SlideShare a Scribd company logo
1 of 6
CHANNAKESHAVA REDDY R.A.
Contact: 00919482117099 / Email: ckreddy2@outlook.com
Seeking assignments as MEP Manager with an organization of high repute
PROFESSIONAL SUMMARY
⇒ A dynamic individual and qualified B.E (EEE) with nearly 10 years of experience in Execution and Design
Development of MEP and Pure Electrical projects.
⇒ Currently working as an Deputy Manager MEP (Design &Developement) with BSCPL Infrastructure Ltd.,
Bangalore and expertise in using modern frameworks, proven methodologies, best practices and patterns.
⇒ Adroit in managing the department resources to support project and setting up systems and work procedures for
project controls, etc.
⇒ Proficient in maintaining all requirements related to Bye laws of NBC, BBMP, BDA, BIAAPA, BESCOM,KPTCL,CEIG ISO
9001:2000, 14001, OSHAS18000 and conversant with project control procedures, manpower control, work
breakdown structures and procure resources required in time with cost control measures.
LEADERSHIP ATTRIBUTES
Driven to succeed and excel, Organisation building, Innovative in thought and solutions, Effective business
negotiations, Team management & mentoring
CORE SKILLS
EXPERTISE IN
1. MEP Design and Development, Evaluation of Service consultants,Analysis and Evaluation of Vendors
2. Method Statement – Execution as per procedure mentioned.
3. Risk Assessment –Hazards and Risk Identification in Execution & Material Handling , Measures taken to
prevent accidents.
4. Site visits and Material Inspections to Check whether all materials and Manpower are in competent with
Specifications mentioned and client requirements.
5. Communication to Contractors If there are any Deviations marked cc to Immediate superior and colleges.
6. Resolving if there are any Hindrances for work proceedings with client for any further.
7. Installation/Erection Checkings,,,,,,,,,,,,,,,,,, . . . .Dimensions, Alignment, Clearance and Fixing
Methods.
8. Testing and Commissioning, as per specifications and safety requirements
9. Update the Observations with Immediate Superior.
10. Planning Micro level as per Master plan with MSP and Primavera.
11. Stock checking, Procurement status and Evaluation.
12. Vendor evaluation, rate analysis and finalization.
13. Design Reviews, Checking as per Norms. Check for Value Engineering.
14. Quantity Surveying.
15. Inventory of Executed Quantities.
16. Sub contractor Billing, Client Billing.
17. Getting completion certificates from client and Handing Over -Taking Over with Client
PROFESSIONAL EXPERIENCE
Since Nov’2007 to July 2014 with Larsen and Toubro Ltd., Bangalore
The Growth Path with Key Projects Handled:
As a Client side Design and Developer of services required to the projects since July 2014.
BSCPL INFRASTRUCTURE LTD.
Responsibilities
1. Evaluation of Design feasibilities as per the bye laws and cost of the project
2.Co-ordinating with architect and service consultant(Fire, Electrical, PHE, HVAC) for optimal ot put of the project.
3.Fallow up with above said people for deliverables in time.
4.Floating of Tenders and Vendor evaluations.
5.Fallow up for liasoning and approvals for the proposed project lands.
Projects in Hand
1.Bollineni Hilside-2, Chennai
Consisting of 587750 sq ft, with 10n nos G+3 Towers and a Club House and Basement parking.
2.Bollineni Step stone and Bollineni Iris
156 No’s premium apartments and Villaments with elite type amenities.
3.Bollineni SILAS,
Consisting of 499 flats in white field Bangalore consisting of 10 towers and a club House.
4.Bollineni Serene ,
19 floors Premium project in Bangalore at Yelahanka, Having smart home facilities. Two Basements with only 56 flats and
Infinite swimming pol and club house.
5.Bollineni Nestor,
Affordable Housing project at Doddaballapura road Bangalore.
6.Bollineni Pinnacle,
A high raised Residential Development in Chennai with 18 towers a unique club house and a school with required amenities and
Substation.
There is a 200 acre project In pipe line, in the process of Design Development and Liasoning.
As an Electrical Package Manager and MEP coordinator since June 2013.
DAN HOTEL
CLIENT: Dan HOSPITALITY Ltd
CONSULTANT: JONES LANG LASALLE(JLL)
A FIVE STAR HOTEL CONSISTING OF 229 GUEST ROOMS,ELEVATED UPTO 24 FLOORS WITH CONFERNCE ROOMS , BANQUET
HALL, SWIMMING POOL , AMPHITHEATRE AND ALL AMINITIES AND UTILITIES LIKE ELECTRICAL SUBSTATION ,BOILER ROOM,
HVAC PLANT ROOM, KITCHEN, STP/WTP ARE ESTABLISHED AT 6 BASEMENTFLOORS.
 MONITORING OF ELECTRICAL WORKS. CO-ORDINATION FOR EXECUTION OF MEP ACTIVITIES
 RESPONSIBLE FOR INVOICING AND FUND FLOW OF THE ELECTRICAL PACKAGE.
 MOBALIZATION OF RESOURCES AND SITE INFRASTRUCTURE
 EXTRACTING QUANTITY OF MATERIAL FROM CONCEPTUAL DRAWING GIVEN BY DESIGNER.
 FLOATING ORDERS, NEGOTIATON AND FINALIZING THE AGENCIES FOR SPECIALIZED WORKS.
 CO-ORDINATION FOR ALL MEP SERVICES FOR PROVIDING WORK FRONT TO CIVIL WORKS AND INTERIOR DESIGNER
WORKS.
 FIRE HYDRANTS AND SPRINKLERS
 ERECTION OF PUMPS , PIPE LINES AND STP AND WTP
 ELECTRICAL WORKS CONSIST OF 2 X 1500KVA TRANSFORMER, 2 X 1250 KVA DG AND 380 KVA DG. PROVIDING
POWER SUPPLY TO ALL UTILITIES AND GUEST ROOMS.
As an Assistant Construction Manager (Electrical): Jun2013 to Dec 2013
Client : SHELL Petroleum Ltd., New Technology Centre, Bangalore
Consultant : Mott Macdonald Ltd.
Overview : It’s a state of art project spread over 40 acres near Bangalore International Airport, Which the
one of three Research and administration centers is set up by SHELL Petroleum’s. The scope
Includes total turnkey of engineering, procurement and construction of following buildings:
⇒ Office Building (basement +ground + 7floors &
roof)
⇒ Laboratory Building (ground + 2 floors + 2
Mezzanine floors)
⇒ Multi Level Car Parking & Gate Complexes
⇒ Electrical Substation & Utility Buildings
⇒ Storage & Warehouse
⇒ Mechanical Workshop & Utility Buildings
⇒ External Works
⇒ Electrical Equipments
⇒ 66KV/11 KV GIS
⇒ DG Sets
⇒ Transformer
⇒ UPS
⇒ Batteries
⇒ HT & LT Switch Gear Panels, Capacitor Banks, DB, Cables, Lighting Fixtures, Switches, Sockets,SCADA, Lightning
Protection System, Earthling Systems and External lighting etc.
⇒ Providing structural supports for above said all system including exhaust, fueling and cooling system of DG.
Role:
⇒ Mentoring and monitoring a team of 8 Engineers with the value of project 138Cr INR.
⇒ Responsible for:
o Mobalizing resources for project requirements.
o Evaluating and comparing vendors for the specialized activities.
⇒ Doing sample & data sheet approvals from client and scheduling micro view level & fallowing up for material
procurement.
⇒ Handling site logistical arrangements, preparing hazard investigation reports and method statements for the any
activity before starting any particular activity.
⇒ Managing monthly invoicing and joint measurement from client and taking approval from client.
⇒ Accountable for doing erection and commissioning of all illumination systems for the above said Buildings with
DALI, High Mast Tower and erection of structural supports for cables up to 20000KM, Panels and Pipelines.
As Site Incharge (Electrical) from Jan’12-Jun’13
Baba Atomic Research Centre, Reare Material Project Mysore
Title : Emergency Power Supply Facility with 8 X 2500KVA DG Sets
Client : BARC
Consultant : MECON
Overview : The project was executed with supply & erection, testing & commissioning of 8 sets of
marine
duty seismically qualified (Zone -2) 11kv/ 2500kva Diesel Generator with following systems:
⇒ Electrical systems including HT Panel, AMF Panel, Relay and Metering Panel, Control Panel, NGR with Isolator and
CTs, FCBC Battery Banks and 2X500KVA Dry type Transformers.
⇒ Diesel Engine system and Engine Start-up system with Dry Type Suction Air Filter, Combustion Air System,
Engine Governing System with necessary Instrumentation Systems with SCADA, and Pipelines.
⇒ Four numbers of motor driven air compressors, eight numbers of air receivers and four numbers air dryers along
with necessary pipe lines and valves.
⇒ Co2 Dosing system includes Co2 Cylinders Bank along with Pilot Cylinder and Valves, Co2 Discharge Hoses,
Nozzles and Pipelines, Fire Alarm Panel, Gas Release Panel, Gas Discharge Indicator, Multisensory Detectors
Abort Units.
⇒ AC and Ventilation system consists of Erection of27000CFM AHU, 37500CFM Fresh Air Fan, 34000 CFM Exhaust
Fan, Propeller Fans for Battery Rooms, VCDs, Fire Dampers, Ducts and Grills.
⇒ Acoustics and Exhaust system sound proof acoustics with seismic qualified supports and Exhaust system with 20”
pipe with suitable tower.
⇒ Exhaust silencer with thermal insulation.
⇒ Fuel oil system with eight numbers 2500Ltr Day tank and a 500 Ltr. over flow collection tank. Necessary valves,
filters, pipelines and with electric & control instrumentation in the fuel line.
Role:
⇒ Supervised sub contractor for timely completion of the above mentioned works.
⇒ Completed successfully Electrical, Mechanical and Civil works together.
⇒ Coordinated between consultants, client and sub-contractors for timely completion of the project.
⇒ Handled logistical arrangements and manpower management at site.
⇒ Done micro view scheduling and fallowed up for each and every activity.
⇒ Executed all the above mentioned activities as per the requirements of Atomic Energy Commission and CEA.
⇒ Overseen the installation of automation/process control and supervised devices such as PLC’s, HT Panels, FAS,
FPS and Air starting system of required specifications.
As Senior Engineer (Electrical) from Dec’10-Jan’12
Company : Jawaharlal Nehru Institute for Post Graduation in Medical Education & Research
Client : CPWD
Overview : The project was spread over large geographical area of 150 acres which consisting of
Teaching
Blocks, Regional Cancer Research Centre, Women & Children Hospital, 10 Blocks for Doctors
Quarters and Four Hostel Blocks for Boys & Girls. Two sub stations of 22/415kv having
2x1500kva Transformers, 2x1500kva Generators each and providing supply for all HVAC
units and Fire Protection System.
Role:
⇒ Accountable for:
o Monitoring execution of electrical activities in the project which includes supply and erection of HT/LT
Panels, Transformers, & Internal Electrification, UPS and Installations in all 7 Blocks.
o Verifying & recording all the quality checklists related to material inspection & test plan and work
inspection & test plan and issuing conformance and non-conformance of the ongoing activities.
o Resolving quality issues, device methods to achieve quality standards, organizing joint inspection to
facilitate faster resolution of quality issues, performing all activities listed under material inspection &
test plan and work inspection & test plan
o Handing over and certifying the completed blocks to client.
⇒ Solved quality issues, device methods to achieve quality standards, organized joint inspection to facilitate
faster resolution of quality issues, performed all activities listed under material inspection, test plan, work
inspection and test plan.
⇒ Communicated with engineering team at HO for preparation of engineering drawings as per specifications
given by client.
⇒ Done installation, testing and commissioning of all HV and LV Panels, Cables, Transformers, DG Sets, etc. and
responsible for execution of Electrical and HVAC systems Ducting / Insulation.
⇒ Interacted with Architects, Consultants, PMC, Contractors and Engineers.
⇒ Monitored work as per schedule from all Sub-ordinates from individual blocks including internal electrification and
substation commissioning.
As Senior Engineer (Planning Coordination and Electrical Engineer) from Dec’09-Nov’10
Title : Special Economic Zone Warehouse Project, Panvel, Mumbai
Client : Arshiya International Ltd.
Overview : The project was spread over large geographical area of 200 acres which consisting of 11
Warehouses of 180X60 mtr Each and International Level corporate facilities and A
Substation of 22/415kv with 2x1500kva Transformers, 2x1500kva Generators.
Role:
⇒ Coordinated with all service consultants & contractors like electrical, plumbing, air conditioning and structural
engineers, architects, landscape consultants, interior designers and civil & interior contractors and to ensure work
is completed within scheduled time.
⇒ Finalized requirements and specifications in consultation with engineering consultants/ collaborators, external
suppliers, contractors and clients.
⇒ Mentored Industrial Lighting in Warehouses of total area up to 96700 Sq mtrs.
⇒ Handled the installation of access control systems, CCTV cameras and building automation systems.
⇒ Supervised Office Lighting up to area 560 sq mtrs, all street lights including 6 nos. high mast towers and all
HT/LT Panels and Cable Installation works.
⇒ Overseen the installation of automation/process control and supervised devices such as PLC’s and drives of
required specifications.
⇒ Developed & checked SLD, Electrical Equipment Layouts, Cable Layouts, Earthing Layouts and Lighting Layouts.
⇒ Responsible for testing and commissioning of generators, motors like pneumatic controlled water suppliers,
sprinkler and hysrant umps, starters, breakers, panel, diesel generator, transformers, earthing, etc.
⇒ Installation, Testing and Commissioning of all HV and LV Panels, Cables, Transformers, DG Sets etc Will be
responsible for execution of Electrical and HVAC systems Ducting / Insulation.
Other Projects:
Title : Execution of Electrical Works At L&T Southcity, Bangalore.
Client : L&T (UI Division)
Company : L&T (ECC Division)
Period : Jan’09-Dec 09
Company : L&T (ECC Division)
Period : Coordinated with tender department for a period of 6 months from Aug’08-Jan’09
Title : ITC Housing Project Consisting of Seven Towers, Club House and Swimming Pool
Client : ITC Ltd.
Consultant : Nitesh Estates
Period : Nov’07-Jul’08
Role:
⇒ Responsible for:
o Verifying & recording all the quality checklists related to material inspection & test plan and work
Inspection & test plan.
o Keeping a check on the specifications being followed correctly onsite, coordinating with CS to ensure
the billing of accepted works.
o Resolving quality issues, device methods to achieve quality standards, organizing joint inspection to
facilitate faster resolution of quality issues, performing all activities listed under material inspection &
test plan and work inspection & test plan.
⇒ Accountable for mentoring & monitoring:
o Electrical conducting works in masonry walls, slabs and GI wiring for all conduits such that not to
miss points in walls or ceiling.
o Electrical point wiring in all the 80 Flats, Club House, Fancy Lights for Landscape area and street
lights.
o Erections PCC panel, Transformers, Metering Panels, HT panel and RMU.
⇒ Reported to Project Manager regarding work progress and scheduling for all types of electrical related activities.
⇒ Handled WTP, ETP. STP Air Compressors, Chillers. AHU , HSD yard, Pumps and Pumping System.
PREVIOUS EXPERIENCE
Jun’05-Oct’07 ABB Limited, Bangalore Site Engineer / Site In-charge
Key Project Handled: Accelerating Power Development Reforms Programme from Feb’07-Oct’07
Key Project Handled: Rural Load Management System, an automation project by Bangalore Electric Supply
Company from Jun’05-Aug’07
Key Client Handled: BESCOM
Role:
⇒ Looked after analysis of Power distribution centers and Motor control units.
⇒ Responsible for designing of cable for control panels- boxes containing PLCs, Contactors ranging from 40A to
160A and MCCBs of same ratings and Automated Metering units.
⇒ Managed erection of HT/LT Overhead lines of route length more than 220kM with Rabbit Conductor.
⇒ Handled erection & maintenance of RLMS units up to 1500 numbers and erection of distribution transformers
ranging from 25KVA to250KVA.
⇒ Coordinated and controlled the contractors. Submitted bills for execution and maintenance of above mentioned
systems which includes programming PLC’s and testing.
ACADEMIC CREDENTIALS
2005 B.E (EEE) from Sir. M.V.I.T., Bangalore, V.T. University, Belgaum
IT Forte:
Programming Languages : C, C++, VC++, MFC, MSVisualstudio2005
Design Tools : Labview and AutoCAD
Automation Tools : PLC Programming, Domotics, BMS, Powerview, MS Office, MS Project
ERP
Accolades:
⇒ Successfully acquired:
o 2nd
place in State Level Technical Project Presentation Competition (SHRISTI-2004).
o 1st
place in State Level Mathematics Symposium in the year 1998.
PERSONAL DOSSIER
Date of Birth : 16th
July, 1981
Address : #172, 6th
Main, Vinayaka Nagara, Defence Colony, Bagalur Cross, Bangalore –
560063
Linguistics Abilities : English, Kannada, Hindi, Telugu and Tamil
Jun’05-Oct’07 ABB Limited, Bangalore Site Engineer / Site In-charge
Key Project Handled: Accelerating Power Development Reforms Programme from Feb’07-Oct’07
Key Project Handled: Rural Load Management System, an automation project by Bangalore Electric Supply
Company from Jun’05-Aug’07
Key Client Handled: BESCOM
Role:
⇒ Looked after analysis of Power distribution centers and Motor control units.
⇒ Responsible for designing of cable for control panels- boxes containing PLCs, Contactors ranging from 40A to
160A and MCCBs of same ratings and Automated Metering units.
⇒ Managed erection of HT/LT Overhead lines of route length more than 220kM with Rabbit Conductor.
⇒ Handled erection & maintenance of RLMS units up to 1500 numbers and erection of distribution transformers
ranging from 25KVA to250KVA.
⇒ Coordinated and controlled the contractors. Submitted bills for execution and maintenance of above mentioned
systems which includes programming PLC’s and testing.
ACADEMIC CREDENTIALS
2005 B.E (EEE) from Sir. M.V.I.T., Bangalore, V.T. University, Belgaum
IT Forte:
Programming Languages : C, C++, VC++, MFC, MSVisualstudio2005
Design Tools : Labview and AutoCAD
Automation Tools : PLC Programming, Domotics, BMS, Powerview, MS Office, MS Project
ERP
Accolades:
⇒ Successfully acquired:
o 2nd
place in State Level Technical Project Presentation Competition (SHRISTI-2004).
o 1st
place in State Level Mathematics Symposium in the year 1998.
PERSONAL DOSSIER
Date of Birth : 16th
July, 1981
Address : #172, 6th
Main, Vinayaka Nagara, Defence Colony, Bagalur Cross, Bangalore –
560063
Linguistics Abilities : English, Kannada, Hindi, Telugu and Tamil

More Related Content

What's hot (20)

Brijesh cv
Brijesh cvBrijesh cv
Brijesh cv
 
Behnam Nikouei resume
Behnam Nikouei resumeBehnam Nikouei resume
Behnam Nikouei resume
 
Update profile 2015
Update profile 2015Update profile 2015
Update profile 2015
 
Eng Luai Al-Rabadi CV
Eng Luai Al-Rabadi CVEng Luai Al-Rabadi CV
Eng Luai Al-Rabadi CV
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
MOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CVMOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CV
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
RSR LATEST TRESUME
RSR LATEST TRESUMERSR LATEST TRESUME
RSR LATEST TRESUME
 
Siyabonga Dywili Detailed CV
Siyabonga Dywili Detailed CVSiyabonga Dywili Detailed CV
Siyabonga Dywili Detailed CV
 
Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes MEP manager.
Lee Scholes MEP manager.
 
Manoranjan Bal Resume
Manoranjan Bal ResumeManoranjan Bal Resume
Manoranjan Bal Resume
 
Tauseef_CV PP_Rev2
Tauseef_CV PP_Rev2Tauseef_CV PP_Rev2
Tauseef_CV PP_Rev2
 
RCPRESUMEOCT2016
RCPRESUMEOCT2016RCPRESUMEOCT2016
RCPRESUMEOCT2016
 
Aldrin 2014
Aldrin 2014Aldrin 2014
Aldrin 2014
 
william-second-revision (3)
william-second-revision (3)william-second-revision (3)
william-second-revision (3)
 
CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.CV_SR MEP MANAGER. NT.
CV_SR MEP MANAGER. NT.
 
Ir. Unggang CV latest
Ir. Unggang CV latestIr. Unggang CV latest
Ir. Unggang CV latest
 
Nermin Smajic Resume 3.2016
Nermin Smajic  Resume  3.2016Nermin Smajic  Resume  3.2016
Nermin Smajic Resume 3.2016
 
SELVA RESUME
SELVA RESUMESELVA RESUME
SELVA RESUME
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 

Similar to ckreddycv (1)

Similar to ckreddycv (1) (20)

ckreddycv (1)
ckreddycv (1)ckreddycv (1)
ckreddycv (1)
 
cv_amitava_updated
cv_amitava_updatedcv_amitava_updated
cv_amitava_updated
 
Kdmc
KdmcKdmc
Kdmc
 
Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)Electrical Engineer Sajid Akram N (1)
Electrical Engineer Sajid Akram N (1)
 
CURRICULUM
CURRICULUMCURRICULUM
CURRICULUM
 
Malikjan Resume New
Malikjan Resume NewMalikjan Resume New
Malikjan Resume New
 
NASEER CV JUNE 2015
NASEER CV JUNE 2015NASEER CV JUNE 2015
NASEER CV JUNE 2015
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
RAHUL_CV-2015
RAHUL_CV-2015RAHUL_CV-2015
RAHUL_CV-2015
 
Habibulla Khan Pathan - Engineering & Project Management Professional
Habibulla Khan Pathan - Engineering & Project Management ProfessionalHabibulla Khan Pathan - Engineering & Project Management Professional
Habibulla Khan Pathan - Engineering & Project Management Professional
 
Resume Engineer DB
Resume Engineer DBResume Engineer DB
Resume Engineer DB
 
R.Kumar
R.KumarR.Kumar
R.Kumar
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
CV-Sandeep Kumar Updated
CV-Sandeep Kumar UpdatedCV-Sandeep Kumar Updated
CV-Sandeep Kumar Updated
 
RESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPLRESUME_BS-Project-Maint -1- JPL
RESUME_BS-Project-Maint -1- JPL
 
160615 cs2680551
160615 cs2680551160615 cs2680551
160615 cs2680551
 
160615CS2680551
160615CS2680551160615CS2680551
160615CS2680551
 
Mep manager surendra yadav 26112016
Mep manager surendra  yadav 26112016Mep manager surendra  yadav 26112016
Mep manager surendra yadav 26112016
 
Sathish Kumar-Resume.
Sathish Kumar-Resume.Sathish Kumar-Resume.
Sathish Kumar-Resume.
 

ckreddycv (1)

  • 1. CHANNAKESHAVA REDDY R.A. Contact: 00919482117099 / Email: ckreddy2@outlook.com Seeking assignments as MEP Manager with an organization of high repute PROFESSIONAL SUMMARY ⇒ A dynamic individual and qualified B.E (EEE) with nearly 10 years of experience in Execution and Design Development of MEP and Pure Electrical projects. ⇒ Currently working as an Deputy Manager MEP (Design &Developement) with BSCPL Infrastructure Ltd., Bangalore and expertise in using modern frameworks, proven methodologies, best practices and patterns. ⇒ Adroit in managing the department resources to support project and setting up systems and work procedures for project controls, etc. ⇒ Proficient in maintaining all requirements related to Bye laws of NBC, BBMP, BDA, BIAAPA, BESCOM,KPTCL,CEIG ISO 9001:2000, 14001, OSHAS18000 and conversant with project control procedures, manpower control, work breakdown structures and procure resources required in time with cost control measures. LEADERSHIP ATTRIBUTES Driven to succeed and excel, Organisation building, Innovative in thought and solutions, Effective business negotiations, Team management & mentoring CORE SKILLS EXPERTISE IN 1. MEP Design and Development, Evaluation of Service consultants,Analysis and Evaluation of Vendors 2. Method Statement – Execution as per procedure mentioned. 3. Risk Assessment –Hazards and Risk Identification in Execution & Material Handling , Measures taken to prevent accidents. 4. Site visits and Material Inspections to Check whether all materials and Manpower are in competent with Specifications mentioned and client requirements. 5. Communication to Contractors If there are any Deviations marked cc to Immediate superior and colleges. 6. Resolving if there are any Hindrances for work proceedings with client for any further. 7. Installation/Erection Checkings,,,,,,,,,,,,,,,,,, . . . .Dimensions, Alignment, Clearance and Fixing Methods. 8. Testing and Commissioning, as per specifications and safety requirements 9. Update the Observations with Immediate Superior. 10. Planning Micro level as per Master plan with MSP and Primavera. 11. Stock checking, Procurement status and Evaluation. 12. Vendor evaluation, rate analysis and finalization. 13. Design Reviews, Checking as per Norms. Check for Value Engineering. 14. Quantity Surveying. 15. Inventory of Executed Quantities. 16. Sub contractor Billing, Client Billing. 17. Getting completion certificates from client and Handing Over -Taking Over with Client PROFESSIONAL EXPERIENCE Since Nov’2007 to July 2014 with Larsen and Toubro Ltd., Bangalore The Growth Path with Key Projects Handled: As a Client side Design and Developer of services required to the projects since July 2014. BSCPL INFRASTRUCTURE LTD. Responsibilities 1. Evaluation of Design feasibilities as per the bye laws and cost of the project 2.Co-ordinating with architect and service consultant(Fire, Electrical, PHE, HVAC) for optimal ot put of the project. 3.Fallow up with above said people for deliverables in time. 4.Floating of Tenders and Vendor evaluations. 5.Fallow up for liasoning and approvals for the proposed project lands.
  • 2. Projects in Hand 1.Bollineni Hilside-2, Chennai Consisting of 587750 sq ft, with 10n nos G+3 Towers and a Club House and Basement parking. 2.Bollineni Step stone and Bollineni Iris 156 No’s premium apartments and Villaments with elite type amenities. 3.Bollineni SILAS, Consisting of 499 flats in white field Bangalore consisting of 10 towers and a club House. 4.Bollineni Serene , 19 floors Premium project in Bangalore at Yelahanka, Having smart home facilities. Two Basements with only 56 flats and Infinite swimming pol and club house. 5.Bollineni Nestor, Affordable Housing project at Doddaballapura road Bangalore. 6.Bollineni Pinnacle, A high raised Residential Development in Chennai with 18 towers a unique club house and a school with required amenities and Substation. There is a 200 acre project In pipe line, in the process of Design Development and Liasoning. As an Electrical Package Manager and MEP coordinator since June 2013. DAN HOTEL CLIENT: Dan HOSPITALITY Ltd CONSULTANT: JONES LANG LASALLE(JLL) A FIVE STAR HOTEL CONSISTING OF 229 GUEST ROOMS,ELEVATED UPTO 24 FLOORS WITH CONFERNCE ROOMS , BANQUET HALL, SWIMMING POOL , AMPHITHEATRE AND ALL AMINITIES AND UTILITIES LIKE ELECTRICAL SUBSTATION ,BOILER ROOM, HVAC PLANT ROOM, KITCHEN, STP/WTP ARE ESTABLISHED AT 6 BASEMENTFLOORS.  MONITORING OF ELECTRICAL WORKS. CO-ORDINATION FOR EXECUTION OF MEP ACTIVITIES  RESPONSIBLE FOR INVOICING AND FUND FLOW OF THE ELECTRICAL PACKAGE.  MOBALIZATION OF RESOURCES AND SITE INFRASTRUCTURE  EXTRACTING QUANTITY OF MATERIAL FROM CONCEPTUAL DRAWING GIVEN BY DESIGNER.  FLOATING ORDERS, NEGOTIATON AND FINALIZING THE AGENCIES FOR SPECIALIZED WORKS.  CO-ORDINATION FOR ALL MEP SERVICES FOR PROVIDING WORK FRONT TO CIVIL WORKS AND INTERIOR DESIGNER WORKS.  FIRE HYDRANTS AND SPRINKLERS  ERECTION OF PUMPS , PIPE LINES AND STP AND WTP  ELECTRICAL WORKS CONSIST OF 2 X 1500KVA TRANSFORMER, 2 X 1250 KVA DG AND 380 KVA DG. PROVIDING POWER SUPPLY TO ALL UTILITIES AND GUEST ROOMS. As an Assistant Construction Manager (Electrical): Jun2013 to Dec 2013 Client : SHELL Petroleum Ltd., New Technology Centre, Bangalore Consultant : Mott Macdonald Ltd. Overview : It’s a state of art project spread over 40 acres near Bangalore International Airport, Which the one of three Research and administration centers is set up by SHELL Petroleum’s. The scope Includes total turnkey of engineering, procurement and construction of following buildings: ⇒ Office Building (basement +ground + 7floors & roof) ⇒ Laboratory Building (ground + 2 floors + 2 Mezzanine floors) ⇒ Multi Level Car Parking & Gate Complexes ⇒ Electrical Substation & Utility Buildings ⇒ Storage & Warehouse ⇒ Mechanical Workshop & Utility Buildings ⇒ External Works ⇒ Electrical Equipments ⇒ 66KV/11 KV GIS ⇒ DG Sets ⇒ Transformer ⇒ UPS ⇒ Batteries ⇒ HT & LT Switch Gear Panels, Capacitor Banks, DB, Cables, Lighting Fixtures, Switches, Sockets,SCADA, Lightning Protection System, Earthling Systems and External lighting etc. ⇒ Providing structural supports for above said all system including exhaust, fueling and cooling system of DG.
  • 3. Role: ⇒ Mentoring and monitoring a team of 8 Engineers with the value of project 138Cr INR. ⇒ Responsible for: o Mobalizing resources for project requirements. o Evaluating and comparing vendors for the specialized activities. ⇒ Doing sample & data sheet approvals from client and scheduling micro view level & fallowing up for material procurement. ⇒ Handling site logistical arrangements, preparing hazard investigation reports and method statements for the any activity before starting any particular activity. ⇒ Managing monthly invoicing and joint measurement from client and taking approval from client. ⇒ Accountable for doing erection and commissioning of all illumination systems for the above said Buildings with DALI, High Mast Tower and erection of structural supports for cables up to 20000KM, Panels and Pipelines. As Site Incharge (Electrical) from Jan’12-Jun’13 Baba Atomic Research Centre, Reare Material Project Mysore Title : Emergency Power Supply Facility with 8 X 2500KVA DG Sets Client : BARC Consultant : MECON Overview : The project was executed with supply & erection, testing & commissioning of 8 sets of marine duty seismically qualified (Zone -2) 11kv/ 2500kva Diesel Generator with following systems: ⇒ Electrical systems including HT Panel, AMF Panel, Relay and Metering Panel, Control Panel, NGR with Isolator and CTs, FCBC Battery Banks and 2X500KVA Dry type Transformers. ⇒ Diesel Engine system and Engine Start-up system with Dry Type Suction Air Filter, Combustion Air System, Engine Governing System with necessary Instrumentation Systems with SCADA, and Pipelines. ⇒ Four numbers of motor driven air compressors, eight numbers of air receivers and four numbers air dryers along with necessary pipe lines and valves. ⇒ Co2 Dosing system includes Co2 Cylinders Bank along with Pilot Cylinder and Valves, Co2 Discharge Hoses, Nozzles and Pipelines, Fire Alarm Panel, Gas Release Panel, Gas Discharge Indicator, Multisensory Detectors Abort Units. ⇒ AC and Ventilation system consists of Erection of27000CFM AHU, 37500CFM Fresh Air Fan, 34000 CFM Exhaust Fan, Propeller Fans for Battery Rooms, VCDs, Fire Dampers, Ducts and Grills. ⇒ Acoustics and Exhaust system sound proof acoustics with seismic qualified supports and Exhaust system with 20” pipe with suitable tower. ⇒ Exhaust silencer with thermal insulation. ⇒ Fuel oil system with eight numbers 2500Ltr Day tank and a 500 Ltr. over flow collection tank. Necessary valves, filters, pipelines and with electric & control instrumentation in the fuel line. Role: ⇒ Supervised sub contractor for timely completion of the above mentioned works. ⇒ Completed successfully Electrical, Mechanical and Civil works together. ⇒ Coordinated between consultants, client and sub-contractors for timely completion of the project. ⇒ Handled logistical arrangements and manpower management at site. ⇒ Done micro view scheduling and fallowed up for each and every activity. ⇒ Executed all the above mentioned activities as per the requirements of Atomic Energy Commission and CEA. ⇒ Overseen the installation of automation/process control and supervised devices such as PLC’s, HT Panels, FAS, FPS and Air starting system of required specifications. As Senior Engineer (Electrical) from Dec’10-Jan’12 Company : Jawaharlal Nehru Institute for Post Graduation in Medical Education & Research Client : CPWD Overview : The project was spread over large geographical area of 150 acres which consisting of Teaching Blocks, Regional Cancer Research Centre, Women & Children Hospital, 10 Blocks for Doctors Quarters and Four Hostel Blocks for Boys & Girls. Two sub stations of 22/415kv having 2x1500kva Transformers, 2x1500kva Generators each and providing supply for all HVAC units and Fire Protection System. Role: ⇒ Accountable for: o Monitoring execution of electrical activities in the project which includes supply and erection of HT/LT Panels, Transformers, & Internal Electrification, UPS and Installations in all 7 Blocks. o Verifying & recording all the quality checklists related to material inspection & test plan and work inspection & test plan and issuing conformance and non-conformance of the ongoing activities. o Resolving quality issues, device methods to achieve quality standards, organizing joint inspection to facilitate faster resolution of quality issues, performing all activities listed under material inspection & test plan and work inspection & test plan o Handing over and certifying the completed blocks to client. ⇒ Solved quality issues, device methods to achieve quality standards, organized joint inspection to facilitate faster resolution of quality issues, performed all activities listed under material inspection, test plan, work inspection and test plan.
  • 4. ⇒ Communicated with engineering team at HO for preparation of engineering drawings as per specifications given by client. ⇒ Done installation, testing and commissioning of all HV and LV Panels, Cables, Transformers, DG Sets, etc. and responsible for execution of Electrical and HVAC systems Ducting / Insulation. ⇒ Interacted with Architects, Consultants, PMC, Contractors and Engineers. ⇒ Monitored work as per schedule from all Sub-ordinates from individual blocks including internal electrification and substation commissioning. As Senior Engineer (Planning Coordination and Electrical Engineer) from Dec’09-Nov’10 Title : Special Economic Zone Warehouse Project, Panvel, Mumbai Client : Arshiya International Ltd. Overview : The project was spread over large geographical area of 200 acres which consisting of 11 Warehouses of 180X60 mtr Each and International Level corporate facilities and A Substation of 22/415kv with 2x1500kva Transformers, 2x1500kva Generators. Role: ⇒ Coordinated with all service consultants & contractors like electrical, plumbing, air conditioning and structural engineers, architects, landscape consultants, interior designers and civil & interior contractors and to ensure work is completed within scheduled time. ⇒ Finalized requirements and specifications in consultation with engineering consultants/ collaborators, external suppliers, contractors and clients. ⇒ Mentored Industrial Lighting in Warehouses of total area up to 96700 Sq mtrs. ⇒ Handled the installation of access control systems, CCTV cameras and building automation systems. ⇒ Supervised Office Lighting up to area 560 sq mtrs, all street lights including 6 nos. high mast towers and all HT/LT Panels and Cable Installation works. ⇒ Overseen the installation of automation/process control and supervised devices such as PLC’s and drives of required specifications. ⇒ Developed & checked SLD, Electrical Equipment Layouts, Cable Layouts, Earthing Layouts and Lighting Layouts. ⇒ Responsible for testing and commissioning of generators, motors like pneumatic controlled water suppliers, sprinkler and hysrant umps, starters, breakers, panel, diesel generator, transformers, earthing, etc. ⇒ Installation, Testing and Commissioning of all HV and LV Panels, Cables, Transformers, DG Sets etc Will be responsible for execution of Electrical and HVAC systems Ducting / Insulation. Other Projects: Title : Execution of Electrical Works At L&T Southcity, Bangalore. Client : L&T (UI Division) Company : L&T (ECC Division) Period : Jan’09-Dec 09 Company : L&T (ECC Division) Period : Coordinated with tender department for a period of 6 months from Aug’08-Jan’09 Title : ITC Housing Project Consisting of Seven Towers, Club House and Swimming Pool Client : ITC Ltd. Consultant : Nitesh Estates Period : Nov’07-Jul’08 Role: ⇒ Responsible for: o Verifying & recording all the quality checklists related to material inspection & test plan and work Inspection & test plan. o Keeping a check on the specifications being followed correctly onsite, coordinating with CS to ensure the billing of accepted works. o Resolving quality issues, device methods to achieve quality standards, organizing joint inspection to facilitate faster resolution of quality issues, performing all activities listed under material inspection & test plan and work inspection & test plan. ⇒ Accountable for mentoring & monitoring: o Electrical conducting works in masonry walls, slabs and GI wiring for all conduits such that not to miss points in walls or ceiling. o Electrical point wiring in all the 80 Flats, Club House, Fancy Lights for Landscape area and street lights. o Erections PCC panel, Transformers, Metering Panels, HT panel and RMU. ⇒ Reported to Project Manager regarding work progress and scheduling for all types of electrical related activities. ⇒ Handled WTP, ETP. STP Air Compressors, Chillers. AHU , HSD yard, Pumps and Pumping System. PREVIOUS EXPERIENCE
  • 5. Jun’05-Oct’07 ABB Limited, Bangalore Site Engineer / Site In-charge Key Project Handled: Accelerating Power Development Reforms Programme from Feb’07-Oct’07 Key Project Handled: Rural Load Management System, an automation project by Bangalore Electric Supply Company from Jun’05-Aug’07 Key Client Handled: BESCOM Role: ⇒ Looked after analysis of Power distribution centers and Motor control units. ⇒ Responsible for designing of cable for control panels- boxes containing PLCs, Contactors ranging from 40A to 160A and MCCBs of same ratings and Automated Metering units. ⇒ Managed erection of HT/LT Overhead lines of route length more than 220kM with Rabbit Conductor. ⇒ Handled erection & maintenance of RLMS units up to 1500 numbers and erection of distribution transformers ranging from 25KVA to250KVA. ⇒ Coordinated and controlled the contractors. Submitted bills for execution and maintenance of above mentioned systems which includes programming PLC’s and testing. ACADEMIC CREDENTIALS 2005 B.E (EEE) from Sir. M.V.I.T., Bangalore, V.T. University, Belgaum IT Forte: Programming Languages : C, C++, VC++, MFC, MSVisualstudio2005 Design Tools : Labview and AutoCAD Automation Tools : PLC Programming, Domotics, BMS, Powerview, MS Office, MS Project ERP Accolades: ⇒ Successfully acquired: o 2nd place in State Level Technical Project Presentation Competition (SHRISTI-2004). o 1st place in State Level Mathematics Symposium in the year 1998. PERSONAL DOSSIER Date of Birth : 16th July, 1981 Address : #172, 6th Main, Vinayaka Nagara, Defence Colony, Bagalur Cross, Bangalore – 560063 Linguistics Abilities : English, Kannada, Hindi, Telugu and Tamil
  • 6. Jun’05-Oct’07 ABB Limited, Bangalore Site Engineer / Site In-charge Key Project Handled: Accelerating Power Development Reforms Programme from Feb’07-Oct’07 Key Project Handled: Rural Load Management System, an automation project by Bangalore Electric Supply Company from Jun’05-Aug’07 Key Client Handled: BESCOM Role: ⇒ Looked after analysis of Power distribution centers and Motor control units. ⇒ Responsible for designing of cable for control panels- boxes containing PLCs, Contactors ranging from 40A to 160A and MCCBs of same ratings and Automated Metering units. ⇒ Managed erection of HT/LT Overhead lines of route length more than 220kM with Rabbit Conductor. ⇒ Handled erection & maintenance of RLMS units up to 1500 numbers and erection of distribution transformers ranging from 25KVA to250KVA. ⇒ Coordinated and controlled the contractors. Submitted bills for execution and maintenance of above mentioned systems which includes programming PLC’s and testing. ACADEMIC CREDENTIALS 2005 B.E (EEE) from Sir. M.V.I.T., Bangalore, V.T. University, Belgaum IT Forte: Programming Languages : C, C++, VC++, MFC, MSVisualstudio2005 Design Tools : Labview and AutoCAD Automation Tools : PLC Programming, Domotics, BMS, Powerview, MS Office, MS Project ERP Accolades: ⇒ Successfully acquired: o 2nd place in State Level Technical Project Presentation Competition (SHRISTI-2004). o 1st place in State Level Mathematics Symposium in the year 1998. PERSONAL DOSSIER Date of Birth : 16th July, 1981 Address : #172, 6th Main, Vinayaka Nagara, Defence Colony, Bagalur Cross, Bangalore – 560063 Linguistics Abilities : English, Kannada, Hindi, Telugu and Tamil