Bapi Biswas
Assistant Professor
Department of Mechanical Engineering
Vishwavidyalaya Engineering College Ambikapur
(A constituent college of Chhattisgarh Swami Vivekanand Technical
University Bhilai)
Introduction to
CAD
• CAD (Computer Aided
Design) is the use of computer
software to design and
document a product’s design
process.
• Engineering drawing entails
the use of graphical symbols
such as points, lines, curves,
planes and
shapes. Essentially, it gives
detailed description about any
component in a graphical form.
CAD software
enables
• Efficiency in the quality
of design
• Increase in the
Engineer’s productivity
• Improve record keeping
through better
documentation and
communication
Types of CAD
Software
• 2D CAD
• 3D CAD
• 3D Wireframe and Surface Modelling
• Solid Modelling
Who uses
CAD?
Professions that use CAD tools include, but are not limited to:
• Architects
• Engineers
• City planners
• Graphic designers
• Animation illustrators
• Drafters
• Fashion designers
• Interior designers
• Exterior designers
• Game designers
• Product designers
• Industrial designers
• Manufacturers
Expert CAD/CAM software
Modelling for manufacture
A modelling for manufacture
toolkit. Discover how
PowerShape combines the
strengths of surface, solid
and mesh modelling to
prepare moulds, dies and
complex parts for
manufacture.
5-axis machining
Maximise machine efficiency and part
quality. Import PowerShape models
into PowerMill and create precision
high-speed and multi-axis toolpaths
for moulds, dies and highly complex
components.
Inspect manufactured parts
Compare your finished part
against the PowerShape CAD
data with PowerInspect. Inspect
parts on the shop floor, in the
inspection room or integrate
inspection routines on the
machine tool.
CAD/CAM for production machining
Feature recognition
Get feature recognition tools to
scan, identify and
automatically create
machinable features from your
design with associative
operations, reducing
programming time.
Multitask machining
Optimise CNC
programs (US site) for
multitasking turn-mills
capable of performing both
turning and milling
operations in a single
setup, helping reduce cycle
Swiss-type lathes
Focused Swiss machining
strategies for precision
manufacturing give you full
control over your Swiss-
type lathes based on your
tooling, machine tool and
volume of production.
Creo
• Creo CAD software is one of
the market leaders in product
design, developed by Parametric
Technology Corporation more
than 30 years ago. It integrates
many functionalities such as
thermal, structural, motion,
parametric and freestyle surface
generation and direct modeling.
Fusion
360°
Fusion 360
Solidworks
• Published by Dassault
Systèmes, it is often used by
professional 3D designers. It is
a parametric featured-based
model. The software includes a
wide range of features such as
design validation tools, or
reverse engineering. It tends to
be used for industrial objects.
AutoCAD
• AutoCAD software from
Autodesk was one of the first
CAD software to be released on
the market in 1982, making it a
very established CAD software
across industries. Even though
AutoCAD is popular and widely
used, in the 3D printing
community i
CATIA
• The CATIA CAD solution has
historically been developed for
Dassault Aviation’s own needs.
It is more than a simple CAD
Software, as it is also a multi-
platform software suite for
CAD, CAM (Computer Aided
Manufacturing), CAE
(Computer Aided Engineering)
and more.
Rhino
• the world’s most versatile 3D-
modeler. It is a commercial 3D
computer graphics and CAD software.
The program uses a precise and
mathematical model known as NURB
which allows to manipulate points,
curves, meshes, surfaces, solids and
more in all sorts of ways. Rhino3D’s
strong point is its wide range of
design features. It
Unigraphics /
Siemens NX
• The best notable feature
with Simens NX is that it has
the best product life cycle
management (PLM). Mostly
used for electromechanical
designs and mechatronics
design.
AUTOCAD
for Drafting
• AUTOCAD is one of the basic
software for drafting and
documentation of the construction
projects which is developed by
Autodesk. One can notice this
software usage in almost all
structural design consultancies
and firms especially in India.
AUTOCAD 3D version is also
available for 3D Modelling.
STAAD PRO for Design
and Analysis
• Bentley System's STAAD PRO is one such software
which is opted by many professionals in construction
field.
• STAAD.Pro is the structural engineering
professional’s choice for steel, concrete, timber,
aluminum, and cold-formed steel design of virtually any
structure including culverts, petrochemical plants,
tunnels, bridges, piles, and much more through its
flexible modeling environment, advanced features, and
fluent data collaboration.
SketchUp
• SketchUp, formerly Google Sketchup,
is a 3D modeling computer program for
various drawing applications such as
architectural, interior design, landscape
architecture, civil and mechanical
engineering, film, and video game
design.
PRIMAVERA for
Construction
Management
• Primavera is a construction Planning
and Scheduling software. It is opted by
almost greater than 70 percent of all
Planning and scheduling professionals.
MS Office also offering similar software
by name MS PROJECT.
REVIT Structure for
Building Information
Modelling
• Building Information Modelling
can be termed as one of the 21st
century’s greatest innovation
helping big infrastructure projects.
BIM (Building Information
Modeling) is an intelligent 3D
model-based process that gives
architecture, engineering, and
construction (AEC) professionals
the insight and tools to more
efficiently plan, design, construct,
and manage buildings and
infrastructure.
ETABS for Design
and Analysis
• ETABS offers unmatched 3D object
based modeling and visualization tools,
blazingly fast linear and nonlinear analytical
power, sophisticated and comprehensive
design capabilities for a wide-range of
materials, and insightful graphic displays,
reports, and schematic drawings that allow
users to quickly and easily decipher and
understand analysis and design results.
SAP 2000
• SAP2000 is another software available for design and analysis
of structures. It is also used in many structural firms. SAP2000 has
a wide selection of templates for quickly starting a new model.
SAP2000 includes parametric templates for the following types of
structures:
ARCGIS for
Surveying
• ArcGIS is a software used in
Geographical Information
System. It is helpful in creating
Thematic Maps. ArcGIS for
Desktop is the key to realizing
the advantage of location
awareness. Collect and manage
data, create professional maps,
perform traditional and
advanced spatial analysis, and
solve real problems. Make a
difference and add tangible
value for your organization, your
community, and the world.
What is cad cam

What is cad cam

  • 1.
    Bapi Biswas Assistant Professor Departmentof Mechanical Engineering Vishwavidyalaya Engineering College Ambikapur (A constituent college of Chhattisgarh Swami Vivekanand Technical University Bhilai)
  • 2.
    Introduction to CAD • CAD(Computer Aided Design) is the use of computer software to design and document a product’s design process. • Engineering drawing entails the use of graphical symbols such as points, lines, curves, planes and shapes. Essentially, it gives detailed description about any component in a graphical form.
  • 4.
    CAD software enables • Efficiencyin the quality of design • Increase in the Engineer’s productivity • Improve record keeping through better documentation and communication
  • 5.
    Types of CAD Software •2D CAD • 3D CAD • 3D Wireframe and Surface Modelling • Solid Modelling
  • 6.
    Who uses CAD? Professions thatuse CAD tools include, but are not limited to: • Architects • Engineers • City planners • Graphic designers • Animation illustrators • Drafters • Fashion designers • Interior designers • Exterior designers • Game designers • Product designers • Industrial designers • Manufacturers
  • 15.
    Expert CAD/CAM software Modellingfor manufacture A modelling for manufacture toolkit. Discover how PowerShape combines the strengths of surface, solid and mesh modelling to prepare moulds, dies and complex parts for manufacture. 5-axis machining Maximise machine efficiency and part quality. Import PowerShape models into PowerMill and create precision high-speed and multi-axis toolpaths for moulds, dies and highly complex components. Inspect manufactured parts Compare your finished part against the PowerShape CAD data with PowerInspect. Inspect parts on the shop floor, in the inspection room or integrate inspection routines on the machine tool.
  • 16.
    CAD/CAM for productionmachining Feature recognition Get feature recognition tools to scan, identify and automatically create machinable features from your design with associative operations, reducing programming time. Multitask machining Optimise CNC programs (US site) for multitasking turn-mills capable of performing both turning and milling operations in a single setup, helping reduce cycle Swiss-type lathes Focused Swiss machining strategies for precision manufacturing give you full control over your Swiss- type lathes based on your tooling, machine tool and volume of production.
  • 18.
    Creo • Creo CADsoftware is one of the market leaders in product design, developed by Parametric Technology Corporation more than 30 years ago. It integrates many functionalities such as thermal, structural, motion, parametric and freestyle surface generation and direct modeling.
  • 19.
  • 20.
    Solidworks • Published byDassault Systèmes, it is often used by professional 3D designers. It is a parametric featured-based model. The software includes a wide range of features such as design validation tools, or reverse engineering. It tends to be used for industrial objects.
  • 21.
    AutoCAD • AutoCAD softwarefrom Autodesk was one of the first CAD software to be released on the market in 1982, making it a very established CAD software across industries. Even though AutoCAD is popular and widely used, in the 3D printing community i
  • 22.
    CATIA • The CATIACAD solution has historically been developed for Dassault Aviation’s own needs. It is more than a simple CAD Software, as it is also a multi- platform software suite for CAD, CAM (Computer Aided Manufacturing), CAE (Computer Aided Engineering) and more.
  • 23.
    Rhino • the world’smost versatile 3D- modeler. It is a commercial 3D computer graphics and CAD software. The program uses a precise and mathematical model known as NURB which allows to manipulate points, curves, meshes, surfaces, solids and more in all sorts of ways. Rhino3D’s strong point is its wide range of design features. It
  • 24.
    Unigraphics / Siemens NX •The best notable feature with Simens NX is that it has the best product life cycle management (PLM). Mostly used for electromechanical designs and mechatronics design.
  • 26.
    AUTOCAD for Drafting • AUTOCADis one of the basic software for drafting and documentation of the construction projects which is developed by Autodesk. One can notice this software usage in almost all structural design consultancies and firms especially in India. AUTOCAD 3D version is also available for 3D Modelling.
  • 27.
    STAAD PRO forDesign and Analysis • Bentley System's STAAD PRO is one such software which is opted by many professionals in construction field. • STAAD.Pro is the structural engineering professional’s choice for steel, concrete, timber, aluminum, and cold-formed steel design of virtually any structure including culverts, petrochemical plants, tunnels, bridges, piles, and much more through its flexible modeling environment, advanced features, and fluent data collaboration.
  • 28.
    SketchUp • SketchUp, formerlyGoogle Sketchup, is a 3D modeling computer program for various drawing applications such as architectural, interior design, landscape architecture, civil and mechanical engineering, film, and video game design.
  • 29.
    PRIMAVERA for Construction Management • Primaverais a construction Planning and Scheduling software. It is opted by almost greater than 70 percent of all Planning and scheduling professionals. MS Office also offering similar software by name MS PROJECT.
  • 30.
    REVIT Structure for BuildingInformation Modelling • Building Information Modelling can be termed as one of the 21st century’s greatest innovation helping big infrastructure projects. BIM (Building Information Modeling) is an intelligent 3D model-based process that gives architecture, engineering, and construction (AEC) professionals the insight and tools to more efficiently plan, design, construct, and manage buildings and infrastructure.
  • 31.
    ETABS for Design andAnalysis • ETABS offers unmatched 3D object based modeling and visualization tools, blazingly fast linear and nonlinear analytical power, sophisticated and comprehensive design capabilities for a wide-range of materials, and insightful graphic displays, reports, and schematic drawings that allow users to quickly and easily decipher and understand analysis and design results.
  • 32.
    SAP 2000 • SAP2000is another software available for design and analysis of structures. It is also used in many structural firms. SAP2000 has a wide selection of templates for quickly starting a new model. SAP2000 includes parametric templates for the following types of structures:
  • 33.
    ARCGIS for Surveying • ArcGISis a software used in Geographical Information System. It is helpful in creating Thematic Maps. ArcGIS for Desktop is the key to realizing the advantage of location awareness. Collect and manage data, create professional maps, perform traditional and advanced spatial analysis, and solve real problems. Make a difference and add tangible value for your organization, your community, and the world.