INTRODUCTION
PROJECT OBJECTIVE
AUTOMATIC RAILWAY GATE SYSTEM
AUTOMATIC RAILWAY GATE CONTROL
BLOCK DIAGRAM
MICROCONTROLLER
SENSOR USED IN MOTION DETECTOR
IR CIRCUIT
1. reduction of time closing and
opening the gate
2. higher reliability as it is not
subjected to manual errors
3. provide safety to the road
user by reducing the accidents.
RAJKUMARI
CHANDA
VISHAL KUMAR
wireless automatic railway gate control

wireless automatic railway gate control

  • 1.
    RADHA GOVIND GROUPOF INSTITUTIONS MEERUT A Project Report On : wireless automatic railway gate controlling Submitted To Submitted By Mr. puneet singh RAJKUMARI (Assistance Professor) B. Tech (EE final year ) Department Of Electrical Engineering
  • 2.
    INTRODUCTION PROJECT OBJECTIVE AUTOMATIC RAILWAYGATE SYSTEM AUTOMATIC RAILWAY GATE CONTROL BLOCK DIAGRAM MICROCONTROLLER SENSOR USED IN MOTION DETECTOR IR CIRCUIT
  • 4.
    1. reduction oftime closing and opening the gate 2. higher reliability as it is not subjected to manual errors 3. provide safety to the road user by reducing the accidents.
  • 14.