Process Safety Information
Process Safety
Information
Philosophy
 EPCL believes that Process Safety
Information package is necessary to:
 Provide a description of the chemical process
or operation.
 Foundation for identifying and understand the
hazard involved, which is the first step in the
PSRM effort.
Process Safety Information
 It is the First Step in the Process Safety Management effort
and consists of three parts:
 Hazards of Materials
 Process Design Basis
 Equipment Design Basis, including Safety Critical
Equipment
 PSI Package shall be prepared for each process unit.
 Documents of PSI package will be maintained up-to-date – for
the life of each process unit.
 Where the original technical information no longer exists,
information shall be developed
Hazards of Materials
 Material Safety Data Sheets (MSDS) are primary
source. The hazard information must contain:
 Permissible Exposure Limits, TLV (NH3 = 25 ppm)
 Physical Data, such as:
 Boiling point, Freezing point, Vapor pressure, Flammability
limits, Combustion range,
 Reactivity Data
 Shall contain Environmental Impact due to
Inadvertent Leakage or Spillage
 Hazard information communicated to and readily
available to all relevant employees
Process Design Basis - Requirements
 Process Flow Diagram – Flow Path, Major Equipment and
Material / Energy balances.
 Process Description including:
 Purpose of the Process / Major Equipment
 How the Process Works & Process chemistry
 Any Side / Runaway Reactions
 Standard Operating Conditions, Understanding and
Consequences
 Maximum Intended Inventories – Inherently Safer Design
 Alarm and Interlock Summary
 Data History, Change History and References for Operating
Conditions / Alarms, Equipment, Inspections, etc.
Equipment Design Basis –
Requirements
 Design Basis Documented (Calculations, Schematics, Drawings
etc) for:
 PSVs, PRVs and Vent systems
 Protective Safety Systems – ESD, Shutdown and Isolation
Systems etc.
 P&IDs
 Interlock Instrument / Electrical Schematics / Settings
 Alarms, Communication Systems and Monitoring Device
 Electrical Classification
 Fire Protection Systems, including Fire Water Supply
 Detection and suppression systems
Equipment Design Basis – SC
Equipment
 Equipment Specification Drawings and
Sheets
 Quality Assurance Inspection Reports.
 Design codes and standards employed.
 Pump specifications and characteristics
 Piping systems / Pipe and Valve Codes.
 Electrical Diagrams, Electrical Grounding and
Bonding design.
Equipment Design Basis –
Miscellaneous
Equipment design basis documentation to be
included when relevant to process safety for:
 Architectural and Civil Engineering Drawings.
 Piping Flexibility Analysis (including special or spring
hangers and sliding supports).
 Equipment Arrangement Drawings.
 Insulation, Paint and Tracing Codes.
 Plant and Area Maps (e.g., Underground Services).
 Control of Vendor Manuals
PSI Package
Hazards of
Materials
Process Design
Basis
Equipment Design
Basis
Higher
Hazard
Process
Lower Hazard
Operation
Safety
Critical
Equipment
Non-Safety Critical
Equipment
Safety
Critical Top
Level
Document
• Design Basis &
Calculations
• Specification Sheets
Drawings
• Purchase Specifications
SC Equipment List Development
Process
Identify HHP (Higher Hazard
Process) Criteria
Identify Hazardous
Substances
OSHA and EPA Regulated
Chemicals
List Major Safety Critical
Equipment
Define Management of PSI
Package
Team Methodology
Documentation of SC
Equipment
Safety Critical Equipment
Lists
Make SC Top Level
Document
Mention SC Equipment on
P&IDs
Contents of SC Top Level Document
A
Identification of
Hazardous
Substances
B
Criteria of
Higher Hazard
Process (HHP)
C
Identification of
HHP activities
E
Identification of
Safety Critical
Equipment
(Excluding
Devices)
D
Criteria of
Safety Critical
Equipment
F
Management of
Safety Critical
Top Level
Document
Identify Hazardous Substances
 List each Hazardous Chemical Quantity in area
 Concentrations
 Hazardous event and identify applicable chemicals on the
site “safety critical hazardous substances” list (attachment).
 Each chemical should be in one of three groups as follows:
 OSHA / EPA regulated chemicals
 EPCL standard for HHP chemicals and
 Area concern critical chemicals.
 Operating Area is responsible for:
 Considering a Chemical as Safety Critical based on
thresholds
 Document precisely what exactly is and what is not safety
critical.
 Chemical Classification Table shall be developed to ascertain
that the area has considered all the chemicals.
HHP Criteria – OSHA / EPA / DuPont
 Various activities may require a Risk Based Consequence
Analysis to classify them as HHP or LHO activities
Sr. No. Criteria Threshold Standard Remarks
1
High and Moderate Acute
Toxicity Materials
Substance
Specific (VCM &
Cl2)
OSHA, EPA
Regulated
Chemicals
OSHA, EPA
2
Quantities of Pressurized
Fuel Gases
Pressure > 5 psig
irrespective of
quantities
DuPont Criteria
Fuel gas for
canteen, shops
colonies
exempted
3 Other Hazardous Chemicals MSDS Based MSDS Based MSDS Based
4 Steam More than 300 More than 300
Chemical Classification Index / Table
Identification of HHP / LHO Activities
Sr.
No.
Criteria HHP LHO Justification
1 Yes --
Significant Quantities of
Hazardous Chemical
2 Yes --
Significant Quantities of
Hazardous Chemical
3 Yes --
Significant Quantities of
Hazardous Chemical
4 Yes -- > 300# steam
5 -- Yes < 300# steam
6 -- Yes Low Hazardous Substance
Area:
Unit: Post Classification: HHP
Conclusion – HHP vs LHO Posts
 PVC F.E. Posts
 PVC B.E. Posts
 Utility-1
 Utility-2
 PM&S
PVC Plant Equipment Summary
SC Criteria Existing SC Equip. Addition
Define Management of PSI Package
 Management process must be defined for the
following:
 Maximo (CMMS)
 P&I Diagrams
 Mechanical Integrity / Quality Assurance
Database
 Procedures
 Other Documentation
Contractor Owned Equipment
 Short / Long Term Contractor Owned Equipment
 PSI package to be developed and maintained by the
contractor and provided to the plant.
 Contractor Owned Equipment PSI Package
 Technical Department to identify the SC Documents
Needed.
 Planning to ask these documents from Contractor
 Contractors to provide the key SC documents.
 Area receiving services to document receipt of key SC
Documents.
Employee Communication
 PSI package shall be communicated to:
 Employees who start-up the new facility
 Employees who are involved in the ongoing Operation.
 All relevant employees must have access to PSI
 Employees shall know the location of various
sections of the PSI package and
 Who to contact if they have a need to review the
information.
22
PSI Management Systems
 Records Management
 The PSI package and associated records be
well-maintained.
 PSI Package Review - Each area must
review the PSI package at intervals not to
exceed 03 years:
 No additional review is required, if any of
these items are in operating manuals which
are already Updated on 03 years cycle.

More Related Content

What's hot

Hazop leaders manual final
Hazop leaders manual finalHazop leaders manual final
Hazop leaders manual finalumar farooq
 
Pressure Relief Devices_Presenation
Pressure Relief Devices_PresenationPressure Relief Devices_Presenation
Pressure Relief Devices_Presenationsumit handa
 
Process Safety Management System
Process Safety Management SystemProcess Safety Management System
Process Safety Management SystemACM Facility Safety
 
Seminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptxSeminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptxMoonJ3
 
Compressed gas safety
Compressed gas safetyCompressed gas safety
Compressed gas safetyReliance
 
Knock outdrums
Knock outdrumsKnock outdrums
Knock outdrumshung do
 
Process Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptxProcess Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptxImtiazHussain312057
 
psv and pvrvdesign calculation.ppt
psv and pvrvdesign calculation.pptpsv and pvrvdesign calculation.ppt
psv and pvrvdesign calculation.pptssuser73bb74
 
HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)
HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)
HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)Angel Darío González-Delgado
 

What's hot (20)

Hazop leaders manual final
Hazop leaders manual finalHazop leaders manual final
Hazop leaders manual final
 
Pressure Relief Devices_Presenation
Pressure Relief Devices_PresenationPressure Relief Devices_Presenation
Pressure Relief Devices_Presenation
 
Process Safety Management
Process Safety ManagementProcess Safety Management
Process Safety Management
 
Process Safety Management System
Process Safety Management SystemProcess Safety Management System
Process Safety Management System
 
Seminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptxSeminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptx
 
Hazop Study
Hazop StudyHazop Study
Hazop Study
 
LAYER OF PROTECTION ANALYSIS
LAYER OF PROTECTION ANALYSISLAYER OF PROTECTION ANALYSIS
LAYER OF PROTECTION ANALYSIS
 
Transporte de líquidos criogénicos
Transporte de líquidos criogénicosTransporte de líquidos criogénicos
Transporte de líquidos criogénicos
 
Compressed gas safety
Compressed gas safetyCompressed gas safety
Compressed gas safety
 
Knock outdrums
Knock outdrumsKnock outdrums
Knock outdrums
 
Hira
HiraHira
Hira
 
International technical certificate in oil and gas operational safety revisio...
International technical certificate in oil and gas operational safety revisio...International technical certificate in oil and gas operational safety revisio...
International technical certificate in oil and gas operational safety revisio...
 
Process Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptxProcess Safety Management Fundamentals.pptx
Process Safety Management Fundamentals.pptx
 
psv and pvrvdesign calculation.ppt
psv and pvrvdesign calculation.pptpsv and pvrvdesign calculation.ppt
psv and pvrvdesign calculation.ppt
 
Hazop analysis
Hazop analysisHazop analysis
Hazop analysis
 
NGI-SIMOPS
NGI-SIMOPSNGI-SIMOPS
NGI-SIMOPS
 
Compressd gas
Compressd gasCompressd gas
Compressd gas
 
HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)
HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)
HAZARD & OPERABILITY STUDY (HAZOP) & MATERIAL SAFETY DATA SHEET (MSDS)
 
Safety In Gas Cutting.
Safety In Gas Cutting.Safety In Gas Cutting.
Safety In Gas Cutting.
 
Presentation hazop introduction
Presentation hazop introductionPresentation hazop introduction
Presentation hazop introduction
 

Similar to PSRM - Process Safety Information.ppt

OSHA PSM Regulations
OSHA PSM RegulationsOSHA PSM Regulations
OSHA PSM Regulationssanjeev saraf
 
Process safety information program Nevada.pdf
Process safety information program Nevada.pdfProcess safety information program Nevada.pdf
Process safety information program Nevada.pdfAngad45
 
Safety System Modularity
Safety System ModularitySafety System Modularity
Safety System ModularityFasiul Alam
 
Technology transfer from Research and development to production
Technology transfer from Research and development  to productionTechnology transfer from Research and development  to production
Technology transfer from Research and development to productionArchana Mandava
 
Asse 04 process_safety_management
Asse 04 process_safety_managementAsse 04 process_safety_management
Asse 04 process_safety_managementFoued DRIDI
 
Ryan Sherman - INST 2450 - HIPPS
Ryan Sherman - INST 2450 - HIPPSRyan Sherman - INST 2450 - HIPPS
Ryan Sherman - INST 2450 - HIPPSRyan Sherman
 
Unit-III Safety in process.pptx
Unit-III Safety in process.pptxUnit-III Safety in process.pptx
Unit-III Safety in process.pptxTYPPEOnlineLecture
 
Facility Upgrade V2
Facility Upgrade V2Facility Upgrade V2
Facility Upgrade V2Rose Buot
 
LauraEngells_FinalPresentation
LauraEngells_FinalPresentationLauraEngells_FinalPresentation
LauraEngells_FinalPresentationLaura Engells
 
Industrial pharmacy ii
Industrial pharmacy   iiIndustrial pharmacy   ii
Industrial pharmacy iiWashifIslam
 
Internship report (Ikram Ali)
Internship report (Ikram Ali)Internship report (Ikram Ali)
Internship report (Ikram Ali)ikram ikram
 
Risk Based Design &amp; SCE
Risk Based Design &amp; SCERisk Based Design &amp; SCE
Risk Based Design &amp; SCEadepp
 

Similar to PSRM - Process Safety Information.ppt (20)

Process Safety Management.pptx
Process Safety Management.pptxProcess Safety Management.pptx
Process Safety Management.pptx
 
OSHA PSM Regulations
OSHA PSM RegulationsOSHA PSM Regulations
OSHA PSM Regulations
 
Process safety information program Nevada.pdf
Process safety information program Nevada.pdfProcess safety information program Nevada.pdf
Process safety information program Nevada.pdf
 
HIPPS
HIPPSHIPPS
HIPPS
 
risk analysis
 risk analysis risk analysis
risk analysis
 
HCF 2106: Kenan Stevick
HCF 2106: Kenan StevickHCF 2106: Kenan Stevick
HCF 2106: Kenan Stevick
 
Safety System Modularity
Safety System ModularitySafety System Modularity
Safety System Modularity
 
Technology transfer from Research and development to production
Technology transfer from Research and development  to productionTechnology transfer from Research and development  to production
Technology transfer from Research and development to production
 
Design qualification
Design qualificationDesign qualification
Design qualification
 
Process safety managment
Process safety managmentProcess safety managment
Process safety managment
 
Asse 04 process_safety_management
Asse 04 process_safety_managementAsse 04 process_safety_management
Asse 04 process_safety_management
 
Ryan Sherman - INST 2450 - HIPPS
Ryan Sherman - INST 2450 - HIPPSRyan Sherman - INST 2450 - HIPPS
Ryan Sherman - INST 2450 - HIPPS
 
OSHA Published Requirements for Relief Systems Documentation
OSHA Published Requirements for Relief Systems DocumentationOSHA Published Requirements for Relief Systems Documentation
OSHA Published Requirements for Relief Systems Documentation
 
Unit-III Safety in process.pptx
Unit-III Safety in process.pptxUnit-III Safety in process.pptx
Unit-III Safety in process.pptx
 
Facility Upgrade V2
Facility Upgrade V2Facility Upgrade V2
Facility Upgrade V2
 
LauraEngells_FinalPresentation
LauraEngells_FinalPresentationLauraEngells_FinalPresentation
LauraEngells_FinalPresentation
 
DPCAC-PSM-Feb-2020-1.pptx
DPCAC-PSM-Feb-2020-1.pptxDPCAC-PSM-Feb-2020-1.pptx
DPCAC-PSM-Feb-2020-1.pptx
 
Industrial pharmacy ii
Industrial pharmacy   iiIndustrial pharmacy   ii
Industrial pharmacy ii
 
Internship report (Ikram Ali)
Internship report (Ikram Ali)Internship report (Ikram Ali)
Internship report (Ikram Ali)
 
Risk Based Design &amp; SCE
Risk Based Design &amp; SCERisk Based Design &amp; SCE
Risk Based Design &amp; SCE
 

Recently uploaded

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 

Recently uploaded (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 

PSRM - Process Safety Information.ppt

  • 1. PSRM Training By: Rizwan A. Taqi (PSRM / PSM Leader) Jan 2008
  • 3. Philosophy  EPCL believes that Process Safety Information package is necessary to:  Provide a description of the chemical process or operation.  Foundation for identifying and understand the hazard involved, which is the first step in the PSRM effort.
  • 4. Process Safety Information  It is the First Step in the Process Safety Management effort and consists of three parts:  Hazards of Materials  Process Design Basis  Equipment Design Basis, including Safety Critical Equipment  PSI Package shall be prepared for each process unit.  Documents of PSI package will be maintained up-to-date – for the life of each process unit.  Where the original technical information no longer exists, information shall be developed
  • 5. Hazards of Materials  Material Safety Data Sheets (MSDS) are primary source. The hazard information must contain:  Permissible Exposure Limits, TLV (NH3 = 25 ppm)  Physical Data, such as:  Boiling point, Freezing point, Vapor pressure, Flammability limits, Combustion range,  Reactivity Data  Shall contain Environmental Impact due to Inadvertent Leakage or Spillage  Hazard information communicated to and readily available to all relevant employees
  • 6. Process Design Basis - Requirements  Process Flow Diagram – Flow Path, Major Equipment and Material / Energy balances.  Process Description including:  Purpose of the Process / Major Equipment  How the Process Works & Process chemistry  Any Side / Runaway Reactions  Standard Operating Conditions, Understanding and Consequences  Maximum Intended Inventories – Inherently Safer Design  Alarm and Interlock Summary  Data History, Change History and References for Operating Conditions / Alarms, Equipment, Inspections, etc.
  • 7. Equipment Design Basis – Requirements  Design Basis Documented (Calculations, Schematics, Drawings etc) for:  PSVs, PRVs and Vent systems  Protective Safety Systems – ESD, Shutdown and Isolation Systems etc.  P&IDs  Interlock Instrument / Electrical Schematics / Settings  Alarms, Communication Systems and Monitoring Device  Electrical Classification  Fire Protection Systems, including Fire Water Supply  Detection and suppression systems
  • 8. Equipment Design Basis – SC Equipment  Equipment Specification Drawings and Sheets  Quality Assurance Inspection Reports.  Design codes and standards employed.  Pump specifications and characteristics  Piping systems / Pipe and Valve Codes.  Electrical Diagrams, Electrical Grounding and Bonding design.
  • 9. Equipment Design Basis – Miscellaneous Equipment design basis documentation to be included when relevant to process safety for:  Architectural and Civil Engineering Drawings.  Piping Flexibility Analysis (including special or spring hangers and sliding supports).  Equipment Arrangement Drawings.  Insulation, Paint and Tracing Codes.  Plant and Area Maps (e.g., Underground Services).  Control of Vendor Manuals
  • 10. PSI Package Hazards of Materials Process Design Basis Equipment Design Basis Higher Hazard Process Lower Hazard Operation Safety Critical Equipment Non-Safety Critical Equipment Safety Critical Top Level Document • Design Basis & Calculations • Specification Sheets Drawings • Purchase Specifications
  • 11. SC Equipment List Development Process Identify HHP (Higher Hazard Process) Criteria Identify Hazardous Substances OSHA and EPA Regulated Chemicals List Major Safety Critical Equipment Define Management of PSI Package Team Methodology Documentation of SC Equipment Safety Critical Equipment Lists Make SC Top Level Document Mention SC Equipment on P&IDs
  • 12. Contents of SC Top Level Document A Identification of Hazardous Substances B Criteria of Higher Hazard Process (HHP) C Identification of HHP activities E Identification of Safety Critical Equipment (Excluding Devices) D Criteria of Safety Critical Equipment F Management of Safety Critical Top Level Document
  • 13. Identify Hazardous Substances  List each Hazardous Chemical Quantity in area  Concentrations  Hazardous event and identify applicable chemicals on the site “safety critical hazardous substances” list (attachment).  Each chemical should be in one of three groups as follows:  OSHA / EPA regulated chemicals  EPCL standard for HHP chemicals and  Area concern critical chemicals.  Operating Area is responsible for:  Considering a Chemical as Safety Critical based on thresholds  Document precisely what exactly is and what is not safety critical.  Chemical Classification Table shall be developed to ascertain that the area has considered all the chemicals.
  • 14. HHP Criteria – OSHA / EPA / DuPont  Various activities may require a Risk Based Consequence Analysis to classify them as HHP or LHO activities Sr. No. Criteria Threshold Standard Remarks 1 High and Moderate Acute Toxicity Materials Substance Specific (VCM & Cl2) OSHA, EPA Regulated Chemicals OSHA, EPA 2 Quantities of Pressurized Fuel Gases Pressure > 5 psig irrespective of quantities DuPont Criteria Fuel gas for canteen, shops colonies exempted 3 Other Hazardous Chemicals MSDS Based MSDS Based MSDS Based 4 Steam More than 300 More than 300
  • 15. Chemical Classification Index / Table Identification of HHP / LHO Activities Sr. No. Criteria HHP LHO Justification 1 Yes -- Significant Quantities of Hazardous Chemical 2 Yes -- Significant Quantities of Hazardous Chemical 3 Yes -- Significant Quantities of Hazardous Chemical 4 Yes -- > 300# steam 5 -- Yes < 300# steam 6 -- Yes Low Hazardous Substance Area: Unit: Post Classification: HHP
  • 16. Conclusion – HHP vs LHO Posts  PVC F.E. Posts  PVC B.E. Posts  Utility-1  Utility-2  PM&S
  • 17. PVC Plant Equipment Summary SC Criteria Existing SC Equip. Addition
  • 18. Define Management of PSI Package  Management process must be defined for the following:  Maximo (CMMS)  P&I Diagrams  Mechanical Integrity / Quality Assurance Database  Procedures  Other Documentation
  • 19. Contractor Owned Equipment  Short / Long Term Contractor Owned Equipment  PSI package to be developed and maintained by the contractor and provided to the plant.  Contractor Owned Equipment PSI Package  Technical Department to identify the SC Documents Needed.  Planning to ask these documents from Contractor  Contractors to provide the key SC documents.  Area receiving services to document receipt of key SC Documents.
  • 20. Employee Communication  PSI package shall be communicated to:  Employees who start-up the new facility  Employees who are involved in the ongoing Operation.  All relevant employees must have access to PSI  Employees shall know the location of various sections of the PSI package and  Who to contact if they have a need to review the information.
  • 21. 22 PSI Management Systems  Records Management  The PSI package and associated records be well-maintained.  PSI Package Review - Each area must review the PSI package at intervals not to exceed 03 years:  No additional review is required, if any of these items are in operating manuals which are already Updated on 03 years cycle.