SWITCHYARD
www.powerpointpresentationon.blogspot.com
 What is a Switchyard ?
It is a switching station which has the following credits :
(i) Main link between Generating plant and Transmission
system, which has a large influence on the security of the
supply.
(ii) Step-up and/or Step-down the voltage levels
depending upon the Network Node.
(iii) Switching ON/OFF Reactive Power Control devices,
which has effect on Quality of power.
SWITCHYARD EQUIPMENTS
• Equipments commonly found in switchyard :
1. Lightening arrestor
2. Current transformer
3. Voltage transformer
4. Power transformers / I.C.T.
5. Bus bar and clamp fittings
6. Support structure
7. Isolators
8. Circuit Breaker
9. Wave traps
10. Earthing switch
 Functions of various equipment :
* Transformers :
- Transforms the voltage levels from higher to lower level
or vice versa, keeping the power constant.
* Circuit breakers :
- Makes or automatically breaks the electrical circuits under Loaded
condition.
* Isolators :
- Opens or closes the electrical circuits under No-load conditions.
* Instrument transformers :
- For stepping-down the electrical parameter (Voltage or Current) to a
lower and safe value for Metering and Protection logics.
* Earth switch :
- Used to connect the charged body to ground to discharge the trapped
charge to have a safe maintenance zone.
Functions of various equipment :
* Lightning arrestors :
- Safe guards the equipment by discharging the high currents
due to Lightning.
* Overhead earth wire :
- Protects the O/H transmission line from Lightning strokes.
* Bus bar :
- Conductors to which a number of circuits are connected.
* Wave Traps/Line traps :
- Used in PLCC circuits for Communication and Protection of
Transmission lines
* Reactive Power control devices :
- Controls the reactive power imbalance in the grid by switching
ON/OFF the Shunt Reactors, Shunt Capacitors etc.,
* Current Limiting Reactors :
- Limits the Short circuit currents in case of faulty conditions.
Switchyard One line Diagram
Transfer Bus 400 KV
Main Bus II
Main Bus I
CB CB
CB
GT
20.5/400KV
Gen Bay Feeder Bay
Bus
Isolator
Transfer Bus
Bay
 Bus Switching Schemes :
Bus Bar Schemes
* Single Sectionalised bus
* Main & Transfer bus
* Sectionalised Main bus with Transfer bus
* Sectionalised Double Main & Transfer bus
Breaker Schemes
* Ring bus
* One and Half breaker
* Double bus Double breaker
* Single Sectionalized Bus-bar system :
I/C Feeders
O/G Feeders
Bus-bar
CB
Isolators
* Main & Transfer Bus-bar system :
I/C Feeders
Transfer Bus
CB
Isolators
Main Bus
Bus Coupler
* Ring Bus system :
I/C Supply
O/G feeder
Bus
CB
* One and Half Breaker scheme :
Tie CB
Main 1
Main 2
Feeder 1
Feeder 2
Feeder 2
 What is a Switchgear ?
“The apparatus used for Switching, Controlling and
Protecting the Electrical Circuits and equipment”.
 Need of Switchgear :
* Switching during normal operating conditions for the
purpose of Operation and Maintenance.
* Switching during Faults and Abnormal conditions and
interrupting the fault currents.
Relays
 Relay :
“A device that detects the fault and initiates the operation
of the Circuit breaker to isolate the defective element
from the rest of the system”.
* The relays detect the abnormal conditions in the electrical
circuits by constantly measuring the electrical quantities
which are different under normal and faulty conditions.
 Requirements of Protecting relaying :
Selectivity
- Ability to select the faulty part and isolate that part
without disturbing the rest of the system.
Speed
- Ability to disconnect the faulty part at the earliest
possible time.
Sensitivity
- Ability of the relay to operate with low value of
actuating quantity.
Reliability
- Ability of the system to operate under pre-determined
conditions
Simplicity
- Should be so simple so that it can be easily maintained.
- The simpler the protection scheme, the greater is the
reliability
Economy
- Availability at lower cost.
- Generally, the protective gear should not cost more
than 10% of the total cost. However, when the apparatus to
be protected is of utmost importance (e.g. Generator, GT
etc) economic conditions are subordinated to
reliability.
 Basic classification of Relays based on Function :
* Over current
* Under Voltage
* Impedance
* Under Frequency
* Directional
Circuit Breakers
 Main Parts of a Circuit Breaker :
* Fixed Contact
* Movable Contact
* Operating Mechanism
* Arc extinguishing medium
Supply from
source
Equipment
RELAY
Battery
Trip Coil
of
Breaker
CB
CT
Basic relay circuit scheme
 Fault clearing process :
During any Fault…..
* Fault impedance will be low, so fault current will
increase and relay senses this increase in current.
* Relay contacts closes and sends trip signal to circuit
breaker and the trip coil of the circuit breaker will get
energized.
* Operating mechanism of the circuit breaker will
operate and separate the contacts.
* Arc will be initiated between the contacts and it is
extinguished by suitable methods.
 Arcing phenomenon :
- When a fault occurs, heavy current flows through the contacts
of the circuit breaker before they are opened by the protective system.
- At the instant when the contacts begin to separate, the contact
area decreases rapidly and current density (I/A) increases and hence
rise in temperature.
-The heat produced is sufficient to ionise the medium between the
contacts. This ionised medium acts as conductor and an arc is struck
between the contacts.
- The potential difference between the contacts is very small and
is sufficient to maintain the arc.
- The current flow depends upon the Arc resistance.
 Few definitions :
Breaking Capacity Max fault current at which a CB is capable
of breaking a circuit.
Making Capacity Max current a CB can withstand if it closing on
existing Short circuit.
Restriking Voltage –After the arc has been extinguished, the
voltage across the breaker terminals does not normalize
instantaneously but it oscillates The transient voltage which appears
across the breaker contacts at the instant of arc being extinguished.
Recovery Voltage –Power frequency voltage which appears across
the breaker contacts after the arc is finally extinguished and transient
oscillations die out.
 Events/Timings during fault clearing process :
Fault clearing
Time
Relay time Circuit breaker
Time
Instant
Of
Fault
Closure of
Trip
Circuit
Final arc
Extinction
Circuit breaker
Time
Closure of
Trip
Circuit
= +
=
= to
to
Relay time
 Various types of CBs :
(i) Miniature CB
(ii) Air Break CB
(iii) Air Blast CB
(iv) Oil CB
(v) SF6 CB
(vi) Vacuum CB
Bulk Oil CB
Minimum Oil CB
 Air Break CB :
 Air Blast CB :
ABCB- Principle of arc quenching
 Bulk Oil CB :
 Minimum Oil CB :
 SF6 CB :
1. Op mechanism
2. Interrupter
3. Support
4. Op rod
5. Linkage
6. Terminals
7. Filters
8. Puffer cylinder
9. Nozzle
10. Fixed position
11. Fixed contact
12. Moving contact
13. Gas inlet
* Inert gas with high dielectric strength.
* Colour less and odour less.
* Non-toxic and non- inflammable.
* Sf6 is blown axially to the arc, hence it removes the heat by axial
convection and radial dissipation. As result the arc dia reduces
and comes to zero at current zero.
* Gas pressure in the chamber is at 5 ksc.
* SF6 is filled at a pressure of 12 ksc in the tank and maintained by
means of an individual or a common compressor.
* The decomposition products of arcing are not explosive hence no
chance of fire.
Disadvantages
* SF6 gas condensates at low temperature & high pressure
Advantage of SF6
 Vacuum CB :
* Used up to 66 KV.
* Vacuum is highly dielectric, so arc can’t persists.
* Separation of contacts causes the release of metal vapour from
the contacts, the density of vapour depends on the fault current.
* At current zero the vapour emission will tends to zero and the
density will becomes zero and dielectric strength will build up and
restriking will be prevented.
* No emission to atmosphere, hence pollution free.
* Non- explosive and silent operation.
* Compact size.
Advantage of vacuum CB
Disadvantages
* High initial cost.
* Surge suppressors (R or RC combination) are to be connected
at load side for limiting switching over-voltage while
switching low pf loads.
Isolator- functions
 Operates under off-load conditions
 Physically isolates the electric circuit
 Does not have any current making & breaking
capacity
 Used in addition to C.B.
Earth-Switch
 Operated when Isolator is open.
 Connected between Line conductor and Earth
whenever required.
 Discharge the voltage trap in line.
CB
Earth S/W
Isolator
Isolator Load
Source
* Practically, Pantograph type Earth switches were used.
Current transformers
 Purpose :
- To step-down the high magnitude of current
to a safe value to incorporate Measuring and
Protection logics
• Current transformers are used for the
instrumentation, protection or metering of power
systems and are normally installed on each side
of a circuit breaker.
Voltage transformers
 Purpose :
- To step-down the high magnitude of voltage
to a safe value to incorporate Measuring and
Protection logics.
• Voltage transformers serve a number of functions
in a power system. They are required for the
operation of many types of instrumentation and
relay protective systems. They measure voltage
and in conjunction with CT , they measure
power. They feed synchronizing equipment. They
can be used as coupling capacitors in power
line carrier network.
CAPACITIVE VOLTAGE TRANSFORMER
• - Primary voltage is applied to a series of
capacitors group. The voltage across one of the
capacitor is taken to aux PT. The secondary of
the aux PT is taken for measurement and
protection.
• SECONDARY VOLTAGES(110 VOLTS AC) FOR
METERS AND ENERGY METERS
• VOLTAGES FOR PROTECTIVE RELAYS
• VOLTAGES FOR SYNCHRONIZING
• DISTURBANCE RECORDERS AND EVENT LOGS
• OVERFLUX RELAYS
• PLCC
 Purpose :
- To discharge the high voltage surges in the power
system due to lightning to the ground.
 Apparatus to be protected :
* Overhead lines………Earth/Ground wires (PA=30 deg)
* HV equipment………LAs
* Substation…………...Lightning Masts, Earth wires
Lightening Arrestor
 Types :
Rod gap LA :
Insulator
Equipment
body
Rod gap
* Gap length is such that
the break-down occurs at
80% of the spark voltage
* After the surge, the arc
in the gap is maintained
by the normal supply
voltage. So, only used as
a back-up.
Wave Trap
Wave
Trap
Wave
Trap
Transmission Line
* Wave trap is used for Protection of the transmission line and
communication between the Substations.
* VHF signal is transmitted from one end to the another through the
same power line.
* Sends inter-trip signal to the other end CBs so that fault can be isolated
at the earliest time.
To control room
of S/S-2
To control room
of S/S-1
S/S-1
S/S-2
THANK
YOU

More Related Content

What's hot (20)

Instrument Transformer (ALIV - BANGLADESH)
Instrument Transformer (ALIV - BANGLADESH)Instrument Transformer (ALIV - BANGLADESH)
Instrument Transformer (ALIV - BANGLADESH)
 
132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur
 
Distribution System
Distribution SystemDistribution System
Distribution System
 
132 kv
132 kv132 kv
132 kv
 
Load Distribution
Load DistributionLoad Distribution
Load Distribution
 
220kv substation
220kv substation220kv substation
220kv substation
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 
Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training Presentation on 132/33 KVSubstation Training
Presentation on 132/33 KVSubstation Training
 
Relay coordination
Relay coordinationRelay coordination
Relay coordination
 
Circuit Breakers
Circuit BreakersCircuit Breakers
Circuit Breakers
 
Interconnection issue in microgrid
Interconnection issue in microgridInterconnection issue in microgrid
Interconnection issue in microgrid
 
Cable sizing part 2
Cable sizing part 2Cable sizing part 2
Cable sizing part 2
 
BUSBAR PROTECTION
BUSBAR PROTECTIONBUSBAR PROTECTION
BUSBAR PROTECTION
 
basics of busbar and lbb protection
basics of busbar and lbb protection basics of busbar and lbb protection
basics of busbar and lbb protection
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminar
 
FUNDAMENTALS OF POWER SYSTEM PROTECTION
FUNDAMENTALS OF POWER SYSTEM PROTECTIONFUNDAMENTALS OF POWER SYSTEM PROTECTION
FUNDAMENTALS OF POWER SYSTEM PROTECTION
 
Power system security
Power system securityPower system security
Power system security
 

Similar to Switchyard final

Design of substation
Design of substationDesign of substation
Design of substationSayanSarkar55
 
Electrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCBElectrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCBMANOJ964697
 
33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE Lalit Kumar
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at JassureShuvam Pathania
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khojaASHOK KHOJA
 
220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)Pankaj Rawal
 
Presentation on BSPTCL Grid Sub-Station
Presentation on BSPTCL Grid Sub-StationPresentation on BSPTCL Grid Sub-Station
Presentation on BSPTCL Grid Sub-StationRahul Prajapati
 
Lab manual psd v sem experiment no 7
Lab manual psd v sem experiment no 7Lab manual psd v sem experiment no 7
Lab manual psd v sem experiment no 7Sachin Airan
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1anuphowlader1
 
Presentation 2014
Presentation 2014Presentation 2014
Presentation 2014pinki199319
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSatish Pydimarla
 
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Rahul Prajapati
 
132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training reportMuntazir Mehdi
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharYatendra Parashar
 
Anurag Attri.pptx
Anurag Attri.pptxAnurag Attri.pptx
Anurag Attri.pptxAsif682330
 

Similar to Switchyard final (20)

Design of substation
Design of substationDesign of substation
Design of substation
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
Electrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCBElectrical Installations, MCB, MCCB, ELCB
Electrical Installations, MCB, MCCB, ELCB
 
33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE 33/11 KV TRANSMISSION LINE
33/11 KV TRANSMISSION LINE
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
Circuit breakers
Circuit breakersCircuit breakers
Circuit breakers
 
132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)220kv gss pindwara(sirohi)
220kv gss pindwara(sirohi)
 
Presentation on BSPTCL Grid Sub-Station
Presentation on BSPTCL Grid Sub-StationPresentation on BSPTCL Grid Sub-Station
Presentation on BSPTCL Grid Sub-Station
 
Lab manual psd v sem experiment no 7
Lab manual psd v sem experiment no 7Lab manual psd v sem experiment no 7
Lab manual psd v sem experiment no 7
 
Switchgear and protection lecture 1
Switchgear and protection lecture 1Switchgear and protection lecture 1
Switchgear and protection lecture 1
 
Presentation 2014
Presentation 2014Presentation 2014
Presentation 2014
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptx
 
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
Presentation on 132/33KV BSPTCL(Bodhgaya Substation)
 
132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
Anurag Attri.pptx
Anurag Attri.pptxAnurag Attri.pptx
Anurag Attri.pptx
 

Recently uploaded

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 

Recently uploaded (20)

Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 

Switchyard final

  • 2.  What is a Switchyard ? It is a switching station which has the following credits : (i) Main link between Generating plant and Transmission system, which has a large influence on the security of the supply. (ii) Step-up and/or Step-down the voltage levels depending upon the Network Node. (iii) Switching ON/OFF Reactive Power Control devices, which has effect on Quality of power.
  • 3. SWITCHYARD EQUIPMENTS • Equipments commonly found in switchyard : 1. Lightening arrestor 2. Current transformer 3. Voltage transformer 4. Power transformers / I.C.T. 5. Bus bar and clamp fittings 6. Support structure 7. Isolators 8. Circuit Breaker 9. Wave traps 10. Earthing switch
  • 4.  Functions of various equipment : * Transformers : - Transforms the voltage levels from higher to lower level or vice versa, keeping the power constant. * Circuit breakers : - Makes or automatically breaks the electrical circuits under Loaded condition. * Isolators : - Opens or closes the electrical circuits under No-load conditions. * Instrument transformers : - For stepping-down the electrical parameter (Voltage or Current) to a lower and safe value for Metering and Protection logics. * Earth switch : - Used to connect the charged body to ground to discharge the trapped charge to have a safe maintenance zone.
  • 5. Functions of various equipment : * Lightning arrestors : - Safe guards the equipment by discharging the high currents due to Lightning. * Overhead earth wire : - Protects the O/H transmission line from Lightning strokes. * Bus bar : - Conductors to which a number of circuits are connected. * Wave Traps/Line traps : - Used in PLCC circuits for Communication and Protection of Transmission lines * Reactive Power control devices : - Controls the reactive power imbalance in the grid by switching ON/OFF the Shunt Reactors, Shunt Capacitors etc., * Current Limiting Reactors : - Limits the Short circuit currents in case of faulty conditions.
  • 6.
  • 7.
  • 8.
  • 9. Switchyard One line Diagram Transfer Bus 400 KV Main Bus II Main Bus I CB CB CB GT 20.5/400KV Gen Bay Feeder Bay Bus Isolator Transfer Bus Bay
  • 10.  Bus Switching Schemes : Bus Bar Schemes * Single Sectionalised bus * Main & Transfer bus * Sectionalised Main bus with Transfer bus * Sectionalised Double Main & Transfer bus Breaker Schemes * Ring bus * One and Half breaker * Double bus Double breaker
  • 11. * Single Sectionalized Bus-bar system : I/C Feeders O/G Feeders Bus-bar CB Isolators
  • 12. * Main & Transfer Bus-bar system : I/C Feeders Transfer Bus CB Isolators Main Bus Bus Coupler
  • 13. * Ring Bus system : I/C Supply O/G feeder Bus CB
  • 14. * One and Half Breaker scheme : Tie CB Main 1 Main 2 Feeder 1 Feeder 2 Feeder 2
  • 15.  What is a Switchgear ? “The apparatus used for Switching, Controlling and Protecting the Electrical Circuits and equipment”.  Need of Switchgear : * Switching during normal operating conditions for the purpose of Operation and Maintenance. * Switching during Faults and Abnormal conditions and interrupting the fault currents.
  • 17.  Relay : “A device that detects the fault and initiates the operation of the Circuit breaker to isolate the defective element from the rest of the system”. * The relays detect the abnormal conditions in the electrical circuits by constantly measuring the electrical quantities which are different under normal and faulty conditions.
  • 18.  Requirements of Protecting relaying : Selectivity - Ability to select the faulty part and isolate that part without disturbing the rest of the system. Speed - Ability to disconnect the faulty part at the earliest possible time. Sensitivity - Ability of the relay to operate with low value of actuating quantity. Reliability - Ability of the system to operate under pre-determined conditions
  • 19. Simplicity - Should be so simple so that it can be easily maintained. - The simpler the protection scheme, the greater is the reliability Economy - Availability at lower cost. - Generally, the protective gear should not cost more than 10% of the total cost. However, when the apparatus to be protected is of utmost importance (e.g. Generator, GT etc) economic conditions are subordinated to reliability.
  • 20.  Basic classification of Relays based on Function : * Over current * Under Voltage * Impedance * Under Frequency * Directional
  • 22.  Main Parts of a Circuit Breaker : * Fixed Contact * Movable Contact * Operating Mechanism * Arc extinguishing medium
  • 24.  Fault clearing process : During any Fault….. * Fault impedance will be low, so fault current will increase and relay senses this increase in current. * Relay contacts closes and sends trip signal to circuit breaker and the trip coil of the circuit breaker will get energized. * Operating mechanism of the circuit breaker will operate and separate the contacts. * Arc will be initiated between the contacts and it is extinguished by suitable methods.
  • 25.  Arcing phenomenon : - When a fault occurs, heavy current flows through the contacts of the circuit breaker before they are opened by the protective system. - At the instant when the contacts begin to separate, the contact area decreases rapidly and current density (I/A) increases and hence rise in temperature. -The heat produced is sufficient to ionise the medium between the contacts. This ionised medium acts as conductor and an arc is struck between the contacts. - The potential difference between the contacts is very small and is sufficient to maintain the arc. - The current flow depends upon the Arc resistance.
  • 26.  Few definitions : Breaking Capacity Max fault current at which a CB is capable of breaking a circuit. Making Capacity Max current a CB can withstand if it closing on existing Short circuit. Restriking Voltage –After the arc has been extinguished, the voltage across the breaker terminals does not normalize instantaneously but it oscillates The transient voltage which appears across the breaker contacts at the instant of arc being extinguished. Recovery Voltage –Power frequency voltage which appears across the breaker contacts after the arc is finally extinguished and transient oscillations die out.
  • 27.  Events/Timings during fault clearing process : Fault clearing Time Relay time Circuit breaker Time Instant Of Fault Closure of Trip Circuit Final arc Extinction Circuit breaker Time Closure of Trip Circuit = + = = to to Relay time
  • 28.  Various types of CBs : (i) Miniature CB (ii) Air Break CB (iii) Air Blast CB (iv) Oil CB (v) SF6 CB (vi) Vacuum CB Bulk Oil CB Minimum Oil CB
  • 31. ABCB- Principle of arc quenching
  • 32.  Bulk Oil CB :
  • 33.
  • 35.
  • 36.  SF6 CB : 1. Op mechanism 2. Interrupter 3. Support 4. Op rod 5. Linkage 6. Terminals 7. Filters 8. Puffer cylinder 9. Nozzle 10. Fixed position 11. Fixed contact 12. Moving contact 13. Gas inlet
  • 37.
  • 38.
  • 39. * Inert gas with high dielectric strength. * Colour less and odour less. * Non-toxic and non- inflammable. * Sf6 is blown axially to the arc, hence it removes the heat by axial convection and radial dissipation. As result the arc dia reduces and comes to zero at current zero. * Gas pressure in the chamber is at 5 ksc. * SF6 is filled at a pressure of 12 ksc in the tank and maintained by means of an individual or a common compressor. * The decomposition products of arcing are not explosive hence no chance of fire. Disadvantages * SF6 gas condensates at low temperature & high pressure Advantage of SF6
  • 41.
  • 42.
  • 43. * Used up to 66 KV. * Vacuum is highly dielectric, so arc can’t persists. * Separation of contacts causes the release of metal vapour from the contacts, the density of vapour depends on the fault current. * At current zero the vapour emission will tends to zero and the density will becomes zero and dielectric strength will build up and restriking will be prevented. * No emission to atmosphere, hence pollution free. * Non- explosive and silent operation. * Compact size. Advantage of vacuum CB
  • 44. Disadvantages * High initial cost. * Surge suppressors (R or RC combination) are to be connected at load side for limiting switching over-voltage while switching low pf loads.
  • 45. Isolator- functions  Operates under off-load conditions  Physically isolates the electric circuit  Does not have any current making & breaking capacity  Used in addition to C.B.
  • 46. Earth-Switch  Operated when Isolator is open.  Connected between Line conductor and Earth whenever required.  Discharge the voltage trap in line.
  • 47. CB Earth S/W Isolator Isolator Load Source * Practically, Pantograph type Earth switches were used.
  • 48. Current transformers  Purpose : - To step-down the high magnitude of current to a safe value to incorporate Measuring and Protection logics • Current transformers are used for the instrumentation, protection or metering of power systems and are normally installed on each side of a circuit breaker.
  • 49. Voltage transformers  Purpose : - To step-down the high magnitude of voltage to a safe value to incorporate Measuring and Protection logics. • Voltage transformers serve a number of functions in a power system. They are required for the operation of many types of instrumentation and relay protective systems. They measure voltage and in conjunction with CT , they measure power. They feed synchronizing equipment. They can be used as coupling capacitors in power line carrier network.
  • 50. CAPACITIVE VOLTAGE TRANSFORMER • - Primary voltage is applied to a series of capacitors group. The voltage across one of the capacitor is taken to aux PT. The secondary of the aux PT is taken for measurement and protection. • SECONDARY VOLTAGES(110 VOLTS AC) FOR METERS AND ENERGY METERS • VOLTAGES FOR PROTECTIVE RELAYS • VOLTAGES FOR SYNCHRONIZING • DISTURBANCE RECORDERS AND EVENT LOGS • OVERFLUX RELAYS • PLCC
  • 51.  Purpose : - To discharge the high voltage surges in the power system due to lightning to the ground.  Apparatus to be protected : * Overhead lines………Earth/Ground wires (PA=30 deg) * HV equipment………LAs * Substation…………...Lightning Masts, Earth wires Lightening Arrestor
  • 52.  Types : Rod gap LA : Insulator Equipment body Rod gap * Gap length is such that the break-down occurs at 80% of the spark voltage * After the surge, the arc in the gap is maintained by the normal supply voltage. So, only used as a back-up.
  • 54. Wave Trap Wave Trap Transmission Line * Wave trap is used for Protection of the transmission line and communication between the Substations. * VHF signal is transmitted from one end to the another through the same power line. * Sends inter-trip signal to the other end CBs so that fault can be isolated at the earliest time. To control room of S/S-2 To control room of S/S-1 S/S-1 S/S-2