Introduction Windows Vista  is a line of operating systems developed by Microsoft for use on personal computers, including home and business desktops, laptops, tablet PCs, and media center PCs. Prior to its announcement on July 22, 2005, Windows Vista was known by its codename "Longhorn." Development was completed on November 8, 2006; over the following three months it was released in stages to computer hardware and software manufacturers, business customers, and retail channels. On January 30, 2007, it was released worldwide, and was made available for purchase and download from Microsoft's website. The release of Windows Vista came more than five years after the introduction of its predecessor, Windows XP, the longest time span between successive releases of Microsoft Windows desktop operating systems. It was succeeded by Windows 7 which was released to manufacturing on July 22, 2009 and is scheduled for general availability on October 22, 2009
Windows Vista contains many changes and new features, including an updated graphical user interface and visual style dubbed Windows Aero, a redesigned search function, multimedia tools including Windows DVD Maker, and redesigned networking, audio, print, and display sub-systems. Vista aims to increase the level of communication between machines on a home network, using peer-to-peer technology to simplify sharing files and digital media between computers and devices. Windows Vista includes version 3.0 of the .NET Framework, allowing software developers to write applications without traditional Windows APIs. Microsoft's primary stated objective with Windows Vista has been to improve the state of security in the Windows operating system. One common criticism of Windows XP and its predecessors is their commonly exploited security vulnerabilities and overall susceptibility to malware, viruses and buffer overflows. In light of this, Microsoft chairman Bill Gates announced in early 2002 a company-wide "Trustworthy Computing initiative" which aims to incorporate security work into every aspect of software development at the company.
Development Microsoft began work on Windows Vista, known at the time by its codename Longhorn, in May 2001, five months before the release of Windows XP. It was originally expected to ship sometime late in 2003 as a minor step between Windows XP and Blackcomb, which was planned to be the company's next major operating system release. Gradually, "Longhorn" assimilated many of the important new features and technologies slated for Blackcomb, resulting in the release date being pushed back several times. Many of Microsoft's developers were also re-tasked to build updates to Windows XP and Windows Server 2003 to strengthen security. Faced with ongoing delays and concerns about feature creep, Microsoft announced on August 27, 2004 that it had revised its plans. After Blackcomb was named Windows Vista in July 2005, an unprecedented beta-test program was started, involving hundreds of thousands of volunteers and companies. In September of that year, Microsoft started releasing regular Community Technology Previews (CTP) to beta testers.
The builds that followed incorporated most of the planned features for the final product, as well as a number of changes to the user interface, based largely on feedback from beta testers. Windows Vista was deemed feature-complete with the release of the "February CTP", released on February 22, 2006, and much of the remainder of work between that build and the final release of the product focused on stability, performance, application and driver compatibility, and documentation Development of Windows Vista came to an end when Microsoft announced that it had been finalized on November 8, 2006. Windows Vista cost Microsoft 6 billion dollars to develop
End-User Windows Media Player 11 Windows Explorer in Windows Vista Windows Mobility Center Windows Update with Windows Ultimate Extras
Games Explorer on Windows Vista A User Account Control
Hardware requirement Computers capable of running Windows Vista are classified as  Vista Capable  and  Vista Premium Ready . A  Vista Capable  or equivalent PC is capable of running all editions of Windows Vista although some of the special features and high-end graphics options may require additional or more advanced hardware. A  Vista Premium Ready  PC can take advantage of Vista's high-end features.  Windows Vista's Basic and Classic interfaces work with virtually any graphics hardware that supports Windows XP or 2000; accordingly, most discussion around Vista's graphics requirements centers on those for the Windows Aero interface. As of Windows Vista Beta 2, the NVIDIA  GeForce  6  series and later, the ATI Radeon 9500 and later, Intel's GMA 950 and later integrated graphics, and a handful of VIA chipsets and S3 Graphics discrete chips are supported. Although originally supported, the GeForce FX 5 series has been dropped from newer drivers from NVIDIA. The last driver from NVIDIA to support the GeForce FX series on Vista was 96.85. Microsoft offers a tool called the  Windows Vista Upgrade Advisor [ to assist Windows XP and Vista users in determining what versions of Windows their machine is capable of running. Although the installation media included in retail packages is a 32-bit DVD, customers needing a CD-ROM or customers who wish for a 64-bit install media are able to acquire this media through the Windows Vista Alternate Media program The Ultimate edition includes both 32-bit and 64-bit media. The digitally downloaded version of Ultimate includes only one version, either 32-bit or 64-bit, from Windows Marketplace.
DVD-ROM Other drives 15 GB HDD free space 40 GB 20 GB HDD capacity 128 MB 32 MB Graphics memory DirectX 9.0 capable and WDDM 1.0 driver support DirectX 9.0 capable Graphics card 1 GB 512 MB Memory 1 GHz 800 MHz Processor Vista Premium Ready Vista Capable Windows Vista system requirements

Windows Vista

  • 1.
  • 2.
    Introduction Windows Vista is a line of operating systems developed by Microsoft for use on personal computers, including home and business desktops, laptops, tablet PCs, and media center PCs. Prior to its announcement on July 22, 2005, Windows Vista was known by its codename "Longhorn." Development was completed on November 8, 2006; over the following three months it was released in stages to computer hardware and software manufacturers, business customers, and retail channels. On January 30, 2007, it was released worldwide, and was made available for purchase and download from Microsoft's website. The release of Windows Vista came more than five years after the introduction of its predecessor, Windows XP, the longest time span between successive releases of Microsoft Windows desktop operating systems. It was succeeded by Windows 7 which was released to manufacturing on July 22, 2009 and is scheduled for general availability on October 22, 2009
  • 3.
    Windows Vista containsmany changes and new features, including an updated graphical user interface and visual style dubbed Windows Aero, a redesigned search function, multimedia tools including Windows DVD Maker, and redesigned networking, audio, print, and display sub-systems. Vista aims to increase the level of communication between machines on a home network, using peer-to-peer technology to simplify sharing files and digital media between computers and devices. Windows Vista includes version 3.0 of the .NET Framework, allowing software developers to write applications without traditional Windows APIs. Microsoft's primary stated objective with Windows Vista has been to improve the state of security in the Windows operating system. One common criticism of Windows XP and its predecessors is their commonly exploited security vulnerabilities and overall susceptibility to malware, viruses and buffer overflows. In light of this, Microsoft chairman Bill Gates announced in early 2002 a company-wide "Trustworthy Computing initiative" which aims to incorporate security work into every aspect of software development at the company.
  • 4.
    Development Microsoft beganwork on Windows Vista, known at the time by its codename Longhorn, in May 2001, five months before the release of Windows XP. It was originally expected to ship sometime late in 2003 as a minor step between Windows XP and Blackcomb, which was planned to be the company's next major operating system release. Gradually, "Longhorn" assimilated many of the important new features and technologies slated for Blackcomb, resulting in the release date being pushed back several times. Many of Microsoft's developers were also re-tasked to build updates to Windows XP and Windows Server 2003 to strengthen security. Faced with ongoing delays and concerns about feature creep, Microsoft announced on August 27, 2004 that it had revised its plans. After Blackcomb was named Windows Vista in July 2005, an unprecedented beta-test program was started, involving hundreds of thousands of volunteers and companies. In September of that year, Microsoft started releasing regular Community Technology Previews (CTP) to beta testers.
  • 5.
    The builds thatfollowed incorporated most of the planned features for the final product, as well as a number of changes to the user interface, based largely on feedback from beta testers. Windows Vista was deemed feature-complete with the release of the "February CTP", released on February 22, 2006, and much of the remainder of work between that build and the final release of the product focused on stability, performance, application and driver compatibility, and documentation Development of Windows Vista came to an end when Microsoft announced that it had been finalized on November 8, 2006. Windows Vista cost Microsoft 6 billion dollars to develop
  • 6.
    End-User Windows MediaPlayer 11 Windows Explorer in Windows Vista Windows Mobility Center Windows Update with Windows Ultimate Extras
  • 7.
    Games Explorer onWindows Vista A User Account Control
  • 8.
    Hardware requirement Computerscapable of running Windows Vista are classified as Vista Capable and Vista Premium Ready . A Vista Capable or equivalent PC is capable of running all editions of Windows Vista although some of the special features and high-end graphics options may require additional or more advanced hardware. A Vista Premium Ready PC can take advantage of Vista's high-end features. Windows Vista's Basic and Classic interfaces work with virtually any graphics hardware that supports Windows XP or 2000; accordingly, most discussion around Vista's graphics requirements centers on those for the Windows Aero interface. As of Windows Vista Beta 2, the NVIDIA GeForce 6 series and later, the ATI Radeon 9500 and later, Intel's GMA 950 and later integrated graphics, and a handful of VIA chipsets and S3 Graphics discrete chips are supported. Although originally supported, the GeForce FX 5 series has been dropped from newer drivers from NVIDIA. The last driver from NVIDIA to support the GeForce FX series on Vista was 96.85. Microsoft offers a tool called the Windows Vista Upgrade Advisor [ to assist Windows XP and Vista users in determining what versions of Windows their machine is capable of running. Although the installation media included in retail packages is a 32-bit DVD, customers needing a CD-ROM or customers who wish for a 64-bit install media are able to acquire this media through the Windows Vista Alternate Media program The Ultimate edition includes both 32-bit and 64-bit media. The digitally downloaded version of Ultimate includes only one version, either 32-bit or 64-bit, from Windows Marketplace.
  • 9.
    DVD-ROM Other drives15 GB HDD free space 40 GB 20 GB HDD capacity 128 MB 32 MB Graphics memory DirectX 9.0 capable and WDDM 1.0 driver support DirectX 9.0 capable Graphics card 1 GB 512 MB Memory 1 GHz 800 MHz Processor Vista Premium Ready Vista Capable Windows Vista system requirements