrated below:
 Double track can manage a larger amount of traffic with usually twice
the capacity of single track. It is often seen around large metropolis or
on busy inter-city corridors.
 In double track, faster trains can overtake slower ones, and doubling can
contribute to faster operation of trains. High speed train of 200 km/h
average speed and commuter rail of 40 km/h average can co-exist in
double track without interrupting each other.
 It is relatively easy to do maintenance and engineering work of tracks in
double line with minimum effect of train delay because single tracks are
halted during the work.
 When we lay double track in deserted area and if one of the tracks is
covered with the sand then other track can be still functional. Thus
ensuring no hindrances in rail operation.
 Provision of alternate routes :
 Pressure on existing network will reduce
 Economic scenario will improve
 Higher penetration of products
 More flexibility in movement
 Better connectivity.
11 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD
 improved utilization of tracks
 Higher efficiency
 Reduction in operating expenses
 Lesser or no idling situations
Limitations
 Double track costs more due to requiring more materials and
increased land acquisition costs. This also applies to tunneling and
bridge costs.
 When adding tracks, land acquisition can become prohibitively
expensive.
 Maintenance costs are higher and often more complex as there
may be more switches (points) on the track than on a one-track
line.
12 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD
Chapter 5:
References
 Internet websites referred are:
 www.nr.indianrailways.gov.in
 www.rvnl.org
 www.rdso.indianrailways.gov.in
 www.wikipedia.com
 "Railway Works Engineering" By M.M. Agarwal
 "Indian Railway Tack " By M.M. Agarwal

More Related Content

What's hot

BRIEF STUDY OF IRC STANDARD CODES
BRIEF STUDY OF IRC STANDARD CODESBRIEF STUDY OF IRC STANDARD CODES
BRIEF STUDY OF IRC STANDARD CODESJayvant Choudhary
 
3. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 31506113. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 3150611VATSAL PATEL
 
INTERNSHIP REPORT ON FLEXIBLE PAVEMENT by SANJAY ACHARYA.pdf
INTERNSHIP REPORT ON FLEXIBLE PAVEMENT by SANJAY ACHARYA.pdfINTERNSHIP REPORT ON FLEXIBLE PAVEMENT by SANJAY ACHARYA.pdf
INTERNSHIP REPORT ON FLEXIBLE PAVEMENT by SANJAY ACHARYA.pdfSANJAY ACHARYA
 
BRT System in Delhi
BRT System in DelhiBRT System in Delhi
BRT System in DelhiJaspal Singh
 
training report on pwd
training report on pwdtraining report on pwd
training report on pwdAjay Upadhyay
 
Presentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanPresentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanAamir Rajput Khan
 
Roadway Condition Survey
Roadway Condition SurveyRoadway Condition Survey
Roadway Condition SurveyMd Tanvir Alam
 
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...Hossam Shafiq I
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway EngineeringLatif Hyder Wadho
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro raillibin paul
 
2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdfRoshani Shahi
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and EconomicsKunal Bhadane
 
Earthwork & track formation Railway Engineering
Earthwork & track formation Railway EngineeringEarthwork & track formation Railway Engineering
Earthwork & track formation Railway EngineeringLatif Hyder Wadho
 
Railway track design ppt 2018
Railway track design ppt 2018Railway track design ppt 2018
Railway track design ppt 2018ishwar dhakad
 
Width of formation or Roadway , Right of way and land width, Typical cross se...
Width of formation or Roadway , Right of way and land width, Typical cross se...Width of formation or Roadway , Right of way and land width, Typical cross se...
Width of formation or Roadway , Right of way and land width, Typical cross se...RAMPRASAD KUMAWAT
 

What's hot (20)

Chenab Bridge
Chenab BridgeChenab Bridge
Chenab Bridge
 
Construction of cc_road
Construction of cc_roadConstruction of cc_road
Construction of cc_road
 
BRIEF STUDY OF IRC STANDARD CODES
BRIEF STUDY OF IRC STANDARD CODESBRIEF STUDY OF IRC STANDARD CODES
BRIEF STUDY OF IRC STANDARD CODES
 
3. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 31506113. RAIL TRANSPORTATION (TRE) GTU 3150611
3. RAIL TRANSPORTATION (TRE) GTU 3150611
 
INTERNSHIP REPORT ON FLEXIBLE PAVEMENT by SANJAY ACHARYA.pdf
INTERNSHIP REPORT ON FLEXIBLE PAVEMENT by SANJAY ACHARYA.pdfINTERNSHIP REPORT ON FLEXIBLE PAVEMENT by SANJAY ACHARYA.pdf
INTERNSHIP REPORT ON FLEXIBLE PAVEMENT by SANJAY ACHARYA.pdf
 
BRT System in Delhi
BRT System in DelhiBRT System in Delhi
BRT System in Delhi
 
training report on pwd
training report on pwdtraining report on pwd
training report on pwd
 
Presentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanPresentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir Khan
 
Roadway Condition Survey
Roadway Condition SurveyRoadway Condition Survey
Roadway Condition Survey
 
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
 
Railway Tender
Railway TenderRailway Tender
Railway Tender
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway Engineering
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf2. Geometric Design of Highways.pdf
2. Geometric Design of Highways.pdf
 
Delhi metro and Economics
Delhi metro and EconomicsDelhi metro and Economics
Delhi metro and Economics
 
Earthwork & track formation Railway Engineering
Earthwork & track formation Railway EngineeringEarthwork & track formation Railway Engineering
Earthwork & track formation Railway Engineering
 
report
reportreport
report
 
Bullet train In India
Bullet train In IndiaBullet train In India
Bullet train In India
 
Railway track design ppt 2018
Railway track design ppt 2018Railway track design ppt 2018
Railway track design ppt 2018
 
Width of formation or Roadway , Right of way and land width, Typical cross se...
Width of formation or Roadway , Right of way and land width, Typical cross se...Width of formation or Roadway , Right of way and land width, Typical cross se...
Width of formation or Roadway , Right of way and land width, Typical cross se...
 

Similar to doubling project synopsis

Doubling progress report
Doubling progress reportDoubling progress report
Doubling progress reportNeha Singh
 
Research on Linking between Bridges and Existing Road Network of Mountainous ...
Research on Linking between Bridges and Existing Road Network of Mountainous ...Research on Linking between Bridges and Existing Road Network of Mountainous ...
Research on Linking between Bridges and Existing Road Network of Mountainous ...IJERA Editor
 
Union City Letter to Samtrans Dumbarton Corridor
Union City Letter to Samtrans Dumbarton CorridorUnion City Letter to Samtrans Dumbarton Corridor
Union City Letter to Samtrans Dumbarton CorridorAdina Levin
 
02_West-of-Exeter-Route-Resilience-Study.pdf
02_West-of-Exeter-Route-Resilience-Study.pdf02_West-of-Exeter-Route-Resilience-Study.pdf
02_West-of-Exeter-Route-Resilience-Study.pdfssuser709d96
 
02_West-of-Exeter-Route-Resilience-Study.pdf
02_West-of-Exeter-Route-Resilience-Study.pdf02_West-of-Exeter-Route-Resilience-Study.pdf
02_West-of-Exeter-Route-Resilience-Study.pdfssuser709d96
 
Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach Nishanth Patil
 
Transport poster
Transport posterTransport poster
Transport posterGordon Best
 
2010 10 14_bay_bridge_report_v5_d
2010 10 14_bay_bridge_report_v5_d2010 10 14_bay_bridge_report_v5_d
2010 10 14_bay_bridge_report_v5_dE'ville Eye
 
Railway sector investment eng
Railway sector investment engRailway sector investment eng
Railway sector investment engBataa
 
Rail yard container terminal
Rail yard container terminalRail yard container terminal
Rail yard container terminalKapilLamba6
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracksGowtham G
 
A Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiA Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiIJSRD
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gaugeMani Vel
 

Similar to doubling project synopsis (20)

Doubling progress report
Doubling progress reportDoubling progress report
Doubling progress report
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Sky bus
Sky busSky bus
Sky bus
 
Research on Linking between Bridges and Existing Road Network of Mountainous ...
Research on Linking between Bridges and Existing Road Network of Mountainous ...Research on Linking between Bridges and Existing Road Network of Mountainous ...
Research on Linking between Bridges and Existing Road Network of Mountainous ...
 
Union City Letter to Samtrans Dumbarton Corridor
Union City Letter to Samtrans Dumbarton CorridorUnion City Letter to Samtrans Dumbarton Corridor
Union City Letter to Samtrans Dumbarton Corridor
 
02_West-of-Exeter-Route-Resilience-Study.pdf
02_West-of-Exeter-Route-Resilience-Study.pdf02_West-of-Exeter-Route-Resilience-Study.pdf
02_West-of-Exeter-Route-Resilience-Study.pdf
 
02_West-of-Exeter-Route-Resilience-Study.pdf
02_West-of-Exeter-Route-Resilience-Study.pdf02_West-of-Exeter-Route-Resilience-Study.pdf
02_West-of-Exeter-Route-Resilience-Study.pdf
 
Makkah Metro Presentation
Makkah Metro Presentation Makkah Metro Presentation
Makkah Metro Presentation
 
Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach Grievance redressal of Hubli railway station : A multistorey approach
Grievance redressal of Hubli railway station : A multistorey approach
 
Transport poster
Transport posterTransport poster
Transport poster
 
2010 10 14_bay_bridge_report_v5_d
2010 10 14_bay_bridge_report_v5_d2010 10 14_bay_bridge_report_v5_d
2010 10 14_bay_bridge_report_v5_d
 
Railway sector investment eng
Railway sector investment engRailway sector investment eng
Railway sector investment eng
 
Kenya rail sector
 Kenya rail sector Kenya rail sector
Kenya rail sector
 
Rail yard container terminal
Rail yard container terminalRail yard container terminal
Rail yard container terminal
 
constr.pptx
constr.pptxconstr.pptx
constr.pptx
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracks
 
A Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and MumbaiA Review on High Speed Rail Project between Ahmedabad and Mumbai
A Review on High Speed Rail Project between Ahmedabad and Mumbai
 
Railway.pdf
Railway.pdfRailway.pdf
Railway.pdf
 
Passenger Trains For Va Peninsula Csx 7 17 09
Passenger Trains For Va Peninsula Csx 7 17 09Passenger Trains For Va Peninsula Csx 7 17 09
Passenger Trains For Va Peninsula Csx 7 17 09
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gauge
 

Recently uploaded

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 

Recently uploaded (20)

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 

doubling project synopsis

  • 1. 1 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD Chapter 1: Introduction 1.1 Definition of doubling. A new railway line is required to be constructed normally in a new area for one or more of the following considerations:  Strategic and political considerations.  Development of backward area.  Connecting new trade centres.  To shorten the existing rail lines. Doubling of existing single railway line is also done in few cases to cope up with the additional requirement to traffic. Doubling of railway line means construction of an additional line. It is normally done when single line is not a position to carry the number of trains required to pass on the section. 1.2 Main steps involved in doubling of railway line. i. Engineering cum traffic survey: engineering cum traffics survey is firstcarried out to examine the traffic prospects of the section and to roughly estimate the quantum of work involved and cost aspect of the same. ii. Specifications of work:while executing the work, it is necessary to clearly understand the standard of construction and specifications to be followed. iii. Land acquisition: extra land, if necessary, for the double line station yard, bridges, etc. Is acquired, if not already done. iv. Earthwork: it is done for double line, by widening the existing formations the suit the double line. Earthwork is divided in different zones and the contract is awarded for each separately. v. Bridges: the existing bridges are extended to suit the double lines. The extension is done with proper planning so that there is minimum dislocation to traffic.
  • 2. 2 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD vi. Plate lying: rails, sleepers and fastenings are collected in track depots established for the projects. vii. Opening for goods traffic and ballasting: as soon as construction work is completed, the line is opened for goods traffic at restricted speed. viii. Opening line for passenger traffic: the speed restrictions are slowly relaxed and speed is brought to maximum permissible speed of the section. 1.3 Prominence of this project. The importance of this project lies in the fact that it forms a vital link in a sequential chain of rail sections which together constitutes the trunk "b" route of northern railway. This trunk "b" route extends from Mughalsarai at one end, to Amritsar at the other end, and passes through Varanasi - Lucknow - Bareilly- Moradabad- Saharanpur- Ambala and beyond up to Amritsar. The other trunk route i.e. the "a" route of northern railway also originates from Mughalsarai and, after passing through Allahabad - Kanpur- Ghaziabad - Delhi - Panipat, it merges with the "b" route at Ambala. The rail traffic originating from eastern / south eastern parts of the country , and bound for Punjab and other adjoining areas in the northern part of the country , has traditionally been moving mainly via this "a" route . The "a" route is a broad gauge , double line , completely electrified route .but, during the recent years the "a" rout is beginning to feel the strain of having to movevery large quantum of traffic, so much so that in several sections of the route , the density of rail traffic exceeded the saturated limits of line capacity and by the end of this century , the pressure of "a" route is only destined to increase , thereby inducing important need for introducing a new line i.e. Doubling.
  • 3. 3 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD Chapter 2: Problem definition Object of proposed work is illustrated below: With this mounting pressure of rail traffic on "a" route, the need for diverting some of the rail traffic to the "b" route is increasingly being felt. In fact, all the freight traffic from eastern /south eastern railways bound for destinations beyond Ambala, which is presently moving via the "a" route, is actually identified as freighttraffic which should rationally move through the "b" route. However, the existing line capacity of the "b" route is not commensurate with the requirement of handling any diversion of rail traffic from "a" route. Besides the fact that it is non - electrified, one major operational constraint of the "b" route is that the Utraitia - Sultanpur - Zafrabad section is single line section which severely restricts the smooth flow of traffic. Some sort of route rationalism is being followed by Lucknow division by utilizing the two adjoining section of Varanasi- Zafrabad- Sultanpur- Utraitia and Varanasi -Janghai - Pratapgarh- Utraitia as a double line section for the purpose of freight traffic. The down goods traffic (i.e., Mughalsarai) is moved via Sultanpur, while the goods traffic in UP direction is routed via the adjoining Varanasi- Janghai - Pratapgarh - Rai Bareilly -Utraitia section. But, the line capacity utilization of this adjoining section (i.e. Via Pratapgarh) has also reached a saturation point, and as such, it will not be able to shoulder any further burden of rail traffic. In the circumstances, one viable option is to make Utraitia - Zafrabad a double line section so that the resultant increasing line capacity of this section would enable it to handle the anticipated increase in traffic on this route. The need for diverting some rail traffic from "a" route to "b" route is not only visualised from the point of view of existing line capacity constraints of the former , but is also felt for several other reasons. With the modernisation of track maintenance procedure, the requirement of traffic blocks of longer duration has been recognised so as to get the optimum benefit from the modern maintenance machines. Proper maintenance of track in strict conformity with the specified safety standards /parameters is absolutely
  • 4. 4 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD essential for important rail routes like the "a" route that handles heavy freight loads and prestigious. Superfast trains like the Rajdhani and Shatabdi trains. With the growing emphasis on safety in trains operations, there is a constant pressure on the traffic department to sanction appropriate traffic blocks at frequent intervals for the maintenance of "a" route. This in turn, necessitates diversion of some trains from "a" route to "b" route.
  • 5. 5 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD Figure 1 this map shows the route proposed for doubling work.
  • 6. 6 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD Chapter 3: Project description 3.1 Introduction. Utraitia - Sultanpur- Zafrabad is a broad gauge, single line rail section, 219.6 kms in length under the administrative jurisdiction of Lucknow division of northern railway. Territorially, the entire section lies in the state of Uttar Pradesh and its alignment traverses through Lucknow, Sultanpur and Varanasi districts of the state. 3.2 Backgrounds. The need for diverting some rail traffic from "a" route to "b" route is not only visualized from view of existing line capacity constraints of the former, but is also felt for several other reasons. With the modernisation of the track maintenance procedure, the requirement of traffic blocks of longer duration has been recognised so as to get the optimum benefit from the modern maintenance machines. With the growing emphasis on safety in trains operations, there is a constant pressure on the traffic department to sanction appropriate traffic blocks at frequent intervals for the maintenance of "a" route. This in turn, necessitates diversion of some from "a" route t "b" route. Besides, the need to divert rail traffic from "a" route to "b" route is also actually felt whenever there is dislocation / stoppage of traffic on "a" route due to accident /mishap, or any other unforeseen reason. Heavy pressure of running mail/express trains and freight train on "a" route , an electrified section, correspondingly increases the need for diversion of some of the freight traffic of "a" to its proper route i.e. The "b" route , even though the latter is not electrified . The existing situation is adversely affecting the maintenance aspect of "a" route as well as leading to the over utilization of its provided line capacity, thereby, increasingly heavy detention to freight traffic. Zafrabad section has been selected for development as a nodal freight station for unloading and distribution of bulk commodities such as fertilizers in eastern U.P.
  • 7. 7 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD 3.3 Justification of the Proposed Doubling Of the Project Section. At present, on average, about 40 trains are being received from eastern railway at Mughalsarai, out of which about 30 to 31 trains run via "a" route and the balance 9 to 10 trains are run via route "b" route. Some of the traffic meant for destinations of "b" route e.g. Ropar power house, N.F.L., N.L.D.M. etc. is being moved over "a" route to take advantag3 of the electrified traction and to avoid line capacity constraints on the single line portion of route "b". Since "a" is expected to reach the limiting values of 60 g.m.t. traffic per annum by 1997-98, allincrement traffic from e. Rly after that period would have to be moved per force via "b" route . By the turn of the century, the "a" route would be expected to move about 38 to through goods trains. In addition, there will be about 4% increase in passenger trains also. Doubling of Lucknow –Sultanpur -Zafrabad section is therefore, inescapable. Between Lucknow - Mughalsarai on this route, the section between Zafrabad - Mughalsarai i.e. 82 kms, is already doubled. Between Utraitia and Amritsar, double line has already been completed. Hence, doubling of the project section which is a leftover portion for doubling is absolutely necessary to complete the entire doubling of the "b" route. 3.4 Existing Line Capacity of the Project Section. As per practice on the Lucknow division, freight traffic is being moved between Lucknow - Mughalsarai by adopting route rationalisation. The DN traffic toward Mughalsarai is being carried via Sultanpur, whereas up traffic for Lucknow is being carried out via Pratapgarh. The capacity utilisation of  Utraitia - Sultanpur -Zafrabad section at present is 80%  BSB -JNH-PBH-RBL-LKO 92%  BSB-JNH 92.7%  JNH-PBH 55.5%  PBH -CIL 82.7%  CIL -RBL 63.6%
  • 8. 8 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD  RBL-BCN 81.8%  BCN -UTR 86.4% From the above values it is clear that sections adjacent to the project section are also either already saturated with traffic density, or fast approaching saturation. 3.5 Route Selection. 3.5.1 Various Alternative Routes Examined and Reasons For The Route Adopted. The doubling of Utraitia - Sultanpur-Zafrabad project is for diverting freight traffic from Mughalsarai - Allahabad - New Delhi Rajdhani route so as to provide room for additional coaching traffic to be introduced in near future . The project alignment shall be able to accommodate traffic destined For Uttar Pradesh, Haryana, Himachal Pradesh, Punjab and J& K states. There are three alternatives routes available between Mughalsarai and Lucknow namely via Varanasi - Pratapgarh -Rae Bareilly -Lucknow, via Sultanpur and via Faizabad Loop. Out Of These, The Zafrabad- Sultanpur -Utraitia route is shortest. The route will also cater to the local freight traffic generated from Jagdishpur industrial area having industries viz. Indogulf fertilizer limited and Malvika Steel. 3.5.2 General Description of the Alignment 1. Out of the three alternative routes available for doubling from Varanasi to Lucknow, railway board have sanctioned doubling of Zafrabad - Sultanpur -Utraitia section leaving no room for further examination. However, construction of the new line as up or down line was the main consideration. Following considerations influenced this selection :-  Site of existing stations,  Availability of railway land along the existing alignment.  Existence of religious monuments and other places of worship.
  • 9. 9 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD  Any obligatory location which may hinder acquisition of private land. 2. For a length of 52 kms. From Varanasi to Zafrabad, the section is already a double line section. Zafrabad is a small junction station from where traffic gets diverted to Sultanpur - Utraitia section and also to Faizabad loop. Both of these loop goes to Lucknow. 3. Out of 28 nos. Crossing station en -route, only Jaunpur city, Sultanpur and Sindhurwa stations are important.
  • 10. 10 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD Chapter 4: Span/ Advantage/ limitation Span or scope of this project would be:  Soil report may be used as a reference for other civil project near the site of project.  Topographical survey data can be used for similar projects near the site for design of any other structure.  The traffic survey cab help in proper maintenance and future developments in the concerned area.  The continuation of this project will help in understanding the use of new technologies employed for this purpose. Advantages are illustrated below:  Double track can manage a larger amount of traffic with usually twice the capacity of single track. It is often seen around large metropolis or on busy inter-city corridors.  In double track, faster trains can overtake slower ones, and doubling can contribute to faster operation of trains. High speed train of 200 km/h average speed and commuter rail of 40 km/h average can co-exist in double track without interrupting each other.  It is relatively easy to do maintenance and engineering work of tracks in double line with minimum effect of train delay because single tracks are halted during the work.  When we lay double track in deserted area and if one of the tracks is covered with the sand then other track can be still functional. Thus ensuring no hindrances in rail operation.  Provision of alternate routes :  Pressure on existing network will reduce  Economic scenario will improve  Higher penetration of products  More flexibility in movement  Better connectivity.
  • 11. 11 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD  improved utilization of tracks  Higher efficiency  Reduction in operating expenses  Lesser or no idling situations Limitations  Double track costs more due to requiring more materials and increased land acquisition costs. This also applies to tunneling and bridge costs.  When adding tracks, land acquisition can become prohibitively expensive.  Maintenance costs are higher and often more complex as there may be more switches (points) on the track than on a one-track line.
  • 12. 12 PLANNINGOFDOUBLING OF B.G.RAILWAY LINE AT UTRAITIA - ZAFRABAD Chapter 5: References  Internet websites referred are:  www.nr.indianrailways.gov.in  www.rvnl.org  www.rdso.indianrailways.gov.in  www.wikipedia.com  "Railway Works Engineering" By M.M. Agarwal  "Indian Railway Tack " By M.M. Agarwal