1. AREAS OF EXPERTISE
Design
Site supervision
Landscape planning
Bids Evaluation
Specification and BOQ
Project Technical Reports
Variation Order Study
coordination
administration
PERSONAL SKILLS
Leadership
Strong presentation skills
Willingness to travel
Attention to detail Strategic
vision
LANGUAGES:
Arabic: Mother Tongue.
English: Excellent.
French: Fair
COMPUTER SKILLS:
AutoCad, 2D&3D Diploma
(1995)
3DSttudio Diploma (1997)
Adobe Photoshop (1998)
3DS Max (2002)
Microsoft Office.
MS Office Project (2007)
Mostafa A. M. Abbassy
Architect
PERSONAL SUMMARY
A resourceful, focused and determined architect who has considerable
experience of working in the construction industry designing new
buildings, restoring and conserving old buildings and developing new
ways of using existing buildings, able to work effectively in pressurized
situations and can be relied upon to deliver, irrespective of
circumstances. He has a long history of working on all stages of projects
from inception to completion. He is AutoCAD proficient, has contract
administration experience, and is able to work with multiple stakeholders
on a number of projects simultaneously, has previously worked on a
range of multi million pound projects in the commercial, industrial,
pharmaceutical, healthcare and education sectors. He has excellent
knowledge of architectural design principles, patterns and practices. A
highly motivated and ambitious individual able to give timely and
accurate advice, guidance, support and training to team members and
individuals. Possessing excellent management skills and having the
ability to work with the minimum of supervision whilst leading a team
and organizes time efficiently.
Right now he is looking for a suitable opportunity to join a consultancy
which not only has a stable workforce and healthy order book but is able
to offer progression opportunities too.
WORK EXPERIENCE
Saudi Consult – Saudi Arabia
LEAD ARCHITECT October 2013 – Present
Responsible for coordinating and supervising the design implementation
on site. Also in charge of ensuring design and construction quality,
leading site meetings with different parties, managing design changes,
documentation as well as overall administration.
Duties:
client/owner requirements
unambiguous direction to members of the project team. Site
Supervision Reports, Site Visits and large-scale Project
-
applications.
2. PERSONAL DETAILS
Mostafa A. M. Abbassy
Gender: Male
Date of birth: 19/3/1976
Place of birth: Egypt.
Religion: Muslim.
Nationality: Egyptian.
Marital status: Married.
Tel.: +201116666828
Mobile: +966548492797
E-mail:
mostafa_abbassy@yahoo
Driving license: Yes
EGYPTAIR Holding Company “Project Branch-
Design DEP.”
Architect September 2000 – October 2013
KEY SKILLS AND COMPETENCIES
-ordinate and translate the needs of multiple
to lead a project with multiple t
Dr.Amr Gira Engineering Office
Architect August 1998 – September 2000
Working in Engineering Consultant Offices as Part Time like:
NECB- Dr.Farouk Elkadi
Al-Habashi - General Contracting
SAUDI ARCHITECT - Cairo Branch Office
UTOPIA-architectural office
Arabic Office for Architectural Design & Consultant
ACADEMIC QUALIFICATIONS
- B. SC. DEPARTEMENT of ARCHITECTURE FACULTY
OF ENGINNEERING Ain Shams University.
GRADUATION YEAR : June 1998
PROJECT : V.GOOD
Diploma in Financial Analysis & Budget Planning – CDC Academy .
(Aug 2007)
PROJECTS HISTORY:
King Khaled Int’l AirPort Development Project – Terminal
(5) Lead Architect consultant and supervision. (10-2013)
EgyptAir Hospital 2nd floor operation theatre Renovation
“Architecture design and complete working drawing with bill of
quantity and specification , supervision “ average cost for this
project is 4 million L.E “. (4-2012)
EgyptAir Inflight Services Co. Complex Renovation–Cairo
Airport “Architecture design , modeling and complete working
drawing with bill of quantity and specification , supervision “
average cost for this project is 20 million L.E “. (11-2008)
3. EgyptAir Ground Services Co. Complex – Cairo Airport
“Architecture design , modeling and complete working drawing
with complete bill of quantity and specification “ average cost for
this project is 80 million L.E “. (9-2008)
Alexandria Airport - Passenger Terminal Renovation
“Architecture design, modeling and complete working drawing
with complete bill of quantity and specification “average cost for
this project is 100 million L.E “. (5 -2008 )
Commercial building in Nasr city – Cairo
“Architecture design, modeling and complete working drawing
with estimation cost “average cost for this project is 30 million
L.E “.(2-2008)
EgyptAir Ground Services Equipment Shed –Alex- Elnozha
Airport “Architecture design, complete working drawing with
complete bill of quantity and specification “average cost for this
project is 1 million L.E “. (5-2007)
EgyptAir Hospital Main Building Facade Renovation–Cairo
“Architecture design , modeling and complete working drawing
with estimation cost “ average cost for this project is 8 million
L.E “. (11-2007)
Asiout Airport new Terminal – Asiout
“Architecture design, modeling and complete working drawing
with complete bill of quantity and specification “average cost for
this project is 150 million L.E “. (11-2007)
EgyptAir Cargo Village Main Building Renovation – Cairo
Airport “Architecture design , modeling and complete working
drawing with complete bill of quantity and specification “ average
cost for this project is 6.5 million L.E “. (5-2007)
Administration building - EgyptAir Cargo Village – Cairo
Airport “Architecture design , modeling and complete working
drawing with complete bill of quantity and specification “ average
cost for this project is 1.5 million L.E “. (4-2007)
EgyptAir Airline Co. Complex – Cairo Airport
“Modeling and complete working drawing with complete bill of
quantity and specification “average cost for this project is 120
million L.E “. (5-2007)
EgyptAir Maintenance & Technical Services Co. Complex–
Cairo Airport
“Architecture design, modeling and complete working drawing
with complete bill of quantity and specification “average cost for
this project is 140 million L.E “. (5-2007)
EgyptAir Exhibition Hall
“Architecture design and complete working drawing with
complete bill of quantity and specification and supervision
“average cost for this project is 1.5 million L.E “. (3-2007)
Training Building and General layout Landscape Upgrade –
second phase–Cairo Airport
“Architecture design and complete working drawing with complete
bill of quantity and specification and supervision “average cost for this
project is 30 million L.E “. (5-2007 )
Training Building Complex – second phase – Cairo Airport
“Architecture design and complete working drawing with complete
bill of quantity and specification and supervision “ average cost for
4. this project is 50 million L.E “. (10-2006 )
Sport Playground Area – Fayoum
“Architecture design and complete working drawing with complete bill
of quantity and specification “(1-2007)
Aviation show deck – Cairo
“Architecture design and modeling and complete working drawing
with complete bill of quantity and specification “average cost for this
project is 1.5 million L.E “. (12-2006)
Golden island – Nile river
“Architecture design and modeling“ (11-2006)
Social Building – baniSweif
“Architecture design and complete working drawing with complete
bill of quantity and specification “(11-2006)
Business men Club – Nasr city
“Architecture design and modeling “ (11-2006)
Piano Resort - Hurghada
“Architecture design and model design“ (11-2006)
Egypt Air Employer Show Room
“Architecture design and complete working drawing with complete
bill of quantity and specification “average cost for this project is 1.5
million L.E “. (10-2006)
Service Building upgrade – Egypt Air Hospital
“Architecture design and complete working drawing with complete
bill of quantity and specification and consultant supervision “average
cost for this project is 3 million L.E “. (10-2005 )
Egypt Air Hospital Extension Building
“Architecture design and complete working drawing with complete
bill of quantity and specification and consultant supervision “average
cost for this project is 6 million L.E “. (10-2005 )
East Delta Bus Station – Zagazig
“3D Modeling and computer graphics. (11-2004)
Egypt Air Catering Building- Sharm-elsheikh
“Architecture design and complete working drawing with complete bill
of quantity and specification and supervision “average cost for this
project is 24 million L.E “. (10-2004 )
Egypt Air uniform factory – Cairo Suez road
“Architecture design and modeling “ (8-2004)
Tax Free Shop Sales Shop (hall 4) – Cairo Airport
“Architecture design and complete working drawing with complete
bill of quantity and specification. (4-2004)
Town House – 6th October city
“Concept lay out and Residential unit design. (6-2004)
Training center building upgrade - Egypt Air
“Complete Architecture design and complete working drawing with
bill of quantity and specification “average cost for this project is 8
million L.E “. (2-2004 )
Medical Services Administration Building elevation
Renovation(62003)
Production and Buildings Maintenance Workshop center –Egypt
Air
“Architecture design and complete working drawing with complete
bill of quantity and specification “average cost for this project is 20
million L.E“ (2-2003 )
5. Proposal for labors office in tarmac- Cairo Int’l Airport. (8-2002)
Sharing in “Egyptian academy – Rome” competition. ( 10-2002 )
Plastic Product Factory –Egypt Air
“Architecture design and complete working drawing with complete bill
of quantity and specification “average cost for the project is 8 million
L.E “. (2-2002)
Interior design for show room (Pioneers museum)- Egypt Air
Interior design for a big Hotel – Mohandseen – Cairo (10-2001)
Interior design for Egypt Air sales-office – Sanaa, Yemen ( 9-2001)
Landscape design for Egypt Air hospital entrance (8-2001)
Exterior & interior design for Barber shop – Heliopolis ( 7-2001 )
Modeling and computer graphics for Flight Simulator building –
Egypt Air. (3-2001)
Interior design and Modeling for El-Nasser Tower– Heliopolis (6-
2001)
Modeling and computer graphics for TIYI Nile Cruising interior
design. (5-2001)
Working and workshop drawing for EgyptAir sales office interior
fixture - 10th of Ramadan ( 3-2001)
Working and workshop drawing for Villa Dr.Rehab interior design
“Saudi Arabia”. (2-2001)
Modeling and computer graphics for El-Khima Resort - Sharm El-
sheikh. ( 1-2001 )
MENA Nile cruise redesign. ( 1-2001 )
Concept Design For housing project for Egypt Air-Saudi Arabia.12-
2000
Design, working drawings and workshop drawings for Aswan
Airport Café. ( 12-2000 )
Tax Free-shop - Cairo Airport. ( 11-2000 )
Dev. of Airport Road Fountain. ( 11-2000 )
Working drawing for Dar Al-Abtal Project. ( 5-2000 )
Modeling and computer graphics for Ms.Marhaba Nile Boat - Dev.
Presentation for New Venice Resort – I.E.C. ( 2-2000 )
Modeling and computer graphics for V.I.P. Building – Air
Defense.
Modeling and computer graphics for Conference Hall – Lakkah
Group.
Concept Design for El-Daghestany Mall – Saudi Arabia. ( 9-99 )
Presentation and modeling for El-Noor Mosque – Dubai. ( 8 - 99 )
Workshop drawing for El-Rahman Mosque – Shoubra. ( 8 -99 )
Interior Design for Pharmacy - Nasr City. ( 7 - 99 )
Architectural design for Religion Institute – Misr Elkadima. ( 5 - 99 )
Architectural design for Religion Institute – Shoubra. ( 3- 99 )
Modeling and computer graphics for Hobas Factory – Elkatamia.(8-
98)
Architectural design for Social Building – Shooting Club. ( 7-95 )
Working drawing for Police Station – Tanta. ( 7-94 )