Janardan Pratap Singh Dubey is seeking a senior manager position with over 10 years of experience in electrical engineering projects, operations and maintenance, testing, and teaching. He has a master's degree in high voltage engineering and relevant work experience planning, designing, supervising and maintaining transmission lines, substations, and industrial distribution systems. His specialized areas include project management, training, high voltage testing, and electrical consultancy.