1. CARRICULAM VITAE
Proposed Position: Sr. MANAGER (Project, Training & High Voltage Testing & consultancy)
Name ofFirm : ASDC, Mumbai
Name ofStaff : Janardan Pratap Singh Dubey
Profession : Sr. Manager (Electrical)
Date ofBirth : 27th
Sep. 1984
Nationality : Indian
Membership with
Professional Societies : National Safety council of India
Confederation of Engineers (India)
Consulting Engineers Association Of India
The Indian Institution of Engineers
Life time member of Indian Nuclear Society, IIT Mumbai
Member Editorial Board, IJCEM , IIT Madras
Electrical Supervisor Licensee
Red Ribbon Club, Rewa
Key Qualification:
Mr. Janardan Pratap Singh Dubey is a post graduate in electrcial Engineering having more than 10.5 years of
prfoessional experience in electrcial engineeing Project, O&M, Testing as well as Teaching work. His work
experience encompasses planing, detailed design, supervison of excution and maintenance of transmission lines,
LV & HV substations and Industrial disribution system, checking, testing and comissoning of grid subsatains
metering and protection system. I have worked in 6 Projects & 1 Engineering College Project as well as
teaching. I have given a best performance in EPC Project work, Head of Electrical Department, Training
Placement Cell , Media Cell, Examination Cell & NSS Cell as a Incharge. I am always ready to relocate in short
term or Long term Project work in anywhere india & abroad. My specilised area is given in the Resume.
Educational Details :
1. M.E. (HIGH VOLTAGE) ENGINEERING 68.77% FROM JEC,JABALPUR 2011
2. B.E.(Electrical) from Jabalpur engineering college,2006 with 62 %
3. Diploma (Electrical) from Govt. Polytechnic college Waidhan,2003 with 77.78%
2. 4. Diploma (Railway Engineering) from IPWE, New Delhi
5. NCC B Certificate.
6. GATE Percentile 79.96 in 2008 conducted by I.I.Sc. BANGLORE
7. Electrical Supervisor Licensee from Chief Electrical Inspector Bhopal May 2015 (MP)
DOJ : 25 March 2015 on Project
Anuptech Skill Development Centre , Rabale, Mumbai
General Manager (Training & High Voltage Testing
Project : Validation of Engineers, supervisors, Technicians Working in World Lagest Reliance Oil
Refinaries Jamnagar (Gujrat)
Detailed Tasks Assigned:
Training & evaluation of All Engineers, Electrical Technician & Supervisor and Issue Cirtificate
Assesment Work for Following Trades of Technician , Supervisor & Engineer. Prepairing
Question papers & Practicle Examination setup for All electricals Trades as well as Safety.
Validation of All Technician , supervisor & Engineers working under Vedors of Ril Jamnagar.
Training on Electrical Satefy
Trainining on Electrical Operation & Maintenance
Training on Routine maintenance , Preventice maintenance with Different Check Formats
Training on Bruero of Indian Standard (IS) Rules & International Standard Rules , Indian
Electricity Rules & Industrial Safety Rules & Check Format
Different type Electrical Project Work Testing
Electrical , Civil & Mechanical Testing for Electrical Projects
Planning , Supervision, Preparation of Check formats , Making Schedule for work completion
& Achievement of Targets
Sub Station (Operation & Maintenance , Project Work
Cathodic protection technician
HVAC
Motor Maintenance
Lift, Bucket, EOT
Battery & charger
Testing of LV & HV switch gear, Transformer , UPS
Misc. technicians like EDMS, Security automation, support service
Electrical Testing
NABL Accreditation Work & Lab Setting
ISO Related Work
02 APRAIL 2014 to date 31 DEC 2014 (10 Month) National Highway Authority of India
Independent Engineer (Electrical) Renardet S.A
Position on Project
3. Detailed Tasks Assigned:
The Electrical Engineer shall be responsible for supervising the electrcial works of highway to be
constructed by the Concessionaire for this project.
Independent Engineer services for Four laning of Jalgaon-Maharashtra/Gujarat Border section of
NH-6 from441.950 TO 650.794 under NHDP Phase-IV in the state of Maharashtra on BOT(TOLL)
basis (Package No. NHAI/Tech//11019/Amt- Gmh/Pkg-II/2011)
Measument of Work Quantity
Joint measurment of Work
Billing & Work inspection
Inspection of Work asPer IS, BIS & Indian Electricity Rules
Corrdinating With MSEB Electrical officers for Shifting of Electrical Lines& Work Petrmitt
Inspection for following Electrical sefty Rulesin Construction Work
Checking of Electrical & Work safety during Construction Work
Submitting third party observation Report to NHAI Officials
Direct coordination & Repoting with PIU & Project DirectorPrasant Fegde (PD Panvel-Pune
Highway)
DoJ: 04Feb 2011 to Till 23.03.2016
Position : Regular
Jawaharlal Nehru college of Technology , Rewa (MP)
Head Of Department , Director –Training & Placement , Media Incharge , NSS Incharge
Job Scope and Responsibilities:
Monitoring of All Classes in Branch
Teaching Special Subject High Voltage , Power System Operation & Protection , Energy Audit , Power
system Economics ,Planning & Preparation for Practical Work as well as Mid semester Examination
Review deployment of manpower, material and equipment for College & Maintenance of 33KV Sub
Station .
Miantenance of All College Labs from Electrical Side
Maintenance of DG Set 125KVA
Maintenance & Supervision of Electrical Equipments
Maintenance & Supervision of Solar Project installed in College
Maintain day-to-day project dairy, recording all events pertaining to the execution of work.
Conduct International ,National Seminar & Conferences on intennational Issues of Power
Assist the Chairman & Director in preparation of final Daily reports & Planning .
Check / conduct tests on Electrical Equipment As per Electricity Rules.
Maintain all the records as required.
Prepare Weekly, Monthly and Quarterly Progress Reports.
Prepare new electrical Project in Genaration of Power (Solar & Wind )
Planning for Training & Placement of M.E., B.E. & Diploma Students .
Maintenance of Electrical Equipments .
Conduct Seminar , National Conference , Internal & External Examination .
4. Prepaire Thisis , Minor & Major Project Reports.
Conduct Practicle & Test Examination
Work as Astt. Examination Suptt. In Makhanlal chaturvedi Patrakarita Vishwa Vidyalaya BHOPAL
2times
In charge National service scheme JNCT Rewa
Media In charge & Public Relation Officer JNCT, Manage daily news Activities in News Papers
Director Training & Placement Cell, Conducting Placement & Special Training Program
Preparing semester examination Question paper & answer book checking for RGPV & Other
Universities
Energy Auditing for JNCT & security system maintenance
Tendering & Documentation for college Canteen ,security, vehicle & civil work
Environment Incharge forPlantation ,Training and motivation of students & Public awareness program
Feb 2009 to date Feb 2011 POWER GRID CORPORATION OF INDIA LIMITED
Asst. Engineer (Electrical) TL & SS Project
Position : Contract Period 2year
765 KV and 400 KV Substation / Transmission near Gaya college more Gaya(Bihar)
1.Funded by : Ministry of Energy
Project cost : INR 765 crores
Length :354 km (double circuit)
Funded by : Ministry of Energy
Project cost : INR 154 crores
Length :215 km (double circuit)
Funded by : PGCIL –STERLITE TRANSMISSION COMPANY
VENDOR : BAJAJ ELECTRICALS
INSPECTION : Moody International Pvt Ltd Kolkata
Project cost : INR 154 crores
Length :215 km (double circuit)
Funded By : APTransmission Company Limited
Company : Sterling & Wilson (Tata Group)
Project Cost :
Work : 400KV , 63MVAR Bus Reactor & Bay Extention Work in Vishakhapattanam (Vizag)
Funded By : AP Transmission company Limited
5. Job Scope and Responsibilities:
Monitor and supervise works as per PGCIL Manual & Specification
Review finalization of Tower construction & Stringging Schedule and alignment of Transmission
Line
Solve Right of Way Problems
Issue compensation
Monitoring of construction , Erection & Stringging Work of 400 KV Transmission Line
Monitoring of Construction Work in HVDS Sceme in Gaya District Funded by Ministry of Energy
Joint Measurement Work & Follow TS & Work quality Plan for Site Activities
Follow Work Progress Report & Reporting to DGM
Project Work 132KV Gaya –Tekari Transmission Line Foundation , Erection & Stringing Work
Project Work 400KV Maithan –Gaya Transmission Line Foundation , Erection & Stringing Work
With ROW Problem & Crop Compensation
Metering Work JMC for LT & HT Meter in Gaya, Jahanabad, Nawada, Aurangabad District
132kv Wazirganj Substation Project work
132 KV Sub Station Goh Foundation Work & Control Room Civil Work
Project management of 400kv transmission line, 4OO KV Sub station Civil works, Erection, testing,
commissioning, staff management, SF Quality control, billing, routine and surprise visiting of sites.
Contractor management
400KV double circuit Civil works/erection/testing/pre commissioning testing/commissioning
testing/ commissioning/ handling over of sub station and Transmission line planning, surveying,
foundation, erection, stringing and testing. Tower earthing both pipe and counter poise. Testing,
commissioning and handing over.
4OOKV SS Bay Extension Work Vizag of AP Transco , Vishakhapattanam (Vizag) for Sterling &
Wilson Kolkata
400KV Transmission Project Work Purniya-Nawada Transmission Line for Sterlite Group
Apr 2007 to feb 2009 M/s.Anant Spinning Mills (Vardhman Textiles Ltd )
Engineer (O&M , Project)
Position : Regular
Erection of 132 kv Sub station, 1.6 Km Transmission Line & 16mva Transformer& Operation & Maintenance
of 33 KV Running SubStation
Client : MPKVVCL Bhopal MP
Funded by : Vardhman Textiles Ltd , Mandideep Bhopal
Project cost : INR 13.00 crores
Length :1.6 km (Single Circuit)
6. Job Scope and Responsibilities:
Assist Electrical Inspector Office bhopal For Drawing Approval
Responsible for Prevantive maintenance & Routine Mainenance
Planning & supervision for Routine, Preventive maintenance
Finalise the Drawing & Designing Work for New 132Kv Sub station
Implement of Industrial & Eletctrical Sefty Rules during Project Work & Supervision
Proper storage of Minar & Major Electrical Equipments
Purchasing of Electrical Equipments with help of SAP Software
Day-to-day site inspection for timely Completion of Project Work
Laying Of LT / HT Cable & Cable fault detection With Help of Cable fault Locator .
Maintenance of 24KV DG Set Wartsill From Electrical Side
Maintenance of HVAC Equipments
Maintenance & Testing of Transformer , Breaker, Relay Bus Bar, Capacitor Bank , Cable , Cable
Tray , Earthing , Grounding , AC Motor
Ensure that the field tests are conducted as per the frequency, relevant codes and specifications.
Maintenace of Daily , Weekly & Monthly Records for
Take measurements and keep measurement records, as per the directions from the C.E.O./Vice
President (Technical)
Maintain inspection reports, site records
Monitor progress of work and implementation of the construction & maintenance program.
Checking of Concessionaire's site reports for regular maintenance.
Ensure that the works are being executed as per approved standards and codes as Per MPEB ,
Bhopal.
132/33/.433kv KV substation operation, maintenance & erection. Textiles plant
substation maintenance.
24 MW power plants Erection from Electrical side.
24 MW dg Wartsilla operation and maintenance
O&M of All LV & HV (PM /CM /RM) Electrical equipments
July 2006 to Mar 2007 JBS Pvt Ltd Bhopal
(Shift Incharge Operation )
Position :Regular
Power Grid Sub Station , Khadarpara (Silvassa)
Client : Power Grid
Funded by : Power Grid Corporation of India Ltd
Project cost : INR 12 crores annual maintenance of PGCIL 400 KV Sub station
Job Scope and Responsibilities:
Monitoring of Load Shedding & Load Distribution
7. Review deployment of manpower, material and equipment.
Maintain day-to-day project dairy, recording all events pertaining to the execution of work.
Follow daily, Weekly , Monthly , Quarterly , Half Yearly , Yearly maintenance of Electrical
Equipment
Assist the Team Leader in preparation of final Daily reports.
Check / conduct tests on Electrical Equipment to check there suitability for construction, ensure and
implement QA/QC procedures.
Maintain all the records as required.
Prepare Weekly, Monthly and Quarterly Progress Reports.
Assist in recording / layout of works and levels required at every stage of work.
400 KV substation /operation and maintenance.
1. Member Professional Organization of India
National Safety council of India
Confederation of Engineers (India)
Consulting Engineers Association Of India
The Indian Institution of Engineers
Life time member of Indian Nuclear Society ,IIT Mumbai
CONFRENCES /PAPER PRESENTATION :
International conference in VIT, Vellore
International conference in MANIT, Bhopal
National conference in Jabalpur engineering college, Jabalpur
National conference in Jabalpur engineering college, Jabalpur
National conference at IIT Roorkee 2011
International Summit 2012 , American Nuclear society, organized at IIT Mumbai
National Summit 2015 , Indian Nuclear society, organized at Atomic Energy Regulatory
Board Mumbai
Workshop on VLSI & Embedded System , Navigator Technology for Industrial Research &
Development , 18-19 March 2014
PROJECT UNTERTAKEN:
Manual Control of Stepper Motor”. B.E. 5th
Semester JEC Jabalpur
Transient Analysis of D.C. Motor. B.E. 7th
Semester In JEC Jabalpur
Partial Discharge Measurement & analysis of cable joints in High Voltage Cable. M.E. Thesis 4TH
Sem
On line condition monitoring of power transformer . 1st
sem M.E. Project
Recent trends of Earthing in Extra high voltage R&D.
8. Repairing & Maintenance of EHV Transformer
Calculation & Measurement of Soil Resistivity for High Voltage Lab
Calculation of Transformer Faults & Age Through Condition Monitoring
Training:
Power transformer maintenance program (7 Days) Jabalpur Engineering college.
NTPC (VINDHYA NAGAR) 2 MONTH Training Program in all CHP, Generation of power, Power
transmission
MPPTCL (Singroulli) Two Month Training Program in 132KV Substation operation and
Maintenance.
15 days training on partial discharge testing of High Voltage Cable by Universal Cable Ltd., Satna
2 Days workshop on Interactual Property & Patent Under Ministry of Small and Medium scale
Industry, Indore
Tifac Centre for Relevance & Excellence in High Voltage & Power System Engineering , Jabalpur
Engineering College 1 week Training Program on High Voltage Testing from 06.10.2010 to
13.10.2010
Tifac Centre for Relevance & Excellence in High Voltage & Power System Engineering , Jabalpur
Engineering College 1 week Training Program on High Voltage Transformer Maintenance from
14.02.2011 to 21.02.2011
10 days Workshop on data management system Under Faculty development Program at
IIT,MUMBAI
14 Days Workshop on analogue Electronics Under faculty development Program at IIT,Kharagpur.
7 days Short term course in power economics at IIT , Kanpur
02 days International Summit 2012 on Nuclear power at IIT Mumbai.
2days International Conference at IIT Mumbai by American Nuclear Society U.S.
7days Special Training on Digital Security by Kyrion Pvt Ltd
Interested Subject
Basic electrical Engineering
MATLAB (Basics)
COMPUTER AIDDED DESIGN OF MACHINE
ENERGY CONSERVATION
HIGH VOLTAGE & POWER SYSTEM
POWER SYSTEM ECONOMICS
POWER SYSTEM
Auto-Cad
Os-cad
9. Extra Educational Activities :
Book Writing on Ancient Indian Sage: Their Invention & Contribution in world social society
Examination Paper Setter (RKDF University, SVNU Sagar, SVSTU Raipur)
Answer Book Checking Panel (RGPV for BE & Diploma, SVSTU, RKDFU)
External Examination panel (RGPV, SVSTU, RKDF, JP Polytechnic Rewa, VITS Satna, Aditya
Engineering College Satna)
Member, Red Ribbon Club, District Hospital Rewa
In charge, National Service Scheme JNCT Rewa
Member of International Journal & Council:
Mentor, Institute for Research and Development India (IRD India) , Bangalore
Member, Editorial Board, IJIRCCE Chennai, ISBN 2320 9798
Research Paper Published:
1. Global Journal of multi displinary studies, ISSN 2348 0459 volume 4, Issue 5 , April 2015, Impact
factor 2.389, Topic : Modeling of high voltage transformer & Power Transformers of High Frequency
2. Distributed Generation a: A Future generation for Power, National Conference on recent Trends in
engineering and Technology, Yashwantrao Chavan college of Engineering, 17-18 February 2011.
3. A renewable energy source : Tidal Power , National conference on energy conservation for
sustainable development , 18-19 February 2011, Gyan Ganga Institute of technology and science,
Jabalpur Sponsored by Ministry of New & renewable energy (Govt. of India), AICTE New Delhi,
MP Council for science & Technology , Bhopal
4. Recent Trends’ in High voltage cable Joints , International conference on “ Advances in
communication , Embedded System and computing” 14-15 january 2011 , Sagar institute of research
and technology , Bhopal in collaboration with CSI, Bhopal Chapter & IETE Bhopal Chapter
5. HV Measurement Techniques , Workshop on “ High Voltage Testing Techniques ” RTL Noida , 17
Oct 2014
6. Testing of Pre payment Meters as per IS 15884: 2010 & Some Others Testing Recommendation
“Workshop JNCT Rewa 10-11 January 2015.
7. Study, Modeling, And Experimental Analysis Of Partial Discharge In Solid Dielectric Material With
Cavity JPS Dubey & DPS Dubey
8. Neuro fuzzy trajectory generation of robotic rehabilitation therapyUsing MATLAB
9. Measurement techniques of high voltage earthing and grounding
10. Diagnostic Tools For Condition Monitoring Of Power Transformers:A Review
Research Interest:
Civil, Mechanical, Electrical Testing
Specific Field Quality Plan in Electrical EHV Projects
10. Collecting Ancient Knowledge from Vedas and Hindu Sahitya
Implementation of Research Methodology in Social & Technical Areas
Extra Activities:
Conduct Education Seminar for Improving Knowledge of Indian Law in Panchayat
Human Rights Awareness Program in Villages
Education quality Improvement Program in Village Higher Secondary Schools
Skill Development Program in Panchayat
Awareness Program through Social & Print Media
Conduct Awareness Program for Government Policies in Rural Areas.
Conduct Seminar & Workshop for Nashamukti in Urban & Rural Areas.
Work for Improve Employment in rural areas & Provide employment in Urban Areas
Area of Interest:
New Project Related to Public Welfare & Starting Innovative Business
Electrical Project, O&M,Testing & Valuation work in Transmission & Distribution System.
Engineering Teaching & Training
Assessment of Electrical workers
Develop New Projects for Industrial Growth
Any Challenging Work
Making large Public & official network for growth of Company
Search new Technology
Study of foreign technology & Research Work
Awards :
Awarded By Jawaharlal Nehru College of Technology for Placement of 215 students in Session
2013-14
Awarded By Jawaharlal Nehru College of Technology for Installation of CCTV in major Project
Work in may 2013. As Best Guide in College for Useful Project.
Awarded By Jawaharlal Nehru College of Technology for Installation of Solar Power Plant in major
Project Work in may 2014. As Best Guide in College for Useful Project.
Awarded By Jawaharlal Nehru College of Technology for Installation of 2 Audio Video
Announcement System in all classes & Auditorium Hall in major Project Work in may 2015. As Best
Guide in College for Useful Project.
Awarded By Jawaharlal Nehru College of Technology for Placement of 215 students in Session
2013-14
Awarded By Jawaharlal Nehru College of Technology for Installation of wind Power Plant in major
Project Work in May 2014. As Best Guide in College for Useful Project
Awarded By Jawaharlal Nehru College of Technology for Adding the Name in National Service
Scheme APS University Rewa.
11. Awarded by PGCIL ER-1 Patna for Completing the 132 KV Substation Wazirganj Bihar within 14
month.
Awarded by PGCIL ER-1 Patna for completing the 90% Metering Work in Gaya, Jahanabad, Nawada
& Aurangabad District within 23 month with 90.
Awarded By Jawaharlal Nehru College of Technology for All seats in M.E. (HVPS) in 2014-15
Session.
Awarded for Conduct Seminar on Nasha Mukti Abhiyan in Rewa by Jan Abhiyan Parishad.
Awarded for Best Coordinator in Bichchiya River Cleaning in Rewa by Jan Abhiyan Parishad
District AIDS Control Unit Rewa Awarded for Speech on Control & Prevention of AIDS in Rewa
District
Current salary:- Last Package 12.5 Lakh CTC per Year
Expected Salary:- Negotiable
Personal Details :
Name: Janardan Pratap Singh Dubey
Father’s name: Mr. Narendra Pratap Singh Dubey
Sex: Male
Date of Birth: 27th
Sep. 1984
Height : 178 cms
Weight: 72kgs
Eyesight: Normal
Hobbies: lead the generation in positive direction, Reading new research on web & contact with high
profile person in free time & Social Work .
Family Details:
Father: NPS Dubey (Retd. Post Master) Waidhan
Mother: Kusum Dubey (Primary Head Master Govt. Primary School, Waidhan)
Wife: Dr. Ruchi Tiwari (Housewife) Govt. College Mauganj Rewa
Daughter 2, Brother 2 (Unmarried, Under Competitive Exam Preparation, Completed M.Tech. In High
Voltage ), Sister -1 (Completed BE Civil Unmarried & Preparation for Govt Examination)
Correspondence Address :-
C/o Naresh Singh Tiwari , Infront of IG Office , Sirmour Chouraha Rewa (MP) 486001
Permanent Address :
C/o Shri Narendra Pratap Singh Dubey (Retd. Head Post Master)
Post office: Amlory Project , MQ-632 , Near SwaraswatiSchool Distt. Singroulli (M.P.) 486887
Mo. 09425179254
12. References:-
1. Prasant Fegde,Project Director , NHAI Dhule & Panvel
2. Sivaji Pawar (Manager-Technical) NHAI Dhule
3. Dr. A.K.Sharma (HOD) Electricaldepartment Jabalpur Engineering College, Jabalpur
4. Dr. A.K. Tiwari Executive Engineer T,raining Centre MPKVVCL,Jabalpur
5. Md. Ajmal , Chief Manager RHQ -PGCIL Patna
6. Mr. C.C.Prasad (DGM),Transmission line 765& 400KV Power grid Gaya Bihar
7. Mr. Ram Nivash ( DGM) DMS/RE Power grid Gaya(Bihar)
8. Mr. Shishir Das (Director Finance) Ministry of Power New Delhi
9. Mr. Swetabh Verma (Dy. Manager) Power finance corporation of India Ltd. New Delhi
10. Mr. T.P.KUNDU (Sr. V.P.),Sterling & Wilson Ltd, Kolkata
11. Dr. S C Choubey (HOD ) Electrical Department UIT .RGPV BHOPAL
12. Dr. S S Tiwari Chairman JNCT Rewa
13. Dr. S.N. Singh IIT ,Kanpur
14. Dr. Vimal Kumar. IIT Kanpur
15. Mr. Anup Nair MD, ASDC Mumbai
Languages:
Language Read Write Speak
English Yes Yes Yes
Hindi Yes Yes Yes
Certification by the Candidate:
I, the undersigned, Janardan Pratap Singh Dubey, C/o NPS DUBEY (Retrd . SPM) Post office Devsar (Jiyawan)
District Singrouli (MP) 486882 undertake that this CV correctly describes myself, my qualifications
and my experience and Employer would be at liberty to debar me if any information given in the CV, in
particular the Summary of Qualification & Experience vis-à-vis the requirements as per TOR is found
incorrect. I further undertake that I have neither been debarred by any Organization nor left any
assignment.
I hereby declare that all the information given above is true and I hold the responsibility of its
authenticity.
DATE 21/07/2016 Signature
PLACE MUMBAI Janardan Pratap Singh Dubey