VISTA – KNOW MORE !BYBiswadip Goswami
Walkthrough !Introduction.Prologue for its development(Project Longhorn).New and Changed features.The Core (technical description).Security (The promise).Vista for Business.Vista for developer.Vanished features.Hardware Requirements.Resources(c) Biswadip Goswami,  biswadip@cognobytes.com
SOME FACTS !In 1983 Microsoft announced the development of Windows, a graphical user interface (GUI) for its own operating system (MS-DOS), which had shipped for IBM PC and compatible computers since 1981.(c) Biswadip Goswami,  biswadip@cognobytes.com
Progress report !MS-DOS basedMS-DOS 1.x through 6.22Windows 95 (MS-DOS 7.0)Windows 95 OEM Service Release 2.x and Windows 98 (MS-DOS 7.1)Windows Millennium Edition (MS-DOS 8.0)(c) Biswadip Goswami,  biswadip@cognobytes.com
Contd…Windows (MS-DOS Based)Windows 1.0Windows 2.0Windows/286 and Windows/386 (Windows 2.1)Windows 3.0Windows 3.1, Windows 3.1 for Workgroups, Windows  3.11, and Windows 3.11 for Workgroups (WfW)Windows 95 (Windows 4.0)Windows 98 (Windows 4.1)Windows Millennium Edition (Windows 4.9)(c) Biswadip Goswami,  biswadip@cognobytes.com
Contd…Windows NT basedWindows NT 3.1Windows NT 3.5Windows NT 3.51Windows NT 4.0 including up to Service Pack 6aWindows 2000 (Windows NT 5.0) including up to Service Pack 4Windows XP (Windows NT 5.1) including up to Service Pack 3Windows Server 2003 (Windows NT 5.2) including up to Service Pack 2Windows XP Professional x64 Edition (Windows NT 5.2) including up to Service Pack 2Windows Fundamentals for Legacy PCs (Windows NT 5.1) including up to Service Pack 3Windows Home Server (Windows NT 5.2)Windows Vista (Windows NT 6.0) including up to Service Pack 2Windows Server 2008 (Windows NT 6.0) including up to Service Pack 2Windows 7 (Windows NT 6.1)Windows Server 2008 R2 (Windows NT 6.1)(c) Biswadip Goswami,  biswadip@cognobytes.com
Vista Editions !	Windows Vista ships in several editions:Starter (32 bits only)Home BasicHome PremiumBusinessEnterprise (only available to large businesses and enterprises)Ultimate (combines both Home Premium and Business)(c) Biswadip Goswami,  biswadip@cognobytes.com
VISTA (codename: longhorn)Release Date – 08/11/2006Current Version – SP2-6002License : MS EULABased on Kernel –NT 6.0Supported architecture – x86-32,x86-64APIs – win32, .NET , POSIXFILES System - FAT16,FAT32,UDF,NTFSv3.1(c) Biswadip Goswami,  biswadip@cognobytes.com
Long Story Short !Microsoft began work on Windows Vista, known at the time by its codename Longhorn, in May 2001.Microsoft announced on August 27, 2004 that it had revised its plans.  Longhorn's development started anew, building on the Windows Server 2003 Service Pack 1 codebase. A new software development methodology called the Security Development Life cycle was incorporated in an effort to address concerns with the security of the Windows codebase.Windows Vista cost Microsoft 6 billion dollars to develop.(c) Biswadip Goswami,  biswadip@cognobytes.com
New and Changed Features !	Sync Center:              windows->all programs->accessories->sync centerBitLocker Drive Encryption: BitLocker prevents a thief who boots another operating system or runs a software hacking tool from breaking Windows Vista file and system protections or performing offline viewing of the files stored on the protected drive.Ease of Access CenterBuilt-in diagnostics: Disk Diagnostics, Memory Diagnostics, Network Diagnostics and troubleshooting, Resource Exhaustion PreventionFLIP and FLIP 3D	Games Explorer(c) Biswadip Goswami,  biswadip@cognobytes.com
Contd…Parental ControlMedia player 11Internet Explorer 8.0Media CenterMeeting SpaceWindows MailWindows Calender Publishing(c) Biswadip Goswami,  biswadip@cognobytes.com
Enhancement for End Users !Windows Aero: Authentic, Energetic, Reflective, and OpenWindows Shell:  The address bar has been replaced with a breadcrumb navigation system.Instant SearchWindows SidebarBackup and Restore CenterWindows DVD Maker(c) Biswadip Goswami,  biswadip@cognobytes.com
Contd…Windows Mobility CenterShadow copyWindows Photo GalleryWindows UpdateParental ControlWindows SideshowWindows System Assessment ToolsUltimate Extra(c) Biswadip Goswami,  biswadip@cognobytes.com
CoreVista includes technologies such as Ready Boost and Ready Drive which employ fast flash memory (located on USB drives and hybrid hard disk drives) to improve system performance by caching commonly used programs and data.As part of the redesign of the networking architecture, IPv6 has been fully incorporated into the operating system and a number of performance improvements have been introduced, such as TCP window scaling.(c) Biswadip Goswami,  biswadip@cognobytes.com
For graphics, Vista introduces a new Windows Display Driver Model and a major revision to Direct3D. The new driver model facilitates the new Desktop Window Manager, which provides the tearing-free desktop and special effects that are the cornerstones of Windows Aero.(c) Biswadip Goswami,  biswadip@cognobytes.com
The Heap Manager implements additional features such as integrity checking in order to improve robustness and defend against buffer overflow security exploits, although this comes at the price of breaking backward compatibility with some legacy applications. A Kernel Transaction Manager has been implemented that enables applications to work with the file system and Registry using atomic transaction operations.(c) Biswadip Goswami,  biswadip@cognobytes.com
SecurityMicrosoft's Trustworthy Computing initiative, which aims to improve public trust in its products, has had a direct effect on its development.User Account Control, or UAC is perhaps the most significant and visible of these changes. UAC is a security technology that makes it possible for users to use their computer with fewer privileges by default, with a view to stopping malware from making unauthorized changes to the system.(c) Biswadip Goswami,  biswadip@cognobytes.com
Contd…Testing by Symantec Corporation has proved the effectiveness of UAC. Symantec used over 2,000 active malware samples, consisting of backdoors, keyloggers , rootkits, mass mailers, trojan horses, spyware, adware, and various other samples.  Phishing filter, IDN with anti-spoofing capabilities, and integration with system-wide parental controls.(c) Biswadip Goswami,  biswadip@cognobytes.com
Contd…Microsoft's anti-spyware product, Windows Defender, has been incorporated into Windows, providing protection against malware and other threats.  BitLocker requires approximately a 1.5-gigabyte partition to be permanently unencrypted and to contain system files in order for Windows to boot.(c) Biswadip Goswami,  biswadip@cognobytes.com
BitLocker can work in conjunction with a Trusted Platform Module (TPM) cryptoprocessor (version 1.2) embedded in a computer's motherboard, or with a USB key.(c) Biswadip Goswami,  biswadip@cognobytes.com
VISTA for Business !The Windows Imaging Format (WIM) is the cornerstone of Microsoft's new deployment and packaging system. Windows Deployment Services replaces Remote Installation Services for deploying Vista and prior versions of Windows.New Group Policy settings have been added.Vista also introduced an XML based format (ADMX) to display registry-based policy settings, making it easier to manage networks that span geographic locations and different languages.(c) Biswadip Goswami,  biswadip@cognobytes.com
Services for UNIX has been renamed "Subsystem for UNIX-based Applications," and is included with the Enterprise and Ultimate editions of Vista.Multilingual User InterfaceWireless Projector support(c) Biswadip Goswami,  biswadip@cognobytes.com
For DevelopersWindows Presentation Foundation Windows Communication FoundationWindows Workflow FoundationWindows CardSpace(c) Biswadip Goswami,  biswadip@cognobytes.com
Removed featuresIncluding Windows Messenger, NTBackup, the network Messenger Service, HyperTerminal, MSN Explorer, Active Desktop, and the replacement of NetMeeting with Windows Meeting Space. The "Hardware profiles" start up feature has also been removed, along with support for older motherboard technologies like the EISA bus, APM and Game port support(c) Biswadip Goswami,  biswadip@cognobytes.com
Hardware RequiredWindows Vista system requirements,Vista Capable            Vista Premium ReadyProcessor800 MHz/ 1 GHzMemory512 MB/1 GBGraphics cardDirectX 9.0 capable/DirectX 9.0 capable and WDDM 1.0 driver supportGraphics memory32 MB/128 MBHDD capacity20 GB/40 GBHDD free space15 GBOther drivesDVD-ROM(c) Biswadip Goswami,  biswadip@cognobytes.com
Resourceshttp://www.microsoft.com/windows/windows-vista/default.aspxhttp://en.wikipedia.org/wiki/Comparison_of_Windows_Vista_and_Windows_XP(c) Biswadip Goswami,  biswadip@cognobytes.com
Thank You !For any assistance with your computing requirements contact:Biswadip GoswamiPrimary e-mail: biswadip_g@hotmail.comAlt e-mail: biswadip@cognobytes.comWebpage: http://people.cognobytes.com/biswadip(c) Biswadip Goswami,  biswadip@cognobytes.com

Windows Vista Tour

  • 1.
    VISTA – KNOWMORE !BYBiswadip Goswami
  • 2.
    Walkthrough !Introduction.Prologue forits development(Project Longhorn).New and Changed features.The Core (technical description).Security (The promise).Vista for Business.Vista for developer.Vanished features.Hardware Requirements.Resources(c) Biswadip Goswami, biswadip@cognobytes.com
  • 3.
    SOME FACTS !In1983 Microsoft announced the development of Windows, a graphical user interface (GUI) for its own operating system (MS-DOS), which had shipped for IBM PC and compatible computers since 1981.(c) Biswadip Goswami, biswadip@cognobytes.com
  • 4.
    Progress report !MS-DOSbasedMS-DOS 1.x through 6.22Windows 95 (MS-DOS 7.0)Windows 95 OEM Service Release 2.x and Windows 98 (MS-DOS 7.1)Windows Millennium Edition (MS-DOS 8.0)(c) Biswadip Goswami, biswadip@cognobytes.com
  • 5.
    Contd…Windows (MS-DOS Based)Windows1.0Windows 2.0Windows/286 and Windows/386 (Windows 2.1)Windows 3.0Windows 3.1, Windows 3.1 for Workgroups, Windows 3.11, and Windows 3.11 for Workgroups (WfW)Windows 95 (Windows 4.0)Windows 98 (Windows 4.1)Windows Millennium Edition (Windows 4.9)(c) Biswadip Goswami, biswadip@cognobytes.com
  • 6.
    Contd…Windows NT basedWindowsNT 3.1Windows NT 3.5Windows NT 3.51Windows NT 4.0 including up to Service Pack 6aWindows 2000 (Windows NT 5.0) including up to Service Pack 4Windows XP (Windows NT 5.1) including up to Service Pack 3Windows Server 2003 (Windows NT 5.2) including up to Service Pack 2Windows XP Professional x64 Edition (Windows NT 5.2) including up to Service Pack 2Windows Fundamentals for Legacy PCs (Windows NT 5.1) including up to Service Pack 3Windows Home Server (Windows NT 5.2)Windows Vista (Windows NT 6.0) including up to Service Pack 2Windows Server 2008 (Windows NT 6.0) including up to Service Pack 2Windows 7 (Windows NT 6.1)Windows Server 2008 R2 (Windows NT 6.1)(c) Biswadip Goswami, biswadip@cognobytes.com
  • 7.
    Vista Editions ! WindowsVista ships in several editions:Starter (32 bits only)Home BasicHome PremiumBusinessEnterprise (only available to large businesses and enterprises)Ultimate (combines both Home Premium and Business)(c) Biswadip Goswami, biswadip@cognobytes.com
  • 8.
    VISTA (codename: longhorn)ReleaseDate – 08/11/2006Current Version – SP2-6002License : MS EULABased on Kernel –NT 6.0Supported architecture – x86-32,x86-64APIs – win32, .NET , POSIXFILES System - FAT16,FAT32,UDF,NTFSv3.1(c) Biswadip Goswami, biswadip@cognobytes.com
  • 9.
    Long Story Short!Microsoft began work on Windows Vista, known at the time by its codename Longhorn, in May 2001.Microsoft announced on August 27, 2004 that it had revised its plans.  Longhorn's development started anew, building on the Windows Server 2003 Service Pack 1 codebase. A new software development methodology called the Security Development Life cycle was incorporated in an effort to address concerns with the security of the Windows codebase.Windows Vista cost Microsoft 6 billion dollars to develop.(c) Biswadip Goswami, biswadip@cognobytes.com
  • 10.
    New and ChangedFeatures ! Sync Center: windows->all programs->accessories->sync centerBitLocker Drive Encryption: BitLocker prevents a thief who boots another operating system or runs a software hacking tool from breaking Windows Vista file and system protections or performing offline viewing of the files stored on the protected drive.Ease of Access CenterBuilt-in diagnostics: Disk Diagnostics, Memory Diagnostics, Network Diagnostics and troubleshooting, Resource Exhaustion PreventionFLIP and FLIP 3D Games Explorer(c) Biswadip Goswami, biswadip@cognobytes.com
  • 11.
    Contd…Parental ControlMedia player11Internet Explorer 8.0Media CenterMeeting SpaceWindows MailWindows Calender Publishing(c) Biswadip Goswami, biswadip@cognobytes.com
  • 12.
    Enhancement for EndUsers !Windows Aero: Authentic, Energetic, Reflective, and OpenWindows Shell:  The address bar has been replaced with a breadcrumb navigation system.Instant SearchWindows SidebarBackup and Restore CenterWindows DVD Maker(c) Biswadip Goswami, biswadip@cognobytes.com
  • 13.
    Contd…Windows Mobility CenterShadowcopyWindows Photo GalleryWindows UpdateParental ControlWindows SideshowWindows System Assessment ToolsUltimate Extra(c) Biswadip Goswami, biswadip@cognobytes.com
  • 14.
    CoreVista includes technologiessuch as Ready Boost and Ready Drive which employ fast flash memory (located on USB drives and hybrid hard disk drives) to improve system performance by caching commonly used programs and data.As part of the redesign of the networking architecture, IPv6 has been fully incorporated into the operating system and a number of performance improvements have been introduced, such as TCP window scaling.(c) Biswadip Goswami, biswadip@cognobytes.com
  • 15.
    For graphics, Vistaintroduces a new Windows Display Driver Model and a major revision to Direct3D. The new driver model facilitates the new Desktop Window Manager, which provides the tearing-free desktop and special effects that are the cornerstones of Windows Aero.(c) Biswadip Goswami, biswadip@cognobytes.com
  • 16.
    The Heap Managerimplements additional features such as integrity checking in order to improve robustness and defend against buffer overflow security exploits, although this comes at the price of breaking backward compatibility with some legacy applications. A Kernel Transaction Manager has been implemented that enables applications to work with the file system and Registry using atomic transaction operations.(c) Biswadip Goswami, biswadip@cognobytes.com
  • 17.
    SecurityMicrosoft's Trustworthy Computing initiative, whichaims to improve public trust in its products, has had a direct effect on its development.User Account Control, or UAC is perhaps the most significant and visible of these changes. UAC is a security technology that makes it possible for users to use their computer with fewer privileges by default, with a view to stopping malware from making unauthorized changes to the system.(c) Biswadip Goswami, biswadip@cognobytes.com
  • 18.
    Contd…Testing by Symantec Corporation hasproved the effectiveness of UAC. Symantec used over 2,000 active malware samples, consisting of backdoors, keyloggers , rootkits, mass mailers, trojan horses, spyware, adware, and various other samples.  Phishing filter, IDN with anti-spoofing capabilities, and integration with system-wide parental controls.(c) Biswadip Goswami, biswadip@cognobytes.com
  • 19.
    Contd…Microsoft's anti-spyware product, WindowsDefender, has been incorporated into Windows, providing protection against malware and other threats.  BitLocker requires approximately a 1.5-gigabyte partition to be permanently unencrypted and to contain system files in order for Windows to boot.(c) Biswadip Goswami, biswadip@cognobytes.com
  • 20.
    BitLocker can workin conjunction with a Trusted Platform Module (TPM) cryptoprocessor (version 1.2) embedded in a computer's motherboard, or with a USB key.(c) Biswadip Goswami, biswadip@cognobytes.com
  • 21.
    VISTA for Business!The Windows Imaging Format (WIM) is the cornerstone of Microsoft's new deployment and packaging system. Windows Deployment Services replaces Remote Installation Services for deploying Vista and prior versions of Windows.New Group Policy settings have been added.Vista also introduced an XML based format (ADMX) to display registry-based policy settings, making it easier to manage networks that span geographic locations and different languages.(c) Biswadip Goswami, biswadip@cognobytes.com
  • 22.
    Services for UNIX hasbeen renamed "Subsystem for UNIX-based Applications," and is included with the Enterprise and Ultimate editions of Vista.Multilingual User InterfaceWireless Projector support(c) Biswadip Goswami, biswadip@cognobytes.com
  • 23.
    For DevelopersWindows PresentationFoundation Windows Communication FoundationWindows Workflow FoundationWindows CardSpace(c) Biswadip Goswami, biswadip@cognobytes.com
  • 24.
    Removed featuresIncluding Windows Messenger,NTBackup, the network Messenger Service, HyperTerminal, MSN Explorer, Active Desktop, and the replacement of NetMeeting with Windows Meeting Space. The "Hardware profiles" start up feature has also been removed, along with support for older motherboard technologies like the EISA bus, APM and Game port support(c) Biswadip Goswami, biswadip@cognobytes.com
  • 25.
    Hardware RequiredWindows Vistasystem requirements,Vista Capable Vista Premium ReadyProcessor800 MHz/ 1 GHzMemory512 MB/1 GBGraphics cardDirectX 9.0 capable/DirectX 9.0 capable and WDDM 1.0 driver supportGraphics memory32 MB/128 MBHDD capacity20 GB/40 GBHDD free space15 GBOther drivesDVD-ROM(c) Biswadip Goswami, biswadip@cognobytes.com
  • 26.
  • 27.
    Thank You !Forany assistance with your computing requirements contact:Biswadip GoswamiPrimary e-mail: biswadip_g@hotmail.comAlt e-mail: biswadip@cognobytes.comWebpage: http://people.cognobytes.com/biswadip(c) Biswadip Goswami, biswadip@cognobytes.com