SlideShare a Scribd company logo
1 of 4
Download to read offline
Upendra Narayan Singh
Contact: 09430840823 / E-Mail: unsinghese@gmail.com
Result-oriented professional seeking senior managerial level assignments in Project Planning & Control with a
leading organization of repute in Power Distribution & Transmission industry
Profile Summary
A seasoned professional with nearly 34 years of commendable success in:
~ Project Management ~ Transmission & Distribution ~ Plant Administration
~ Techno-commercial Operations ~ Erection & Commissioning ~ Cost Optimization
~ Procurement ~ MIS Reporting & Documentation ~ Inventory Control
~ Electrical & Mechanical Maintenance ~ HR & General Administration ~ Power Generation
~ Grid Management ~ Site Engineering ~ People Management
 Deft in providing direction & structure for operating units in the field of Power Transmission & Distribution and EHV
Sub-Stations / Thermal Power Stations
 Expertise in handling invoicing & payment collection as well as in
assisting the preparation and approval of standards
 In-depth understanding of legal work related to electricity laws &
environmental issues during construction of transmission lines and sub-
stations
 Well versed with the concepts of maintenance of transmission lines to
achieve maximum availability of lines
 Talent for proactively identifying & resolving problems, ramping up
project activities with on time deliverables and maximizing efficiency
 Experience in managing maintenance operations for reducing breakdown
/ downtime & enhancing operational effectiveness of equipment
 An effective communicator with excellent relationship management
skills and strong analytical, leadership, decision making, problem solving, planning & organizational abilities
Career Milestones
 Essayed a stellar role in the:
o Operation & maintenance of 132/33/25 KV, 220/132/33KVG/S/S.
Construction of 132/33KVG/S/S.&220/132/33KV Grid Sub Station
o Construction of 2*250 MW Thermal Power Station
o Preparation & Obtaining statutory clearances: Rly-Xing, Forest, PTCC
 Expertise in handling:
o Operation, maintenance of 110 MW Thermal Power Station
o Transmission Line from Preliminary Survey, preparation of Route Diagram
o Tower spotting, tower schedule, material requirement, estimate, construction
of 132KV, 220 KV, transmission Line
o Restoration of fallen tower 132KV, 220KV using Pylon or ERS
 Holds the credit of handling project value cost of over Rs 1000 crore of thermal &
500 Crore of transmission system
Core Competencies
 Monitoring and executing power plant projects with respect to budgeted cost,
demand forecasts & time over-runs to ensure their timely execution
 Conducting cost benefit analysis of the projects including feasibility studies, assessment of the requirements, interface
and commissioning; guiding the preparation and submission of offers for tender inquiries
 Anchoring on-site erection & commissioning of plants and ensuring effective resource utilization to maximize the
output; ascertaining compliance to safety, economical and technical assessments to secure the best economical results
 Designing the HT/LT transmission & distribution systems for rural electrification works and handling the sizing of
equipment, earthing & lighting and equipment layouts
 Planning material and developing vendors for obtaining timely procurement of materials & equipment at cost effective
prices to ensure smooth execution of projects
 Monitoring quality systems & compliance with pre-set standards; troubleshooting and maintaining requisite
documents to ensure complete in-process quality & improvement in process capabilities
 Executing preventive & breakdown maintenance schedules of Turbines for improving overall reliability and safety
 Working on succession planning of the workforce, shift management activities, appraising members’ performance &
providing feedback
Organizational Experience
Jan’80-Jun’13 with Bihar State Power Generation Company Limited
Growth Path / Deputations:
Jan’80-Dec’86 Assistant Executive Engineer (Operations)
Jan’87-Jul’89 Assistant Executive Engineer (Turbine Maintenance - Patratu Thermal Power Station)
Aug’89-Mar’94 Assistant Executive Engineer (Transmission Sub-Division, Arrah)
Apr’94-Jul’97 Assistant Executive Engineer (Transmission Sub-Division – 2, Adityapur (Jamshedpur))
Aug’97-May’02 Electrical Executive Engineer – Technical (Transmission Circle, Dehri-On-Sone (BSEB))
Jun’00-Oct’02 Electrical Executive Engineer (Transmission Circle, Dehri-On-Sone (BSEB))
Oct’02-Dec’04 Electrical Executive Engineer (Testing & Commissioning, Transmission, Circle, Purnea
(BSEB))
Dec’04-Nov’05 Electrical Superintending Engineer (Transmission Zone, Gaya)
Dec’05-Feb’07 Electrical Superintending Engineer (Transmission Circle, Gaya (Bihar))
Mar’07-Jun’08 Electrical Superintending Engineer (Project & Design, Board Head Quarter)
Jul’08-Jan’12 Electrical Superintending Engineer (BSEB) - Transmission Circle, Patna
Feb’12-Jun’13 General Manager-cum-Chief Engineer (Barauni Thermal Power Station)
KEY RESULT AREAS
As General Manager-cum-Chief Engineer (Barauni Thermal Power Station):
 Entrusted with the responsibility of handling:
o Administrative sanction & retrial benefit paper at Zone level worker & their payment
o Implementation of order received from Head quarter in true sprit & letter. With over 400 staffs & 91 officers
o Acquisition of land for ash dyke & ash corridor
o Issues related to land displaced persons with different political parties.
 Imparting training to acquire knowledge for development in Power Sector & their application for Plant betterment
As Electrical Superintending Engineer (BSEB) - Transmission Circle, Patna:
 Shouldered the responsibility of handling:
o Sanction of Annual Increment of Workmen, GPF loan, Promotional aspect. Transfer & Posting, of worker, Audit
report, cash& material annual budget of circle. Resolve workers problems through unions
o 24 officers &165 workers to ensure uninterrupted &quality electricity to Capital town PATNA.
As Electrical Superintending Engineer (Project & Design, Board Head Quarter):
 Contributed in the Nuclear Plant to be established at Rajauli Bihar with detail studies
 Carried out the scrutinization of new Power Plant plan submitted by private firm. Associated is obtaining statuary
clearances as well as the detail study of PPA submitted by firm
 Managed the clearance of electrical connection given for establishment of new industries in Bihar through State
investment Promotion Board
As Electrical Superintending Engineer (Transmission Circle, Gaya (Bihar)):
 HR related work of workmen as sanction of loan, grant of leave, promotion, transfer & posting
As Electrical Superintending Engineer (Transmission Zone, Gaya):
 Managed the promotion of workman, Transfer & Posting of workman and Junior Engineers
 Maintained technical data, Revenue statement, Sanction of estimate, tender, issue of work orders
 Looked after the O&M work of all for four circles under this zone
As Electrical Executive Engineer (Testing & Commissioning, Transmission, Circle, Purnea (BSEB)):
 Carried out the fault rectification of secondary circuit of equipment of all G/S/S under transmission circle, Purnea viz
Purnea, Katihar, Naugachia, Saharsa, Khagaria
As Electrical Executive Engineer (Transmission Circle, Dehri-On-Sone (BSEB)):
 Handled HR work related to workmen as sanction of leave, over time, resolving workers problem through union
 Ensured effective maintenance of power supply to adjoin area & 132 HT consumer like Railway, Banjari cement, as
well as healthiness of interstate tie line from UP & Jharkhand
As Electrical Executive Engineer – Technical (Transmission Circle, Dehri-On-Sone (BSEB)):
 Administered and verified all workers related files & papers routed EEE.Tecnical, cheking of estmates, preparation of
tender papers, preparation of all report, and return to HQ
As Assistant Executive Engineer (Transmission Sub-Division – 2, Adityapur (Jamshedpur)):
 Spearheaded the Preliminary line survey, preparing of route diagram, route profile, tower spotting, Tower Schedule,
preparation of erection estimate of transmission lines, requirement of materials of 4 (four) nos. Transmission Lines:
o 132KV D/C Ramchandrapur (Jamshedpur) - Manoharpur
o 132KV D/C Ramchandrapur - Gamharia
o 132KV D/C Ramchandrapur - Jadugora
o 220KV D/C Ramchandrapur - Chandil
 Looked after the preparation of:
o Rly. Crossing drawing & questioners’
o Forest clearance
o PLCC clearance
 Supervised the construction of 132KV bays at 220/132KV G/S/S Ramchandrapur
As Assistant Executive Engineer (Transmission Sub-Division, Arrah):
 Single-handedly maintained the power supply to all connected to 33/11 KV Power Sub Station
As Assistant Executive Engineer (Turbine Maintenance - Patratu Thermal Power Station):
 Served as an In-charge of 4x110MW main Turbine i.e. Unit No. 6, 7, 8, 9 10
 Ensured smooth functioning of turbine, regeneration, Oil pups, centrifuge, oil systems, etc.
 Managed the Leakage of L.P heaters, condenser as well as the defects of chemical dozing pumps
 Key Assignments:
o 4 nos. Turbine bearings of Unit No. 10 were replaced in 1987, 2 mm generator pedestal of this unit which was up,
was machined at site
o 3 nos. turbine bearings of Unit No. 7 were replaced
o Damaged L.P turbine rotor of Unit No. 10 was replaced in the year 1988
o 2 nos. turbine bearings of Unit No. 9 were replaced in year 1989
As Assistant Executive Engineer (Operations):
 Handled overall control panel turbine, ball mills and electrical control based operations
Academic Details
 B.Sc. (Electrical Engineering) from Regional Institute of Technology, Jamshedpur (Presently NIT Jamshedpur) in YY’
Personal Details
Date of Birth: 28th June 1953
Address: F/402, Jagmano Sri Garden, Ved Nagar, Rukunpura, Patna, Bihar 800014
(Refer to Annexure for Major Projects)
ANNEXURE
As General Manager-cum-Chief Engineer (Barauni Thermal Power Station):
Major Project:
 This thermal Power Station have 2*110 MW which is called old Plant-const, unit 6&7.2*250MW under construction-
called New Plant
o Preparation of yearly Material budget; annual Cash budget, revised budget
o Take daily stock of progress of work by physically visiting site, through daily Co-ordination meeting, discussion
with working agency, officials, sub-ordinate official
o Unit No. 7 110 MW Unit was under R&M work at the time of taking over charge 2/12 while Unit No. 6 of 110MW
was under break down. Unit No. 6 made operation & achieved record generation in the month of February 2012, >
23 MU for the year 2011-12. Lowest Oil consumption 5.21ml/KWH, 17th March 2012 when the Unit put under
shut down for R&M work
o Unit No. 7 likely to commission by December 2013 & Unit No. 6 by March2014
o 2x250MW New Project
o Unique feature, plant work taken place on ash dyke 2nd in India after Ampara
o Soil investigation, topographical survey just started including DCPT, PLT, SPT, SRT. Levelling grading took place
o Most of Stone column, RCC pile completed
o Raft casting of chimney 3/8 segment completed
o Ganga Water pipe line corridor work in progress
o Erection of ESP, Boiler, Power House of both units under progress
o Boiler drum lifting of 1st Unit took place on 05/06/2013, 2nd Unit Plant on last week of June 2013
o Organise fortnightly meeting with vendors, BHEL, consultants, follow officials with monthly target weekly basis on
L 2 Schedule
As Electrical Superintending Engineer (BSEB) - Transmission Circle, Patna:
Major Project:
 At Patna Transmission Circle maintained 24 Hours quality Electicity as such following steps taken:
o A new 132 KV D/C Transmission line between Fatuha-Katra-Gaighat was constructed, charged
&commissinened.2nos 132 KV, 6 No 33KV bays at Fatuha was constructed.
o A new132/33KV G/S/S with 132 KV Transmission Line Digha (Patna) 132/33 KV G/S/S katra were constructed,
charged &commissioned
o Capacity of Grid s/s –Khagaul, Fatuha, Gaighat, Jakanpur, and Masaurhi was increased. Construction of
220/132/33kv G/S/S Sipara was in final stage of commissioning
o 132/33KV G/S/S Katra was constructed &commissioned.
As Electrical Superintending Engineer (Transmission Circle, Gaya (Bihar)):
Major Project:
 This is very important circle because two International religious places Bodh Gaya & Vishnupad Temple, power supply
was to be maintained along with Railway. Annual, routine maintenance of Transmission line &G/S/S were planned &
schedule was strictly followed & maintained

More Related Content

What's hot

Resume mep latest
Resume mep latestResume mep latest
Resume mep latestArun Das
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerSatish Tumbare
 
RE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICESRE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICESBerr Industry
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
CV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_intCV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_intashish saxena
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
BERR INDUSTRY - TR : PRESENTATION OF THE WORKS
BERR INDUSTRY - TR : PRESENTATION OF THE WORKSBERR INDUSTRY - TR : PRESENTATION OF THE WORKS
BERR INDUSTRY - TR : PRESENTATION OF THE WORKSBerr Industry
 
Engine and Turbine Power Plants Engineering and Commissioning Services
Engine and Turbine Power Plants Engineering and Commissioning ServicesEngine and Turbine Power Plants Engineering and Commissioning Services
Engine and Turbine Power Plants Engineering and Commissioning ServicesBerr Industry
 
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERjongguanzon
 
Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)PIYUSHKUMAR PRAJAPATI
 
2015 03 31 cv giovanni koolman.docx lattes update jan 2016
2015 03 31 cv giovanni koolman.docx lattes update jan 20162015 03 31 cv giovanni koolman.docx lattes update jan 2016
2015 03 31 cv giovanni koolman.docx lattes update jan 2016Giovanni Silvio Koolman
 
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanagermathavan2008
 

What's hot (20)

Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
Mahesh_Y_Patil
Mahesh_Y_PatilMahesh_Y_Patil
Mahesh_Y_Patil
 
RESUME_25_09_16
RESUME_25_09_16RESUME_25_09_16
RESUME_25_09_16
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation Engineer
 
Saikaat Saha CV
Saikaat Saha CVSaikaat Saha CV
Saikaat Saha CV
 
R.Kumar
R.KumarR.Kumar
R.Kumar
 
RE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICESRE-LOCATION ENGINEERING SERVICES
RE-LOCATION ENGINEERING SERVICES
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
CV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_intCV_ADS_oman_JULY_16_int
CV_ADS_oman_JULY_16_int
 
SASIdharan p CV
SASIdharan p CVSASIdharan p CV
SASIdharan p CV
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
BERR INDUSTRY - TR : PRESENTATION OF THE WORKS
BERR INDUSTRY - TR : PRESENTATION OF THE WORKSBERR INDUSTRY - TR : PRESENTATION OF THE WORKS
BERR INDUSTRY - TR : PRESENTATION OF THE WORKS
 
Engine and Turbine Power Plants Engineering and Commissioning Services
Engine and Turbine Power Plants Engineering and Commissioning ServicesEngine and Turbine Power Plants Engineering and Commissioning Services
Engine and Turbine Power Plants Engineering and Commissioning Services
 
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEER
 
Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)Instrument engineer resume 2year (1)
Instrument engineer resume 2year (1)
 
2015 03 31 cv giovanni koolman.docx lattes update jan 2016
2015 03 31 cv giovanni koolman.docx lattes update jan 20162015 03 31 cv giovanni koolman.docx lattes update jan 2016
2015 03 31 cv giovanni koolman.docx lattes update jan 2016
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
Rajesh CV -E & I
Rajesh CV -E & IRajesh CV -E & I
Rajesh CV -E & I
 
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
 

Viewers also liked

01 translation and interpretation
01 translation and interpretation01 translation and interpretation
01 translation and interpretationJonni Tapia
 
Raja Resume+
Raja  Resume+Raja  Resume+
Raja Resume+Raja T
 
Tecnologia.odt
Tecnologia.odtTecnologia.odt
Tecnologia.odthelengj20
 
Operating system; Multitasking
Operating system; MultitaskingOperating system; Multitasking
Operating system; MultitaskingFlameDimension95
 
Dfc2043 operating system; open & closed source systems
Dfc2043 operating system; open & closed source systemsDfc2043 operating system; open & closed source systems
Dfc2043 operating system; open & closed source systemsFlameDimension95
 

Viewers also liked (8)

Academic Transcript
Academic TranscriptAcademic Transcript
Academic Transcript
 
Enabling Spam filtering
Enabling Spam filteringEnabling Spam filtering
Enabling Spam filtering
 
01 translation and interpretation
01 translation and interpretation01 translation and interpretation
01 translation and interpretation
 
Raja Resume+
Raja  Resume+Raja  Resume+
Raja Resume+
 
Accounting standards
Accounting standardsAccounting standards
Accounting standards
 
Tecnologia.odt
Tecnologia.odtTecnologia.odt
Tecnologia.odt
 
Operating system; Multitasking
Operating system; MultitaskingOperating system; Multitasking
Operating system; Multitasking
 
Dfc2043 operating system; open & closed source systems
Dfc2043 operating system; open & closed source systemsDfc2043 operating system; open & closed source systems
Dfc2043 operating system; open & closed source systems
 

Similar to profile (20)

CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_Electrical
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_Electrical
 
CV Solar
CV SolarCV Solar
CV Solar
 
resume_GAUTAM_03112016
resume_GAUTAM_03112016resume_GAUTAM_03112016
resume_GAUTAM_03112016
 
NEW CV
NEW CVNEW CV
NEW CV
 
CV_Mahesh Prajapati
CV_Mahesh PrajapatiCV_Mahesh Prajapati
CV_Mahesh Prajapati
 
Resume
Resume Resume
Resume
 
Electrical engineer 5 Years Exp
Electrical engineer 5 Years ExpElectrical engineer 5 Years Exp
Electrical engineer 5 Years Exp
 
CV_Parulkar
CV_ParulkarCV_Parulkar
CV_Parulkar
 
vishwassharma5yearexp
vishwassharma5yearexpvishwassharma5yearexp
vishwassharma5yearexp
 
jose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resumejose varun-Technical - Assistant Facility Manager- resume
jose varun-Technical - Assistant Facility Manager- resume
 
Resume
ResumeResume
Resume
 
Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOM
 
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
 
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
 
CV - VAC-JUL 2015
CV - VAC-JUL 2015CV - VAC-JUL 2015
CV - VAC-JUL 2015
 
New Resume Ajay
New Resume AjayNew Resume Ajay
New Resume Ajay
 
New Resume JPSD
New Resume JPSDNew Resume JPSD
New Resume JPSD
 
Resume_Darpan Majumder1
Resume_Darpan Majumder1Resume_Darpan Majumder1
Resume_Darpan Majumder1
 
Bhushan warghane 1_
Bhushan warghane 1_Bhushan warghane 1_
Bhushan warghane 1_
 

profile

  • 1. Upendra Narayan Singh Contact: 09430840823 / E-Mail: unsinghese@gmail.com Result-oriented professional seeking senior managerial level assignments in Project Planning & Control with a leading organization of repute in Power Distribution & Transmission industry Profile Summary A seasoned professional with nearly 34 years of commendable success in: ~ Project Management ~ Transmission & Distribution ~ Plant Administration ~ Techno-commercial Operations ~ Erection & Commissioning ~ Cost Optimization ~ Procurement ~ MIS Reporting & Documentation ~ Inventory Control ~ Electrical & Mechanical Maintenance ~ HR & General Administration ~ Power Generation ~ Grid Management ~ Site Engineering ~ People Management  Deft in providing direction & structure for operating units in the field of Power Transmission & Distribution and EHV Sub-Stations / Thermal Power Stations  Expertise in handling invoicing & payment collection as well as in assisting the preparation and approval of standards  In-depth understanding of legal work related to electricity laws & environmental issues during construction of transmission lines and sub- stations  Well versed with the concepts of maintenance of transmission lines to achieve maximum availability of lines  Talent for proactively identifying & resolving problems, ramping up project activities with on time deliverables and maximizing efficiency  Experience in managing maintenance operations for reducing breakdown / downtime & enhancing operational effectiveness of equipment  An effective communicator with excellent relationship management skills and strong analytical, leadership, decision making, problem solving, planning & organizational abilities Career Milestones  Essayed a stellar role in the: o Operation & maintenance of 132/33/25 KV, 220/132/33KVG/S/S. Construction of 132/33KVG/S/S.&220/132/33KV Grid Sub Station o Construction of 2*250 MW Thermal Power Station o Preparation & Obtaining statutory clearances: Rly-Xing, Forest, PTCC  Expertise in handling: o Operation, maintenance of 110 MW Thermal Power Station o Transmission Line from Preliminary Survey, preparation of Route Diagram o Tower spotting, tower schedule, material requirement, estimate, construction of 132KV, 220 KV, transmission Line o Restoration of fallen tower 132KV, 220KV using Pylon or ERS  Holds the credit of handling project value cost of over Rs 1000 crore of thermal & 500 Crore of transmission system Core Competencies  Monitoring and executing power plant projects with respect to budgeted cost, demand forecasts & time over-runs to ensure their timely execution  Conducting cost benefit analysis of the projects including feasibility studies, assessment of the requirements, interface and commissioning; guiding the preparation and submission of offers for tender inquiries  Anchoring on-site erection & commissioning of plants and ensuring effective resource utilization to maximize the output; ascertaining compliance to safety, economical and technical assessments to secure the best economical results  Designing the HT/LT transmission & distribution systems for rural electrification works and handling the sizing of equipment, earthing & lighting and equipment layouts  Planning material and developing vendors for obtaining timely procurement of materials & equipment at cost effective prices to ensure smooth execution of projects  Monitoring quality systems & compliance with pre-set standards; troubleshooting and maintaining requisite documents to ensure complete in-process quality & improvement in process capabilities  Executing preventive & breakdown maintenance schedules of Turbines for improving overall reliability and safety  Working on succession planning of the workforce, shift management activities, appraising members’ performance & providing feedback
  • 2. Organizational Experience Jan’80-Jun’13 with Bihar State Power Generation Company Limited Growth Path / Deputations: Jan’80-Dec’86 Assistant Executive Engineer (Operations) Jan’87-Jul’89 Assistant Executive Engineer (Turbine Maintenance - Patratu Thermal Power Station) Aug’89-Mar’94 Assistant Executive Engineer (Transmission Sub-Division, Arrah) Apr’94-Jul’97 Assistant Executive Engineer (Transmission Sub-Division – 2, Adityapur (Jamshedpur)) Aug’97-May’02 Electrical Executive Engineer – Technical (Transmission Circle, Dehri-On-Sone (BSEB)) Jun’00-Oct’02 Electrical Executive Engineer (Transmission Circle, Dehri-On-Sone (BSEB)) Oct’02-Dec’04 Electrical Executive Engineer (Testing & Commissioning, Transmission, Circle, Purnea (BSEB)) Dec’04-Nov’05 Electrical Superintending Engineer (Transmission Zone, Gaya) Dec’05-Feb’07 Electrical Superintending Engineer (Transmission Circle, Gaya (Bihar)) Mar’07-Jun’08 Electrical Superintending Engineer (Project & Design, Board Head Quarter) Jul’08-Jan’12 Electrical Superintending Engineer (BSEB) - Transmission Circle, Patna Feb’12-Jun’13 General Manager-cum-Chief Engineer (Barauni Thermal Power Station) KEY RESULT AREAS As General Manager-cum-Chief Engineer (Barauni Thermal Power Station):  Entrusted with the responsibility of handling: o Administrative sanction & retrial benefit paper at Zone level worker & their payment o Implementation of order received from Head quarter in true sprit & letter. With over 400 staffs & 91 officers o Acquisition of land for ash dyke & ash corridor o Issues related to land displaced persons with different political parties.  Imparting training to acquire knowledge for development in Power Sector & their application for Plant betterment As Electrical Superintending Engineer (BSEB) - Transmission Circle, Patna:  Shouldered the responsibility of handling: o Sanction of Annual Increment of Workmen, GPF loan, Promotional aspect. Transfer & Posting, of worker, Audit report, cash& material annual budget of circle. Resolve workers problems through unions o 24 officers &165 workers to ensure uninterrupted &quality electricity to Capital town PATNA. As Electrical Superintending Engineer (Project & Design, Board Head Quarter):  Contributed in the Nuclear Plant to be established at Rajauli Bihar with detail studies  Carried out the scrutinization of new Power Plant plan submitted by private firm. Associated is obtaining statuary clearances as well as the detail study of PPA submitted by firm  Managed the clearance of electrical connection given for establishment of new industries in Bihar through State investment Promotion Board As Electrical Superintending Engineer (Transmission Circle, Gaya (Bihar)):  HR related work of workmen as sanction of loan, grant of leave, promotion, transfer & posting As Electrical Superintending Engineer (Transmission Zone, Gaya):  Managed the promotion of workman, Transfer & Posting of workman and Junior Engineers  Maintained technical data, Revenue statement, Sanction of estimate, tender, issue of work orders  Looked after the O&M work of all for four circles under this zone As Electrical Executive Engineer (Testing & Commissioning, Transmission, Circle, Purnea (BSEB)):  Carried out the fault rectification of secondary circuit of equipment of all G/S/S under transmission circle, Purnea viz Purnea, Katihar, Naugachia, Saharsa, Khagaria As Electrical Executive Engineer (Transmission Circle, Dehri-On-Sone (BSEB)):  Handled HR work related to workmen as sanction of leave, over time, resolving workers problem through union  Ensured effective maintenance of power supply to adjoin area & 132 HT consumer like Railway, Banjari cement, as well as healthiness of interstate tie line from UP & Jharkhand As Electrical Executive Engineer – Technical (Transmission Circle, Dehri-On-Sone (BSEB)):  Administered and verified all workers related files & papers routed EEE.Tecnical, cheking of estmates, preparation of tender papers, preparation of all report, and return to HQ As Assistant Executive Engineer (Transmission Sub-Division – 2, Adityapur (Jamshedpur)):  Spearheaded the Preliminary line survey, preparing of route diagram, route profile, tower spotting, Tower Schedule, preparation of erection estimate of transmission lines, requirement of materials of 4 (four) nos. Transmission Lines:
  • 3. o 132KV D/C Ramchandrapur (Jamshedpur) - Manoharpur o 132KV D/C Ramchandrapur - Gamharia o 132KV D/C Ramchandrapur - Jadugora o 220KV D/C Ramchandrapur - Chandil  Looked after the preparation of: o Rly. Crossing drawing & questioners’ o Forest clearance o PLCC clearance  Supervised the construction of 132KV bays at 220/132KV G/S/S Ramchandrapur As Assistant Executive Engineer (Transmission Sub-Division, Arrah):  Single-handedly maintained the power supply to all connected to 33/11 KV Power Sub Station As Assistant Executive Engineer (Turbine Maintenance - Patratu Thermal Power Station):  Served as an In-charge of 4x110MW main Turbine i.e. Unit No. 6, 7, 8, 9 10  Ensured smooth functioning of turbine, regeneration, Oil pups, centrifuge, oil systems, etc.  Managed the Leakage of L.P heaters, condenser as well as the defects of chemical dozing pumps  Key Assignments: o 4 nos. Turbine bearings of Unit No. 10 were replaced in 1987, 2 mm generator pedestal of this unit which was up, was machined at site o 3 nos. turbine bearings of Unit No. 7 were replaced o Damaged L.P turbine rotor of Unit No. 10 was replaced in the year 1988 o 2 nos. turbine bearings of Unit No. 9 were replaced in year 1989 As Assistant Executive Engineer (Operations):  Handled overall control panel turbine, ball mills and electrical control based operations Academic Details  B.Sc. (Electrical Engineering) from Regional Institute of Technology, Jamshedpur (Presently NIT Jamshedpur) in YY’ Personal Details Date of Birth: 28th June 1953 Address: F/402, Jagmano Sri Garden, Ved Nagar, Rukunpura, Patna, Bihar 800014 (Refer to Annexure for Major Projects)
  • 4. ANNEXURE As General Manager-cum-Chief Engineer (Barauni Thermal Power Station): Major Project:  This thermal Power Station have 2*110 MW which is called old Plant-const, unit 6&7.2*250MW under construction- called New Plant o Preparation of yearly Material budget; annual Cash budget, revised budget o Take daily stock of progress of work by physically visiting site, through daily Co-ordination meeting, discussion with working agency, officials, sub-ordinate official o Unit No. 7 110 MW Unit was under R&M work at the time of taking over charge 2/12 while Unit No. 6 of 110MW was under break down. Unit No. 6 made operation & achieved record generation in the month of February 2012, > 23 MU for the year 2011-12. Lowest Oil consumption 5.21ml/KWH, 17th March 2012 when the Unit put under shut down for R&M work o Unit No. 7 likely to commission by December 2013 & Unit No. 6 by March2014 o 2x250MW New Project o Unique feature, plant work taken place on ash dyke 2nd in India after Ampara o Soil investigation, topographical survey just started including DCPT, PLT, SPT, SRT. Levelling grading took place o Most of Stone column, RCC pile completed o Raft casting of chimney 3/8 segment completed o Ganga Water pipe line corridor work in progress o Erection of ESP, Boiler, Power House of both units under progress o Boiler drum lifting of 1st Unit took place on 05/06/2013, 2nd Unit Plant on last week of June 2013 o Organise fortnightly meeting with vendors, BHEL, consultants, follow officials with monthly target weekly basis on L 2 Schedule As Electrical Superintending Engineer (BSEB) - Transmission Circle, Patna: Major Project:  At Patna Transmission Circle maintained 24 Hours quality Electicity as such following steps taken: o A new 132 KV D/C Transmission line between Fatuha-Katra-Gaighat was constructed, charged &commissinened.2nos 132 KV, 6 No 33KV bays at Fatuha was constructed. o A new132/33KV G/S/S with 132 KV Transmission Line Digha (Patna) 132/33 KV G/S/S katra were constructed, charged &commissioned o Capacity of Grid s/s –Khagaul, Fatuha, Gaighat, Jakanpur, and Masaurhi was increased. Construction of 220/132/33kv G/S/S Sipara was in final stage of commissioning o 132/33KV G/S/S Katra was constructed &commissioned. As Electrical Superintending Engineer (Transmission Circle, Gaya (Bihar)): Major Project:  This is very important circle because two International religious places Bodh Gaya & Vishnupad Temple, power supply was to be maintained along with Railway. Annual, routine maintenance of Transmission line &G/S/S were planned & schedule was strictly followed & maintained