SlideShare a Scribd company logo
1 of 4
DARPAN MAJUMDER
National Park, Post- Naihati, Dist. 24 Parganas (N), Pin: 743165(West Bengal)
Contact: +91 9051511042, E-mail: darpan.majumder@gmail.com
ELECTRICAL ENGINEER
Seeking Middle Level Executive position across the EPC business of Power / Energy / Substation / Transmission & Distribution /
Railway Electrification / Consultancy / Design / Steel / Oil & Gas/ Water / Large Industrial or Real Estate Projects sector
PROFILE
 Qualified B.Tech (Electrical Engineering) form Academy of Technology under West Bengal University of Technology;
currently spearheading as Construction Engineer (Electrical) in Development Consultants Pvt. Ltd.
 Presently acquiring experience in MEP projects.
 Acquired experience in Restructured Accelerated Power Development & Reforms Programme (R-APDRP) project,
33/11KV Substation and Rural Electrification Projects under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY).
 Acquired knowledge in IT enabled Power Transmission & Distribution System Planning Studies and knowledge of
Advance Power System.
 Ability to manage and deliver projects to the highest standard, with meticulous attention to detail and within agreed
deadline.
PROFESSIONAL DETAILS
Total Experience : 07 Years 09 Months
Present Employer :
Development Consultants Pvt. Ltd. Since Apr’15
Construction Engineer (Electrical)
Spearheading electrical part of construction of Superspeciality Hospital for client Hooghly River Bridge Commissioner
(HRBC) under Backward Region Grant Fund (BRGF) at Kakdwip, West Bengal.
Client’s Designation: Field Engineer (Electrical)
Scope of work:
 Construction of indoor type 11/0.415 KV Sub-station with installation of 2x500 KVA Transformer for power supply,
HT and LT panels and 2x625 KVA DG set for power backup supply.
 HT and LT Underground cabling in multitier buried cable trench in open trenching method.
 Installation of all Pump Motors (LT type) and LT control panels for Motor Control Centre (MCC), HVAC,
Ventilation, Hot Water Boilers, Chillers, Gas Manifold, Under Ground Tank, Fire Fighting Tank, Sewerage
Treatment Plant (STP) & Effluent Treatment Plant (ETP).
 Installation of 4x15 KVA and 3x80 KVA UPS and Battery Bank.
 Installation of 20 Passengers lift having 15 KW 3Ph. Induction Motor, 13 Passengers lift having 9 KW 3Ph. Induction
Motor and one goods lift having 5.5 KW 3Ph. Induction Motor with power supply and control panels.
 Wiring of internal light, fan and power plug points and installation of VTPN DB, MDB, LDB and UPSDB.
 Erection of 20 meter high High Mast and 7.5m, 4.5m and 3.5m tubular poles with light fixtures for external/area
illumination.
 Installation of LV System like CCTV, MATV, Fire alarm, Nurse Calling System, Data & Voice communication
system, Aviation Light and Building Management System (BMS).
Key Responsibilities:
 Supervision of day to day work at site
 Monitoring of progress of work and follow up of progress as per L2 network. Preparation of progress report.
 Management Information System (MIS) of project status and review of planning.
Page 1 of 4
 Inspection of Field Quality Plan (FQP) as per Technical Specification.
 Verification of Supply and Erection Bills of executing agencies.
 Decision making on modification of drawing/layouts according to suit at site.
Previous Employers :
SPML Infra Ltd. (Formerly Subhash Projects & Marketing Ltd.) Since Jan’14 – Apr’15
Project Coordinator
Spearheaded, Executed and Coordinated Restructured Accelerated Power Development & Reforms Programme
(R-APDRP) Part-B project of Bhagalpur, Bihar for client South Bihar Power Distribution Company Ltd. (SBPDCL) from
Kolkata Head Office.
Key Responsibilities:
 Back to back responsibility to execute and complete project within time schedule and cost. Project Planning and
Progress Monitoring. Coordination with site for daily work and activities.
 Coordination with client and consultant (M/s Feedback Infra Pvt. Ltd.). Decision making in consultation with
management. Management Information System (MIS) of project for procurement and material management,
progress reporting etc.
 Attending client meeting and decision making in consultation with management.
 Preparation of revised Bill of Quantity (BoQ) based on survey.
 Analysing delay during procurement of material and execution, preparing recovery plan accordingly.
 Analysing various delay for seeking project time extension.
 Coordination with vendors for supply of materials and tracking material procurement status day to day basis.
 Preparation of Work Breakdown Structure (WBS), Cost Budget, Material Budget and implementation in SAP.
 Preparation of BAR chart/Revised BAR Chart, Budget, Vendor and Sub-contractor bill verification and release.
 Placing work order to sub-contractor in SAP.
 Posting Sales Bill in SAP
 Coordination with Sub-contractors to expedite execution of erection activity.
 Coordination with various intra office departments like Engineering, Purchase, Inspection, Accounts etc. to expedite
activities.
 Manpower management and Cost Management of project.
 Preparing Bill of Material (BoM) for store inventory management to implement Procam Wearehouse Software (PWS)
for ensuring sufficient stock availability at store and easy reconciliation.
POWER RESEARCH & DEVELOPMENT CONSULTANTS PVT. LTD. Since May ’11 – Jan’14
Project Coordinator
 Coordinated Restructured Accelerated Power Development & Reforms Programme (R-APDRP) Part-A project for West
Bengal & Sikkim, Jharkhand and North East States based out of Kolkata, West Bengal.
 Executed Power Distribution Planning for 12th
and 13th
five year plan for Assam Power Distribution Company Limited
(APDCL) funded by Assian Development Bank(ADB).
Project Name : Updating Load Forecasting and Power System Master Plan for Assam - PSMPA
Project Code : TA-8129 IND
 Executed Design of Disaster Proof Transmission & Distribution System in Brahmapur and Chatrapur Command Area of
OPTCL and SOUTHCO (an ADB funded project).
Key Responsibilities:
In R-APDRP (Part-A) Project:
 Integration of Network Analysis (MiPDAP) with Geographical Information System (GIS), Meter Data Acquisition
System (MDAS)-Meter Data Management (MDM), Energy Audit (EA) and New Consumer Connection/Customer
Relationship Management (CRM) under R-APDRP project.
 Providing technical clarification to client and other business partners and explaining business flow of the project.
Page 2 of 4
 Co-ordination with Client Offices and Corporate Office in Bangalore for implementation of time to time client
requirements and timely delivery of project.
 Attending Client Meetings and decision making consulting with management.
 Review of Project Planning and Monitoring of project status.
 Making monthly plan for invoice raising and timely follow up with client for release of payment against raised invoice.
 Checking the validity of electrical data for various components of Power Distribution System.
 Calculating Technical Loss by Load Flow Analysis of Power Distribution Network for evaluation of Aggregate Technical
& Commercial (AT&C) Loss.
 Conducting demonstration of the application to Client and System Integrator (SI), Functional Acceptance Test (FAT),
User Acceptance Test (UAT), Go-Live and User Training & Role Out of project.
In PSMPA Project:
 Data collection of electrical assets upto 33KV and collection of HT & LT consumer’s details.
 Performing Load Flow Analysis based on the collected data.
 Preparation of interim and final reports.
 Presentation of key observations and remedies to client regarding required capacity addition and augmentation of
Power and Distribution Transformers, Conductors and other Plant and Equipments (P&E) based on the Load flow
analysis reports.
 Incorporation of client’s feedback and decision making consulting with management.
In OPTCL & SOUTHCO Project:
 Design and Cost Estimation of 132KV, 33KV & 11 KV Under Ground Cable for Phailin affected areas.
 Design of Ring Main Supply system in 33KV network.
 Site survey and data collection from field for the designs.
 Preparation of Detail Project Report(DPR).
 Support to structural designing team for design of 33KV lattice & H pole structure and 11KV H pole structure for 33KV
and 11KV lines.
POWER GRID CORPORATION OF INDIA LIMITED Jan ’09 – May ‘11
Assistant Engineer - Electrical
 Spearheaded as Assistant Engineer in Rural Electrification/Distribution Management Services (DMS) Division at
Bhadrak, Orissa.
 Executed Rural Electrification Project under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) of Govt. Of India in
Bhadrak District (Orissa) in 309 villages including construction of 01 New and 09 Augmentation 33/11 KV Substations.
 Project planning and follow up of progress as per L2 network. Preparation of progress report.
 Management Information System (MIS) of project status and review of planning.
 Preparation of Revised Cost Estimation of project.
 Inspection of Field Quality Plan (FQP) as per Technical Specification.
 Verification of Supply and Erection Bills of executing agencies.
M/s IVRCL INFRASTRUCTURES & PROJECTS LIMITED July ’08 – Dec ‘08
Assistant Engineer – Trainee (Infrastructure Division) at Kharagpur, West Bengal
 Planed and executed the construction of Industrial Power Distribution System for Project Site Electrification and easy
access to electricity at various location of Heavy Engineering Equipment Assembly Plant of client, M/s Telco
Construction Equipment Company Limited (Telcon).
 Preparation of erection bills for electrical works as per BOQ.
EDUCATIONAL CREDENTIALS
B.Tech (Electrical Engineering) 2008
Academy Of Technology, West Bengal University of Technology, 75.60%
Page 3 of 4
Higher Secondary 2004
Naihati Narendra Vidyaniketan (H.S.), West Bengal Board of Higher Secondary Education, 53.60%
Madhyamick (Secondary) 2002
Bhatpara Amarkrishna Pathsala (H.S), West Bengal Board of Secondary Education, 76.12%
Computer Proficiency
 Operating System : Conversant with Windows 7, XP Environment
 Application : SAP (MM & SD), 2D Autocad Drawings, MS OFFICE
 Electrical Software : MiPOWER, MiPDAP
 Languages Known : C
PERSONAL DETAILS
Date of Birth : 3rd
August, 1986
Gender : Male
Nationality : Indian
Marital Status : Married
Passport No : G3764016
Languages Known : English, Hindi and Bengali
Hobbies : Learning Astrology, Listening to Music, Social Works
I hereby affirm that the above information furnished by me is true and correct.
DATE: 10/04/2015 (DARPAN MAJUMDER)
Page 4 of 4

More Related Content

What's hot

Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta
 
CV - S.Saravanan Mudaliar (Network Planning & GIS)
CV - S.Saravanan Mudaliar (Network Planning & GIS)CV - S.Saravanan Mudaliar (Network Planning & GIS)
CV - S.Saravanan Mudaliar (Network Planning & GIS)Saravanan Mudaliar
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15Santosh Singh
 
cv_amitava_updated
cv_amitava_updatedcv_amitava_updated
cv_amitava_updatedAMITAVA DAS
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerSatish Tumbare
 
Resume Rohan Badadhe
Resume Rohan BadadheResume Rohan Badadhe
Resume Rohan Badadherohan badadhe
 
CS Design Engineer
CS Design EngineerCS Design Engineer
CS Design EngineerJOSE MANAHAN
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)Reddy Premnath
 
Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis
 
Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...
Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...
Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...IJPEDS-IAES
 

What's hot (20)

Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
SRao_cv
SRao_cvSRao_cv
SRao_cv
 
CV - S.Saravanan Mudaliar (Network Planning & GIS)
CV - S.Saravanan Mudaliar (Network Planning & GIS)CV - S.Saravanan Mudaliar (Network Planning & GIS)
CV - S.Saravanan Mudaliar (Network Planning & GIS)
 
CURRICULUM VITAE - Asif
CURRICULUM VITAE - AsifCURRICULUM VITAE - Asif
CURRICULUM VITAE - Asif
 
Resume - Shobhit
Resume - ShobhitResume - Shobhit
Resume - Shobhit
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
Engr. Asim Mahmood CV
Engr. Asim Mahmood CVEngr. Asim Mahmood CV
Engr. Asim Mahmood CV
 
MASP-QA-CV-2016-A
MASP-QA-CV-2016-AMASP-QA-CV-2016-A
MASP-QA-CV-2016-A
 
Resume
ResumeResume
Resume
 
cv_amitava_updated
cv_amitava_updatedcv_amitava_updated
cv_amitava_updated
 
Rajesh CV -E & I
Rajesh CV -E & IRajesh CV -E & I
Rajesh CV -E & I
 
E, Control & Instrumentation Engineer
E, Control & Instrumentation EngineerE, Control & Instrumentation Engineer
E, Control & Instrumentation Engineer
 
Resume Rohan Badadhe
Resume Rohan BadadheResume Rohan Badadhe
Resume Rohan Badadhe
 
CS Design Engineer
CS Design EngineerCS Design Engineer
CS Design Engineer
 
Ramabrahmachary Sattenapalli
Ramabrahmachary SattenapalliRamabrahmachary Sattenapalli
Ramabrahmachary Sattenapalli
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017
 
Pdv narasimha rao 7+
Pdv narasimha rao 7+Pdv narasimha rao 7+
Pdv narasimha rao 7+
 
Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...
Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...
Real Coded Genetic Algorithm Based Improvement of Efficiency in Interleaved B...
 
Electrical engineer 5 Years Exp
Electrical engineer 5 Years ExpElectrical engineer 5 Years Exp
Electrical engineer 5 Years Exp
 

Similar to Resume_Darpan Majumder1

Similar to Resume_Darpan Majumder1 (20)

ikbal resume
ikbal resumeikbal resume
ikbal resume
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016
 
krishnaraj CV1
krishnaraj CV1krishnaraj CV1
krishnaraj CV1
 
Manish MBA-PM
Manish  MBA-PMManish  MBA-PM
Manish MBA-PM
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.
 
RAJPAL @cv
RAJPAL @cvRAJPAL @cv
RAJPAL @cv
 
CV Solar
CV SolarCV Solar
CV Solar
 
Lakhdeep Singh CV
Lakhdeep Singh CVLakhdeep Singh CV
Lakhdeep Singh CV
 
SUDHAKAR DIVYAPATI
SUDHAKAR DIVYAPATISUDHAKAR DIVYAPATI
SUDHAKAR DIVYAPATI
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated Resume
 
Resume-Smita
Resume-SmitaResume-Smita
Resume-Smita
 
Jaydeep_Resume
Jaydeep_ResumeJaydeep_Resume
Jaydeep_Resume
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_Electrical
 
CV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_ElectricalCV_ Sayantan Ghosh_B.Tech_Electrical
CV_ Sayantan Ghosh_B.Tech_Electrical
 
Resume-Sagar-1
Resume-Sagar-1Resume-Sagar-1
Resume-Sagar-1
 
T.chandramouli O & M_ele
T.chandramouli O & M_eleT.chandramouli O & M_ele
T.chandramouli O & M_ele
 
T.chandramouli O & M_Electrical
T.chandramouli O & M_ElectricalT.chandramouli O & M_Electrical
T.chandramouli O & M_Electrical
 
SOUMEN-RESUME
SOUMEN-RESUMESOUMEN-RESUME
SOUMEN-RESUME
 
JOVIN RESUME
JOVIN RESUMEJOVIN RESUME
JOVIN RESUME
 

Resume_Darpan Majumder1

  • 1. DARPAN MAJUMDER National Park, Post- Naihati, Dist. 24 Parganas (N), Pin: 743165(West Bengal) Contact: +91 9051511042, E-mail: darpan.majumder@gmail.com ELECTRICAL ENGINEER Seeking Middle Level Executive position across the EPC business of Power / Energy / Substation / Transmission & Distribution / Railway Electrification / Consultancy / Design / Steel / Oil & Gas/ Water / Large Industrial or Real Estate Projects sector PROFILE  Qualified B.Tech (Electrical Engineering) form Academy of Technology under West Bengal University of Technology; currently spearheading as Construction Engineer (Electrical) in Development Consultants Pvt. Ltd.  Presently acquiring experience in MEP projects.  Acquired experience in Restructured Accelerated Power Development & Reforms Programme (R-APDRP) project, 33/11KV Substation and Rural Electrification Projects under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY).  Acquired knowledge in IT enabled Power Transmission & Distribution System Planning Studies and knowledge of Advance Power System.  Ability to manage and deliver projects to the highest standard, with meticulous attention to detail and within agreed deadline. PROFESSIONAL DETAILS Total Experience : 07 Years 09 Months Present Employer : Development Consultants Pvt. Ltd. Since Apr’15 Construction Engineer (Electrical) Spearheading electrical part of construction of Superspeciality Hospital for client Hooghly River Bridge Commissioner (HRBC) under Backward Region Grant Fund (BRGF) at Kakdwip, West Bengal. Client’s Designation: Field Engineer (Electrical) Scope of work:  Construction of indoor type 11/0.415 KV Sub-station with installation of 2x500 KVA Transformer for power supply, HT and LT panels and 2x625 KVA DG set for power backup supply.  HT and LT Underground cabling in multitier buried cable trench in open trenching method.  Installation of all Pump Motors (LT type) and LT control panels for Motor Control Centre (MCC), HVAC, Ventilation, Hot Water Boilers, Chillers, Gas Manifold, Under Ground Tank, Fire Fighting Tank, Sewerage Treatment Plant (STP) & Effluent Treatment Plant (ETP).  Installation of 4x15 KVA and 3x80 KVA UPS and Battery Bank.  Installation of 20 Passengers lift having 15 KW 3Ph. Induction Motor, 13 Passengers lift having 9 KW 3Ph. Induction Motor and one goods lift having 5.5 KW 3Ph. Induction Motor with power supply and control panels.  Wiring of internal light, fan and power plug points and installation of VTPN DB, MDB, LDB and UPSDB.  Erection of 20 meter high High Mast and 7.5m, 4.5m and 3.5m tubular poles with light fixtures for external/area illumination.  Installation of LV System like CCTV, MATV, Fire alarm, Nurse Calling System, Data & Voice communication system, Aviation Light and Building Management System (BMS). Key Responsibilities:  Supervision of day to day work at site  Monitoring of progress of work and follow up of progress as per L2 network. Preparation of progress report.  Management Information System (MIS) of project status and review of planning. Page 1 of 4
  • 2.  Inspection of Field Quality Plan (FQP) as per Technical Specification.  Verification of Supply and Erection Bills of executing agencies.  Decision making on modification of drawing/layouts according to suit at site. Previous Employers : SPML Infra Ltd. (Formerly Subhash Projects & Marketing Ltd.) Since Jan’14 – Apr’15 Project Coordinator Spearheaded, Executed and Coordinated Restructured Accelerated Power Development & Reforms Programme (R-APDRP) Part-B project of Bhagalpur, Bihar for client South Bihar Power Distribution Company Ltd. (SBPDCL) from Kolkata Head Office. Key Responsibilities:  Back to back responsibility to execute and complete project within time schedule and cost. Project Planning and Progress Monitoring. Coordination with site for daily work and activities.  Coordination with client and consultant (M/s Feedback Infra Pvt. Ltd.). Decision making in consultation with management. Management Information System (MIS) of project for procurement and material management, progress reporting etc.  Attending client meeting and decision making in consultation with management.  Preparation of revised Bill of Quantity (BoQ) based on survey.  Analysing delay during procurement of material and execution, preparing recovery plan accordingly.  Analysing various delay for seeking project time extension.  Coordination with vendors for supply of materials and tracking material procurement status day to day basis.  Preparation of Work Breakdown Structure (WBS), Cost Budget, Material Budget and implementation in SAP.  Preparation of BAR chart/Revised BAR Chart, Budget, Vendor and Sub-contractor bill verification and release.  Placing work order to sub-contractor in SAP.  Posting Sales Bill in SAP  Coordination with Sub-contractors to expedite execution of erection activity.  Coordination with various intra office departments like Engineering, Purchase, Inspection, Accounts etc. to expedite activities.  Manpower management and Cost Management of project.  Preparing Bill of Material (BoM) for store inventory management to implement Procam Wearehouse Software (PWS) for ensuring sufficient stock availability at store and easy reconciliation. POWER RESEARCH & DEVELOPMENT CONSULTANTS PVT. LTD. Since May ’11 – Jan’14 Project Coordinator  Coordinated Restructured Accelerated Power Development & Reforms Programme (R-APDRP) Part-A project for West Bengal & Sikkim, Jharkhand and North East States based out of Kolkata, West Bengal.  Executed Power Distribution Planning for 12th and 13th five year plan for Assam Power Distribution Company Limited (APDCL) funded by Assian Development Bank(ADB). Project Name : Updating Load Forecasting and Power System Master Plan for Assam - PSMPA Project Code : TA-8129 IND  Executed Design of Disaster Proof Transmission & Distribution System in Brahmapur and Chatrapur Command Area of OPTCL and SOUTHCO (an ADB funded project). Key Responsibilities: In R-APDRP (Part-A) Project:  Integration of Network Analysis (MiPDAP) with Geographical Information System (GIS), Meter Data Acquisition System (MDAS)-Meter Data Management (MDM), Energy Audit (EA) and New Consumer Connection/Customer Relationship Management (CRM) under R-APDRP project.  Providing technical clarification to client and other business partners and explaining business flow of the project. Page 2 of 4
  • 3.  Co-ordination with Client Offices and Corporate Office in Bangalore for implementation of time to time client requirements and timely delivery of project.  Attending Client Meetings and decision making consulting with management.  Review of Project Planning and Monitoring of project status.  Making monthly plan for invoice raising and timely follow up with client for release of payment against raised invoice.  Checking the validity of electrical data for various components of Power Distribution System.  Calculating Technical Loss by Load Flow Analysis of Power Distribution Network for evaluation of Aggregate Technical & Commercial (AT&C) Loss.  Conducting demonstration of the application to Client and System Integrator (SI), Functional Acceptance Test (FAT), User Acceptance Test (UAT), Go-Live and User Training & Role Out of project. In PSMPA Project:  Data collection of electrical assets upto 33KV and collection of HT & LT consumer’s details.  Performing Load Flow Analysis based on the collected data.  Preparation of interim and final reports.  Presentation of key observations and remedies to client regarding required capacity addition and augmentation of Power and Distribution Transformers, Conductors and other Plant and Equipments (P&E) based on the Load flow analysis reports.  Incorporation of client’s feedback and decision making consulting with management. In OPTCL & SOUTHCO Project:  Design and Cost Estimation of 132KV, 33KV & 11 KV Under Ground Cable for Phailin affected areas.  Design of Ring Main Supply system in 33KV network.  Site survey and data collection from field for the designs.  Preparation of Detail Project Report(DPR).  Support to structural designing team for design of 33KV lattice & H pole structure and 11KV H pole structure for 33KV and 11KV lines. POWER GRID CORPORATION OF INDIA LIMITED Jan ’09 – May ‘11 Assistant Engineer - Electrical  Spearheaded as Assistant Engineer in Rural Electrification/Distribution Management Services (DMS) Division at Bhadrak, Orissa.  Executed Rural Electrification Project under Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) of Govt. Of India in Bhadrak District (Orissa) in 309 villages including construction of 01 New and 09 Augmentation 33/11 KV Substations.  Project planning and follow up of progress as per L2 network. Preparation of progress report.  Management Information System (MIS) of project status and review of planning.  Preparation of Revised Cost Estimation of project.  Inspection of Field Quality Plan (FQP) as per Technical Specification.  Verification of Supply and Erection Bills of executing agencies. M/s IVRCL INFRASTRUCTURES & PROJECTS LIMITED July ’08 – Dec ‘08 Assistant Engineer – Trainee (Infrastructure Division) at Kharagpur, West Bengal  Planed and executed the construction of Industrial Power Distribution System for Project Site Electrification and easy access to electricity at various location of Heavy Engineering Equipment Assembly Plant of client, M/s Telco Construction Equipment Company Limited (Telcon).  Preparation of erection bills for electrical works as per BOQ. EDUCATIONAL CREDENTIALS B.Tech (Electrical Engineering) 2008 Academy Of Technology, West Bengal University of Technology, 75.60% Page 3 of 4
  • 4. Higher Secondary 2004 Naihati Narendra Vidyaniketan (H.S.), West Bengal Board of Higher Secondary Education, 53.60% Madhyamick (Secondary) 2002 Bhatpara Amarkrishna Pathsala (H.S), West Bengal Board of Secondary Education, 76.12% Computer Proficiency  Operating System : Conversant with Windows 7, XP Environment  Application : SAP (MM & SD), 2D Autocad Drawings, MS OFFICE  Electrical Software : MiPOWER, MiPDAP  Languages Known : C PERSONAL DETAILS Date of Birth : 3rd August, 1986 Gender : Male Nationality : Indian Marital Status : Married Passport No : G3764016 Languages Known : English, Hindi and Bengali Hobbies : Learning Astrology, Listening to Music, Social Works I hereby affirm that the above information furnished by me is true and correct. DATE: 10/04/2015 (DARPAN MAJUMDER) Page 4 of 4