SlideShare a Scribd company logo
1 of 54
UNIT II SWITCHING TRANSIENTS
Over voltages due to switching transients -
resistance switching and the equivalent circuit for
interrupting the resistor current - load switching and
equivalent circuit - waveforms for transient voltage
across the load and the switch - normal and abnormal
switching transients. Current suppression - current
chopping – effect ive equivalent circuit. Capacitance
switching - effect of source regulation - capacitance
switching with a restrike, with multiple restrikes.
Illustration for multiple restriking transients - ferro
resonance.
• A transient occurs in the power system when the network
changes from one steady state into another.
• The majority of power system transients is, however, the
result of a switching action. Load break switches and
disconnectors switch off and switch on parts of the
network under load and no-load conditions.
• Fuses and circuit breakers interrupt higher currents and
clear short-circuit currents flowing in faulted parts of the
system.
• The time period when transient voltage and current
oscillations occur is in the range of microseconds to
milliseconds.
INTRODUCTION
OVERVOLTAGE
• An overvoltage is an increase in the r.m.s. ac
voltage greater than 110 % at the power
frequency for a duration longer than 1 min.
• It is a result of load switching.
Eg : Switching OFF a Large load
Energizing a capacitor bank
• Switchings in a power system occur
frequently.
• A variety of switchings are performed for
routine operations or automatically by
control and protection systems.
• Typical switchings are as follows:
– Lines (transmission or distribution)
– Cables
– Shunt/series capacitors
– Shunt reactors
– Transformers
– Generators/motors
OVER VOLTAGES
• The causes of power system over voltages
are numerous and the waveforms are
complex.
• It is customary to classify the transients on
the basis of frequency content of the
waveforms.
• In this sense, the following three broad
categories are defined:
–Power frequency overvoltages
–Switching overvoltages
–Lightning overvoltages
RESISTANCE SWITCHING
RESISTANCE SWITCHING
How does Resistance Switching
Work
• Let us consider a circuit and connect a shunt
resistance R across the contacts of the breaker
as shown . Suppose a fault occurs on the line.
Because of the occurrence of fault, the
contacts of breaker will open and an arc will
stuck between the contacts.
• Since the contacts of breaker are shunted by resistance R, therefore a
part of arc current will flow through this resistance R. Due to this the
magnitude of arc current will reduce which in turn will result in increase
in the rate of de-ionization of arc path. In this way, the arc resistance
increases. This increased arc resistance leads to further increases in the
current through the shunt resistance R.
• Thus again, the arc current will reduce and hence the arc resistance
increases. This cumulative process will continue till the magnitude of
arc current becomes so low that it is not able to maintain the arc. Thus
the arc extinguishes and the current is interrupted by the breaker.
• Resistance Switching also reduces the oscillatory growth of Re-striking
Voltage. The natural frequency of the circuit shown above is given by
fn = (1/2π)√(1/LC – 1/4R2C2)
• The main role of shunt resistance R is to limit the growth of re-strike
voltage and cause it to grow exponentially up to recovery voltage. If the
value of R is so selected that the circuit becomes critically damped then
re-strike voltage rises exponentially till recovery voltage is reached.
Equivalent circuit of resistance switching problem.
OBJECTIVES
i) To reduce switching surges and over
voltages
ii) For potential control access multi-breakers
per phase in the high voltage breakers
iii) To reduce natural frequencies effects and
breaker recovery voltage
NEED FOR RESISTANCE SWITCHING
• The shunt resistors connected across circuit
breaker have two functions:
i) To distribute the transient recovery voltage
more uniformly across the several breaks.
ii) To reduce the severity of transient recovery
voltage at the time of interruption by
introducing damping into oscillation.
• Thus the advantages of resistance switching
are as follows:
• It reduces the rate of rise of re-striking voltage
and the peak value of re-striking voltage.
• Resistance Switching helps to reduce the
voltage transient surge during current
chopping and capacitive current breaking.
ANALYSIS OF RESISTANCE SWITCHING
Normal switching transients are circumstances in
which voltage or current within the normal peak
values Closing switch or circuit in a dominantly
capacitive or inductive network results in inrush
currents which can cause problems for the
protection system.
Abnormal switching transients are circumstances
in which voltage or current are far in excess of twice
in normal peak values. Insulation of high voltage
circuit breakers typically can over voltages up to 2.5
times over its normal voltage.
Capacitor Switching
• Capacitor switching is one of the most common
switching events on utility systems.
• Capacitors are used to provide reactive power (in
units of vars) to correct the power factor, which
reduces losses and supports the voltage on the
system.
• They are a very economical and generally
trouble-free means of accomplishing these goals.
• Alternative methods such as the use of rotating
machines and electronic var compensators are
much more costly or have high maintenance
costs.
One drawback to the use of capacitors is that
they yield oscillatory transients when switched.
Some capacitors are energized all the time (a
fixed bank), while others are switched according
to load levels.
Various control means, including time,
temperature, voltage, current, and reactive
power, are used to determine when the
capacitors are switched.
It is common for controls to combine two or
more of these functions, such as temperature
with voltage override.
• One of the common symptoms of power quality problems
related to utility capacitor-switching overvoltages is that the
problems appear at nearly the same time each day.
• On distribution feeders with industrial loads, capacitors are
frequently switched by time clock in anticipation of an increase
in load with the beginning of the working day.
• Common problems are adjustable speed-drive trips and
malfunctions of other electronically controlled load equipment
that occur without a noticeable blinking of the lights or impact
on other, more conventional loads.
Restrikes During Capacitor
De-Energizing
 When a grounded capacitor bank is energized using a
mechanical oil filled switch, the switching is most likely
to occur at or near the system voltage peak.
 At this instant, the capacitor voltage is zero while the
system voltage is near maximum.
 The largest potential difference between contacts is 1.0
pu.
 Due to the slow-moving nature of the mechanical
switch and the large potential difference, insulation
across the switch contacts tends to break down giving
rise to an electric arc.
 It allows capacitive current to flow, thereby energizing
the capacitor before the actual switch contacts close or
touch. This phenomenon is known as pre-strike.
It occurs in many types of switches without
closing control.
It is usually considered as a natural
behavior of the switch and should not raise
any concern because capacitor voltage prior
to energizing is negligible.
The resulting peak transient voltage is no
worse than that when the capacitor is
intentionally energized at the system
voltage peak.
 On the other hand, restrikes (or reignitions) during
capacitor deenergizing do rise concerns.
 Restrikes or reignitions occur when arcs between parting
contacts are re-established after initial current extinction
causing unintended re-energizing of the capacitor.
 Because of the trapped charges following the initial
extinction, significant overvoltage well above 2 pu can
result.
 It should be noted that a successful capacitor deenergizing
(i.e., no restrike) does not normally yield any transient
overvoltage.
Restrikes can occur multiple times and in
succession over a short time period.
It can also be intermittent over a longer
time span. In either circumstance, a restrike
poses problems to the power system as well
as to the switching device itself.
Capacitance Switching Off
• Disconnect: C /unload Transmission
lines
• Concerns: reignite/restrike in
opening
• Chance low, Cap. Sw. frequent
• Cap fully charged
• Half Cycle VCB=2 Vp
Capacitance Switching off
Discussion Cap. Sw. Off
• In fact Vc>Vsys Ferranti Rise
• Vsource_side decrease to Vsys
• There is a ∆V change (however,exist in weak systems)
• Discon. a C.B. in lower side of step down Transformer
supplying an unloaded cable
• Current in Cap. Sw. is freq. small and it is
possible to disconnect it In first zero
-- with small contact sep., 2 V appear across contacts
--- increased possibility of restrike (small separation)
• Oscillating to new voltage with f0=1/2Π√LC
• I(restrike)=2Vp/√L/C sinω0t
• Transient peak of 3 Vp
Capacitance Switching with a Restrike at
Peak of Voltage
Capacitor Switching …continued
• A 13.8 KV, 5000KVAR, 3ph bank,NGr
• Source Gr, inductance:1 mH
• Restrike at Vp:
1- c=5/(377x13.8 )=69.64μF
2- Z=√1000/69.64=3.789Ω
3-Ip=2√2x13.8/(√3x3.789)=5.947 KA
4-f0=603 Hz
Multiple Restrikes During Capacitance Switching
FERRO RESONANCE - DEFINITION
• The term Ferro resonance refers to a special kind of
resonance that involves capacitance and iron-core
inductance. The most common condition in which it
causes disturbances is when the magnetizing
impedance of a transformer is placed in series with a
system capacitor. This happens when there is an
open-phase conductor. Under controlled conditions,
ferro resonance can be exploited for useful purpose
such as in a constant-voltage transformer
RLC SERIES CIRCUIT
Ferro resonance- Occurence
• Nonlinear resonance between unloaded transformer
magnetizing branch and a series capacitor
• May occur when distribution transformers fed from
cables are switched one phase at a time
• Especially a problem on ungrounded star-delta
transformers
• May occur any time an unloaded iron-core coil is in
series with a capacitor
2. Terms and definitions 49
Long-duration overvoltage caused by
ferroresonance of transformer
Ferro resonance is different than resonance
in linear system elements. In linear systems,
resonance results in high sinusoidal
voltages and currents of the resonant
frequency.
Ferro resonance can also result in high
voltages and currents, but the resulting
waveforms are usually irregular and chaotic
in shape.
The most common events leading ferro resonance are,
Manual switching of an unloaded, cable-fed,
three-phase transformer where only one phase
is closed.
Ferroresonance may be noted when the first
phase is closed upon energization or before the
last phase is opened on de-energization.
Ferroresonant circuits
A
C
B
C
B
A
Possible effects of ferroresonance
• Overvoltage
• Audible noise
• Overheating
• Sustained overvoltage => arrester failure
• Flicker due to erratic voltage
• Subharmonic voltages (e.g., at 1/3 or 1/2 of
normal frequency)
• Chaotic response
Summary
• In Unit 2, we have seen
switching transient- Resistance switching
Load switching
Capacitor switching
Current chopping
Normal and Abnormal switching transient
Current suppression
Ferro resonance

More Related Content

Similar to unit_2.ppt

ECE 505 Power electronics final paper
ECE 505 Power electronics final paperECE 505 Power electronics final paper
ECE 505 Power electronics final paperRob Garrone
 
Psoc voltage control 2018
Psoc voltage control 2018Psoc voltage control 2018
Psoc voltage control 2018Mohamed Samir
 
Switchyard final
Switchyard finalSwitchyard final
Switchyard finalHAIDER ALI
 
33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE Lalit Kumar
 
Application of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage RegulationApplication of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage RegulationAmeen San
 
Transcat and Megger: Power Quality 101 Webinar
Transcat and Megger: Power Quality 101 WebinarTranscat and Megger: Power Quality 101 Webinar
Transcat and Megger: Power Quality 101 WebinarTranscat
 
power-factor-correction.pptx
power-factor-correction.pptxpower-factor-correction.pptx
power-factor-correction.pptxBabySweet5
 
Presentation1.pptx power system
Presentation1.pptx power systemPresentation1.pptx power system
Presentation1.pptx power systemArvind Nathan
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1anuphowlader1
 
Review of Step down Converter with Efficient ZVS Operation
Review of Step down Converter with Efficient ZVS OperationReview of Step down Converter with Efficient ZVS Operation
Review of Step down Converter with Efficient ZVS OperationIJRST Journal
 
Switching Transient Problem with Loads
Switching Transient Problem with LoadsSwitching Transient Problem with Loads
Switching Transient Problem with LoadsNoralina A.
 
SGPD(MOD-4).pdf...................................................
SGPD(MOD-4).pdf...................................................SGPD(MOD-4).pdf...................................................
SGPD(MOD-4).pdf...................................................MANOJ KHARADE
 
SGPD(MOD-4).pdfsgp .....................
SGPD(MOD-4).pdfsgp .....................SGPD(MOD-4).pdfsgp .....................
SGPD(MOD-4).pdfsgp .....................MANOJ KHARADE
 
Power quality & demand side management
Power quality & demand side managementPower quality & demand side management
Power quality & demand side managementMark Anthony Enoy
 
Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...
Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...
Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...Ali Sepehri
 
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Rahul Prajapati
 

Similar to unit_2.ppt (20)

ECE 505 Power electronics final paper
ECE 505 Power electronics final paperECE 505 Power electronics final paper
ECE 505 Power electronics final paper
 
Psoc voltage control 2018
Psoc voltage control 2018Psoc voltage control 2018
Psoc voltage control 2018
 
Voltage Regulation
Voltage RegulationVoltage Regulation
Voltage Regulation
 
Devices part 2
Devices part 2Devices part 2
Devices part 2
 
Switchyard final
Switchyard finalSwitchyard final
Switchyard final
 
33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE
 
Application of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage RegulationApplication of Capacitors to Distribution System and Voltage Regulation
Application of Capacitors to Distribution System and Voltage Regulation
 
Sub station training
Sub station trainingSub station training
Sub station training
 
Transcat and Megger: Power Quality 101 Webinar
Transcat and Megger: Power Quality 101 WebinarTranscat and Megger: Power Quality 101 Webinar
Transcat and Megger: Power Quality 101 Webinar
 
Tap changer
Tap changerTap changer
Tap changer
 
power-factor-correction.pptx
power-factor-correction.pptxpower-factor-correction.pptx
power-factor-correction.pptx
 
Presentation1.pptx power system
Presentation1.pptx power systemPresentation1.pptx power system
Presentation1.pptx power system
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1
 
Review of Step down Converter with Efficient ZVS Operation
Review of Step down Converter with Efficient ZVS OperationReview of Step down Converter with Efficient ZVS Operation
Review of Step down Converter with Efficient ZVS Operation
 
Switching Transient Problem with Loads
Switching Transient Problem with LoadsSwitching Transient Problem with Loads
Switching Transient Problem with Loads
 
SGPD(MOD-4).pdf...................................................
SGPD(MOD-4).pdf...................................................SGPD(MOD-4).pdf...................................................
SGPD(MOD-4).pdf...................................................
 
SGPD(MOD-4).pdfsgp .....................
SGPD(MOD-4).pdfsgp .....................SGPD(MOD-4).pdfsgp .....................
SGPD(MOD-4).pdfsgp .....................
 
Power quality & demand side management
Power quality & demand side managementPower quality & demand side management
Power quality & demand side management
 
Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...
Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...
Transient Recovery Voltage(TRV) in Interruption of Small Inductive Currents b...
 
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
 

Recently uploaded

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 

unit_2.ppt

  • 1. UNIT II SWITCHING TRANSIENTS Over voltages due to switching transients - resistance switching and the equivalent circuit for interrupting the resistor current - load switching and equivalent circuit - waveforms for transient voltage across the load and the switch - normal and abnormal switching transients. Current suppression - current chopping – effect ive equivalent circuit. Capacitance switching - effect of source regulation - capacitance switching with a restrike, with multiple restrikes. Illustration for multiple restriking transients - ferro resonance.
  • 2.
  • 3.
  • 4. • A transient occurs in the power system when the network changes from one steady state into another. • The majority of power system transients is, however, the result of a switching action. Load break switches and disconnectors switch off and switch on parts of the network under load and no-load conditions. • Fuses and circuit breakers interrupt higher currents and clear short-circuit currents flowing in faulted parts of the system. • The time period when transient voltage and current oscillations occur is in the range of microseconds to milliseconds. INTRODUCTION
  • 5. OVERVOLTAGE • An overvoltage is an increase in the r.m.s. ac voltage greater than 110 % at the power frequency for a duration longer than 1 min. • It is a result of load switching. Eg : Switching OFF a Large load Energizing a capacitor bank
  • 6. • Switchings in a power system occur frequently. • A variety of switchings are performed for routine operations or automatically by control and protection systems. • Typical switchings are as follows: – Lines (transmission or distribution) – Cables – Shunt/series capacitors – Shunt reactors – Transformers – Generators/motors
  • 7. OVER VOLTAGES • The causes of power system over voltages are numerous and the waveforms are complex. • It is customary to classify the transients on the basis of frequency content of the waveforms. • In this sense, the following three broad categories are defined: –Power frequency overvoltages –Switching overvoltages –Lightning overvoltages
  • 10. How does Resistance Switching Work • Let us consider a circuit and connect a shunt resistance R across the contacts of the breaker as shown . Suppose a fault occurs on the line. Because of the occurrence of fault, the contacts of breaker will open and an arc will stuck between the contacts.
  • 11. • Since the contacts of breaker are shunted by resistance R, therefore a part of arc current will flow through this resistance R. Due to this the magnitude of arc current will reduce which in turn will result in increase in the rate of de-ionization of arc path. In this way, the arc resistance increases. This increased arc resistance leads to further increases in the current through the shunt resistance R. • Thus again, the arc current will reduce and hence the arc resistance increases. This cumulative process will continue till the magnitude of arc current becomes so low that it is not able to maintain the arc. Thus the arc extinguishes and the current is interrupted by the breaker. • Resistance Switching also reduces the oscillatory growth of Re-striking Voltage. The natural frequency of the circuit shown above is given by fn = (1/2π)√(1/LC – 1/4R2C2) • The main role of shunt resistance R is to limit the growth of re-strike voltage and cause it to grow exponentially up to recovery voltage. If the value of R is so selected that the circuit becomes critically damped then re-strike voltage rises exponentially till recovery voltage is reached.
  • 12. Equivalent circuit of resistance switching problem.
  • 13.
  • 14. OBJECTIVES i) To reduce switching surges and over voltages ii) For potential control access multi-breakers per phase in the high voltage breakers iii) To reduce natural frequencies effects and breaker recovery voltage
  • 15. NEED FOR RESISTANCE SWITCHING • The shunt resistors connected across circuit breaker have two functions: i) To distribute the transient recovery voltage more uniformly across the several breaks. ii) To reduce the severity of transient recovery voltage at the time of interruption by introducing damping into oscillation.
  • 16. • Thus the advantages of resistance switching are as follows: • It reduces the rate of rise of re-striking voltage and the peak value of re-striking voltage. • Resistance Switching helps to reduce the voltage transient surge during current chopping and capacitive current breaking.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30. Normal switching transients are circumstances in which voltage or current within the normal peak values Closing switch or circuit in a dominantly capacitive or inductive network results in inrush currents which can cause problems for the protection system. Abnormal switching transients are circumstances in which voltage or current are far in excess of twice in normal peak values. Insulation of high voltage circuit breakers typically can over voltages up to 2.5 times over its normal voltage.
  • 31.
  • 32.
  • 33. Capacitor Switching • Capacitor switching is one of the most common switching events on utility systems. • Capacitors are used to provide reactive power (in units of vars) to correct the power factor, which reduces losses and supports the voltage on the system. • They are a very economical and generally trouble-free means of accomplishing these goals. • Alternative methods such as the use of rotating machines and electronic var compensators are much more costly or have high maintenance costs.
  • 34. One drawback to the use of capacitors is that they yield oscillatory transients when switched. Some capacitors are energized all the time (a fixed bank), while others are switched according to load levels. Various control means, including time, temperature, voltage, current, and reactive power, are used to determine when the capacitors are switched. It is common for controls to combine two or more of these functions, such as temperature with voltage override.
  • 35. • One of the common symptoms of power quality problems related to utility capacitor-switching overvoltages is that the problems appear at nearly the same time each day. • On distribution feeders with industrial loads, capacitors are frequently switched by time clock in anticipation of an increase in load with the beginning of the working day. • Common problems are adjustable speed-drive trips and malfunctions of other electronically controlled load equipment that occur without a noticeable blinking of the lights or impact on other, more conventional loads.
  • 36. Restrikes During Capacitor De-Energizing  When a grounded capacitor bank is energized using a mechanical oil filled switch, the switching is most likely to occur at or near the system voltage peak.  At this instant, the capacitor voltage is zero while the system voltage is near maximum.  The largest potential difference between contacts is 1.0 pu.  Due to the slow-moving nature of the mechanical switch and the large potential difference, insulation across the switch contacts tends to break down giving rise to an electric arc.  It allows capacitive current to flow, thereby energizing the capacitor before the actual switch contacts close or touch. This phenomenon is known as pre-strike.
  • 37. It occurs in many types of switches without closing control. It is usually considered as a natural behavior of the switch and should not raise any concern because capacitor voltage prior to energizing is negligible. The resulting peak transient voltage is no worse than that when the capacitor is intentionally energized at the system voltage peak.
  • 38.  On the other hand, restrikes (or reignitions) during capacitor deenergizing do rise concerns.  Restrikes or reignitions occur when arcs between parting contacts are re-established after initial current extinction causing unintended re-energizing of the capacitor.  Because of the trapped charges following the initial extinction, significant overvoltage well above 2 pu can result.  It should be noted that a successful capacitor deenergizing (i.e., no restrike) does not normally yield any transient overvoltage.
  • 39. Restrikes can occur multiple times and in succession over a short time period. It can also be intermittent over a longer time span. In either circumstance, a restrike poses problems to the power system as well as to the switching device itself.
  • 40. Capacitance Switching Off • Disconnect: C /unload Transmission lines • Concerns: reignite/restrike in opening • Chance low, Cap. Sw. frequent • Cap fully charged • Half Cycle VCB=2 Vp
  • 42. Discussion Cap. Sw. Off • In fact Vc>Vsys Ferranti Rise • Vsource_side decrease to Vsys • There is a ∆V change (however,exist in weak systems) • Discon. a C.B. in lower side of step down Transformer supplying an unloaded cable • Current in Cap. Sw. is freq. small and it is possible to disconnect it In first zero -- with small contact sep., 2 V appear across contacts --- increased possibility of restrike (small separation) • Oscillating to new voltage with f0=1/2Π√LC • I(restrike)=2Vp/√L/C sinω0t • Transient peak of 3 Vp
  • 43. Capacitance Switching with a Restrike at Peak of Voltage
  • 44. Capacitor Switching …continued • A 13.8 KV, 5000KVAR, 3ph bank,NGr • Source Gr, inductance:1 mH • Restrike at Vp: 1- c=5/(377x13.8 )=69.64μF 2- Z=√1000/69.64=3.789Ω 3-Ip=2√2x13.8/(√3x3.789)=5.947 KA 4-f0=603 Hz
  • 45. Multiple Restrikes During Capacitance Switching
  • 46. FERRO RESONANCE - DEFINITION • The term Ferro resonance refers to a special kind of resonance that involves capacitance and iron-core inductance. The most common condition in which it causes disturbances is when the magnetizing impedance of a transformer is placed in series with a system capacitor. This happens when there is an open-phase conductor. Under controlled conditions, ferro resonance can be exploited for useful purpose such as in a constant-voltage transformer
  • 48. Ferro resonance- Occurence • Nonlinear resonance between unloaded transformer magnetizing branch and a series capacitor • May occur when distribution transformers fed from cables are switched one phase at a time • Especially a problem on ungrounded star-delta transformers • May occur any time an unloaded iron-core coil is in series with a capacitor
  • 49. 2. Terms and definitions 49 Long-duration overvoltage caused by ferroresonance of transformer
  • 50. Ferro resonance is different than resonance in linear system elements. In linear systems, resonance results in high sinusoidal voltages and currents of the resonant frequency. Ferro resonance can also result in high voltages and currents, but the resulting waveforms are usually irregular and chaotic in shape.
  • 51. The most common events leading ferro resonance are, Manual switching of an unloaded, cable-fed, three-phase transformer where only one phase is closed. Ferroresonance may be noted when the first phase is closed upon energization or before the last phase is opened on de-energization.
  • 53. Possible effects of ferroresonance • Overvoltage • Audible noise • Overheating • Sustained overvoltage => arrester failure • Flicker due to erratic voltage • Subharmonic voltages (e.g., at 1/3 or 1/2 of normal frequency) • Chaotic response
  • 54. Summary • In Unit 2, we have seen switching transient- Resistance switching Load switching Capacitor switching Current chopping Normal and Abnormal switching transient Current suppression Ferro resonance