SlideShare a Scribd company logo
1 of 7
Applied for the Post of Contract Manager
CURRICULUM VITAE
Name : Iftikhar Hussain
Father’s Name : Mujtaba Hussan
Date of Birth / Age : 16 December 1972/42 years
CNIC No : 36302-9476292-1
Passport No : YQ6892921
Marital Status : Married
Phone : +92-300-0695399
Email : sqsiftikhar@gmail.com
Mailing Address : House No 20, Block-Y
Lane No 7, New Multan
Multan
Academic Qualification (1) Master of Business
Administration
(2) PGD (Software
Engineering)
(3) Diploma of Assistant
Engineer (Civil)
Computer Skill : Computer Skill in following
System Management
Programs:-
(1) Auto CAD
(2) Eagle Point (Ver 98)
(3) Microsoft Windows
(4) Microsoft Office
(5) Special working approach
in Microsoft Excel
Key Activities / Duties
(1) Responsible for managing all project costs from pitch to completion.
(2) Preparation / Verification of Project Estimation / Project Cost.
(3) Preparation / Verification of Interim Payment Certificates.
(4) Preparation / Verification of Escalation / Delay Payment Certificates.
(5) Preparation / Verification of Idling / Other Claims.
(6) Preparation of Prequalification / Enlistment / Up Gradation of Category
Documentation.
(7) Developing strong relationships with the clients and sub contractors.
(8) Undertaking costs analysis for construction projects.
(9) Writing reports and advising on construction costs.
(10) Attending meetings and liaising with stakeholders on commercial matters.
(11) Preparing tender and contract documents.
(12) Monitoring the cost of site resources.
(13) Providing advice and guidance to staff in the preparation and presentation of
works proposals, reviews and updates.
Experience 23 Years
Osmani and Company (Pvt) Ltd
(From January 2016 todate)
Serving in Consultants as a Senior Quantity Surveyor and working on
Construction of Metro Bus System from BZU to Chungi No 6 Package-1:-
Responsibilities
a. Preparation / Verification of Revised Project Cost / Variation Order.
b. Verification of Bills of Contractors.
c. Verification of Variation Orders,
d. Verification of Rate Analysis of Project Items, and
e. Other project relevant documents.
Zahir Khan and Brothers
(From June 2015 to January 2016)
Served in Contractor as a Contract Manager and worked on Construction of
Metro Bus Fly and Rotary from Chungi No 6 to Fish Market (4345 Million
Cost):-
Responsibilities
1. Provide necessary technical Guidance to staff in:-
a. Preparation of Interim Payment Certificates.
b. Verification of Bills of Sub Contractors.
c. Preparation of Variation Orders,
d. Preparation of Rate Analysis, and
e. Other project relevant documents.
2. Participating, as necessary, in developing the solicitation and writing the
draft documents. Contract administration must be considered during this
process.
3. Monitoring the contractor’s progress and performance.
4. Documenting significant events.
5. Maintaining appropriate records.
6. Meeting with the concerned authorities on a regular basis to review
progress, discuss problems and consider necessary changes.
Maaksons (Pvt) Ltd
(From November 2014 to June 2015)
Serving in Contractor as a Contract Manager and worked on following projects
of (1174 Million Cost):-
a. Construction of Main Sheikhupura Road, Sheikhupura.
b. Construction of Sharqpur Road, Sheikhupura.
Responsibilities
1. Provide necessary technical Guidance to staff in:-
a. Preparation of Interim Payment Certificates.
b. Verification of Bills of Sub Contractors.
c. Preparation of Variation Orders,
d. Preparation of Rate Analysis, and
e. Other project relevant documents.
2. Participating, as necessary, in developing the solicitation and writing the
draft documents. Contract administration must be considered during this
process.
3. Monitoring the contractor’s progress and performance.
4. Documenting significant events.
5. Maintaining appropriate records.
6. Meeting with the concerned authorities on a regular basis to review
progress, discuss problems and consider necessary changes.
Zeeruck ~ Loya (JV)
(From June 2014 to October 2014)
Serving in Supervisory Consultants as a Quantity Surveyor and worked on
following projects:-
a. Construction of Bosan Road, Multan
b. Construction of Fly Over at Chungi No 06, Multan
Responsibilities
a. Verification of Interim Payment Certificates.
b. Verification of Escalation Bills/Claim/Delay Payment Certificate.
c. Verification of Variation Orders, and Other project relevant documents.
Habib Rafiq Limited
(From August 2013 to May 2014)
Serving in Contractor as a Senior Quantity Surveyor and worked on following
projects:-
a. Construction of Gray Structure of Grand Hotel and Resort.
b. Construction of Gray Structure of Terraced 31 Residental Complex in
Bahria Town Phase-7
Responsibilities
a. Preparation of Interim Payment Certificates.
b. Verification of Bills of Sub Contractors.
c. Preparation of Variation Orders, Rate Analysis and Other project
relevant documents.
Frontier Works Organisation (FWO)
(From Apr 2012 to Aug 2013)
Serving in Contractor as a Cheif Quantity Surveyor and worked on following
projects:-
a. Construction of Shaheed Benazir Bhutto Bridge Linking N-5 with N-55 at
Chacharan (1.2 Km)
b. Construction of Additional Carriageway on Sehwan – Ratodero Section
(200 Km) Section – IV
Responsibilities
a. Vetting of IPCs/Escalations.
b. Project Execution Plan.
c. Verification of Bills of Sub Contractors.
d. Preparation of Variation Orders.
e. Other project related documents.
RMC Constructions
(From 19 Feb 2011 to Apr 2012)
Serving in Contractor as a Chief Quantity Surveyor and worked on
(1) Construction of Fly Over (Package-1) at Chowk Kumharan Wala, Multan
including approaches & roads.
(2) Construction of Tool Plaza Complex including offices & residential area.
Responsibilities
a. Vetting of IPCs/Escalations.
b. Verification of Bills of Sub Contractors.
c. Preparation of Variation Orders.
d. Preparation of Reply of letter of Sponsor and other departments.
e. Checking of Bills of Supplier and Sub-Contractor.
f. Other project related documents.
Limak JV ZKB
(From April 2010 to February 2011)
Served in Contractor as a Chief Quantity Surveyor and worked on 150 Km
Road Project from Qila Saifullah to Zhob (24 Bridges and 800 Culverts).
Responsibilities
a. Vetting of IPCs/Escalations.
b. Verification of Bills of Sub Contractors.
c. Preparation of Final Bill of last 50 Km project from Muslim Bagh to Qila
Saifullah.
Asif Ali and Associates
(From December 2008 to April 2010)
Served in Consultants as a Quantity Surveyor and working on Project
Dualization / Strengthing of Road (Six Lane) from Vehari Chowk to Chowk
Kumharan Wala Project.
Responsibilities
a. Vetting of IPCs/Escalations.
b. Preparation of Project Estimates.
c. Vetting of Escalation Claims.
d. Preparation Project Report for Sponsor (NHA).
e. Other project related documents.
Frontier Works Organisation (FWO)
(From January 1993 to December 2008)
Served as a Quantity Surveyor and worked on following projects:-
(1) Construction of Ratto Dero ~ Ghaus Pur Road
(2) Big City Development Package, Bahawalpur.
(3) Construction of Dual Carriageway (N-5) Rahim Yar Khan to Taranda
Muhammad Pannah.
(4) WAPDA Employees Cooperative Housing Scheme Phase-I (Ext) and
Phase-II.
(5) Dualization of Railway Track from Khanewal to Raiwind
Responsibilities
a. Preparation and Vetting of IPC.
b. Preparation of Execution Plan.
c. Preparation Escalation Claims.
d. Preparation Project Report.
e. Checking of Bills of Supplier and Sub-Contractor.
f. Other project related documents.

More Related Content

What's hot

What's hot (20)

PP1 Project 1 Project implementation
PP1 Project 1 Project implementationPP1 Project 1 Project implementation
PP1 Project 1 Project implementation
 
PP1 Project 2 Project Report
PP1 Project 2 Project ReportPP1 Project 2 Project Report
PP1 Project 2 Project Report
 
Seminar - Question
Seminar - QuestionSeminar - Question
Seminar - Question
 
CV Aug. 2016 - Ali Ayyad
CV  Aug. 2016 - Ali AyyadCV  Aug. 2016 - Ali Ayyad
CV Aug. 2016 - Ali Ayyad
 
Defects liability
Defects liabilityDefects liability
Defects liability
 
CV waqar Azeem QS
CV waqar Azeem QSCV waqar Azeem QS
CV waqar Azeem QS
 
ICI Project 2 - Building and process & sample document
ICI Project 2 - Building and process & sample documentICI Project 2 - Building and process & sample document
ICI Project 2 - Building and process & sample document
 
CV_Civil_Engineer
CV_Civil_EngineerCV_Civil_Engineer
CV_Civil_Engineer
 
Pathway guide quantity_surveying_construction_dwl_pt
Pathway guide quantity_surveying_construction_dwl_ptPathway guide quantity_surveying_construction_dwl_pt
Pathway guide quantity_surveying_construction_dwl_pt
 
EC Barnes-CV
EC Barnes-CVEC Barnes-CV
EC Barnes-CV
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Detailed Experiance - REV01
Detailed Experiance - REV01Detailed Experiance - REV01
Detailed Experiance - REV01
 
Fidic comparison red yellow - silver book
Fidic comparison red   yellow - silver bookFidic comparison red   yellow - silver book
Fidic comparison red yellow - silver book
 
Eng. Ahmed Yhia
Eng.  Ahmed YhiaEng.  Ahmed Yhia
Eng. Ahmed Yhia
 
Quantity surveyingguide
Quantity surveyingguideQuantity surveyingguide
Quantity surveyingguide
 
Mohamed khamis
Mohamed khamisMohamed khamis
Mohamed khamis
 
WORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-IWORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-I
 
JPResume
JPResumeJPResume
JPResume
 
C V -
C V -C V -
C V -
 
Nit55
Nit55Nit55
Nit55
 

Similar to CV Iftikhar Hussain - 12-4-16 (20)

CV Muhammad Kashif Khan
CV Muhammad Kashif KhanCV Muhammad Kashif Khan
CV Muhammad Kashif Khan
 
Furrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity SurveyorFurrukh Shahzad CV Quantity Surveyor
Furrukh Shahzad CV Quantity Surveyor
 
CV Shehzad SQS
CV Shehzad SQSCV Shehzad SQS
CV Shehzad SQS
 
Project Manager CV -Rev
Project Manager CV -RevProject Manager CV -Rev
Project Manager CV -Rev
 
CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)
 
AYMAN HELMY_CV
AYMAN HELMY_CVAYMAN HELMY_CV
AYMAN HELMY_CV
 
Mukesh__CV_SQS_QS
Mukesh__CV_SQS_QSMukesh__CV_SQS_QS
Mukesh__CV_SQS_QS
 
Mohamed Abuzaid CV
Mohamed Abuzaid CVMohamed Abuzaid CV
Mohamed Abuzaid CV
 
Kamal Farid CV
Kamal Farid CVKamal Farid CV
Kamal Farid CV
 
Cv of Shadrul with Pic
Cv of Shadrul with PicCv of Shadrul with Pic
Cv of Shadrul with Pic
 
Eng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract EngineerEng's Nisar CV for Sr QS & Contract Engineer
Eng's Nisar CV for Sr QS & Contract Engineer
 
CV Shreenivash Chandra
CV Shreenivash ChandraCV Shreenivash Chandra
CV Shreenivash Chandra
 
experience letters in canada dubai bangladesh singapore.PDF
experience letters in canada  dubai bangladesh singapore.PDFexperience letters in canada  dubai bangladesh singapore.PDF
experience letters in canada dubai bangladesh singapore.PDF
 
CV Hassan Abbas
CV Hassan AbbasCV Hassan Abbas
CV Hassan Abbas
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
C.V
C.VC.V
C.V
 
Q130302108111
Q130302108111Q130302108111
Q130302108111
 
ICI MAGAZINE
ICI MAGAZINE  ICI MAGAZINE
ICI MAGAZINE
 
CV_Saifullah Khalid-
CV_Saifullah Khalid-CV_Saifullah Khalid-
CV_Saifullah Khalid-
 
Giang CV
Giang CVGiang CV
Giang CV
 

CV Iftikhar Hussain - 12-4-16

  • 1. Applied for the Post of Contract Manager CURRICULUM VITAE Name : Iftikhar Hussain Father’s Name : Mujtaba Hussan Date of Birth / Age : 16 December 1972/42 years CNIC No : 36302-9476292-1 Passport No : YQ6892921 Marital Status : Married Phone : +92-300-0695399 Email : sqsiftikhar@gmail.com Mailing Address : House No 20, Block-Y Lane No 7, New Multan Multan Academic Qualification (1) Master of Business Administration (2) PGD (Software Engineering) (3) Diploma of Assistant Engineer (Civil) Computer Skill : Computer Skill in following System Management Programs:- (1) Auto CAD (2) Eagle Point (Ver 98) (3) Microsoft Windows (4) Microsoft Office (5) Special working approach in Microsoft Excel
  • 2. Key Activities / Duties (1) Responsible for managing all project costs from pitch to completion. (2) Preparation / Verification of Project Estimation / Project Cost. (3) Preparation / Verification of Interim Payment Certificates. (4) Preparation / Verification of Escalation / Delay Payment Certificates. (5) Preparation / Verification of Idling / Other Claims. (6) Preparation of Prequalification / Enlistment / Up Gradation of Category Documentation. (7) Developing strong relationships with the clients and sub contractors. (8) Undertaking costs analysis for construction projects. (9) Writing reports and advising on construction costs. (10) Attending meetings and liaising with stakeholders on commercial matters. (11) Preparing tender and contract documents. (12) Monitoring the cost of site resources. (13) Providing advice and guidance to staff in the preparation and presentation of works proposals, reviews and updates. Experience 23 Years Osmani and Company (Pvt) Ltd (From January 2016 todate) Serving in Consultants as a Senior Quantity Surveyor and working on Construction of Metro Bus System from BZU to Chungi No 6 Package-1:- Responsibilities a. Preparation / Verification of Revised Project Cost / Variation Order. b. Verification of Bills of Contractors. c. Verification of Variation Orders, d. Verification of Rate Analysis of Project Items, and e. Other project relevant documents.
  • 3. Zahir Khan and Brothers (From June 2015 to January 2016) Served in Contractor as a Contract Manager and worked on Construction of Metro Bus Fly and Rotary from Chungi No 6 to Fish Market (4345 Million Cost):- Responsibilities 1. Provide necessary technical Guidance to staff in:- a. Preparation of Interim Payment Certificates. b. Verification of Bills of Sub Contractors. c. Preparation of Variation Orders, d. Preparation of Rate Analysis, and e. Other project relevant documents. 2. Participating, as necessary, in developing the solicitation and writing the draft documents. Contract administration must be considered during this process. 3. Monitoring the contractor’s progress and performance. 4. Documenting significant events. 5. Maintaining appropriate records. 6. Meeting with the concerned authorities on a regular basis to review progress, discuss problems and consider necessary changes. Maaksons (Pvt) Ltd (From November 2014 to June 2015) Serving in Contractor as a Contract Manager and worked on following projects of (1174 Million Cost):- a. Construction of Main Sheikhupura Road, Sheikhupura. b. Construction of Sharqpur Road, Sheikhupura. Responsibilities 1. Provide necessary technical Guidance to staff in:- a. Preparation of Interim Payment Certificates. b. Verification of Bills of Sub Contractors.
  • 4. c. Preparation of Variation Orders, d. Preparation of Rate Analysis, and e. Other project relevant documents. 2. Participating, as necessary, in developing the solicitation and writing the draft documents. Contract administration must be considered during this process. 3. Monitoring the contractor’s progress and performance. 4. Documenting significant events. 5. Maintaining appropriate records. 6. Meeting with the concerned authorities on a regular basis to review progress, discuss problems and consider necessary changes. Zeeruck ~ Loya (JV) (From June 2014 to October 2014) Serving in Supervisory Consultants as a Quantity Surveyor and worked on following projects:- a. Construction of Bosan Road, Multan b. Construction of Fly Over at Chungi No 06, Multan Responsibilities a. Verification of Interim Payment Certificates. b. Verification of Escalation Bills/Claim/Delay Payment Certificate. c. Verification of Variation Orders, and Other project relevant documents. Habib Rafiq Limited (From August 2013 to May 2014) Serving in Contractor as a Senior Quantity Surveyor and worked on following projects:- a. Construction of Gray Structure of Grand Hotel and Resort. b. Construction of Gray Structure of Terraced 31 Residental Complex in Bahria Town Phase-7 Responsibilities a. Preparation of Interim Payment Certificates. b. Verification of Bills of Sub Contractors.
  • 5. c. Preparation of Variation Orders, Rate Analysis and Other project relevant documents. Frontier Works Organisation (FWO) (From Apr 2012 to Aug 2013) Serving in Contractor as a Cheif Quantity Surveyor and worked on following projects:- a. Construction of Shaheed Benazir Bhutto Bridge Linking N-5 with N-55 at Chacharan (1.2 Km) b. Construction of Additional Carriageway on Sehwan – Ratodero Section (200 Km) Section – IV Responsibilities a. Vetting of IPCs/Escalations. b. Project Execution Plan. c. Verification of Bills of Sub Contractors. d. Preparation of Variation Orders. e. Other project related documents. RMC Constructions (From 19 Feb 2011 to Apr 2012) Serving in Contractor as a Chief Quantity Surveyor and worked on (1) Construction of Fly Over (Package-1) at Chowk Kumharan Wala, Multan including approaches & roads. (2) Construction of Tool Plaza Complex including offices & residential area. Responsibilities a. Vetting of IPCs/Escalations. b. Verification of Bills of Sub Contractors. c. Preparation of Variation Orders. d. Preparation of Reply of letter of Sponsor and other departments. e. Checking of Bills of Supplier and Sub-Contractor. f. Other project related documents.
  • 6. Limak JV ZKB (From April 2010 to February 2011) Served in Contractor as a Chief Quantity Surveyor and worked on 150 Km Road Project from Qila Saifullah to Zhob (24 Bridges and 800 Culverts). Responsibilities a. Vetting of IPCs/Escalations. b. Verification of Bills of Sub Contractors. c. Preparation of Final Bill of last 50 Km project from Muslim Bagh to Qila Saifullah. Asif Ali and Associates (From December 2008 to April 2010) Served in Consultants as a Quantity Surveyor and working on Project Dualization / Strengthing of Road (Six Lane) from Vehari Chowk to Chowk Kumharan Wala Project. Responsibilities a. Vetting of IPCs/Escalations. b. Preparation of Project Estimates. c. Vetting of Escalation Claims. d. Preparation Project Report for Sponsor (NHA). e. Other project related documents. Frontier Works Organisation (FWO) (From January 1993 to December 2008) Served as a Quantity Surveyor and worked on following projects:- (1) Construction of Ratto Dero ~ Ghaus Pur Road (2) Big City Development Package, Bahawalpur. (3) Construction of Dual Carriageway (N-5) Rahim Yar Khan to Taranda Muhammad Pannah. (4) WAPDA Employees Cooperative Housing Scheme Phase-I (Ext) and Phase-II. (5) Dualization of Railway Track from Khanewal to Raiwind
  • 7. Responsibilities a. Preparation and Vetting of IPC. b. Preparation of Execution Plan. c. Preparation Escalation Claims. d. Preparation Project Report. e. Checking of Bills of Supplier and Sub-Contractor. f. Other project related documents.