SlideShare a Scribd company logo
Table of Contents
Participant Guide Standards (Heading 1) ......................................................Error! Bookmark not defined.
Sub Heading Text (Heading 2) ................................ Error! Bookmark not defined.
Additional heading text (Heading 3)......................................................... Error! Bookmark not defined.
Create a Participant Guide...........................................................................Error! Bookmark not defined.
Introduction to Participant Guide Creation...........Error! Bookmark not defined.
Document Naming Convention ............................................................... Error! Bookmark not defined.
Document Properties ............................................................................. Error! Bookmark not defined.
Numbered Lists ..................................................................................... Error! Bookmark not defined.
Inserting Text Tables ............................................................................. Error! Bookmark not defined.
Inserting Table of Figures and Table of Tables ........................................ Error! Bookmark not defined.
Inserting Exercises ................................................................................ Error! Bookmark not defined.
Exercise 1 – Inserta Step-by-StepExerciseTableError! Bookmark not defined.
Exercise 2 – Inserta ScenarioBasedExercise Error! Bookmark not defined.
Inserting Smart Art................................................................................. Error! Bookmark not defined.
Tables and Figures
Figure 1 Smart Art Graphic Sample......................................................................................................1
Table 1 Text Table Sample..................................................................... Error! Bookmark not defined.
Table 2 Step-by-Step Exercise Example ................................................. Error! Bookmark not defined.
Table 3 Scenario Based Exercise Example ............................................. Error! Bookmark not defined.
Page 1 of 67
Table of Contents
QM Master Data Introduction ....................................................................................................................4
Using this Guide......................................................................................................4
Lesson 1: QM Overview ...........................................................................................................................5
Lesson 1 Objectives............................................................................................... 5
QM Process Overview 5
QM Inspection Process 5
Exercise 1 – Displayan InspectionLot(QA03) 8
Exercise 2 – DisplayMaterial MasterQM View (MM03) 9
Lesson 2: Material Master QM View ........................................................................................................10
Lesson 2 Objectives.............................................................................................10
Master Data 10
Material Master Data 10
The Importance of Master Data 11
Catalog Profile 12
QM proc. active 12
QM Control Key12
Quality Inspection Settings – Inspection Lots 13
Exercise 1 Material Master Settings(MM02) 16
Exercise 2 AssignMaterial to InspectionPlan(QP02) 18
Lesson 3: Sampling Procedures ..............................................................................................................19
Lesson 3 Objectives.............................................................................................19
Sampling Overview 19
Exercise 1 DisplaySamplingProcedure (QDV3) 22
Exercise 2 Create SamplingProcedure(QDV1) 23
Exercise 3 Change SamplingProcedure(QDV2) 24
Dynamic Modification Rule (DMR) 25
Lesson 4: Master Inspection Characteristics ............................................................................................26
Lesson 4 Objectives.............................................................................................26
Master Inspection Characteristics Overview 26
WCB Qualitative Control Indicators 27
WCB Quantitative Control Indicators 27
Exercise 1 Create QualitativeMasterInspectionCharacteristic(QS21) 30
Lesson 5: Inspection Plan.......................................................................................................................31
Lesson 5 Objectives.............................................................................................31
Inspection Plan Overview 31
Page 2 of 67
Inspection Plan Structure 32
Exercise 1 Display InspectionPlan(QP03) 34
Exercise 2 Create InspectionPlan(QP01) 35
Material Assignment to an Inspection Plan 37
Exercise 3 Display Material AssignmentforanInspectionPlan(QS62) 38
Exercise 4 Create a Material AssignmentforanInspectionPlan(QS61) 39
Inspection Plan Operation Level 40
Inspection Characteristics 40
Changes to Inspection Plans 41
Exercise 5 Change InspectionPlan(QP02) 42
Engineering Workbench 43
Exercise 6 MaintainInspection Plan(CWBQM) 44
Quality Info Records 45
Vendor Contact Persons 45
Code Groups and Codes 46
Selected Sets 47
Quality Notifications 48
Lesson 6: Vendor Portal .........................................................................................................................50
Lesson 6 Objectives.............................................................................................50
Vendor Portal Overview 50
Vendor Portal – Pre-inspection App 50
Vendor Portal – Quality Tasks App 50
Vendor Portal – Deviation Management App 50
Vendor Portal – Inspection Report Email Program 50
Lesson 7: Batch Jobs .............................................................................................................................52
Lesson 7 Objectives.............................................................................................52
Batch Jobs Overview 52
Inspection Report 52
Automatic Usage Decision 52
Appendix – End User Procedures ...........................................................................................................53
Lesson 1: Display Inspection Lot (QA03)..........................................................53
Lesson 1: Display Material Master QM View (MM03).......................................53
Material Master Processing 53
Page 3 of 67
Related Transactions & Processes 53
Tips & Tricks 53
Activity 54
Lesson 2: Material Master Settings (MM02)......................................................56
Material Master Processing 56
Related Transactions & Processes 56
Tips & Tricks 56
Activity 57
Lesson 2: Assign Material to Inspection Plan (QP02).....................................58
Lesson 3: Display Sampling Procedure (QDV3) ..............................................58
Lesson 3: Create Sampling Procedure (QDV1)................................................59
Create Sampling Procedure 59
Related Transactions 59
Activity 59
Lesson 3: Change Sampling Procedure (QDV2)..............................................61
Change Sample Procedures 61
Related Transactions 61
Activity 61
Lesson 4: Create Qualitative Master Inspection Characteristic (QS21) .......62
Lesson 5: Display Inspection Plan (QP03)........................................................62
Lesson 5: Create Inspection Plan (QP01) .........................................................62
Create Inspection Plan 62
Related Transactions 62
Tips and Tricks 63
Activity 63
Lesson 5: Display Material Assignment for an Inspection Plan (QS62).......67
Lesson 5: Create a Material Assignment for an Inspection Plan (QS61) .....67
Lesson 5: Change Inspection Plan (QP02) .......................................................67
Lesson 5: Maintain Inspection Plan (CWBQM) ................................................67
Page 4 of 67
QM MASTER DATA INTRODUCTION
This course will equip participants with the SAP skills necessary to create, change and manage master data
records that impact the quality management process.
The following topics are covered in this guide:
 The quality management process
 Types of master data used in the quality management process
 Material master – QM view
 Inspection characteristics
 Sampling procedures
 Inspection plans
After completing this course, you will be able to:
 Explain the role of master data in the quality management process
 Describe the master data used in QM
 Maintain the material master – QM view
 Create and assign inspection characteristics to task list
 Create and maintain sampling procedures
 Create and maintain inspection plans
Using this Guide
This guide is designed to provide you with:
 Information regarding the listed topics
 Exercises to practice what you learn
 Quick reference guides to assist you while doing your job in SAP
Use this guide in a classroom setting to follow along with the instructor and add notes wherever needed. You can
also use this guide in a self-paced manner to review how to perform the listed tasks learned in class.
Page 5 of 67
LESSON 1: QM OVERVIEW
Lesson 1 Objectives
After completing this lesson, you will be able to:
 Describe the three phases of QM
 Define an inspection lot
 Describe the QM inspection process
 Recognize log triggers
QM Process Overview
Figure 1 QM Process
QM Inspection Process
The data important for the quality inspection is contained in the inspection lot data record that includes:
 The lot quantity lot
 Sample size
 Origin
 Vendor
 Order number
 PO number
 Delivery number
Planning
•Material Master, Inspection Characteristics, Inspection Plan
•Sample Procedures & Dynamic Modification (Skip)
Processing
•Record Results (Accept / Reject)
•UsageDecision
Evaluation
•Quality Notifications
•Quality Scores
Page 6 of 67
The originating documents contain the inspection lot materials and may be any one of the following:
 Purchasing document
 Material document
 Order
 Delivery document
Page 7 of 67
An inspection lot is assigned to a material.
Each inspection lot follows the same process regardless of the type of inspection (goods movements, returns,
etc.).
Figure 2 QM Inspection Process
An inspection lot is a request to perform a quality inspection for a quantity (sample) of a material. Inspectino lots
are data records and have statuses. Inspection lots are assigned to an inspection plan and may contain seeral
opererations that define inspection activities.
Each operation on the inspection plan may contain one or many inspection characteristics that describe what
needs to be inspected. Inspection lots can be triggered by the following events:
Business Process Event
Goods movements
Good receipts – Goods receipt for purchase order into the warehouse.
Transfer postings – Plant to plant moves.
Returns – Return from vendor or customer orders.
Complaints
Customer – Each customer complaint will be inspected.
Vendor – Each vendor complaint will be inspected.
Internal problems Defects – All defects will be inspected.
Table 1 Master Data Terms
Create
Inspection Lot
Determine
Sample
Inspect
Material
Record
Results /
Defects
Usage
Decision
Evaluation
Page 8 of 67
Exercise 1 – Display an Inspection Lot (QA03)
Scenario: An inspection lot is a request to inspect a quantity of material for pre- defined characteristics. Display an
inspection lot and answer the questions below.
Support Document: QA03 Display Inspection Lot
Complete the following field(s): Required Data / Results
Transaction Code QA03
Complete the following field(s): Required Data
Inspection Lot
What is the Insp.lot origin?
Who is the vendor?
What is the inspection lot quantity?
What is the valuation code?
Has a usage decision been made on this lot?
Don’t have an
eup
Page 9 of 67
Exercise 2 – Display Material Master QM View (MM03)
Scenario: The inspection set-up in the material master (QM view) activates and triggers the creation of
inspections lots, assigns an inspection plan and calculates the sample size. In addition to other settings on the
inspection type, other actions are performed automatically. Display the QM view inspection set-up for goods
receipt for PO – B and answer the following questions.
Support Document: MM03 Display Material Master Record
Transaction Code MM03
Complete the following field(s): Required Data
Material
Select views Quality Management
Plant
Enter
Review inspection setup
What is the inspection type for Goods Receipt
Inspection?
What is the description of the material?
Want is the material group number and name?
Enter
What is the base unit of measure?
What is the Catalog profile?
Don’t have an
eup
Page 10 of 67
LESSON 2: MATERIAL MASTER QM VIEW
Lesson 2 Objectives
After completing this lesson, you will be able to:
 Explain the master data used in QM processes
 Define inspection types
 Maintain and activate inspection types
 Assign a material to an inspection plan
 Display material master – QM view
 Additional material master transactions
Master Data
Accurate master data is one of the key factors for a successful SAP implementation. Master data is centrally
stored data that forms the base of all business transactions. The data is static in nature, meaning it does not
change when it used in a transaction. While the transactions themselves are dynamic and changed based on the
execution of the transaction, the master data itself used does not.
Master Data is the responsibility of a team dedicated to its creation maintenance to insure the data’s correctness.
This important task also reduces redundancy of data records across the entire company.
The main Master Data types ae shown below. For this course, we will focus primarily on Material and Vendor
Master Data.
Figure 3 Master Data Types
Material Master Data
Master data is created at different levels to accommodate its use by the various organization elements in the
company. For example, members of the procurement team work with information different from the data used by
the sales team. Master data is created at different organizational levels. Depending on the material type, different
functional areas within the company maintain different data screens. This screen selection applying specifically to
an application is called a "view".
Because of the large of amount of information contained in a single material master record, the viewing method
for a material employs multiple data screens. Depending on the material type, different functional areas within the
company maintain the different data screens. Basic data views are the same across all company locations. Other
views are specific for each plant location. Each material is created for at least one plant, but can be “extended” to
additional plants. When a material is extended to other plants, the plant specific data can then be changed from
plant to plant, if necessary.
Page 11 of 67
Figure 4 Material Master Data
The Importance of Master Data
The accuracy of master data is essential to efficient performance of the inspection process.
Characteristics of master data include:
 Static
 Centrally stored and shared across other modules and systems
 Is copied into transaction data
Examples of QM master data include:
 Materials
 Inspection plans
 Master inspections characteristics
Material types in the SAP system can be, for example, finished goods, semi-finished goods, raw materials, or
services. The material type represents certain features of materials in the system, and has important control
functions: the material type is used, among other things, to group field selection functions for a material, or to
define the screen sequence, the type of number assignment and number ranges during material master record
maintenance.
The following material types will have active inspection types:
Material Type Description
FERT Finished Goods
HALB Semi-finished goods
ROH Raw Materials
Table 2 Material Types
Once and inspection type is created and activated, the material is assigned to an inspection plant.
Page 12 of 67
The QM view of the material master activates quality inspection for a material within a plant and controls the
inspection process.
The material master settings control how materials will be inspected during the procurement process.
Catalog Profile
Each business unit has a catalog profile created. This profile is entered in the QM View and determines which
code groups and codes appear in the quality notifications for that material.
 ZCB – Char-Broil Codes
 ZLL – Lamplight Codes
 ZZB – Zebco Codes
The Catalog Profiles contain the name of the code groups and codes that should be displayed in quality
notifications for a material.
QM proc. active
Every item should have this box checked. It designates that there are QM functions active in the procurement
process. The specific QM functions that are active are determined by two subsequent items, the QM Control Key
configuration and the Quality Info Record
QM Control Key
Every item should ‘0000’ in this box. This means that there are no controling functions active in configuration. This
simply designates that a Quality Info Record should exist, and serves as a place holder for a different control key
if other functions are even implemented.
a. 0000 – No active functions
The QM Control Key can activate various QM functions in the procurement process. Control Key 0000 indicates
the requirement for a Quality Info Record.
There are two views for the QM view in the material master:
 The main view, which maintains general and procurement settings.
 The sub-view: Inspection Set-up where the various inspection types are maintained and activated (or
deactivated).
Page 13 of 67
Quality Inspection Settings – Inspection Lots
Inspection lots contain the inspection types, origins, number ranges, and usage decisions for inspection plans.
Inspection Type Setup
Every item that is inspected will have certain inspection types activated to allow for the creation of inspection lots.
A material can have several inspection types maintained and activated based on the inspection process defined
for that material.
Inspection types define when an inspection is to be carried out (goods receipts or stock transfers) in addition to
how the inspection is to be carried out based on the settings for each inspection type.
The inspection type must be activated to have an inspection lot created.
Note: An inspection type can also be deactivated by deselecting the Active checkbox. From that date forward, no
inspection lots will be created for that material in that plant. However, the deactivation will have no effect on
existing inspection lots.
Type Description
01 This inspection type is used to ensure that stock goes into Quality
Inspection when received from a PO/Inbound Delivery. It is used in
conjuntion with inspection type 17 for receiving inspections.
ZLL01 This inspection type is a copy of 01 and is used to ensure that stock
goes into Quality Inspection when received from a PO/Inbound
Delivery for Lamplight specifically. It is used in conjuntion with
inspection type 17 for receiving inspections.
17 This inspection type is used to create inspection lots based on goods
receipts in the EWM system.
ZPSI This inspection type is used to create inspection lots for internal pre-
shipment inspections in SAP. These inspection lots are manually
created by inspectors in QA01.
ZLLPSI This inspection type is used to create inspection lots for internal pre-
shipment inspections in SAP specifically for Lamplight. These
inspection lots are created by a batch job running QI07 in the
background. This inspection type requires a Quality Ino Record to be
set up as well.
Z7 This inspection type is used by external vendors via the Vendor Portal
Pre-inspection App. It is used by the vendors to submit their own
inspection reports and should be active for any material that gets a
vendor report submitted.
ZRW This inspection type is used to create inspection lots after the goods
receipt from a rework production order.
Page 14 of 67
Other Settings
Setting Description
UD Selected Set This is the name of the selected set of UD codes that is used when
processing the usage decision for an inspection lot with this inspection
type.
Selected Set in Same
Plant
This check box requires that the selected set used for the UD must be
set up in the same plant that the inspection lot exists in (a Char-Broil
inspection lot cannot be evaluated with a UD from Zebco).
Notification type This field determines the type of notification that is created
automatically at the time of defects recording within results recording
for the inspection lot.
Task list usage This setting determines what type of inspection plans will be called up
when inspection lots are created with this inspection type. This field
will match the task list usage field in the inspection plan.
Page 15 of 67
Additional transactions for the material master are described below:
Tcode Description Function
MM01 Create Material Master Use this transaction to create new materials for a plant or
to extend current materials to other WCB plants
This is a highly authorized transaction
MM06 Flag Material for Deletion This transaction flags a material for deletion at different
organizational levels
The material will still exist in the database and depending
on the configuration – the system will issue either a
warning or error message when it is used in a transaction.
It is physically removed from the database when the
archive program is run
MM03 Display a material master – QM
View
Use this transaction to display the QM view in a material /
plant
This transaction displays the QM inspection type(s) that
are activated for a material / plant and the associated
settings for each type
Changes are not allowed with this transaction
MM19 Display material at Key Date Use this transaction to display a material for a particular
point in time (date).
QA08 Mass Change of Inspection
Setup Data in Materials
This transaction is used to activate, deactivate, materials in
a plants(s)
Hint: The QM view must exist before using this transaction
Page 16 of 67
Exercise 1 Material Master Settings (MM02)
Scenario: Every material should have a plant-specific QM view in the material master. Activate the procurement
data for a material in your plant.
Support Document: MM02 Create Duty of Inspection
Transaction Code MM02
Complete the following field(s): Required Data
Material
Select views Quality Management
Plant
Enter
Select a catalog profile type
Select procurement data
Make sure the QM procurement data selection
box is selected.
Select one or more inspection types and select
the Active checkbox
Save
Don’t have an
eup
Page 17 of 67
The material assignment to an inspection plan is performed at the Header level in the inspection plan. An
inspection plan can have many materials assigned to it.
Once the inspection type is created and activated, the material must be assigned to an inspection plan. A material
can be assigned to an inspection plan by using the change transaction (QP02) and adding the material to the
existing assignments. If no inspection plan is available, a new plan for the material has to be created. We will
discuss creating an inspection plan in another lesson.
Inspection Plan
Header
Material 1
Material 2
Page 18 of 67
Exercise 2 Assign Material to Inspection Plan (QP02)
Scenario: The inspection types have been created and activated in the material master. Based on the settings
for the inspection type, the material must be assigned to an inspection. Assign the material to an existing
inspection plan.
Support Document: QP02 Assign Material to Inspection Plan
Transaction Code QP02
Complete the following field(s): Required Data
Plant
Group
Click task lists overview
Click material assignment
Group counter
Material
Plant
Enter
Save
Don’t have an
eup
Page 19 of 67
LESSON 3: SAMPLING PROCEDURES
Lesson 3 Objectives
After completing this lesson, you will be able to:
 Display a sampling procedure
 Create a sampling procedure
 Change a sampling procedure
Sampling Overview
Sampling procedures are used to determine the scope of samples for measuring an inspection characteristic.
Sampling procedures are necessary to define the quantity of a sample and the valuation (accept / reject) for an
inspection characteristic during results recording.
An example of a sampling procedure is described in the following table.
Sampling Procedure Transaction Code: QDV1
Name 8 Characters (alpha / numeric)
Description 40 Characters (alpha / numeric)
Sampling Type Fixed Sample
Valuation mode Attributive inspection non-conforming units
Inspection Points Without inspection points
Sample Size 5
Acceptance number Zero
Page 20 of 67
Sampling Schemes
Sampling schemes are used to determine the sample size for each characteristic that is evaluated during results
recording for an inspection lot. It determines a sample size based on the receipt quantity and determines
accept/reject numbers. These accept/reject numbers can be determined by AQL and inspection severity.
Sampling
Scheme
Description
Lot size This corresponds to the inspection lot size and determines the sample size and
accept/reject numbers for the sample size.
Sample size Sample size for an inspection characteristic at the given lot size.
Accept Number This number (blank for zero) determies the acceptance number for the sample
size at the given AWL and inspection severity.
Reject Number Determines the rejection number for the sample size at the given AQL and
inspection severity (blank for zero).
Sampling Procedure
A sampling procedure defines the rules that specify how the system calculates the sample size and it contains
information about the valuation of an inspection characteristic during results recording. Sampling procedures are
usually used at characteristic level of an inspection plan.
Sampling
Procedure
Description
Sampling Type Designates how the sample size is determined.
Value Mode Designates how to determine if an inspection characteristic has passed or failed.
Sampling Scheme This field references which sampling scheme this procedure is based on.
Additional data Specific inspection Severity and AQL from the sampling scheme are assigned to
the sampling procedure.
Page 21 of 67
Additional transactions used for sampling procedures include:
Tcode Description Function
QDV3 Change Sampling Procedure This transaction is used to display a sampling
procedure
Changes cannot be made using this transaction
QDV6 Sampling Procedure Where-Used
List
This transaction displays all the inspection plans
and material masters where the sampling procedure
is assigned
QDV7 Replace Sampling Procedure Use this transaction to replace an obsolete sampling
procedure with a new or changes sampling
procedure in inspections plans
Page 22 of 67
Exercise 1 Display Sampling Procedure (QDV3)
Scenario: Display a sampling procedure.
Support Document: QDV3 Display Sampling Procedure
Transaction Code QDV3
Complete the following field(s): Required Data
Sampling Procedure
Enter
What settings display for the sampling
procedure?
Which sampling types are available?
Which evaluation modes are available?
Don’t have an
eup
Page 23 of 67
Exercise 2 Create Sampling Procedure (QDV1)
Scenario: Sampling procedures are used to calculate the sample size of an inspection lot and also to how
characteristics are valuated during results recording. Create a sampling procedure.
Support Document: QDV1 Create Sampling Procedures
Transaction Code QDV1
Complete the following field(s): Required Data
Sampling Procedure (enter a name)
Click
Short Text
Sampling Type
Valuation Mode
Inspection Points
Enter
Which multiple samples display?
Select a multiple samples option
Click
Save
Page 24 of 67
Exercise 3 Change Sampling Procedure (QDV2)
Scenario: Change the sample size of the sampling procedure created in the previous exercise.
Support Document: QDV2 Change Sampling Procedure
Transaction Code QDV2
Complete the following field(s): Required Data
Sampling Procedure
Click
Change the sample size 5
Change the acceptance number 0
Save
Page 25 of 67
Dynamic Modification Rule (DMR)
The DMR defines the change of the inspection stages, the dynamic modification time (at lot creation or after the
usage decision has been made), and the conditions for the inspection stage change. Inspection stage changes
occur on the basis of the inspection results that are recorded for inspection lots and inspection characteristics
(that is, on the basis of their acceptance or rejection). Collectively these rules make up the conditions for creating
SKIP LOTS in SAP.
The rules in the inspection stages are set with rules for advancing and reverting the inspection stage.
If you want to use a DMR and Sampling Procedures in the same inspection plan, their relationship has to be
explicitly allowed using SAP transaction QDB1.
Page 26 of 67
LESSON 4: MASTER INSPECTION CHARACTERISTICS
Lesson 4 Objectives
After completing this lesson, you will be able to:
 Define the different types of master inspection characteristics
 Explain the function of control indicators
 Define the hierarchy of catalogs and when they are required for an MIC
 Create and display an MIC
Master Inspection Characteristics Overview
Master Inspection Characteristics (MICs) are assigned to inspection plans at the operation level. MICs
standardize the inspection process and make it more efficient – one MIC can be assigned to many inspection
plants. It is QM master data that is created once and used long term.
A master inspection characteristic is an inspection characteristic, which has been defined for frequent use in t ask
lists or should be evaluated for all inspection plans. For example, if particular specifications are required in many
inspection plans, a suitable MIC is created and assigned to many inspections plans
 MICs help to improve and standardize inspection planning.
 When a master inspection characteristic is created, the characteristic type has to be defined. There are
two options:
 Quantitative characteristic: Numeric values are expected as inspection results (e.g. thickness in meter)
 Qualitative characteristic: Attribute values are expected as inspection results (e.g. color by color palette)
MIC
Control
Indicators
What isto
be
Inspected?
Admin.
Data
General
Data
Page 27 of 67
WCB will create master inspection characteristics as complete copy models. Complete copy models allow
changes to the MIC when it is assigned to an inspection plan operation (for example, tolerances or color).
WCB Qualitative Control Indicators
Qualitative Characteristic Control Indicators
Characteristic attribute (required)
Sampling procedure (required)
Required characteristic (required)
Fixed scope (required)
No documentation
Print
WCB Quantitative Control Indicators
Quantitative Characteristic Control Indicators
Lower value (required, if the characteristic has a lower value)
Upper value (required, if the characteristic has an upper value)
Target value (required, if the characteristic has a target value)
Sampling procedure (required)
Single result
Required characteristic (required)
Fixed scope (required)
No documentation
Record measured values (required)
Print
No formula
Page 28 of 67
The following quantitative data of the characteristic should be maintained:
• Decimal places
• Unit of measure
• Lower value (must, if selected in control key)
• Upper value (must, if selected in control key)
• Target value (must, if selected in control key)
For Qualitative characteristics, the selected set of the characteristic must be maintained for the catalog type
‘characteristic attributes’ (catalog type identifier ‘1’). The catalog and the plant specific selected set must be
defined before by customizing settings.
Indicator Description
Sampling Procedure
Indicator
Designates that a sample size must be determined for the inspection lot
and will cause a sampling procedure to be required for inspection plans
that use this characteristic.
Record Number of Defects
Indicator
Designates that the data recorded during results recording should be
for the number of defects found when evaluating the material for
critical, major, and minor defects.
Defects Recording Indicator Designates that defect codes should be recorded when the number of
defects entered during results recording is greater than the reject
number. This indicator causes the defect screen to pop up
automatically.
Page 29 of 67
Additional transactions used for master inspection characteristics include:
Tcode Description
QS25 Delete a MIC. This transaction deletes a MIC. Once
deleted, the MIC can no longer be used for new
assignments in an inspection plan.
QS26 Where-Used List for MICs. This list displays all the
inspection plans the MIC is assigned to. The selection
criteria are based on the MIC and plant and version.
QS27 Replace one MIC with another MIC in a plant.
Page 30 of 67
Exercise 1 Create Qualitative MasterInspection Characteristic (QS21)
Scenario: Create a qualitative master inspection characteristic.
Support Document: QS21 Create Qualitative Master Inspection Characteristic
Transaction Code QS21
Complete the following field(s): Required Data
Plant
Master insp.charac.
Enter
Short text
Search field
Which qualitative characteristics are available?
Select appropriate characteristic control
indicators
Enter
Save
Don’t have an
eup
Page 31 of 67
LESSON 5: INSPECTION PLAN
Lesson 5 Objectives
After completing this lesson, you will be able to:
 Define inspection plan
 Explain the structure of an inspection plan
 Create an inspection plan
 Assign master data to an inspection plan
Inspection Plan Overview
Inspection plans describe how a quality inspection of one or several materials is to take place. The inspection
plan designates the sequence of inspection operations and the range of specifications available for inspecting
inspection characteristics. Inspection plans are defined at the plant-specific level.
Inspection plans are created to assign a material for quality inspection.
• An inspection lot must have a status of “REL” for it to be processed
• To display the status of an inspection lot: use transaction code QA03
• The inspection lot number can be found on the material document from the good receipt or by
using other transactions.
• WCB will use inspection plans for the quality check of raw material and are assigned to the
material when the inspection lot is created at goods receipt
• If a new material is created, generally only an assignment of the material to an existing plan is
necessary
• The assignment of an inspection plan to a material is important because it defines which
characteristics of a material has to be inspected
• If an inspection plan does not exist for a material, a new plan has to be created for the material
Page 32 of 67
Inspection Plan Structure
The inspection plan group represents the material group in SAP and plan group counters are used if materials
have different units of measure. This is necessary because the unit of measure in the plan header must match the
unit of measure of the material assigned.
Inspection Plan Header
The inspection plan header defines settings that apply to the entire inspection plan.
Page 33 of 67
 The inspection plan usage ties this inspection plan to a specific inspection type(s). The task list usage
defined for an inspection type will cause an inspection lot to call an inspection plan with the same usage.
 Inspection Plan Unit of Measure – The inspection plan unit of measure designates what the unit of
measure can be for any material on the inspection plan. In order to use an inspection plan, a material
must have that unit of measure as its base unit of measure, or there must be a conversion from the
material’s base unit of measure to the inspection plan usage maintained in the alternate unit of measure
are of the material master.
 DMR level – The dynamic modification level determines whether inspection stage changes (and skip lots)
are determined by acceptable results at the inspection lot level, the inspection characteristic level, or the
inspection type level. Char-Broil and Zebco will use the inspection lot level.
 DMR – This field links the inspection plan to a previously created dynamic modification rule.
Page 34 of 67
Exercise 1 Display Inspection Plan (QP03)
Scenario: Display an inspection plan.
Support Document: QP03 Display Inspection Plan
Transaction Code QP03
Complete the following field(s): Required Data
Material
Plant
Enter
Which operations are identified in the plan?
Review header information.
What is the modification rule?
Look at details for an operation.
What is the control key for the operation?
Review the inspection characteristics.
What are the master inspection characteristics for
the plan?
Don’t have an
eup
Page 35 of 67
Exercise 2 Create InspectionPlan (QP01)
Scenario: Create an inspection plan that will be used for quality inspections.
Support Document: QP01 Create Inspection Plan
Transaction Code QP01
Complete the following field(s): Required Data
Key date
Click Header icon
Create new entries for the inspection plan
Group counter
Short text
Plant
Usage
Status
Lot size
Assign operations
Control key
Description
Create inspection characteristics
Enter twice
Char
Short text
Set control indicators
Sampling Procedure
Page 36 of 67
Exercise 2 Create InspectionPlan (QP01)
SPC criterion
Save
Page 37 of 67
Material Assignment to an Inspection Plan
Materials are assigned at the header level in the inspection plan. An inspection plan can be assigned to many
materials and group counters.
Materials are assigned at the plant-specific level. A material must exist in a plant to be assigned to an inspection
plan there.
Page 38 of 67
Exercise 3 Display MaterialAssignmentfor an Inspection Plan (QS62)
Scenario: You want to display the material assignment for an inspection plan.
Support Document: QS62 Display Material Specification
Transaction Code QS62
Complete the following field(s): Required Data
Material
Enter
Which master inspection characteristics are
assigned to the material?
Review master inspection characteristics.
What is the status?
Look at the control indicators.
Are sampling procedures scheduled for the
material?
Review the inspection characteristics.
Enter
Don’t have an
eup
Page 39 of 67
Exercise 4 Create a MaterialAssignmentfor an Inspection Plan (QS61)
Scenario: You want to create a new material assignment for an inspection plan and set the master isnpection
characteristics.
Support Document: QS61 Create Material Specification
Transaction Code QS61
Complete the following field(s): Required Data
Material
Enter
Plant
Assign master inspection characteristic(s).
Which characteristics did you assign?
Save
Don’t have an
eup
Page 40 of 67
Inspection Plan Operation Level
Inspection plan operations allow for the sequencing of inspection activities, similar to a routing. Inspection
characteristics are assigned to an inspection plan operation.
Inspection Characteristics
Within each operation in an inpection plan there are inspection characteristics. These can be direct references to
master inspection characteristics, or these can be set up uniquely in the inspection plan. All settings that are
available in a master inspection characteristic are available and editable for an individual inspection plan.
Characteristic Description
Master inspection
characteristic
This column is where the reference to a master inspection characteristic is
entered for an inspection plan.
Sampling Procedure This column is where the reference to a sampling procedure is entered for
an inspection characteristic.
Page 41 of 67
Changes to Inspection Plans
Changes can be made to inspection plans using transaction code QP02.
Typical changes can include:
 Adding material assignment
 Creating a new group counter
 Any changes to master data (master inspection characteristic, sample procedures)
OldData
NewData
Inspection
Plan
Page 42 of 67
Exercise 5 ChangeInspection Plan (QP02)
Scenario: You need to make changes to an inspection plan. For this exercise, add a work center.
Support Document: QP02 Change Inspection Plan
Transaction Code QP02
Complete the following field(s): Required Data
Material
Plant
Enter
Which operations are identified in the plan?
Add or change the work center.
Save
Don’t have an
eup
Page 43 of 67
Engineering Workbench
The engineering workbench is a mass maintenance tool for inspection plans. The engineering workbench uses
the object-oriented approach and includes all of the object types that belong to an inspection plan. Object types
can be combined to form complex search criteria resulting in a very specific work list. The work list allows
changes to be made at one time and will lock the inspection plan until the changes are saved.
You use the inspection planning functions to define inspection criteria (for example, material to be inspected, how
the inspection is to take place, characteristics to be inspected, required test equipment, work center and
inspection specifications). The system contains the following inspection planning options:
You can use task lists (inspection plans, routings, rate routings, and maintenance task lists) to define inspection
characteristics, their assignment to inspection operations and the test equipment to be used. This enables you to
inspect materials at a quality inspection.
Additional transactions used for inspection plans include:
Tcode Description Function
QP03 Display inspection plan. Use this transaction to display all
inspection plans for a plant / material.
QP60 Task list changes. This transaction displays all changes to an
inspection plan based on selection criteria.
QP61 Display change documents for inspection plan
group.
Use this transaction to display change
documents for an inspection plan / group
based on the selection criteria entered.
Page 44 of 67
Exercise 6 Maintain Inspection Plan (CWBQM)
Scenario: You want to create a task for an inspection plan using the engineering workbench function.
Support Document: CWBQM Workbench
Transaction Code CWBQM
Complete the following field(s): Required Data
Current Working Area
Enter
Enter
What is the heading for the initial screen?
Date Defaults to today’s date
Material
Plant
Task List Type
Group
Group Counter
Load the details you added
Did you get a system message?
Save
Don’t have an
eup
Page 45 of 67
Quality Info Records
Quality info records are used to document the quality relationship between a vendor and the material they supply.
These records are maintained at the plant level and have various functions in QM in procurement. Zebco will use
quality info records to document the supply relationship with vendors and have them in place for future
considerations. Use transaction QI02 to make changes to the quality info records for procurement.
The Release tab displays details about quantities and blocks.
The Insp. control tab displays vendor details and lead time information.
Field Description
Release Until Used to release the vendor relationship until the specified date. If the vendor
control function is active, purchase orders to this vendor are prevented if the
current date is after the release until date.
Source
Inspection
Designates which inspection type is used when source inspection lots are created
by SAP. This field will only be used by Lamplight.
Lead time This field determines how many days before the the PO line item delivery date a
source inspection lot should be created. This field will only be used by Lamplight.
Vendor Contact Persons
Vendor contacts will be used to store the name and email address of the person at a vendor who should be the
recipient of the inspection report generated when a usage decision codes ending in the letter S is applied to an
inspection lot. Use MAP2 to make changes to partner details.
Page 46 of 67
The Function field is used to indicate that this contact is the one that should be used to supply the email address
for the inspection report.
Code Groups and Codes
The SAP QM application utlizes codes in various areas for documentation and reporting purposes. The codes
were loaded as part of the data migration based on legacy data provided by the businesses. The codes visible to
each business are determined by their inclusion in a catalog profile assigned in the QM View of each material.
Use QS41 to make changes to code groups and codes.
2 – Task Codes
Task codes are used in quality notifications to document the specific tasks that are required and tracked in the
completion of an issue related to a vendor, product, or customer. Tasks are assigned at the header (general) level
or at the defect (item) level. Tasks can be assigned to vendors and accessed through the vendor portal, or assign
to users and accessed in SAP GUI.
3 – Usage Decision Codes
Usage decision codes are used to evaluate and close an inspection lot. Genreally they reflect an ac ceptance or
rejection of the inspection lot. For Char-Broil, Lamplight, and Zebco, the usage decision will drive the stock type
(unrestricted or blocked) in the warehouse, and will also designate inspection lots that should generate an email
report to vendors. Any code that ends in the letter S will cause SAP to automatically send a report to the related
vendor when it is applied as the usage decision for an inspection lot.
5 – Cause Codes
Cause codes are used in notifications and are applied specifically to individual defect codes to document the root
cause of the defect.
9 – Defect Codes
Page 47 of 67
Defect codes are used in notifications to document the specific defects that are found in a material. These are a
very important piece of information as these codes are used in reporting to determins specific and recurring
problems with products, vendors, or customers. Defects can be tied to location codes, cause codes, and task
codes.
D – Coding Codes
Coding codes are assigned at the header level of a notification to provide an additional level of classification
about the issue.
E – Defect Location Codes
Defect location codes are used to document where on the product a defect was found. This codes are available to
all businesses but are most extensively used by Char-Broil.
Selected Sets
Selected sets are created to combine code groups and codes into a single group for use within a specific area.
For Char-Broil, Lamplight, and Zebco, selected sets will be used to determine which usage decisions codes are
available for a given inspection type. Selected sets are set up at the plant-specific level. SAP transaction QS51 is
used to make changes to selected sets.
Selected sets are tied to inspection types in the inspection type configuration.
Page 48 of 67
Quality Notifications
Quality notifications are used to document quality issues with a product, a vendor, a customer, or a combination
of the three. Notifications capture data like issue descriptions, long text, material number, plant number, defects,
tasks, causes, etc. Notifications can be created directly from results recording for an inspection lot.
The following notification types are available for Char-Broil, Lamplight, and Zebco:
Notification Type Description
F1 – Customer related defects There are no current processes utilizing this notification type, but it
is available for future considerations.
F2 – Vendor related defects This notification type is tied to inspection types 01, ZLL01, 17,
ZPSI, and ZLLPSI and documents quality issues experienced in
vendor related inspections.
F3 – Material related defects This notification type is tied to inspection type ZRW and
documents quality issues related to post-rework inspections.
Q1 – Customer Complaints There are no current processes utilizing this notification type, but it
is available for future considerations.
Q2 – Vendor Complaints This notification type is created manually to document issues
related to vendors that are not discovered as part of an inspection
lot processing.
Q3 – Internal problem This notification type documents issues encountered internally
outside of an inspection process.
ZC – Char-Broil Deviation
Request
This notification type is created via the vendor portal for vendors to
submit deviation requests.
ZL – Lamplight Deviation Request This notification type is created via the vendor portal for vendors to
submit deviation requests.
ZZ – Zebco Deviation Request This notification type is created via the vendor portal for vendors to
submit deviation requests.
Notification statuses and selection profiles are maintained by configuration specialists and display the information
about how notifications will display during the QM processes.
Page 49 of 67
Work with your configuration specialist to determine which SAP transaction should be used to maintain settings
for notifications.
Page 50 of 67
LESSON 6: VENDOR PORTAL
Lesson 6 Objectives
After completing this lesson, you will be able to:
 Define the vendor portal master data
 Describe the pre-inspection app
 Explain how tasks are assigned and maintained
 Report on the vendor portal
Vendor Portal Overview
The vendor portal is an application that can be used by vendors to log quality complaints and is made up of the
following components for QM:
 Pre-inspection App
 Quality Tasks App
 Deviation Management App
 Inspection Report Email Program
These components will help WCB and vendors identify and resolve issues quickly and effectively.
Vendor Portal – Pre-inspection App
The pre-inspection application in the vendor portal is designed to allow vendors to submit inspection reports
directly into the WC Bradley SAP system. The vendors will access PO line items via the application and create
inspection lots within the SAP system. These inspection lots will have inspection type Z7 and do not require
results recording. They will stay in released status (REL) for 24 hours, after which time SAP will make an
automatic usage decision for them via a batch job.
Vendors are assigned to a quality engineer and will report purchase orders to that quality engineer using the
vendor portal.
Vendor Portal – Quality Tasks App
The quality tasks application in the vendor portal is designed to allow vendors to see and process tasks that are
assigned to them in quality notifications within the SAP system. Vendors can submit text notes, attach documents,
and set tasks to complete status (TSCO).
In order to see quality tasks, the task in the notification must be assigned to the correct vendor number in the
notification.
Vendors will see quality tasks that need to be addressed in the vendor portal.
Vendor Portal – Deviation Management App
The deviation management application in the vendor portal is designed to allow vendors to submit deviation
requests directly in to the SAP system. The deviation request is submitted via a notification type (ZC – Char-Broil,
ZL – Lamplight, ZZ – Zebco).
Vendors will submit deviation requests in the vendor portal.
Vendor Portal – Inspection Report Email Program
The inspection report email program is designed to send an email to the reference vendor for an inspection lot.
This program finds all inspection lots that have a usage decision code that ends in the letter S and generates an
email which is sent via SOST. The variant for the batch job that runs the program will limit the selection to
Page 51 of 67
inspection lots with a usage decision date of the current date and a usage decision time within the last 30
minutes. The batch job will run every 30 minutes. The email will have the following attachments:
 the standard SAP inspection report
 Any files attached to the inspection lot via the generic object services function.
In order to function properly, the reference vendor must have a contact person created in transaction MAP1 with a
function of ZQ to designate that contact as the recipient of the email report. The contact person must have a valid
email address.
Page 52 of 67
LESSON 7: BATCH JOBS
Lesson 7 Objectives
After completing this lesson, you will be able to:
 Define the batch jobs used for quality management
 Maintain the inspection report
 Maintain automatic usage decisions
Batch Jobs Overview
Batch jobs are utilized to tell the system how often to report certain quality management reports.
 Inspection report
 Automatic usage decision
Inspection Report
A batch job runs the inspection report email program. There is one batch job for each plant that does inspections
and sends reports to vendors. The interval for this batch job is every 30 minutes, and the pulls in all inspection lot
numbers for a specific plant with a UD (usage decision) date equal to the current date. The program populates the
time fields to select inspection lots from the last 30 minutes.
Automatic Usage Decision
A batch job makes usage decisions for inspection lots with inspection type Z7 because these lots are submitted
by the vendors and WCB users will not be directly processing them. The transaction to set up the automatic
usage decision job is QA17. One batch job is set up for each plant that has vendors submitting inspection reports
using Z7 inspection lots.
Page 53 of 67
APPENDIX – END USER PROCEDURES
Lesson 1: Display Inspection Lot (QA03)
No EUP
Lesson 1: Display Material Master QM View (MM03)
Material Master Processing
Use this transaction to display a material master record. The material master contains information for all the
materials that a company procures or produces, stores, and sells. The material master is used by all components
in the SAP logistics system:
 In Purchasing for ordering
 In Inventory management for goods movement postings and physical inventory
 In Invoice verification for posting invoices
 In sales and distribution for sales order processing
 In production planning and control for material requirements planning
The data in a material master record can be divided into two categories:
 Data of a purely descriptive nature, such as name, size, or dimension
 Data that system uses to perform control function, such as MRP type control, and price control
The Material Master is maintained at different organization levels such as client, plant, and storage location.
A Material Master record is created in following cases:
 If no material master record exists for a particular material. In this case, you must create the material master
record.
 If a material master record exists for a particular material, but the master for your department is missing. In
this case, you must extend the material master record.
 If a material master record exists for a particular material and the master data for your user department is
entered, but not for the appropriate organizational level. In this case, you must extend the material master
record.
Related Transactions & Processes
MM01 Material Master - Create
MM02 Material Master - Change
MM03 Material Master - Display
MM04 List of Quotations
MM06 Flag for deletion
MMSC Enter storage locations
MM60 Material Master - List
MM50 Extend material list
Tips & Tricks
 If the same values are used frequently, it will be faster to access the material master data by setting up
defaults. Default values can be set up for Industry Sector, Views and Organizational levels. These defaults
are set from the MM03 initial screen, from the menu selection “Defaults”.
 If all views should be displayed, it is faster to click the Select All button rather than clicking on each view
button.
Page 54 of 67
Activity
1. Follow the SAP menu as shown, or type the transaction code MM03 in the command field.
Result: The Display Material (Initial Screen) displays.
2. Enter the Material number.
3. Click .
Result: The Select View(s) dialog box displays.
Page 55 of 67
4. Select the appropriate screens to view, for example, MRP1 view.
5. Click .
Result: The Organizational Levels dialog box displays:
6. Enter the Plant code.
7. Click .
Result: The Purchase view screen displays:
8. Click .
Result: The Last data screen reached screen displays.
9. Click .
Page 56 of 67
Lesson 2: Material Master Settings (MM02)
Material Master Processing
Use this transaction to change a material master record. The material master contains information for all the
materials that a company procures or produces, stores, and sells. The material master is used by all components
in the SAP logistics system:
 In Purchasing for ordering
 In Inventory management for goods movement postings and physical inventory
 In Invoice verification for posting invoices
 In sales and distribution for sales order processing
 In production planning and control for material requirements planning
The data in a material master record can be divided into two categories:
 Data of a purely descriptive nature, such as name, size, or dimension
 Data that system uses to perform control function, such as MRP type control, and price control
The Material Master is maintained at different organization levels such as client, plant, and storage location.
A Material Master record is created in following cases:
 If no material master record exists for a particular material. In this case, you must create the material
master record.
 If a material master record exists for a particular material, but the master for your department is missing.
In this case, you must extend the material master record.
 If a material master record exists for a particular material and the master data for your user department is
entered, but not for the appropriate organizational level. In this case, you must extend the material
master record.
Fields within the material master can be added and maintained after the initial creation process. Some fields
cannot be changed after transactions have been processed against the material (i.e., base unit of measure), and
some should not be changed without proper precautions.
Related Transactions & Processes
MM01 Material Master - Create
MM02 Material Master - Change
MM03 Material Master - Display
MM04 List of Quotations
MM06 Flag for deletion
MMSC Enter storage locations
MM60 Material Master - List
MM50 Extend the material views
Tips & Tricks
 To select the view to change, it is faster to click the Select All button rather than clicking on each view
button.
 Click to move between the displayed views. You can also click the view tabs individually to control the
progression through the views.
 The Views that you select will determine the Organizational level dialog box and its fields.
 To set user defaults for views and organizational levels for a new material, follow these steps:
o Views:
 Use the menu path Defaults  Views
 Select those views for which you want to establish defaults. You can also select
when the select view dialog box is to be by-passed unless selected.
o Organizational levels:
 Use the menu path Defaults  organizational levels
 Select those organizational levels for which you want to establish defaults. Select
when the select view dialog box is to be by-passed unless selected.
Page 57 of 67
Activity
1. Follow the SAP menu as shown, or type the transaction code MM02 in the command field.
Result: The Change Material (Initial Screen) displays.
2. Enter the Material number.
3. Click .
Result: Pop –up select view screen
4. Select the appropriate views you want to display, for example, the Purchasing view.
5. Click .
Page 58 of 67
Result: The Organizational Levels dialog box displays:
6. Enter the Plant code.
7. Click .
Result: The Purchasing view screen displays:
8. Change the field information as needed. For example, change the GR processing time from 3 days to 4
9. days. Click .
Result: The Last data screen reached screen displays.
10. Click .
Result: SAP displays a message at the bottom of screen like the one shown below.
Lesson 2: Assign Material to Inspection Plan (QP02)
No EUP
Lesson 3: Display Sampling Procedure (QDV3)
No EUP
Page 59 of 67
Lesson 3: Create Sampling Procedure (QDV1)
Create Sampling Procedure
A sampling procedure defines the rules that specify how the system calculates the sample size and it contains
information about the valuation of an inspection characteristic during results recording (attributive, variable,
manual, etc.). This document describes the process of creating a new sampling procedure.
Related Transactions
QDV2 Change Sampling Procedure
QDV3 Display Sampling Procedure
Activity
1. Follow the SAP menu as shown, or type the transaction code QDV1 in the command field.
Result: The Create Sampling Procedure: Initial screen displays.
2. Enter the name of the sampling procedure and click on
Result: The Create Sampling Procedure: Assignments screen displays
3. Enter the information as specified in the table below:
Page 60 of 67
Field Name Description R/O/C User Action and Values
Short Text Short Text for sampling procedure R Enter the short text or short description for
the Sampling Procedure
Sampling
Type
Specifies how the sample is determined
e.g., 100% sample, sample w ith a fixed
size.
R Enter the alphanumeric that uniquely
identifies the sampling type. (use the dow n
arrow to search and pickthe required one)
Valuation
Mode
Defines the rules for accepting or
rejecting a characteristic or sample
R Enter the alphanumeric that uniquely
identifies the valuation mode (use the dow n
arrow to search and pickthe required one).
Inspection
Points
Choose one of the follow ing inspection
points indicator
Without insp. points
Plant maintenance
Sample Management
Free inspection pts
R Click on one of the 4 radio buttons
4. Hit Enter
Result: The Create Sampling Procedure: Special Conditions screen displays
5. Choose one of the 3 options present under the Multiple Samples group. (No multiple samples, Indep.
Multiple samples, Sep. multiple samples).
6. Click on
Result: The Fixed Sample pop-up box displays.
Note: The fields in this screen will be different based on the inspection Type and Valuation
mode selected. The following are the ones for “Fixed Sample” inspection type and “Attributive inspection
nonconf units” valuation mode. Enter the sample size and click on
7. Click on
Result: The sample is saved. Confirmatory message appears on the bottom of the SAP screen.
8. To return to the SAP menu, click on .
Page 61 of 67
Lesson 3: Change Sampling Procedure (QDV2)
Change Sample Procedures
A sampling procedure defines the rules that specify how the system calculates the sample size and it contains
information about the valuation of an inspection characteristic during results recording (attributive, variable,
manual, etc.). This document describes the process of changing a sampling procedure.
Related Transactions
QDV1 Create Sample Procedure
QDV2 Display Sample Procedure
Activity
1. Follow the SAP menu as shown, or type the transaction code QDV2 in the command field.
Result: The Change Sample Procedure: Initial screen displays.
2. Enter the sampling procedure name
3. Click on
Result: The Change Sampling Procedure: Assignments screen is displayed
Page 62 of 67
4. Make changes to each tab as required.
Note: Click on the “Administrative Data” icon in order to view the person created or changed the
dynamic modification and the data it was done
5. Click on
Result: Confirmatory message appears at the bottom of the SAP screen.
6. To return to the SAP menu, click on .
Lesson 4: Create Qualitative Master Inspection Characteristic (QS21)
No EUP
Lesson 5: Display Inspection Plan (QP03)
No EUP
Lesson 5: Create Inspection Plan (QP01)
Create Inspection Plan
The inspection plan is the task list used by the Quality Management (QM) component to process quality
inspections. Inspection plans are used to carry out such production-related tasks (for example, inspecting goods
upon goods receipt or goods issue). Quality inspections during production are carried out on the basis of the
routing. This end user procedure covers the use of inspection plans for quality management applications.
The inspection plan structure mirrors the structure of the routing in the Production Planning (PP) component.
The plan consists of the following elements:
 General information (header)
 One or more operations; operations within the QM component are created and maintained exactly as
those within the Production Planning (PP) component. For information about operations, see the
online documentation for PP Production Planning.
For each operation you can define
 Test equipment used for the inspection (as production resources)
 Location where the inspection takes place (as work centers)
Related Transactions
QP02 Change Inspection Plan
QP03 Display Inspection Plan
Page 63 of 67
Tips and Tricks
 You can assign one or more materials to an inspection plan.
 Providing you do not use master inspection characteristics in the plan, you can assign different characteristic
values for each material for an inspection characteristic. These are known as allocation values for an
inspection characteristic.
 Inspection characteristics (inspection characteristics cannot be assigned to a sub-operation).
Activity
1. Follow the SAP menu as shown, or type the transaction code QP01 in the command field.
Result: The Create Inspection Plan: Initial screen displays.
Page 64 of 67
2. Enter the information as specified in the table below:
Field Name Description R/O/C User Action and Values
Material Material number O Enter the alphanumeric key that uniquely
identifies the material that the inspection plan is
to be created for.
Plant Plant number O Enter the alphanumeric key that uniquely
identifies the plant w here the inspection plan is to
be used.
Group Group number (inspection plans) O Enter the alphanumeric key that uniquely
identifies group number w here the new
inspection plan is to be grouped.
Change
number
Change master record number O Enter the alphanumeric key that uniquely
identifies the change master record associated
w ith the new inspection plan.
Key date Key date R Enter a date in the future the inspection plan w ill
be valid. The systemw illpopulate this field w ith
the current date
Revision
level
Revision level ID O Used in conjunction w ith the change number, this
field identifies the status of the inspection plan.
Profile Profile ID O Enter the alphanumeric key that uniquely
identifies the inspection plan profile, this w illuse
predefined data to populate some of the data
fields in the new inspection plan.
3. Click on the Header Icon
Result: The Inspection Plan Create: Task List Overview screen is displayed
Note: You will get to this screen only if you did not enter a material with a plant on the previous
screen.
4. Click on .
Result: The Create Inspection Plan: Header Details appears
Page 65 of 67
5. Enter the information as specified in the table below.
Field Name Description R/O/C User Action and Values Comments
Group Group number D The alphanumeric key that uniquely
identifies the inspection group number
that includes the group counter of the
inspection plan. This is a system-
generated number.
Group
counter
Group counter ID R Enter the alphanumeric key that
uniquely identifies the inspection plan
group counter that specifically
identifies the inspection plan.
Short text Group counter short text O Enter a short description of the
inspection plan.
Plant Plant number R Enter the alphanumeric key that
uniquely identifies the plant at w hich
the inspection plan is to be valid for.
Deletion flag Deletion flag O Check this box to set the deletion flag
so that the inspection plan w illbe
deleted at the next reorganization run
or archiving procedure.
Use Inspection plan use ID R Enter the alphanumeric key that
uniquely identifies the inspection plan
use ID, (I.E. production, goods issue,
goods receipt, universal…)
Status Inspection plan status ID R Enter the alphanumeric key that
uniquely identifies the inspection plan
status, (I.E. created, released…)
The
inspection
plan has to
be release
before it can
be used.
Planner
group
Planner group O Enter the alphanumeric key that
uniquely identifies the planner group
responsible for maintaining the
inspection plan.
Planning
w orkcenter
Planning w orkcenter O Enter the alphanumeric key that
uniquely identifies the planning w ork
center w here the inspection is to take
place
Lot size Lot size R Enter the low er and upper lot sizes for
the validity of the inspection plan.
Old tasklist
number
Old tasklist number O If the new inspection plan is replacing
an older inspection plan, enter the old
inspection plan number.
Inspec.
points
Inspection points O If using inspection points to process
the inspection, enter the inspection
point.
Dynamic
mod. Level
Dynamic modification
level
O Enter the level at w hich the inspection
stage is made and on w hich the quality
level is maintained, (I.E. w ithout, at lot
level, at characteristic level)
Modification
rule
Modification rule O Enter the dynamic modification rule
that contains the inspection stages and
the conditions that lead to changes in
inspection stages.
Note: If you want to assign more than one material to the Inspection Plan, attach the required
materials by clicking on
6. Click on
Result: The Inspection Plan Create: Operation Overview screen is displayed.
Page 66 of 67
7. Enter the information as specified in the table below.
Field Name Description R/O/C User Action and Values
Operation Operation ID number O Enter the numeric key that uniquely
identifies the operation. (I.E. 0010, 0020,
0030…)
Work center Work Center ID Number O Enter the alphanumeric key that uniquely
identifies the w orkcenter where the
inspection is to take place.
Plnt Plant ID number O Enter the alphanumeric key that uniquely
identifies the plant w here the inspection w ill
take place.
Control key Control key ID R Enter the alphanumeric key that uniquely
identifies the controlkey. A controlkey w ill
specify a set of business transactions to
maintain for the inspection operation. Use
QM01 or QM02
Standard text
key
Standard text key O Enter the alphanumeric key that uniquely
identifies the standard text key. A standard
text key w illimport a standard description in
the description field.
Description Operation description R Enter a description of the inspection
operation
Long text
exist
Long text exist indicator O Use this checkbox to indicate if long text
exists. Also use this indicator to enter the
long text area.
8. Select an Operation and click on
Result: The Create Inspection Plan: Characteristic Overview screen appears
9. Enter the information as specified in the table below.
Field Name Description R/O/C User Action and Values Comments
Char Characteristic number R Enter the characteristic number.
(I.E. 10, 20, 30 …)
Qn Quantitative characteristic
indicator
O Check if characteristicis quantitative
in nature.
One of these
options Qn or
Ql has to be
selected
Ql Qualitative characteristic
indicator
O Check if characteristicis qualitative
in nature.
MstrChar Master inspection
characteristic
O Enter or search the alphanumeric
key that uniquely identifies the
master inspection characteristickey.
Short text Short text R Short text description of the
inspection characteristic.
L Long text O Long text description of the
inspection characteristic
Method Inspection Method. An
inspection method describes
how to inspect an inspection
characteristic.
O Use the search to select an
inspection method
Page 67 of 67
10. Select a characteristic and click on
11. On the first two screens, hit
Result: The Create Inspection Plan: Dynamic Modification Screen: Sample tab appears
12. Enter the information as specified below:
 Sampling Procedure: Procedure by which the sample size for an inspection is determined. Select a
sampling procedure from the drop-down
 SPC criterion: Serves as a criterion for establishing and limiting quality control charts for statistical
process control (SPC). Select a SPC criterion from the drop-down
13. Hit Enter
Result: The Create Inspection Plan – Characteristic Overview screen appears with the filled in data.
14. Click on .
Result: Inspection Plan is saved and confirmatory message is displayed.
15. To return to the SAP menu, click on .
Lesson 5: Display Material Assignment for an Inspection Plan (QS62)
No EUP
Lesson 5: Create a Material Assignment for an Inspection Plan (QS61)
No EUP
Lesson 5: Change Inspection Plan (QP02)
No EUP
Lesson 5: Maintain Inspection Plan (CWBQM)
No EUP

More Related Content

What's hot

Docin pdf
Docin pdfDocin pdf
Docin pdf
Vishal Nigam
 
Creating entreprenual change - CIM Level 07
Creating entreprenual change - CIM Level 07Creating entreprenual change - CIM Level 07
Creating entreprenual change - CIM Level 07
Dinesh Tharanga
 
bilateral_trade_treaties_20080508105059
bilateral_trade_treaties_20080508105059bilateral_trade_treaties_20080508105059
bilateral_trade_treaties_20080508105059Neha Jindal
 
SAP Business Process Management - SAP Roadmap
SAP Business Process Management - SAP RoadmapSAP Business Process Management - SAP Roadmap
SAP Business Process Management - SAP Roadmap
Aisyah Widjaja
 
fannie mae 2004 10-K
fannie mae 2004 10-K fannie mae 2004 10-K
fannie mae 2004 10-K finance6
 
Sap fi
Sap fiSap fi
Sap fi
nasimh
 
Getting started with excise for manufacturers | Tally Corporate Services | Ta...
Getting started with excise for manufacturers | Tally Corporate Services | Ta...Getting started with excise for manufacturers | Tally Corporate Services | Ta...
Getting started with excise for manufacturers | Tally Corporate Services | Ta...
stannventures.Pvt.Ltd
 
Candy - Construction Estimating & Valuations - rev 2.01
Candy - Construction Estimating & Valuations - rev 2.01Candy - Construction Estimating & Valuations - rev 2.01
Candy - Construction Estimating & Valuations - rev 2.01Jerico Awat
 
Global marketing decisons - CIM Level 07
Global marketing decisons - CIM Level 07Global marketing decisons - CIM Level 07
Global marketing decisons - CIM Level 07
Dinesh Tharanga
 
National diploma in computer technology unesco-nigeria tve
National diploma in computer technology   unesco-nigeria tveNational diploma in computer technology   unesco-nigeria tve
National diploma in computer technology unesco-nigeria tve
ISAH BABAYO
 
Account determination
Account determinationAccount determination
Account determination
suryanarayana tata
 
Impact of Corporate Governance on Leverage and Firm performance: Mauritius
Impact of Corporate Governance on Leverage and Firm performance: MauritiusImpact of Corporate Governance on Leverage and Firm performance: Mauritius
Impact of Corporate Governance on Leverage and Firm performance: Mauritius
Akshay Ramoogur
 

What's hot (16)

Docin pdf
Docin pdfDocin pdf
Docin pdf
 
Marketing & association banking fyp
Marketing & association banking  fypMarketing & association banking  fyp
Marketing & association banking fyp
 
Creating entreprenual change - CIM Level 07
Creating entreprenual change - CIM Level 07Creating entreprenual change - CIM Level 07
Creating entreprenual change - CIM Level 07
 
bilateral_trade_treaties_20080508105059
bilateral_trade_treaties_20080508105059bilateral_trade_treaties_20080508105059
bilateral_trade_treaties_20080508105059
 
SAP Business Process Management - SAP Roadmap
SAP Business Process Management - SAP RoadmapSAP Business Process Management - SAP Roadmap
SAP Business Process Management - SAP Roadmap
 
fannie mae 2004 10-K
fannie mae 2004 10-K fannie mae 2004 10-K
fannie mae 2004 10-K
 
Sap fi
Sap fiSap fi
Sap fi
 
Getting started with excise for manufacturers | Tally Corporate Services | Ta...
Getting started with excise for manufacturers | Tally Corporate Services | Ta...Getting started with excise for manufacturers | Tally Corporate Services | Ta...
Getting started with excise for manufacturers | Tally Corporate Services | Ta...
 
Cmdm rev eng
Cmdm rev engCmdm rev eng
Cmdm rev eng
 
Candy - Construction Estimating & Valuations - rev 2.01
Candy - Construction Estimating & Valuations - rev 2.01Candy - Construction Estimating & Valuations - rev 2.01
Candy - Construction Estimating & Valuations - rev 2.01
 
Global marketing decisons - CIM Level 07
Global marketing decisons - CIM Level 07Global marketing decisons - CIM Level 07
Global marketing decisons - CIM Level 07
 
National diploma in computer technology unesco-nigeria tve
National diploma in computer technology   unesco-nigeria tveNational diploma in computer technology   unesco-nigeria tve
National diploma in computer technology unesco-nigeria tve
 
Dtcmsv3 nov 14
Dtcmsv3 nov 14Dtcmsv3 nov 14
Dtcmsv3 nov 14
 
Account determination
Account determinationAccount determination
Account determination
 
115payug
115payug115payug
115payug
 
Impact of Corporate Governance on Leverage and Firm performance: Mauritius
Impact of Corporate Governance on Leverage and Firm performance: MauritiusImpact of Corporate Governance on Leverage and Firm performance: Mauritius
Impact of Corporate Governance on Leverage and Firm performance: Mauritius
 

Similar to WCB_Quality_Management_Master_Data_Participant_GuideOLD

UCHILE_M_Sc_Thesis_final
UCHILE_M_Sc_Thesis_finalUCHILE_M_Sc_Thesis_final
UCHILE_M_Sc_Thesis_finalGustavo Pabon
 
UCHILE_M_Sc_Thesis_final
UCHILE_M_Sc_Thesis_finalUCHILE_M_Sc_Thesis_final
UCHILE_M_Sc_Thesis_finalGustavo Pabon
 
SocioTechnical-systems-sim
SocioTechnical-systems-simSocioTechnical-systems-sim
SocioTechnical-systems-simRub Afonso
 
Student database management system PROJECT
Student database management system PROJECTStudent database management system PROJECT
Student database management system PROJECT
Rai Saheb Bhanwar Singh College Nasrullaganj
 
Managing sap upgrade_projects
Managing sap upgrade_projectsManaging sap upgrade_projects
Managing sap upgrade_projectsKishore Kumar
 
Manuel Logiciel Techlog 2012
Manuel Logiciel Techlog 2012Manuel Logiciel Techlog 2012
Manuel Logiciel Techlog 2012
BRIKAT Abdelghani
 
Bwl red book
Bwl red bookBwl red book
Red book Blueworks Live
Red book Blueworks LiveRed book Blueworks Live
Red book Blueworks Live
Francesco Maria Rivera
 
Web2.0 And Business Schools Dawn Henderson
Web2.0 And Business Schools   Dawn HendersonWeb2.0 And Business Schools   Dawn Henderson
Web2.0 And Business Schools Dawn Henderson
Dawn Henderson
 
Introduction to BIRT
Introduction to BIRTIntroduction to BIRT
Introduction to BIRT
Raghavan Mohan
 
Deployment guide series ibm tivoli compliance insight manager sg247531
Deployment guide series ibm tivoli compliance insight manager sg247531Deployment guide series ibm tivoli compliance insight manager sg247531
Deployment guide series ibm tivoli compliance insight manager sg247531Banking at Ho Chi Minh city
 
Deployment guide series ibm tivoli compliance insight manager sg247531
Deployment guide series ibm tivoli compliance insight manager sg247531Deployment guide series ibm tivoli compliance insight manager sg247531
Deployment guide series ibm tivoli compliance insight manager sg247531Banking at Ho Chi Minh city
 

Similar to WCB_Quality_Management_Master_Data_Participant_GuideOLD (20)

UCHILE_M_Sc_Thesis_final
UCHILE_M_Sc_Thesis_finalUCHILE_M_Sc_Thesis_final
UCHILE_M_Sc_Thesis_final
 
UCHILE_M_Sc_Thesis_final
UCHILE_M_Sc_Thesis_finalUCHILE_M_Sc_Thesis_final
UCHILE_M_Sc_Thesis_final
 
Vekony & Korneliussen (2016)
Vekony & Korneliussen (2016)Vekony & Korneliussen (2016)
Vekony & Korneliussen (2016)
 
SocioTechnical-systems-sim
SocioTechnical-systems-simSocioTechnical-systems-sim
SocioTechnical-systems-sim
 
Student database management system PROJECT
Student database management system PROJECTStudent database management system PROJECT
Student database management system PROJECT
 
Managing sap upgrade_projects
Managing sap upgrade_projectsManaging sap upgrade_projects
Managing sap upgrade_projects
 
Manuel Logiciel Techlog 2012
Manuel Logiciel Techlog 2012Manuel Logiciel Techlog 2012
Manuel Logiciel Techlog 2012
 
Ostrander_Project_Final_Report
Ostrander_Project_Final_ReportOstrander_Project_Final_Report
Ostrander_Project_Final_Report
 
Thesis
ThesisThesis
Thesis
 
Bwl red book
Bwl red bookBwl red book
Bwl red book
 
Red book Blueworks Live
Red book Blueworks LiveRed book Blueworks Live
Red book Blueworks Live
 
Ibm tivoli ccmdb implementation recommendations
Ibm tivoli ccmdb implementation recommendationsIbm tivoli ccmdb implementation recommendations
Ibm tivoli ccmdb implementation recommendations
 
affTA00 - 10 Daftar Isi
affTA00 - 10 Daftar IsiaffTA00 - 10 Daftar Isi
affTA00 - 10 Daftar Isi
 
dissertation
dissertationdissertation
dissertation
 
Web2.0 And Business Schools Dawn Henderson
Web2.0 And Business Schools   Dawn HendersonWeb2.0 And Business Schools   Dawn Henderson
Web2.0 And Business Schools Dawn Henderson
 
Introduction to BIRT
Introduction to BIRTIntroduction to BIRT
Introduction to BIRT
 
Thesis_Report
Thesis_ReportThesis_Report
Thesis_Report
 
Deployment guide series ibm tivoli compliance insight manager sg247531
Deployment guide series ibm tivoli compliance insight manager sg247531Deployment guide series ibm tivoli compliance insight manager sg247531
Deployment guide series ibm tivoli compliance insight manager sg247531
 
Deployment guide series ibm tivoli compliance insight manager sg247531
Deployment guide series ibm tivoli compliance insight manager sg247531Deployment guide series ibm tivoli compliance insight manager sg247531
Deployment guide series ibm tivoli compliance insight manager sg247531
 
Thesis writing
Thesis writingThesis writing
Thesis writing
 

More from Deb Martina

UG_Receiving-OF_ESAB
UG_Receiving-OF_ESABUG_Receiving-OF_ESAB
UG_Receiving-OF_ESABDeb Martina
 
O2C0300G_Transportation_PPT_Rev0.4
O2C0300G_Transportation_PPT_Rev0.4O2C0300G_Transportation_PPT_Rev0.4
O2C0300G_Transportation_PPT_Rev0.4Deb Martina
 
SAP_IM_Inventory_Management_Processes_100_C_EN v3.5
SAP_IM_Inventory_Management_Processes_100_C_EN v3.5SAP_IM_Inventory_Management_Processes_100_C_EN v3.5
SAP_IM_Inventory_Management_Processes_100_C_EN v3.5Deb Martina
 
SAP_BusinessObjects_4.x_Web_Intelligence_Advanced_Report_Design_092715_JBREVIEW
SAP_BusinessObjects_4.x_Web_Intelligence_Advanced_Report_Design_092715_JBREVIEWSAP_BusinessObjects_4.x_Web_Intelligence_Advanced_Report_Design_092715_JBREVIEW
SAP_BusinessObjects_4.x_Web_Intelligence_Advanced_Report_Design_092715_JBREVIEWDeb Martina
 
Material Master Data Participant Guide_Pregis
Material Master Data Participant Guide_PregisMaterial Master Data Participant Guide_Pregis
Material Master Data Participant Guide_PregisDeb Martina
 
EX_2.1-MM03 Display Material Master V1.0
EX_2.1-MM03 Display Material Master V1.0EX_2.1-MM03 Display Material Master V1.0
EX_2.1-MM03 Display Material Master V1.0Deb Martina
 
SAP_Inventory_Management_Overview_PPT v1.1
SAP_Inventory_Management_Overview_PPT v1.1SAP_Inventory_Management_Overview_PPT v1.1
SAP_Inventory_Management_Overview_PPT v1.1Deb Martina
 

More from Deb Martina (7)

UG_Receiving-OF_ESAB
UG_Receiving-OF_ESABUG_Receiving-OF_ESAB
UG_Receiving-OF_ESAB
 
O2C0300G_Transportation_PPT_Rev0.4
O2C0300G_Transportation_PPT_Rev0.4O2C0300G_Transportation_PPT_Rev0.4
O2C0300G_Transportation_PPT_Rev0.4
 
SAP_IM_Inventory_Management_Processes_100_C_EN v3.5
SAP_IM_Inventory_Management_Processes_100_C_EN v3.5SAP_IM_Inventory_Management_Processes_100_C_EN v3.5
SAP_IM_Inventory_Management_Processes_100_C_EN v3.5
 
SAP_BusinessObjects_4.x_Web_Intelligence_Advanced_Report_Design_092715_JBREVIEW
SAP_BusinessObjects_4.x_Web_Intelligence_Advanced_Report_Design_092715_JBREVIEWSAP_BusinessObjects_4.x_Web_Intelligence_Advanced_Report_Design_092715_JBREVIEW
SAP_BusinessObjects_4.x_Web_Intelligence_Advanced_Report_Design_092715_JBREVIEW
 
Material Master Data Participant Guide_Pregis
Material Master Data Participant Guide_PregisMaterial Master Data Participant Guide_Pregis
Material Master Data Participant Guide_Pregis
 
EX_2.1-MM03 Display Material Master V1.0
EX_2.1-MM03 Display Material Master V1.0EX_2.1-MM03 Display Material Master V1.0
EX_2.1-MM03 Display Material Master V1.0
 
SAP_Inventory_Management_Overview_PPT v1.1
SAP_Inventory_Management_Overview_PPT v1.1SAP_Inventory_Management_Overview_PPT v1.1
SAP_Inventory_Management_Overview_PPT v1.1
 

WCB_Quality_Management_Master_Data_Participant_GuideOLD

  • 1. Table of Contents Participant Guide Standards (Heading 1) ......................................................Error! Bookmark not defined. Sub Heading Text (Heading 2) ................................ Error! Bookmark not defined. Additional heading text (Heading 3)......................................................... Error! Bookmark not defined. Create a Participant Guide...........................................................................Error! Bookmark not defined. Introduction to Participant Guide Creation...........Error! Bookmark not defined. Document Naming Convention ............................................................... Error! Bookmark not defined. Document Properties ............................................................................. Error! Bookmark not defined. Numbered Lists ..................................................................................... Error! Bookmark not defined. Inserting Text Tables ............................................................................. Error! Bookmark not defined. Inserting Table of Figures and Table of Tables ........................................ Error! Bookmark not defined. Inserting Exercises ................................................................................ Error! Bookmark not defined. Exercise 1 – Inserta Step-by-StepExerciseTableError! Bookmark not defined. Exercise 2 – Inserta ScenarioBasedExercise Error! Bookmark not defined. Inserting Smart Art................................................................................. Error! Bookmark not defined. Tables and Figures Figure 1 Smart Art Graphic Sample......................................................................................................1 Table 1 Text Table Sample..................................................................... Error! Bookmark not defined. Table 2 Step-by-Step Exercise Example ................................................. Error! Bookmark not defined. Table 3 Scenario Based Exercise Example ............................................. Error! Bookmark not defined.
  • 2. Page 1 of 67 Table of Contents QM Master Data Introduction ....................................................................................................................4 Using this Guide......................................................................................................4 Lesson 1: QM Overview ...........................................................................................................................5 Lesson 1 Objectives............................................................................................... 5 QM Process Overview 5 QM Inspection Process 5 Exercise 1 – Displayan InspectionLot(QA03) 8 Exercise 2 – DisplayMaterial MasterQM View (MM03) 9 Lesson 2: Material Master QM View ........................................................................................................10 Lesson 2 Objectives.............................................................................................10 Master Data 10 Material Master Data 10 The Importance of Master Data 11 Catalog Profile 12 QM proc. active 12 QM Control Key12 Quality Inspection Settings – Inspection Lots 13 Exercise 1 Material Master Settings(MM02) 16 Exercise 2 AssignMaterial to InspectionPlan(QP02) 18 Lesson 3: Sampling Procedures ..............................................................................................................19 Lesson 3 Objectives.............................................................................................19 Sampling Overview 19 Exercise 1 DisplaySamplingProcedure (QDV3) 22 Exercise 2 Create SamplingProcedure(QDV1) 23 Exercise 3 Change SamplingProcedure(QDV2) 24 Dynamic Modification Rule (DMR) 25 Lesson 4: Master Inspection Characteristics ............................................................................................26 Lesson 4 Objectives.............................................................................................26 Master Inspection Characteristics Overview 26 WCB Qualitative Control Indicators 27 WCB Quantitative Control Indicators 27 Exercise 1 Create QualitativeMasterInspectionCharacteristic(QS21) 30 Lesson 5: Inspection Plan.......................................................................................................................31 Lesson 5 Objectives.............................................................................................31 Inspection Plan Overview 31
  • 3. Page 2 of 67 Inspection Plan Structure 32 Exercise 1 Display InspectionPlan(QP03) 34 Exercise 2 Create InspectionPlan(QP01) 35 Material Assignment to an Inspection Plan 37 Exercise 3 Display Material AssignmentforanInspectionPlan(QS62) 38 Exercise 4 Create a Material AssignmentforanInspectionPlan(QS61) 39 Inspection Plan Operation Level 40 Inspection Characteristics 40 Changes to Inspection Plans 41 Exercise 5 Change InspectionPlan(QP02) 42 Engineering Workbench 43 Exercise 6 MaintainInspection Plan(CWBQM) 44 Quality Info Records 45 Vendor Contact Persons 45 Code Groups and Codes 46 Selected Sets 47 Quality Notifications 48 Lesson 6: Vendor Portal .........................................................................................................................50 Lesson 6 Objectives.............................................................................................50 Vendor Portal Overview 50 Vendor Portal – Pre-inspection App 50 Vendor Portal – Quality Tasks App 50 Vendor Portal – Deviation Management App 50 Vendor Portal – Inspection Report Email Program 50 Lesson 7: Batch Jobs .............................................................................................................................52 Lesson 7 Objectives.............................................................................................52 Batch Jobs Overview 52 Inspection Report 52 Automatic Usage Decision 52 Appendix – End User Procedures ...........................................................................................................53 Lesson 1: Display Inspection Lot (QA03)..........................................................53 Lesson 1: Display Material Master QM View (MM03).......................................53 Material Master Processing 53
  • 4. Page 3 of 67 Related Transactions & Processes 53 Tips & Tricks 53 Activity 54 Lesson 2: Material Master Settings (MM02)......................................................56 Material Master Processing 56 Related Transactions & Processes 56 Tips & Tricks 56 Activity 57 Lesson 2: Assign Material to Inspection Plan (QP02).....................................58 Lesson 3: Display Sampling Procedure (QDV3) ..............................................58 Lesson 3: Create Sampling Procedure (QDV1)................................................59 Create Sampling Procedure 59 Related Transactions 59 Activity 59 Lesson 3: Change Sampling Procedure (QDV2)..............................................61 Change Sample Procedures 61 Related Transactions 61 Activity 61 Lesson 4: Create Qualitative Master Inspection Characteristic (QS21) .......62 Lesson 5: Display Inspection Plan (QP03)........................................................62 Lesson 5: Create Inspection Plan (QP01) .........................................................62 Create Inspection Plan 62 Related Transactions 62 Tips and Tricks 63 Activity 63 Lesson 5: Display Material Assignment for an Inspection Plan (QS62).......67 Lesson 5: Create a Material Assignment for an Inspection Plan (QS61) .....67 Lesson 5: Change Inspection Plan (QP02) .......................................................67 Lesson 5: Maintain Inspection Plan (CWBQM) ................................................67
  • 5. Page 4 of 67 QM MASTER DATA INTRODUCTION This course will equip participants with the SAP skills necessary to create, change and manage master data records that impact the quality management process. The following topics are covered in this guide:  The quality management process  Types of master data used in the quality management process  Material master – QM view  Inspection characteristics  Sampling procedures  Inspection plans After completing this course, you will be able to:  Explain the role of master data in the quality management process  Describe the master data used in QM  Maintain the material master – QM view  Create and assign inspection characteristics to task list  Create and maintain sampling procedures  Create and maintain inspection plans Using this Guide This guide is designed to provide you with:  Information regarding the listed topics  Exercises to practice what you learn  Quick reference guides to assist you while doing your job in SAP Use this guide in a classroom setting to follow along with the instructor and add notes wherever needed. You can also use this guide in a self-paced manner to review how to perform the listed tasks learned in class.
  • 6. Page 5 of 67 LESSON 1: QM OVERVIEW Lesson 1 Objectives After completing this lesson, you will be able to:  Describe the three phases of QM  Define an inspection lot  Describe the QM inspection process  Recognize log triggers QM Process Overview Figure 1 QM Process QM Inspection Process The data important for the quality inspection is contained in the inspection lot data record that includes:  The lot quantity lot  Sample size  Origin  Vendor  Order number  PO number  Delivery number Planning •Material Master, Inspection Characteristics, Inspection Plan •Sample Procedures & Dynamic Modification (Skip) Processing •Record Results (Accept / Reject) •UsageDecision Evaluation •Quality Notifications •Quality Scores
  • 7. Page 6 of 67 The originating documents contain the inspection lot materials and may be any one of the following:  Purchasing document  Material document  Order  Delivery document
  • 8. Page 7 of 67 An inspection lot is assigned to a material. Each inspection lot follows the same process regardless of the type of inspection (goods movements, returns, etc.). Figure 2 QM Inspection Process An inspection lot is a request to perform a quality inspection for a quantity (sample) of a material. Inspectino lots are data records and have statuses. Inspection lots are assigned to an inspection plan and may contain seeral opererations that define inspection activities. Each operation on the inspection plan may contain one or many inspection characteristics that describe what needs to be inspected. Inspection lots can be triggered by the following events: Business Process Event Goods movements Good receipts – Goods receipt for purchase order into the warehouse. Transfer postings – Plant to plant moves. Returns – Return from vendor or customer orders. Complaints Customer – Each customer complaint will be inspected. Vendor – Each vendor complaint will be inspected. Internal problems Defects – All defects will be inspected. Table 1 Master Data Terms Create Inspection Lot Determine Sample Inspect Material Record Results / Defects Usage Decision Evaluation
  • 9. Page 8 of 67 Exercise 1 – Display an Inspection Lot (QA03) Scenario: An inspection lot is a request to inspect a quantity of material for pre- defined characteristics. Display an inspection lot and answer the questions below. Support Document: QA03 Display Inspection Lot Complete the following field(s): Required Data / Results Transaction Code QA03 Complete the following field(s): Required Data Inspection Lot What is the Insp.lot origin? Who is the vendor? What is the inspection lot quantity? What is the valuation code? Has a usage decision been made on this lot? Don’t have an eup
  • 10. Page 9 of 67 Exercise 2 – Display Material Master QM View (MM03) Scenario: The inspection set-up in the material master (QM view) activates and triggers the creation of inspections lots, assigns an inspection plan and calculates the sample size. In addition to other settings on the inspection type, other actions are performed automatically. Display the QM view inspection set-up for goods receipt for PO – B and answer the following questions. Support Document: MM03 Display Material Master Record Transaction Code MM03 Complete the following field(s): Required Data Material Select views Quality Management Plant Enter Review inspection setup What is the inspection type for Goods Receipt Inspection? What is the description of the material? Want is the material group number and name? Enter What is the base unit of measure? What is the Catalog profile? Don’t have an eup
  • 11. Page 10 of 67 LESSON 2: MATERIAL MASTER QM VIEW Lesson 2 Objectives After completing this lesson, you will be able to:  Explain the master data used in QM processes  Define inspection types  Maintain and activate inspection types  Assign a material to an inspection plan  Display material master – QM view  Additional material master transactions Master Data Accurate master data is one of the key factors for a successful SAP implementation. Master data is centrally stored data that forms the base of all business transactions. The data is static in nature, meaning it does not change when it used in a transaction. While the transactions themselves are dynamic and changed based on the execution of the transaction, the master data itself used does not. Master Data is the responsibility of a team dedicated to its creation maintenance to insure the data’s correctness. This important task also reduces redundancy of data records across the entire company. The main Master Data types ae shown below. For this course, we will focus primarily on Material and Vendor Master Data. Figure 3 Master Data Types Material Master Data Master data is created at different levels to accommodate its use by the various organization elements in the company. For example, members of the procurement team work with information different from the data used by the sales team. Master data is created at different organizational levels. Depending on the material type, different functional areas within the company maintain different data screens. This screen selection applying specifically to an application is called a "view". Because of the large of amount of information contained in a single material master record, the viewing method for a material employs multiple data screens. Depending on the material type, different functional areas within the company maintain the different data screens. Basic data views are the same across all company locations. Other views are specific for each plant location. Each material is created for at least one plant, but can be “extended” to additional plants. When a material is extended to other plants, the plant specific data can then be changed from plant to plant, if necessary.
  • 12. Page 11 of 67 Figure 4 Material Master Data The Importance of Master Data The accuracy of master data is essential to efficient performance of the inspection process. Characteristics of master data include:  Static  Centrally stored and shared across other modules and systems  Is copied into transaction data Examples of QM master data include:  Materials  Inspection plans  Master inspections characteristics Material types in the SAP system can be, for example, finished goods, semi-finished goods, raw materials, or services. The material type represents certain features of materials in the system, and has important control functions: the material type is used, among other things, to group field selection functions for a material, or to define the screen sequence, the type of number assignment and number ranges during material master record maintenance. The following material types will have active inspection types: Material Type Description FERT Finished Goods HALB Semi-finished goods ROH Raw Materials Table 2 Material Types Once and inspection type is created and activated, the material is assigned to an inspection plant.
  • 13. Page 12 of 67 The QM view of the material master activates quality inspection for a material within a plant and controls the inspection process. The material master settings control how materials will be inspected during the procurement process. Catalog Profile Each business unit has a catalog profile created. This profile is entered in the QM View and determines which code groups and codes appear in the quality notifications for that material.  ZCB – Char-Broil Codes  ZLL – Lamplight Codes  ZZB – Zebco Codes The Catalog Profiles contain the name of the code groups and codes that should be displayed in quality notifications for a material. QM proc. active Every item should have this box checked. It designates that there are QM functions active in the procurement process. The specific QM functions that are active are determined by two subsequent items, the QM Control Key configuration and the Quality Info Record QM Control Key Every item should ‘0000’ in this box. This means that there are no controling functions active in configuration. This simply designates that a Quality Info Record should exist, and serves as a place holder for a different control key if other functions are even implemented. a. 0000 – No active functions The QM Control Key can activate various QM functions in the procurement process. Control Key 0000 indicates the requirement for a Quality Info Record. There are two views for the QM view in the material master:  The main view, which maintains general and procurement settings.  The sub-view: Inspection Set-up where the various inspection types are maintained and activated (or deactivated).
  • 14. Page 13 of 67 Quality Inspection Settings – Inspection Lots Inspection lots contain the inspection types, origins, number ranges, and usage decisions for inspection plans. Inspection Type Setup Every item that is inspected will have certain inspection types activated to allow for the creation of inspection lots. A material can have several inspection types maintained and activated based on the inspection process defined for that material. Inspection types define when an inspection is to be carried out (goods receipts or stock transfers) in addition to how the inspection is to be carried out based on the settings for each inspection type. The inspection type must be activated to have an inspection lot created. Note: An inspection type can also be deactivated by deselecting the Active checkbox. From that date forward, no inspection lots will be created for that material in that plant. However, the deactivation will have no effect on existing inspection lots. Type Description 01 This inspection type is used to ensure that stock goes into Quality Inspection when received from a PO/Inbound Delivery. It is used in conjuntion with inspection type 17 for receiving inspections. ZLL01 This inspection type is a copy of 01 and is used to ensure that stock goes into Quality Inspection when received from a PO/Inbound Delivery for Lamplight specifically. It is used in conjuntion with inspection type 17 for receiving inspections. 17 This inspection type is used to create inspection lots based on goods receipts in the EWM system. ZPSI This inspection type is used to create inspection lots for internal pre- shipment inspections in SAP. These inspection lots are manually created by inspectors in QA01. ZLLPSI This inspection type is used to create inspection lots for internal pre- shipment inspections in SAP specifically for Lamplight. These inspection lots are created by a batch job running QI07 in the background. This inspection type requires a Quality Ino Record to be set up as well. Z7 This inspection type is used by external vendors via the Vendor Portal Pre-inspection App. It is used by the vendors to submit their own inspection reports and should be active for any material that gets a vendor report submitted. ZRW This inspection type is used to create inspection lots after the goods receipt from a rework production order.
  • 15. Page 14 of 67 Other Settings Setting Description UD Selected Set This is the name of the selected set of UD codes that is used when processing the usage decision for an inspection lot with this inspection type. Selected Set in Same Plant This check box requires that the selected set used for the UD must be set up in the same plant that the inspection lot exists in (a Char-Broil inspection lot cannot be evaluated with a UD from Zebco). Notification type This field determines the type of notification that is created automatically at the time of defects recording within results recording for the inspection lot. Task list usage This setting determines what type of inspection plans will be called up when inspection lots are created with this inspection type. This field will match the task list usage field in the inspection plan.
  • 16. Page 15 of 67 Additional transactions for the material master are described below: Tcode Description Function MM01 Create Material Master Use this transaction to create new materials for a plant or to extend current materials to other WCB plants This is a highly authorized transaction MM06 Flag Material for Deletion This transaction flags a material for deletion at different organizational levels The material will still exist in the database and depending on the configuration – the system will issue either a warning or error message when it is used in a transaction. It is physically removed from the database when the archive program is run MM03 Display a material master – QM View Use this transaction to display the QM view in a material / plant This transaction displays the QM inspection type(s) that are activated for a material / plant and the associated settings for each type Changes are not allowed with this transaction MM19 Display material at Key Date Use this transaction to display a material for a particular point in time (date). QA08 Mass Change of Inspection Setup Data in Materials This transaction is used to activate, deactivate, materials in a plants(s) Hint: The QM view must exist before using this transaction
  • 17. Page 16 of 67 Exercise 1 Material Master Settings (MM02) Scenario: Every material should have a plant-specific QM view in the material master. Activate the procurement data for a material in your plant. Support Document: MM02 Create Duty of Inspection Transaction Code MM02 Complete the following field(s): Required Data Material Select views Quality Management Plant Enter Select a catalog profile type Select procurement data Make sure the QM procurement data selection box is selected. Select one or more inspection types and select the Active checkbox Save Don’t have an eup
  • 18. Page 17 of 67 The material assignment to an inspection plan is performed at the Header level in the inspection plan. An inspection plan can have many materials assigned to it. Once the inspection type is created and activated, the material must be assigned to an inspection plan. A material can be assigned to an inspection plan by using the change transaction (QP02) and adding the material to the existing assignments. If no inspection plan is available, a new plan for the material has to be created. We will discuss creating an inspection plan in another lesson. Inspection Plan Header Material 1 Material 2
  • 19. Page 18 of 67 Exercise 2 Assign Material to Inspection Plan (QP02) Scenario: The inspection types have been created and activated in the material master. Based on the settings for the inspection type, the material must be assigned to an inspection. Assign the material to an existing inspection plan. Support Document: QP02 Assign Material to Inspection Plan Transaction Code QP02 Complete the following field(s): Required Data Plant Group Click task lists overview Click material assignment Group counter Material Plant Enter Save Don’t have an eup
  • 20. Page 19 of 67 LESSON 3: SAMPLING PROCEDURES Lesson 3 Objectives After completing this lesson, you will be able to:  Display a sampling procedure  Create a sampling procedure  Change a sampling procedure Sampling Overview Sampling procedures are used to determine the scope of samples for measuring an inspection characteristic. Sampling procedures are necessary to define the quantity of a sample and the valuation (accept / reject) for an inspection characteristic during results recording. An example of a sampling procedure is described in the following table. Sampling Procedure Transaction Code: QDV1 Name 8 Characters (alpha / numeric) Description 40 Characters (alpha / numeric) Sampling Type Fixed Sample Valuation mode Attributive inspection non-conforming units Inspection Points Without inspection points Sample Size 5 Acceptance number Zero
  • 21. Page 20 of 67 Sampling Schemes Sampling schemes are used to determine the sample size for each characteristic that is evaluated during results recording for an inspection lot. It determines a sample size based on the receipt quantity and determines accept/reject numbers. These accept/reject numbers can be determined by AQL and inspection severity. Sampling Scheme Description Lot size This corresponds to the inspection lot size and determines the sample size and accept/reject numbers for the sample size. Sample size Sample size for an inspection characteristic at the given lot size. Accept Number This number (blank for zero) determies the acceptance number for the sample size at the given AWL and inspection severity. Reject Number Determines the rejection number for the sample size at the given AQL and inspection severity (blank for zero). Sampling Procedure A sampling procedure defines the rules that specify how the system calculates the sample size and it contains information about the valuation of an inspection characteristic during results recording. Sampling procedures are usually used at characteristic level of an inspection plan. Sampling Procedure Description Sampling Type Designates how the sample size is determined. Value Mode Designates how to determine if an inspection characteristic has passed or failed. Sampling Scheme This field references which sampling scheme this procedure is based on. Additional data Specific inspection Severity and AQL from the sampling scheme are assigned to the sampling procedure.
  • 22. Page 21 of 67 Additional transactions used for sampling procedures include: Tcode Description Function QDV3 Change Sampling Procedure This transaction is used to display a sampling procedure Changes cannot be made using this transaction QDV6 Sampling Procedure Where-Used List This transaction displays all the inspection plans and material masters where the sampling procedure is assigned QDV7 Replace Sampling Procedure Use this transaction to replace an obsolete sampling procedure with a new or changes sampling procedure in inspections plans
  • 23. Page 22 of 67 Exercise 1 Display Sampling Procedure (QDV3) Scenario: Display a sampling procedure. Support Document: QDV3 Display Sampling Procedure Transaction Code QDV3 Complete the following field(s): Required Data Sampling Procedure Enter What settings display for the sampling procedure? Which sampling types are available? Which evaluation modes are available? Don’t have an eup
  • 24. Page 23 of 67 Exercise 2 Create Sampling Procedure (QDV1) Scenario: Sampling procedures are used to calculate the sample size of an inspection lot and also to how characteristics are valuated during results recording. Create a sampling procedure. Support Document: QDV1 Create Sampling Procedures Transaction Code QDV1 Complete the following field(s): Required Data Sampling Procedure (enter a name) Click Short Text Sampling Type Valuation Mode Inspection Points Enter Which multiple samples display? Select a multiple samples option Click Save
  • 25. Page 24 of 67 Exercise 3 Change Sampling Procedure (QDV2) Scenario: Change the sample size of the sampling procedure created in the previous exercise. Support Document: QDV2 Change Sampling Procedure Transaction Code QDV2 Complete the following field(s): Required Data Sampling Procedure Click Change the sample size 5 Change the acceptance number 0 Save
  • 26. Page 25 of 67 Dynamic Modification Rule (DMR) The DMR defines the change of the inspection stages, the dynamic modification time (at lot creation or after the usage decision has been made), and the conditions for the inspection stage change. Inspection stage changes occur on the basis of the inspection results that are recorded for inspection lots and inspection characteristics (that is, on the basis of their acceptance or rejection). Collectively these rules make up the conditions for creating SKIP LOTS in SAP. The rules in the inspection stages are set with rules for advancing and reverting the inspection stage. If you want to use a DMR and Sampling Procedures in the same inspection plan, their relationship has to be explicitly allowed using SAP transaction QDB1.
  • 27. Page 26 of 67 LESSON 4: MASTER INSPECTION CHARACTERISTICS Lesson 4 Objectives After completing this lesson, you will be able to:  Define the different types of master inspection characteristics  Explain the function of control indicators  Define the hierarchy of catalogs and when they are required for an MIC  Create and display an MIC Master Inspection Characteristics Overview Master Inspection Characteristics (MICs) are assigned to inspection plans at the operation level. MICs standardize the inspection process and make it more efficient – one MIC can be assigned to many inspection plants. It is QM master data that is created once and used long term. A master inspection characteristic is an inspection characteristic, which has been defined for frequent use in t ask lists or should be evaluated for all inspection plans. For example, if particular specifications are required in many inspection plans, a suitable MIC is created and assigned to many inspections plans  MICs help to improve and standardize inspection planning.  When a master inspection characteristic is created, the characteristic type has to be defined. There are two options:  Quantitative characteristic: Numeric values are expected as inspection results (e.g. thickness in meter)  Qualitative characteristic: Attribute values are expected as inspection results (e.g. color by color palette) MIC Control Indicators What isto be Inspected? Admin. Data General Data
  • 28. Page 27 of 67 WCB will create master inspection characteristics as complete copy models. Complete copy models allow changes to the MIC when it is assigned to an inspection plan operation (for example, tolerances or color). WCB Qualitative Control Indicators Qualitative Characteristic Control Indicators Characteristic attribute (required) Sampling procedure (required) Required characteristic (required) Fixed scope (required) No documentation Print WCB Quantitative Control Indicators Quantitative Characteristic Control Indicators Lower value (required, if the characteristic has a lower value) Upper value (required, if the characteristic has an upper value) Target value (required, if the characteristic has a target value) Sampling procedure (required) Single result Required characteristic (required) Fixed scope (required) No documentation Record measured values (required) Print No formula
  • 29. Page 28 of 67 The following quantitative data of the characteristic should be maintained: • Decimal places • Unit of measure • Lower value (must, if selected in control key) • Upper value (must, if selected in control key) • Target value (must, if selected in control key) For Qualitative characteristics, the selected set of the characteristic must be maintained for the catalog type ‘characteristic attributes’ (catalog type identifier ‘1’). The catalog and the plant specific selected set must be defined before by customizing settings. Indicator Description Sampling Procedure Indicator Designates that a sample size must be determined for the inspection lot and will cause a sampling procedure to be required for inspection plans that use this characteristic. Record Number of Defects Indicator Designates that the data recorded during results recording should be for the number of defects found when evaluating the material for critical, major, and minor defects. Defects Recording Indicator Designates that defect codes should be recorded when the number of defects entered during results recording is greater than the reject number. This indicator causes the defect screen to pop up automatically.
  • 30. Page 29 of 67 Additional transactions used for master inspection characteristics include: Tcode Description QS25 Delete a MIC. This transaction deletes a MIC. Once deleted, the MIC can no longer be used for new assignments in an inspection plan. QS26 Where-Used List for MICs. This list displays all the inspection plans the MIC is assigned to. The selection criteria are based on the MIC and plant and version. QS27 Replace one MIC with another MIC in a plant.
  • 31. Page 30 of 67 Exercise 1 Create Qualitative MasterInspection Characteristic (QS21) Scenario: Create a qualitative master inspection characteristic. Support Document: QS21 Create Qualitative Master Inspection Characteristic Transaction Code QS21 Complete the following field(s): Required Data Plant Master insp.charac. Enter Short text Search field Which qualitative characteristics are available? Select appropriate characteristic control indicators Enter Save Don’t have an eup
  • 32. Page 31 of 67 LESSON 5: INSPECTION PLAN Lesson 5 Objectives After completing this lesson, you will be able to:  Define inspection plan  Explain the structure of an inspection plan  Create an inspection plan  Assign master data to an inspection plan Inspection Plan Overview Inspection plans describe how a quality inspection of one or several materials is to take place. The inspection plan designates the sequence of inspection operations and the range of specifications available for inspecting inspection characteristics. Inspection plans are defined at the plant-specific level. Inspection plans are created to assign a material for quality inspection. • An inspection lot must have a status of “REL” for it to be processed • To display the status of an inspection lot: use transaction code QA03 • The inspection lot number can be found on the material document from the good receipt or by using other transactions. • WCB will use inspection plans for the quality check of raw material and are assigned to the material when the inspection lot is created at goods receipt • If a new material is created, generally only an assignment of the material to an existing plan is necessary • The assignment of an inspection plan to a material is important because it defines which characteristics of a material has to be inspected • If an inspection plan does not exist for a material, a new plan has to be created for the material
  • 33. Page 32 of 67 Inspection Plan Structure The inspection plan group represents the material group in SAP and plan group counters are used if materials have different units of measure. This is necessary because the unit of measure in the plan header must match the unit of measure of the material assigned. Inspection Plan Header The inspection plan header defines settings that apply to the entire inspection plan.
  • 34. Page 33 of 67  The inspection plan usage ties this inspection plan to a specific inspection type(s). The task list usage defined for an inspection type will cause an inspection lot to call an inspection plan with the same usage.  Inspection Plan Unit of Measure – The inspection plan unit of measure designates what the unit of measure can be for any material on the inspection plan. In order to use an inspection plan, a material must have that unit of measure as its base unit of measure, or there must be a conversion from the material’s base unit of measure to the inspection plan usage maintained in the alternate unit of measure are of the material master.  DMR level – The dynamic modification level determines whether inspection stage changes (and skip lots) are determined by acceptable results at the inspection lot level, the inspection characteristic level, or the inspection type level. Char-Broil and Zebco will use the inspection lot level.  DMR – This field links the inspection plan to a previously created dynamic modification rule.
  • 35. Page 34 of 67 Exercise 1 Display Inspection Plan (QP03) Scenario: Display an inspection plan. Support Document: QP03 Display Inspection Plan Transaction Code QP03 Complete the following field(s): Required Data Material Plant Enter Which operations are identified in the plan? Review header information. What is the modification rule? Look at details for an operation. What is the control key for the operation? Review the inspection characteristics. What are the master inspection characteristics for the plan? Don’t have an eup
  • 36. Page 35 of 67 Exercise 2 Create InspectionPlan (QP01) Scenario: Create an inspection plan that will be used for quality inspections. Support Document: QP01 Create Inspection Plan Transaction Code QP01 Complete the following field(s): Required Data Key date Click Header icon Create new entries for the inspection plan Group counter Short text Plant Usage Status Lot size Assign operations Control key Description Create inspection characteristics Enter twice Char Short text Set control indicators Sampling Procedure
  • 37. Page 36 of 67 Exercise 2 Create InspectionPlan (QP01) SPC criterion Save
  • 38. Page 37 of 67 Material Assignment to an Inspection Plan Materials are assigned at the header level in the inspection plan. An inspection plan can be assigned to many materials and group counters. Materials are assigned at the plant-specific level. A material must exist in a plant to be assigned to an inspection plan there.
  • 39. Page 38 of 67 Exercise 3 Display MaterialAssignmentfor an Inspection Plan (QS62) Scenario: You want to display the material assignment for an inspection plan. Support Document: QS62 Display Material Specification Transaction Code QS62 Complete the following field(s): Required Data Material Enter Which master inspection characteristics are assigned to the material? Review master inspection characteristics. What is the status? Look at the control indicators. Are sampling procedures scheduled for the material? Review the inspection characteristics. Enter Don’t have an eup
  • 40. Page 39 of 67 Exercise 4 Create a MaterialAssignmentfor an Inspection Plan (QS61) Scenario: You want to create a new material assignment for an inspection plan and set the master isnpection characteristics. Support Document: QS61 Create Material Specification Transaction Code QS61 Complete the following field(s): Required Data Material Enter Plant Assign master inspection characteristic(s). Which characteristics did you assign? Save Don’t have an eup
  • 41. Page 40 of 67 Inspection Plan Operation Level Inspection plan operations allow for the sequencing of inspection activities, similar to a routing. Inspection characteristics are assigned to an inspection plan operation. Inspection Characteristics Within each operation in an inpection plan there are inspection characteristics. These can be direct references to master inspection characteristics, or these can be set up uniquely in the inspection plan. All settings that are available in a master inspection characteristic are available and editable for an individual inspection plan. Characteristic Description Master inspection characteristic This column is where the reference to a master inspection characteristic is entered for an inspection plan. Sampling Procedure This column is where the reference to a sampling procedure is entered for an inspection characteristic.
  • 42. Page 41 of 67 Changes to Inspection Plans Changes can be made to inspection plans using transaction code QP02. Typical changes can include:  Adding material assignment  Creating a new group counter  Any changes to master data (master inspection characteristic, sample procedures) OldData NewData Inspection Plan
  • 43. Page 42 of 67 Exercise 5 ChangeInspection Plan (QP02) Scenario: You need to make changes to an inspection plan. For this exercise, add a work center. Support Document: QP02 Change Inspection Plan Transaction Code QP02 Complete the following field(s): Required Data Material Plant Enter Which operations are identified in the plan? Add or change the work center. Save Don’t have an eup
  • 44. Page 43 of 67 Engineering Workbench The engineering workbench is a mass maintenance tool for inspection plans. The engineering workbench uses the object-oriented approach and includes all of the object types that belong to an inspection plan. Object types can be combined to form complex search criteria resulting in a very specific work list. The work list allows changes to be made at one time and will lock the inspection plan until the changes are saved. You use the inspection planning functions to define inspection criteria (for example, material to be inspected, how the inspection is to take place, characteristics to be inspected, required test equipment, work center and inspection specifications). The system contains the following inspection planning options: You can use task lists (inspection plans, routings, rate routings, and maintenance task lists) to define inspection characteristics, their assignment to inspection operations and the test equipment to be used. This enables you to inspect materials at a quality inspection. Additional transactions used for inspection plans include: Tcode Description Function QP03 Display inspection plan. Use this transaction to display all inspection plans for a plant / material. QP60 Task list changes. This transaction displays all changes to an inspection plan based on selection criteria. QP61 Display change documents for inspection plan group. Use this transaction to display change documents for an inspection plan / group based on the selection criteria entered.
  • 45. Page 44 of 67 Exercise 6 Maintain Inspection Plan (CWBQM) Scenario: You want to create a task for an inspection plan using the engineering workbench function. Support Document: CWBQM Workbench Transaction Code CWBQM Complete the following field(s): Required Data Current Working Area Enter Enter What is the heading for the initial screen? Date Defaults to today’s date Material Plant Task List Type Group Group Counter Load the details you added Did you get a system message? Save Don’t have an eup
  • 46. Page 45 of 67 Quality Info Records Quality info records are used to document the quality relationship between a vendor and the material they supply. These records are maintained at the plant level and have various functions in QM in procurement. Zebco will use quality info records to document the supply relationship with vendors and have them in place for future considerations. Use transaction QI02 to make changes to the quality info records for procurement. The Release tab displays details about quantities and blocks. The Insp. control tab displays vendor details and lead time information. Field Description Release Until Used to release the vendor relationship until the specified date. If the vendor control function is active, purchase orders to this vendor are prevented if the current date is after the release until date. Source Inspection Designates which inspection type is used when source inspection lots are created by SAP. This field will only be used by Lamplight. Lead time This field determines how many days before the the PO line item delivery date a source inspection lot should be created. This field will only be used by Lamplight. Vendor Contact Persons Vendor contacts will be used to store the name and email address of the person at a vendor who should be the recipient of the inspection report generated when a usage decision codes ending in the letter S is applied to an inspection lot. Use MAP2 to make changes to partner details.
  • 47. Page 46 of 67 The Function field is used to indicate that this contact is the one that should be used to supply the email address for the inspection report. Code Groups and Codes The SAP QM application utlizes codes in various areas for documentation and reporting purposes. The codes were loaded as part of the data migration based on legacy data provided by the businesses. The codes visible to each business are determined by their inclusion in a catalog profile assigned in the QM View of each material. Use QS41 to make changes to code groups and codes. 2 – Task Codes Task codes are used in quality notifications to document the specific tasks that are required and tracked in the completion of an issue related to a vendor, product, or customer. Tasks are assigned at the header (general) level or at the defect (item) level. Tasks can be assigned to vendors and accessed through the vendor portal, or assign to users and accessed in SAP GUI. 3 – Usage Decision Codes Usage decision codes are used to evaluate and close an inspection lot. Genreally they reflect an ac ceptance or rejection of the inspection lot. For Char-Broil, Lamplight, and Zebco, the usage decision will drive the stock type (unrestricted or blocked) in the warehouse, and will also designate inspection lots that should generate an email report to vendors. Any code that ends in the letter S will cause SAP to automatically send a report to the related vendor when it is applied as the usage decision for an inspection lot. 5 – Cause Codes Cause codes are used in notifications and are applied specifically to individual defect codes to document the root cause of the defect. 9 – Defect Codes
  • 48. Page 47 of 67 Defect codes are used in notifications to document the specific defects that are found in a material. These are a very important piece of information as these codes are used in reporting to determins specific and recurring problems with products, vendors, or customers. Defects can be tied to location codes, cause codes, and task codes. D – Coding Codes Coding codes are assigned at the header level of a notification to provide an additional level of classification about the issue. E – Defect Location Codes Defect location codes are used to document where on the product a defect was found. This codes are available to all businesses but are most extensively used by Char-Broil. Selected Sets Selected sets are created to combine code groups and codes into a single group for use within a specific area. For Char-Broil, Lamplight, and Zebco, selected sets will be used to determine which usage decisions codes are available for a given inspection type. Selected sets are set up at the plant-specific level. SAP transaction QS51 is used to make changes to selected sets. Selected sets are tied to inspection types in the inspection type configuration.
  • 49. Page 48 of 67 Quality Notifications Quality notifications are used to document quality issues with a product, a vendor, a customer, or a combination of the three. Notifications capture data like issue descriptions, long text, material number, plant number, defects, tasks, causes, etc. Notifications can be created directly from results recording for an inspection lot. The following notification types are available for Char-Broil, Lamplight, and Zebco: Notification Type Description F1 – Customer related defects There are no current processes utilizing this notification type, but it is available for future considerations. F2 – Vendor related defects This notification type is tied to inspection types 01, ZLL01, 17, ZPSI, and ZLLPSI and documents quality issues experienced in vendor related inspections. F3 – Material related defects This notification type is tied to inspection type ZRW and documents quality issues related to post-rework inspections. Q1 – Customer Complaints There are no current processes utilizing this notification type, but it is available for future considerations. Q2 – Vendor Complaints This notification type is created manually to document issues related to vendors that are not discovered as part of an inspection lot processing. Q3 – Internal problem This notification type documents issues encountered internally outside of an inspection process. ZC – Char-Broil Deviation Request This notification type is created via the vendor portal for vendors to submit deviation requests. ZL – Lamplight Deviation Request This notification type is created via the vendor portal for vendors to submit deviation requests. ZZ – Zebco Deviation Request This notification type is created via the vendor portal for vendors to submit deviation requests. Notification statuses and selection profiles are maintained by configuration specialists and display the information about how notifications will display during the QM processes.
  • 50. Page 49 of 67 Work with your configuration specialist to determine which SAP transaction should be used to maintain settings for notifications.
  • 51. Page 50 of 67 LESSON 6: VENDOR PORTAL Lesson 6 Objectives After completing this lesson, you will be able to:  Define the vendor portal master data  Describe the pre-inspection app  Explain how tasks are assigned and maintained  Report on the vendor portal Vendor Portal Overview The vendor portal is an application that can be used by vendors to log quality complaints and is made up of the following components for QM:  Pre-inspection App  Quality Tasks App  Deviation Management App  Inspection Report Email Program These components will help WCB and vendors identify and resolve issues quickly and effectively. Vendor Portal – Pre-inspection App The pre-inspection application in the vendor portal is designed to allow vendors to submit inspection reports directly into the WC Bradley SAP system. The vendors will access PO line items via the application and create inspection lots within the SAP system. These inspection lots will have inspection type Z7 and do not require results recording. They will stay in released status (REL) for 24 hours, after which time SAP will make an automatic usage decision for them via a batch job. Vendors are assigned to a quality engineer and will report purchase orders to that quality engineer using the vendor portal. Vendor Portal – Quality Tasks App The quality tasks application in the vendor portal is designed to allow vendors to see and process tasks that are assigned to them in quality notifications within the SAP system. Vendors can submit text notes, attach documents, and set tasks to complete status (TSCO). In order to see quality tasks, the task in the notification must be assigned to the correct vendor number in the notification. Vendors will see quality tasks that need to be addressed in the vendor portal. Vendor Portal – Deviation Management App The deviation management application in the vendor portal is designed to allow vendors to submit deviation requests directly in to the SAP system. The deviation request is submitted via a notification type (ZC – Char-Broil, ZL – Lamplight, ZZ – Zebco). Vendors will submit deviation requests in the vendor portal. Vendor Portal – Inspection Report Email Program The inspection report email program is designed to send an email to the reference vendor for an inspection lot. This program finds all inspection lots that have a usage decision code that ends in the letter S and generates an email which is sent via SOST. The variant for the batch job that runs the program will limit the selection to
  • 52. Page 51 of 67 inspection lots with a usage decision date of the current date and a usage decision time within the last 30 minutes. The batch job will run every 30 minutes. The email will have the following attachments:  the standard SAP inspection report  Any files attached to the inspection lot via the generic object services function. In order to function properly, the reference vendor must have a contact person created in transaction MAP1 with a function of ZQ to designate that contact as the recipient of the email report. The contact person must have a valid email address.
  • 53. Page 52 of 67 LESSON 7: BATCH JOBS Lesson 7 Objectives After completing this lesson, you will be able to:  Define the batch jobs used for quality management  Maintain the inspection report  Maintain automatic usage decisions Batch Jobs Overview Batch jobs are utilized to tell the system how often to report certain quality management reports.  Inspection report  Automatic usage decision Inspection Report A batch job runs the inspection report email program. There is one batch job for each plant that does inspections and sends reports to vendors. The interval for this batch job is every 30 minutes, and the pulls in all inspection lot numbers for a specific plant with a UD (usage decision) date equal to the current date. The program populates the time fields to select inspection lots from the last 30 minutes. Automatic Usage Decision A batch job makes usage decisions for inspection lots with inspection type Z7 because these lots are submitted by the vendors and WCB users will not be directly processing them. The transaction to set up the automatic usage decision job is QA17. One batch job is set up for each plant that has vendors submitting inspection reports using Z7 inspection lots.
  • 54. Page 53 of 67 APPENDIX – END USER PROCEDURES Lesson 1: Display Inspection Lot (QA03) No EUP Lesson 1: Display Material Master QM View (MM03) Material Master Processing Use this transaction to display a material master record. The material master contains information for all the materials that a company procures or produces, stores, and sells. The material master is used by all components in the SAP logistics system:  In Purchasing for ordering  In Inventory management for goods movement postings and physical inventory  In Invoice verification for posting invoices  In sales and distribution for sales order processing  In production planning and control for material requirements planning The data in a material master record can be divided into two categories:  Data of a purely descriptive nature, such as name, size, or dimension  Data that system uses to perform control function, such as MRP type control, and price control The Material Master is maintained at different organization levels such as client, plant, and storage location. A Material Master record is created in following cases:  If no material master record exists for a particular material. In this case, you must create the material master record.  If a material master record exists for a particular material, but the master for your department is missing. In this case, you must extend the material master record.  If a material master record exists for a particular material and the master data for your user department is entered, but not for the appropriate organizational level. In this case, you must extend the material master record. Related Transactions & Processes MM01 Material Master - Create MM02 Material Master - Change MM03 Material Master - Display MM04 List of Quotations MM06 Flag for deletion MMSC Enter storage locations MM60 Material Master - List MM50 Extend material list Tips & Tricks  If the same values are used frequently, it will be faster to access the material master data by setting up defaults. Default values can be set up for Industry Sector, Views and Organizational levels. These defaults are set from the MM03 initial screen, from the menu selection “Defaults”.  If all views should be displayed, it is faster to click the Select All button rather than clicking on each view button.
  • 55. Page 54 of 67 Activity 1. Follow the SAP menu as shown, or type the transaction code MM03 in the command field. Result: The Display Material (Initial Screen) displays. 2. Enter the Material number. 3. Click . Result: The Select View(s) dialog box displays.
  • 56. Page 55 of 67 4. Select the appropriate screens to view, for example, MRP1 view. 5. Click . Result: The Organizational Levels dialog box displays: 6. Enter the Plant code. 7. Click . Result: The Purchase view screen displays: 8. Click . Result: The Last data screen reached screen displays. 9. Click .
  • 57. Page 56 of 67 Lesson 2: Material Master Settings (MM02) Material Master Processing Use this transaction to change a material master record. The material master contains information for all the materials that a company procures or produces, stores, and sells. The material master is used by all components in the SAP logistics system:  In Purchasing for ordering  In Inventory management for goods movement postings and physical inventory  In Invoice verification for posting invoices  In sales and distribution for sales order processing  In production planning and control for material requirements planning The data in a material master record can be divided into two categories:  Data of a purely descriptive nature, such as name, size, or dimension  Data that system uses to perform control function, such as MRP type control, and price control The Material Master is maintained at different organization levels such as client, plant, and storage location. A Material Master record is created in following cases:  If no material master record exists for a particular material. In this case, you must create the material master record.  If a material master record exists for a particular material, but the master for your department is missing. In this case, you must extend the material master record.  If a material master record exists for a particular material and the master data for your user department is entered, but not for the appropriate organizational level. In this case, you must extend the material master record. Fields within the material master can be added and maintained after the initial creation process. Some fields cannot be changed after transactions have been processed against the material (i.e., base unit of measure), and some should not be changed without proper precautions. Related Transactions & Processes MM01 Material Master - Create MM02 Material Master - Change MM03 Material Master - Display MM04 List of Quotations MM06 Flag for deletion MMSC Enter storage locations MM60 Material Master - List MM50 Extend the material views Tips & Tricks  To select the view to change, it is faster to click the Select All button rather than clicking on each view button.  Click to move between the displayed views. You can also click the view tabs individually to control the progression through the views.  The Views that you select will determine the Organizational level dialog box and its fields.  To set user defaults for views and organizational levels for a new material, follow these steps: o Views:  Use the menu path Defaults  Views  Select those views for which you want to establish defaults. You can also select when the select view dialog box is to be by-passed unless selected. o Organizational levels:  Use the menu path Defaults  organizational levels  Select those organizational levels for which you want to establish defaults. Select when the select view dialog box is to be by-passed unless selected.
  • 58. Page 57 of 67 Activity 1. Follow the SAP menu as shown, or type the transaction code MM02 in the command field. Result: The Change Material (Initial Screen) displays. 2. Enter the Material number. 3. Click . Result: Pop –up select view screen 4. Select the appropriate views you want to display, for example, the Purchasing view. 5. Click .
  • 59. Page 58 of 67 Result: The Organizational Levels dialog box displays: 6. Enter the Plant code. 7. Click . Result: The Purchasing view screen displays: 8. Change the field information as needed. For example, change the GR processing time from 3 days to 4 9. days. Click . Result: The Last data screen reached screen displays. 10. Click . Result: SAP displays a message at the bottom of screen like the one shown below. Lesson 2: Assign Material to Inspection Plan (QP02) No EUP Lesson 3: Display Sampling Procedure (QDV3) No EUP
  • 60. Page 59 of 67 Lesson 3: Create Sampling Procedure (QDV1) Create Sampling Procedure A sampling procedure defines the rules that specify how the system calculates the sample size and it contains information about the valuation of an inspection characteristic during results recording (attributive, variable, manual, etc.). This document describes the process of creating a new sampling procedure. Related Transactions QDV2 Change Sampling Procedure QDV3 Display Sampling Procedure Activity 1. Follow the SAP menu as shown, or type the transaction code QDV1 in the command field. Result: The Create Sampling Procedure: Initial screen displays. 2. Enter the name of the sampling procedure and click on Result: The Create Sampling Procedure: Assignments screen displays 3. Enter the information as specified in the table below:
  • 61. Page 60 of 67 Field Name Description R/O/C User Action and Values Short Text Short Text for sampling procedure R Enter the short text or short description for the Sampling Procedure Sampling Type Specifies how the sample is determined e.g., 100% sample, sample w ith a fixed size. R Enter the alphanumeric that uniquely identifies the sampling type. (use the dow n arrow to search and pickthe required one) Valuation Mode Defines the rules for accepting or rejecting a characteristic or sample R Enter the alphanumeric that uniquely identifies the valuation mode (use the dow n arrow to search and pickthe required one). Inspection Points Choose one of the follow ing inspection points indicator Without insp. points Plant maintenance Sample Management Free inspection pts R Click on one of the 4 radio buttons 4. Hit Enter Result: The Create Sampling Procedure: Special Conditions screen displays 5. Choose one of the 3 options present under the Multiple Samples group. (No multiple samples, Indep. Multiple samples, Sep. multiple samples). 6. Click on Result: The Fixed Sample pop-up box displays. Note: The fields in this screen will be different based on the inspection Type and Valuation mode selected. The following are the ones for “Fixed Sample” inspection type and “Attributive inspection nonconf units” valuation mode. Enter the sample size and click on 7. Click on Result: The sample is saved. Confirmatory message appears on the bottom of the SAP screen. 8. To return to the SAP menu, click on .
  • 62. Page 61 of 67 Lesson 3: Change Sampling Procedure (QDV2) Change Sample Procedures A sampling procedure defines the rules that specify how the system calculates the sample size and it contains information about the valuation of an inspection characteristic during results recording (attributive, variable, manual, etc.). This document describes the process of changing a sampling procedure. Related Transactions QDV1 Create Sample Procedure QDV2 Display Sample Procedure Activity 1. Follow the SAP menu as shown, or type the transaction code QDV2 in the command field. Result: The Change Sample Procedure: Initial screen displays. 2. Enter the sampling procedure name 3. Click on Result: The Change Sampling Procedure: Assignments screen is displayed
  • 63. Page 62 of 67 4. Make changes to each tab as required. Note: Click on the “Administrative Data” icon in order to view the person created or changed the dynamic modification and the data it was done 5. Click on Result: Confirmatory message appears at the bottom of the SAP screen. 6. To return to the SAP menu, click on . Lesson 4: Create Qualitative Master Inspection Characteristic (QS21) No EUP Lesson 5: Display Inspection Plan (QP03) No EUP Lesson 5: Create Inspection Plan (QP01) Create Inspection Plan The inspection plan is the task list used by the Quality Management (QM) component to process quality inspections. Inspection plans are used to carry out such production-related tasks (for example, inspecting goods upon goods receipt or goods issue). Quality inspections during production are carried out on the basis of the routing. This end user procedure covers the use of inspection plans for quality management applications. The inspection plan structure mirrors the structure of the routing in the Production Planning (PP) component. The plan consists of the following elements:  General information (header)  One or more operations; operations within the QM component are created and maintained exactly as those within the Production Planning (PP) component. For information about operations, see the online documentation for PP Production Planning. For each operation you can define  Test equipment used for the inspection (as production resources)  Location where the inspection takes place (as work centers) Related Transactions QP02 Change Inspection Plan QP03 Display Inspection Plan
  • 64. Page 63 of 67 Tips and Tricks  You can assign one or more materials to an inspection plan.  Providing you do not use master inspection characteristics in the plan, you can assign different characteristic values for each material for an inspection characteristic. These are known as allocation values for an inspection characteristic.  Inspection characteristics (inspection characteristics cannot be assigned to a sub-operation). Activity 1. Follow the SAP menu as shown, or type the transaction code QP01 in the command field. Result: The Create Inspection Plan: Initial screen displays.
  • 65. Page 64 of 67 2. Enter the information as specified in the table below: Field Name Description R/O/C User Action and Values Material Material number O Enter the alphanumeric key that uniquely identifies the material that the inspection plan is to be created for. Plant Plant number O Enter the alphanumeric key that uniquely identifies the plant w here the inspection plan is to be used. Group Group number (inspection plans) O Enter the alphanumeric key that uniquely identifies group number w here the new inspection plan is to be grouped. Change number Change master record number O Enter the alphanumeric key that uniquely identifies the change master record associated w ith the new inspection plan. Key date Key date R Enter a date in the future the inspection plan w ill be valid. The systemw illpopulate this field w ith the current date Revision level Revision level ID O Used in conjunction w ith the change number, this field identifies the status of the inspection plan. Profile Profile ID O Enter the alphanumeric key that uniquely identifies the inspection plan profile, this w illuse predefined data to populate some of the data fields in the new inspection plan. 3. Click on the Header Icon Result: The Inspection Plan Create: Task List Overview screen is displayed Note: You will get to this screen only if you did not enter a material with a plant on the previous screen. 4. Click on . Result: The Create Inspection Plan: Header Details appears
  • 66. Page 65 of 67 5. Enter the information as specified in the table below. Field Name Description R/O/C User Action and Values Comments Group Group number D The alphanumeric key that uniquely identifies the inspection group number that includes the group counter of the inspection plan. This is a system- generated number. Group counter Group counter ID R Enter the alphanumeric key that uniquely identifies the inspection plan group counter that specifically identifies the inspection plan. Short text Group counter short text O Enter a short description of the inspection plan. Plant Plant number R Enter the alphanumeric key that uniquely identifies the plant at w hich the inspection plan is to be valid for. Deletion flag Deletion flag O Check this box to set the deletion flag so that the inspection plan w illbe deleted at the next reorganization run or archiving procedure. Use Inspection plan use ID R Enter the alphanumeric key that uniquely identifies the inspection plan use ID, (I.E. production, goods issue, goods receipt, universal…) Status Inspection plan status ID R Enter the alphanumeric key that uniquely identifies the inspection plan status, (I.E. created, released…) The inspection plan has to be release before it can be used. Planner group Planner group O Enter the alphanumeric key that uniquely identifies the planner group responsible for maintaining the inspection plan. Planning w orkcenter Planning w orkcenter O Enter the alphanumeric key that uniquely identifies the planning w ork center w here the inspection is to take place Lot size Lot size R Enter the low er and upper lot sizes for the validity of the inspection plan. Old tasklist number Old tasklist number O If the new inspection plan is replacing an older inspection plan, enter the old inspection plan number. Inspec. points Inspection points O If using inspection points to process the inspection, enter the inspection point. Dynamic mod. Level Dynamic modification level O Enter the level at w hich the inspection stage is made and on w hich the quality level is maintained, (I.E. w ithout, at lot level, at characteristic level) Modification rule Modification rule O Enter the dynamic modification rule that contains the inspection stages and the conditions that lead to changes in inspection stages. Note: If you want to assign more than one material to the Inspection Plan, attach the required materials by clicking on 6. Click on Result: The Inspection Plan Create: Operation Overview screen is displayed.
  • 67. Page 66 of 67 7. Enter the information as specified in the table below. Field Name Description R/O/C User Action and Values Operation Operation ID number O Enter the numeric key that uniquely identifies the operation. (I.E. 0010, 0020, 0030…) Work center Work Center ID Number O Enter the alphanumeric key that uniquely identifies the w orkcenter where the inspection is to take place. Plnt Plant ID number O Enter the alphanumeric key that uniquely identifies the plant w here the inspection w ill take place. Control key Control key ID R Enter the alphanumeric key that uniquely identifies the controlkey. A controlkey w ill specify a set of business transactions to maintain for the inspection operation. Use QM01 or QM02 Standard text key Standard text key O Enter the alphanumeric key that uniquely identifies the standard text key. A standard text key w illimport a standard description in the description field. Description Operation description R Enter a description of the inspection operation Long text exist Long text exist indicator O Use this checkbox to indicate if long text exists. Also use this indicator to enter the long text area. 8. Select an Operation and click on Result: The Create Inspection Plan: Characteristic Overview screen appears 9. Enter the information as specified in the table below. Field Name Description R/O/C User Action and Values Comments Char Characteristic number R Enter the characteristic number. (I.E. 10, 20, 30 …) Qn Quantitative characteristic indicator O Check if characteristicis quantitative in nature. One of these options Qn or Ql has to be selected Ql Qualitative characteristic indicator O Check if characteristicis qualitative in nature. MstrChar Master inspection characteristic O Enter or search the alphanumeric key that uniquely identifies the master inspection characteristickey. Short text Short text R Short text description of the inspection characteristic. L Long text O Long text description of the inspection characteristic Method Inspection Method. An inspection method describes how to inspect an inspection characteristic. O Use the search to select an inspection method
  • 68. Page 67 of 67 10. Select a characteristic and click on 11. On the first two screens, hit Result: The Create Inspection Plan: Dynamic Modification Screen: Sample tab appears 12. Enter the information as specified below:  Sampling Procedure: Procedure by which the sample size for an inspection is determined. Select a sampling procedure from the drop-down  SPC criterion: Serves as a criterion for establishing and limiting quality control charts for statistical process control (SPC). Select a SPC criterion from the drop-down 13. Hit Enter Result: The Create Inspection Plan – Characteristic Overview screen appears with the filled in data. 14. Click on . Result: Inspection Plan is saved and confirmatory message is displayed. 15. To return to the SAP menu, click on . Lesson 5: Display Material Assignment for an Inspection Plan (QS62) No EUP Lesson 5: Create a Material Assignment for an Inspection Plan (QS61) No EUP Lesson 5: Change Inspection Plan (QP02) No EUP Lesson 5: Maintain Inspection Plan (CWBQM) No EUP