To take a challenging position in an esteemed organization with devotion and determination to enhance my skills and knowledge in the best interests of the organization, for my personal and professional growth.
1. Waqas Shafique
INTERNATIONAL LAND SURVEYOR SENIOR
A well trained team and a calibrated instrument give good precision to stake in & out
points. No mistakes in coordinates, no waste of time in execution
fatty_malik@yahoo.com
Visa stuts ,Transferable KSA
H.No.J104,Moh.New Modren
Colony Khewra Pakistan Born
06/03/1989
Mob#00966558382704,
Mob# 00966599542276
Single, willing to relocate
worldwide
EDUCATIONAL QUALIFICATION
Matric of Government High School Khewra Rawalpindi Board in2008
TECHNICAL QUALIFICATION
Diploma of Survey from P.M.D.C Surveying Institute Khewra in 2009
AUTO CAD, Microsoft Word, Microsoft Excel
ertificate in Autocad (2D+3D) 3 Months
certificate in Total Station Set 610K,630R etc.
Diploma in Professional Computer Course
SKILLS
Management of survey department
Ordering of adapted instruments Calibrating instruments Training of operators Planning
elaboration Setting reports of technical data Drawing in Autocad and Covadis Setting
reports of surveying procedures quality Safety matter Excellent skills in relationship with
actors on field and customers
2. PROFESSIONAL RUN
IVRCL INFRASTURE
Abv Rock Group
January:2017 till to Date
Project #1: S-04 ARDAH-Eastern Provence
South Boder Housing Project
Duties included:
Building Work Start to End Details Layout ,Grid Line , Offset Excavation, Lean, Raft , Footing,
Starter , Plinth Beam Column , Top Beam , Top Slab, Block Work , Plaster Setting out and
layout marking in High-rise building Layout of Tower, Hospital , Mosque , School, Plaza ,
House Setting out, Sewer line, layout marking, ducked bank, Pipe Rack, Pipe Sleeper, Pipe
Support, Anchor Bolt, Pedestal, Fire Water Line and Cooling Water Line Pipe Rack Steel
Structure Alignment, Setting out Anchor Bolt, Fly Crain Rail Alignment & Adjust top
Elevation, Oil Tank Setting out Alignment & Adjust Elevation, Flare N .S .L. Excavation, Lean,
Footing, Raft, Column, Top
TAJ SEEBAL COM
FAST Riyadh Metro Allience
2014to2017,1january
Project #2:Riyadh Metro Project Line (4,5,6
Duties included
Supervising for underground Riyadh Metro Station Diaphragm wall, Bored Pile, Earth
work and structure work. Utility & Road Diversion work .Carry out inspection with
consultant according to the RFIs raised. Coordinate with relevant team. Prepare Method
Statement and daily with relevant team. Prepare Method Statement and daily progress
report. Report to Manager on daily basis work progress and safety issues and record
Coordinate with relevant team. • Prepare Method Statement and daily progress report
Report to Manager on daily basis work progress and
3. ABV ROCK GROUP
YANBU ARMCO SINOPEC COMPANY(YASERF
January:2012 t0 2014,3,31
Project #3: Yanbu Armco Sinopec Oil refining project (MC5)Yaserf
Duties included
Building Work Start to End Details Layout ,Grid Line , Offset Excavation, Lean, Raft , Footing,
Starter , Plinth Beam Column , Top Beam , Top Slab, Block Work , Plaster Setting out and
layout marking in High-rise building Layout of Tower, Hospital , Mosque , School, Plaza ,
House Setting out, Sewer line, layout marking, ducked bank, Pipe Rack, Pipe Sleeper, Pipe
Support, Anchor Bolt, Pedestal, Fire Water Line and Cooling Water Line Pipe Rack Steel
Structure Alignment, Setting out Anchor Bolt, Fly Crain Rail Alignment & Adjust top
Elevation, Oil Tank Setting out Alignment & Adjust Elevation, Flare N .S .L. Excavation, Lean,
Footing, Raft, Column, Top
IJM GULF PAKISTAN
DEC: 2009 To:january2012
Project #3: Sheikh zayed Bin sultan Al-Nahyan Road Defense Housing Authority Phase -2
Islamabad Pakistan
Duties included
Building Work Start to End Details Layout ,Grid Line , Offset Excavation, Lean, Raft , Footing,
Starter , Plinth Beam Column , Top Beam , Top Slab, Block Work , Plaster Setting out and
layout marking in High-rise building Layout of Tower, Hospital , Mosque , School, Plaza ,
House Setting out, Sewer line, layout marking, ducked bank, Pipe Rack, Pipe Sleeper, Pipe
Support, Anchor Bolt, Pedestal, Fire Water Line and Cooling Water Line Pipe Rack Steel
Structure Alignment, Setting out Anchor Bolt, Fly Crain Rail Alignment & Adjust top
Elevation, Oil Tank Setting out Alignment & Adjust Elevation, Flare N .S .L. Excavation, Lean,
Footing, Raft, Column, Top
4. ACTIVITIES
General survey with total station, scanner and GPS instruments
I have experience with the following positioning System: Leica Gps System 530, System 1200
&1230 Garmin 76x Leica TPS800, Leica TS06, Leica 1205+,Trimble 4000SSI and 4700,C-NAV
Equipment’s,Data Collector Carlson Explorer II,Base C-Nav 2040G, Receiver C-Nav 2050G (StarFire
and RTK)
Topcon Tools 7.5.1, GNSS Solutions 3.70.
Preparing data out of an Auto cad drawing for site layout. Horizontal & vertical
traversing to fix new control points & bench marks. Checking & preparing as built
reports for existing structure in Cad Format. Co-coordinating with Main contractor,
installation supervisor & Engineers according to site conditions etc
Experienced with topography survey mapping road survey setting out by codination system
including vertical & circular curve
Used of Total Station & Leveling Instruments for setting out of Buildings Apron, Shelters, and
GPS (Gprs) work in all continents requiring notion in Geodesy and Geomatics. Modes RTK
Instruments Used
Total Station,GPS, digital levels,etc
REFERENCES:
References Documents will be provided upon request
. From:
Waqas Shafique
(Survey Engineer)