CURRICULUM VITAE
Raisey-Skeats, S Page 1 of 4 April 2015
Raisey-Skeats, Stuart (MHydSoc, MRSGB, MRIN)
Current Role Operations Supervisor, Fugro Survey Ltd, Aberdeen.
PERSONAL INFORMATION: Address 20 Gordon Street, Boddam, Peterhead,
Aberdeenshire, AB42 3AY, United Kingdom.
Telephone +44 1779 470 303
Mobile Phone +44 7908 329 315
Email raiseyskeats@gmai.com
Date of Birth 09 March 1965
Nationality British
Driving License Full UK
QUALIFICATIONS: BBC Engineers Certificate, Broadcast Systems
(Degree Equivalence) 1983 to 1985 BBC ETD, Evesham, Worcestershire
TEC Certificate in Electronics and Communications 1981 to 1983
City & Guilds Licensing, Conditions and Transmitter Interference 1983
City & Guilds Operating Practices, Procedures and Theory 1983
A Level Electronics 1983
Wellingborough Technical College, Wellingborough, Northamptonshire,
EMPLOYMENT: FUGRO SURVEY LTD
Dec 2012 to Present Operations Supervisor – Positioning and Construction
Deputise for Operations Manager in his absence.
Responsible for assigning teams to Survey Vessels for IRM and Construction
tasks. Monitoring validity of Medicals, Survivals, Vaccinations, Visas, and
MLC2006 documentation, implementation of CA-EBS and Bi-deltoid
measurement and ensuring registration in Vantage. Oversight of assigned staff
personal development under the Fugro PPDR system and for identifying
training requirements at all levels within the field staff pool. Relationship
management with Freelance Agencies and other Fugro Operating Companies.
Project Management attachment to Senior Construction Project Manager.
July 2011 –Dec 2012 Fugro Survey Ltd - Offshore Hydrographic Surveyor
Responsibilities: set up, testing, calibration and operation of surface and
subsea survey systems. Duties include collection, arrangement and
presentation of survey data and results. Experienced in ROV pipeline and
structures inspections, and offshore construction tasks using FCV 3000 series
Work Class ROV, Reson 7125 Dual Head Multi Beam Echo Sounder
(MBES), Fugro StarPack DNSS, Fugro StarPort, TSS Surveyor Gyro,
SeaTex SeaPath, Fugro ProTrack GNSS Heading System, Kongsberg
Hipap and Beacons, Vale Port Midas Sound Velocity Profiler, Seaking
Bathy, MRU05 Motion Sensor, TSS 440 Pipe Tracker, Octans Fiber Optic
Gyro, Ixsea ROVINS INS system, Doppler Velocity Log, Fugro Digital Video
system DV1 and DVII, Tiger and Lynx ROV inspection system, water
sampling systems, seabed coring, Mini SVS, mini IPS, water oxygen
concentration probes, soil resistivity probes, current meters,
2010 - 2011 CARPOW SUPPORT FZC (United Arab Emirates)
Technical Support Manager
Deputised for Managing Director, with daily responsibility for sales, marketing,
equipment rentals, cable manufacturing and Trimble GPS repair workshop for
two months in three. Project managed surveys for clients within the United Arab
Emirates. Ran GPS land survey training courses for clients in the use of
Trimble GNSS systems and Trimble Integrated Surveying System. Provision of
ground control points for rectification of aerial photography and satellite imagery
using both GPS Static and Kinematic techniques.
CURRICULUM VITAE
Raisey-Skeats, S Page 2 of 4 April 2015
2007 – 2010 CARPOW SUPPORT UK LTD
General Manager
Responsible for general management of company, financials, sales,
marketing, equipment rentals, procurement and management of field
surveys for clients in the UK. Additionally responsible for cable repair and
manufacture and repair of customer’s GPS Trimble systems. Additionally
worked on 2D land seismic projects as Surveyor and Survey Trainer.
Agricultural, OS Mapping and archaeological surveys conducted. Carpow
Support UK Ltd essentially operated in the same manner as Carpow
Support FZE to whom it was linked.
2005 – 2007 NAUTECH SERVICES
Surveyor
Responsibilities include the installation, commissioning and calibration of
navigation/positioning equipment on client vessels, the configuration of
sensors and software, the provision of positioning services and final
reporting. Primary areas of expertise were in positioning of semi sub and
jack up rig moves, anchor handling, barge moves, structure placement,
levelling and offset determination. Provision of final reports and AutoCAD
drawings. Also undertook training of junior surveyors in operations of
standard survey spread, anchor handling, rig moves, dive support
operations, use of Sector Scan Sonar, vessel calibration, including
GPS/GNSS, gyro heading (by total station and using sun shot) and motion
sensor. Alongside vessel GPS/GNSS, gyro and motion sensor calibration.
2004 – 2005 ROYAL MAIL
Post Office Delivery Rounds Person
Sorting of mail and delivery.
2003 – 2004 INTERACTION RECRUITMENT
Agency Freelancer
Performing duties as directed by end client.
2001 – 2003 CARPOW SUPPORT FZC (United Arab Emirates)
Technical Manager
Project management of land survey, from field planning, though to final
AutoCAD drawing production. Deputised for Managing Director, responsible
for sales and marketing, cable manufacturing and GPS repair facilities. As
required worked as Freelance Surveyor for FSME, conducting rig moves,
anchoring projects, Sector Scan Sonar debris surveys, Side Scan Sonar
surveys, SBES bathymetric pipeline corridor surveys and vessel calibrations.
Conducted land surveys of pipeline corridors, control networks, topographic
surveys, centre line stakeout, Golf Club surveys, crossings surveys, oil refinery
topographic, GIS and DTM survey, Conducted video route survey augmented
with DGPS and heading information (displayed on video and stored for post
processing). Road profile survey using kinematic techniques (through
mountainous region of United Arab Emirates).
2000 – 2001 LAMBDA TRADING (United Arab Emirates)
Assistant General Manager
Deputised for General Manager in his absence.
Responsible for daily management of company, sales and marketing of
Icom Radios, Flyde MicroSystems Trunked Radio Schemes, GPS/GNSS
Survey Systems from Trimble and Topcon in the U.A.E. Supervised the
Icom and GPS/GNSS workshop, provided training in GPS Survey Systems.
Project managed the upgrade of Sharjah International Airport Flyde
MPT1327 Trunked Radio Scheme.
CURRICULUM VITAE
Raisey-Skeats, S Page 3 of 4 April 2015
1997 – 2000 AL MISEHAL COMPANY LIMITED (Saudi Arabia)
Technical Support Manager / Business Development Manager
Technical Support Manager from 1997 to 1999, then promoted to Business
Development Manager, leaving in 2000. Technical support of all of Saudi
Aramco land and marine seismic crews, Arabian Oil Company offshore
survey vessels and processing department. Project Manager for
construction of manufacturing facility for Military GPS navigators (TrimPack
III) for Saudi Arabian National Guard under USMC supervision. Installation
of navigation systems in LAV and logistics vehicles. Conducted all land
surveys for Al Misehal Ltd clients using Trimble Static, Kinematic and RTK
systems. Conducted offshore positioning and bathymetric surveys including
airport navigation aids and harbour surveys.
1994 – 1997 CYFAS SYSTEMS
Field Service Engineer
Responsible for installation, commissioning, S.A.T.’s, upgrade, first and
second line repair of I.C.C.S. used by Emergency Services the North of
England and Scotland. Duties also included working closely with the design
team on identifying and quantifying hardware and software faults, as well as
installation of digital GIS mapping software for various police and fire
services. Installed and commissioned MASC III encryption systems.
1983 – 1994 BBC TRANSMISSION
Transmitter Engineer
Responsibilities include the operation, maintenance and repair of high
power radio, television and link transmitters and associated plant and
equipment from all broadcast bands including Long Wave, Medium Wave,
HF (SW), VHF FM Radio, UHF TV and SHF links, with transmitter powers
ranging from 0.5 watt to 750 kilowatts. Worked as Senior Transmitter
Engineer in both UK and Oman, performed antenna matching on single,
dual and quad band high power horizontal suspended antennas. Conducted
a tape offset survey of the BBC Daventry Antenna Field, later augmented
with theodolite and Three Wire Engineers Level as a prelude to antenna
field re-engineering. On Masirah Island (Oman) conducted a radiation
hazard survey using a field strength meter and paper maps.
Courses and Certificates
HV Switch Gear Course (BBC)
Mobile Phone Base Station Maintenance Training
ROSPA Manual Handling Course (BBC)
Trimble Survey & Mapping Products/GPS Training
Trimble Survey & Mapping Distributor Training
Trimble TrimDesign Road Design Survey Software
Trimble CrossCheck & IQEE Training
Trimble Galaxy & Sentinel Inmarsat-C/GPS
Trimble NT Variants GPS Training Course
Trimble Trimpack & Variants Product/GPS
Flyde MicroSystems MPT1327 Trunk Radio Installation
Cyfas Installation of CX2000 ICCS Series
Cyfas Installation & Commissioning Consort C10
Cyfas Installation & Commissioning Mask III Encryption
Fugro Emergency Response Training
Personal Safety Awareness
RSA Computer Literacy
Calibrating a Gyrocompass
ICT-E-010 Remote Access Security Management
ICT-E-007 Email Acceptable Use Policy
IOSH Managing Safely
HSE Management System
HSE Environmental Management
HSE-E-101 Introduction to Fugro Impact
HSE-E-102 Hazard Observation in Fugro Impact
HSE-E-103 Submitting a First Report in Fugro Impact
HSE-E-104 Responsible Person in Fugro Impact
HSE-E-200 Golden Rules of HSE
HSE-E-201 The Basics of Working at Height
FROV-EL-005 The Basics of Working at Heights
HSE-E-202 Principles of Risk Assessment
HSE-E-204 Principles of HSE Incident Investigation
HSE-E-205 Mechanical Lifting Operations
HSE-E-206 HSE Environmental Management
HSE-E-207 Safe Driving Behaviour
HSE-E-301 Office Workstation Ergonomics
HSE-E-302 Munitions in Marines Aggregates
FSL-DVD-IT-017 Risk Assessment
FSL-DVD-IT-018 Safe Manual Handling
FSL-DVD-IT-020 Safety Matters
ABCD of Malaria Prevention
IMCA Safe Travel and Security
IMCA Gangway Security
Fugro Fire Warden Training
Introduction to Permit to Work
FSL DVD IT 005 Display Screen Equipment
CURRICULUM VITAE
Raisey-Skeats, S Page 4 of 4 April 2015
FSL-DVD-IT-011 Introduction to Control of Substances
Hazardous to Health
Working with Hands and Hand Tools
Effective Use of Feedback for Teams Simulation
Fugro Vision
Managing Contractors
Management of Change
Work Instructions System Overview
The PPD Toolkit Explained
Introduction to Fugro Academy
BERR UK Export Controls
FSL-008 Communications and Interpersonal Skills
OSD-401 Basic Survey Course
OSD-402 Basic Starfix.Seis Software Suite
FSL-407 Basic USBL
FSL-008 Communications and Interpersonal Skills
FSL-417 TSS Pipe tracker
FSL-419 IXSEA Phins/Octans
FSL-422 Vessel Calibration and Reporting
OSD-406 Introduction to Geodesy/Map Projections
OSD-419 Starfix Fine Track
OSD-E-1005 Installing a USBL System OSD-E-1021
OSD-E-1022 Calibrating a Gyrocompass at Sea
OSD-E-1028 How to Take a Sound Velocity Profile
OSD-E-1029 Calibrating a Single Beam Echo sounder
OSD-E-1061 Introduction to Tides
OSD-E-1075 Starfix.HP Services
OSD-E-1105 Role of Data Processor
OSD-E-1106 Role of a Cartographer
OSD-E-1110 Survey Party Chief
OSD-E-1116 An Introduction to Side Scan Sonar
OSD-E-1119 An Introduction to Sub-bottom Profiling
OSD-E-1120 An Introduction to the Magnetometer
OSD-E-1129 An Introduction to Depth Measurement
OSD-E-1151 Starfix.Workbench
OSD-E-1160 Starfix.QCEvent
OSD-E-1168 Starfix.NG 7.3 Presentation
SSD-E-1203 Introduction to Video Commentary
OSD-E-1169 Task Information in Starfix.NG
OSD-E-1171 Vessel Creation in Starfix.NG
OSD-E-1174 Map Creation in Starfix.NG
OSD-E-1175 Logging in Starfix.NG
OSD-E-1177 Waypoint Creation and Use in Starfix.NG
OSD-E-1182 Semi-submersible Rig Move
OSD-E-1189 Offshore Survey Business Line
OSD-E-1213 Introduction to Report Writing
OSD-E-1215 How to Produce a Final Fix Report
OSD-E-1216 How to Produce a Mean Position Report
OSD-E-1217 Rig Move Reporting
OSD-E-1219 Daily Operations Reports
OSD-E-1227 Understanding Convergence
OSD-E-1222 Good Health and Hygiene
OSD-E-1221 Introduction to GLONASS and Starfix G2
OSD-E-1230 Configuration of Starfix.USBL module
OSD-E-1254 Seabird 19 Plus CTD ROV Interface
OSD-E-1288 Introduction to Boomer Plates
PM-E-100 Fugro Project Management Approach
PM-E-101 Project Risk Assessment
PM-E-103 Earned Value Management
SSD-E-1227 Noise Awareness
SSD-E-1222 Portable Appliance Testing Awareness
SSD-E-1001 Introduction to Fibre Optics
SSD-E-1061 Introduction to Electronics
SSD-E-1021 Introduction to Hydraulics 1
SSD-E-1022 Introduction to Hydraulics 2
SSD-E-1224 High Pressure Hydraulics Safety
SSD-E-1041 Introduction to Electricity Control
SSD-E-1061 Introduction to ROV’s
SSD-E-1062 Introduction to ROV Data Transmission
SSD-E-1063 Introduction to Electrostatic Discharge
SSD-E-1081 Introduction to Fault Finding
SSD-E-1082 Introduction to Planned Maintenance
SEIS-E-101 Geo Celtic Seismic Operations
An Introduction to GNSS Novatel
SVY-408 Basic Starfix Nav Suite (including Drone)
SVY-412 Starfix GPS / DGPS Systems and Software
Introduction to Starfix Vessel Editor
Building a Wired Network
Basic Features of Excel 2003
The Story of Oil & Natural Gas
Good Business Acumen
EF7.1 Data Communications 1
EF7.2 Data Communications 2
EF9 Meteorological Instruments
Introduction to Foundation Types
Fugro Anti-Bribery and Corruption Compliance
Hydrographic Society HydroFest 2014
Hydrographic Society HydroFest 2015
Publications
Creating a Control Point, also on a Budget – LinkedIn - 2015
Automatic Vehicle Locations – Aramco Magazine - 1999
Working Offshore – Fugro Connections Magazine - 2014
RTK on a Budget – LinkedIn – 2015
Memberships
Member of the Hydrographic Society
Member of Radio Society of Great Britain
Member of Royal Institute of Navigation
Hobbies and Interests
I am an active, licensed radio amateur and have been since 1982, with a particular interest in antenna
design. I enjoy playing the guitar and have bass, acoustic, 12 String and steel strung acoustic guitars, as well
as keyboards and a violin, and will often sing while I am playing. During the summer I paint still life and
landscapes with oils and I am also a keen gardener (fruit and vegetables) and enjoy baking. I read a lot of
books (I am a collector of the works of Terry Pratchett) and have written a total of four short stories which
have been published for e-reader. Periodically I will also sculpt in modelling clay.

Raisey-Skeats S April 2015 Personal[2]

  • 1.
    CURRICULUM VITAE Raisey-Skeats, SPage 1 of 4 April 2015 Raisey-Skeats, Stuart (MHydSoc, MRSGB, MRIN) Current Role Operations Supervisor, Fugro Survey Ltd, Aberdeen. PERSONAL INFORMATION: Address 20 Gordon Street, Boddam, Peterhead, Aberdeenshire, AB42 3AY, United Kingdom. Telephone +44 1779 470 303 Mobile Phone +44 7908 329 315 Email raiseyskeats@gmai.com Date of Birth 09 March 1965 Nationality British Driving License Full UK QUALIFICATIONS: BBC Engineers Certificate, Broadcast Systems (Degree Equivalence) 1983 to 1985 BBC ETD, Evesham, Worcestershire TEC Certificate in Electronics and Communications 1981 to 1983 City & Guilds Licensing, Conditions and Transmitter Interference 1983 City & Guilds Operating Practices, Procedures and Theory 1983 A Level Electronics 1983 Wellingborough Technical College, Wellingborough, Northamptonshire, EMPLOYMENT: FUGRO SURVEY LTD Dec 2012 to Present Operations Supervisor – Positioning and Construction Deputise for Operations Manager in his absence. Responsible for assigning teams to Survey Vessels for IRM and Construction tasks. Monitoring validity of Medicals, Survivals, Vaccinations, Visas, and MLC2006 documentation, implementation of CA-EBS and Bi-deltoid measurement and ensuring registration in Vantage. Oversight of assigned staff personal development under the Fugro PPDR system and for identifying training requirements at all levels within the field staff pool. Relationship management with Freelance Agencies and other Fugro Operating Companies. Project Management attachment to Senior Construction Project Manager. July 2011 –Dec 2012 Fugro Survey Ltd - Offshore Hydrographic Surveyor Responsibilities: set up, testing, calibration and operation of surface and subsea survey systems. Duties include collection, arrangement and presentation of survey data and results. Experienced in ROV pipeline and structures inspections, and offshore construction tasks using FCV 3000 series Work Class ROV, Reson 7125 Dual Head Multi Beam Echo Sounder (MBES), Fugro StarPack DNSS, Fugro StarPort, TSS Surveyor Gyro, SeaTex SeaPath, Fugro ProTrack GNSS Heading System, Kongsberg Hipap and Beacons, Vale Port Midas Sound Velocity Profiler, Seaking Bathy, MRU05 Motion Sensor, TSS 440 Pipe Tracker, Octans Fiber Optic Gyro, Ixsea ROVINS INS system, Doppler Velocity Log, Fugro Digital Video system DV1 and DVII, Tiger and Lynx ROV inspection system, water sampling systems, seabed coring, Mini SVS, mini IPS, water oxygen concentration probes, soil resistivity probes, current meters, 2010 - 2011 CARPOW SUPPORT FZC (United Arab Emirates) Technical Support Manager Deputised for Managing Director, with daily responsibility for sales, marketing, equipment rentals, cable manufacturing and Trimble GPS repair workshop for two months in three. Project managed surveys for clients within the United Arab Emirates. Ran GPS land survey training courses for clients in the use of Trimble GNSS systems and Trimble Integrated Surveying System. Provision of ground control points for rectification of aerial photography and satellite imagery using both GPS Static and Kinematic techniques.
  • 2.
    CURRICULUM VITAE Raisey-Skeats, SPage 2 of 4 April 2015 2007 – 2010 CARPOW SUPPORT UK LTD General Manager Responsible for general management of company, financials, sales, marketing, equipment rentals, procurement and management of field surveys for clients in the UK. Additionally responsible for cable repair and manufacture and repair of customer’s GPS Trimble systems. Additionally worked on 2D land seismic projects as Surveyor and Survey Trainer. Agricultural, OS Mapping and archaeological surveys conducted. Carpow Support UK Ltd essentially operated in the same manner as Carpow Support FZE to whom it was linked. 2005 – 2007 NAUTECH SERVICES Surveyor Responsibilities include the installation, commissioning and calibration of navigation/positioning equipment on client vessels, the configuration of sensors and software, the provision of positioning services and final reporting. Primary areas of expertise were in positioning of semi sub and jack up rig moves, anchor handling, barge moves, structure placement, levelling and offset determination. Provision of final reports and AutoCAD drawings. Also undertook training of junior surveyors in operations of standard survey spread, anchor handling, rig moves, dive support operations, use of Sector Scan Sonar, vessel calibration, including GPS/GNSS, gyro heading (by total station and using sun shot) and motion sensor. Alongside vessel GPS/GNSS, gyro and motion sensor calibration. 2004 – 2005 ROYAL MAIL Post Office Delivery Rounds Person Sorting of mail and delivery. 2003 – 2004 INTERACTION RECRUITMENT Agency Freelancer Performing duties as directed by end client. 2001 – 2003 CARPOW SUPPORT FZC (United Arab Emirates) Technical Manager Project management of land survey, from field planning, though to final AutoCAD drawing production. Deputised for Managing Director, responsible for sales and marketing, cable manufacturing and GPS repair facilities. As required worked as Freelance Surveyor for FSME, conducting rig moves, anchoring projects, Sector Scan Sonar debris surveys, Side Scan Sonar surveys, SBES bathymetric pipeline corridor surveys and vessel calibrations. Conducted land surveys of pipeline corridors, control networks, topographic surveys, centre line stakeout, Golf Club surveys, crossings surveys, oil refinery topographic, GIS and DTM survey, Conducted video route survey augmented with DGPS and heading information (displayed on video and stored for post processing). Road profile survey using kinematic techniques (through mountainous region of United Arab Emirates). 2000 – 2001 LAMBDA TRADING (United Arab Emirates) Assistant General Manager Deputised for General Manager in his absence. Responsible for daily management of company, sales and marketing of Icom Radios, Flyde MicroSystems Trunked Radio Schemes, GPS/GNSS Survey Systems from Trimble and Topcon in the U.A.E. Supervised the Icom and GPS/GNSS workshop, provided training in GPS Survey Systems. Project managed the upgrade of Sharjah International Airport Flyde MPT1327 Trunked Radio Scheme.
  • 3.
    CURRICULUM VITAE Raisey-Skeats, SPage 3 of 4 April 2015 1997 – 2000 AL MISEHAL COMPANY LIMITED (Saudi Arabia) Technical Support Manager / Business Development Manager Technical Support Manager from 1997 to 1999, then promoted to Business Development Manager, leaving in 2000. Technical support of all of Saudi Aramco land and marine seismic crews, Arabian Oil Company offshore survey vessels and processing department. Project Manager for construction of manufacturing facility for Military GPS navigators (TrimPack III) for Saudi Arabian National Guard under USMC supervision. Installation of navigation systems in LAV and logistics vehicles. Conducted all land surveys for Al Misehal Ltd clients using Trimble Static, Kinematic and RTK systems. Conducted offshore positioning and bathymetric surveys including airport navigation aids and harbour surveys. 1994 – 1997 CYFAS SYSTEMS Field Service Engineer Responsible for installation, commissioning, S.A.T.’s, upgrade, first and second line repair of I.C.C.S. used by Emergency Services the North of England and Scotland. Duties also included working closely with the design team on identifying and quantifying hardware and software faults, as well as installation of digital GIS mapping software for various police and fire services. Installed and commissioned MASC III encryption systems. 1983 – 1994 BBC TRANSMISSION Transmitter Engineer Responsibilities include the operation, maintenance and repair of high power radio, television and link transmitters and associated plant and equipment from all broadcast bands including Long Wave, Medium Wave, HF (SW), VHF FM Radio, UHF TV and SHF links, with transmitter powers ranging from 0.5 watt to 750 kilowatts. Worked as Senior Transmitter Engineer in both UK and Oman, performed antenna matching on single, dual and quad band high power horizontal suspended antennas. Conducted a tape offset survey of the BBC Daventry Antenna Field, later augmented with theodolite and Three Wire Engineers Level as a prelude to antenna field re-engineering. On Masirah Island (Oman) conducted a radiation hazard survey using a field strength meter and paper maps. Courses and Certificates HV Switch Gear Course (BBC) Mobile Phone Base Station Maintenance Training ROSPA Manual Handling Course (BBC) Trimble Survey & Mapping Products/GPS Training Trimble Survey & Mapping Distributor Training Trimble TrimDesign Road Design Survey Software Trimble CrossCheck & IQEE Training Trimble Galaxy & Sentinel Inmarsat-C/GPS Trimble NT Variants GPS Training Course Trimble Trimpack & Variants Product/GPS Flyde MicroSystems MPT1327 Trunk Radio Installation Cyfas Installation of CX2000 ICCS Series Cyfas Installation & Commissioning Consort C10 Cyfas Installation & Commissioning Mask III Encryption Fugro Emergency Response Training Personal Safety Awareness RSA Computer Literacy Calibrating a Gyrocompass ICT-E-010 Remote Access Security Management ICT-E-007 Email Acceptable Use Policy IOSH Managing Safely HSE Management System HSE Environmental Management HSE-E-101 Introduction to Fugro Impact HSE-E-102 Hazard Observation in Fugro Impact HSE-E-103 Submitting a First Report in Fugro Impact HSE-E-104 Responsible Person in Fugro Impact HSE-E-200 Golden Rules of HSE HSE-E-201 The Basics of Working at Height FROV-EL-005 The Basics of Working at Heights HSE-E-202 Principles of Risk Assessment HSE-E-204 Principles of HSE Incident Investigation HSE-E-205 Mechanical Lifting Operations HSE-E-206 HSE Environmental Management HSE-E-207 Safe Driving Behaviour HSE-E-301 Office Workstation Ergonomics HSE-E-302 Munitions in Marines Aggregates FSL-DVD-IT-017 Risk Assessment FSL-DVD-IT-018 Safe Manual Handling FSL-DVD-IT-020 Safety Matters ABCD of Malaria Prevention IMCA Safe Travel and Security IMCA Gangway Security Fugro Fire Warden Training Introduction to Permit to Work FSL DVD IT 005 Display Screen Equipment
  • 4.
    CURRICULUM VITAE Raisey-Skeats, SPage 4 of 4 April 2015 FSL-DVD-IT-011 Introduction to Control of Substances Hazardous to Health Working with Hands and Hand Tools Effective Use of Feedback for Teams Simulation Fugro Vision Managing Contractors Management of Change Work Instructions System Overview The PPD Toolkit Explained Introduction to Fugro Academy BERR UK Export Controls FSL-008 Communications and Interpersonal Skills OSD-401 Basic Survey Course OSD-402 Basic Starfix.Seis Software Suite FSL-407 Basic USBL FSL-008 Communications and Interpersonal Skills FSL-417 TSS Pipe tracker FSL-419 IXSEA Phins/Octans FSL-422 Vessel Calibration and Reporting OSD-406 Introduction to Geodesy/Map Projections OSD-419 Starfix Fine Track OSD-E-1005 Installing a USBL System OSD-E-1021 OSD-E-1022 Calibrating a Gyrocompass at Sea OSD-E-1028 How to Take a Sound Velocity Profile OSD-E-1029 Calibrating a Single Beam Echo sounder OSD-E-1061 Introduction to Tides OSD-E-1075 Starfix.HP Services OSD-E-1105 Role of Data Processor OSD-E-1106 Role of a Cartographer OSD-E-1110 Survey Party Chief OSD-E-1116 An Introduction to Side Scan Sonar OSD-E-1119 An Introduction to Sub-bottom Profiling OSD-E-1120 An Introduction to the Magnetometer OSD-E-1129 An Introduction to Depth Measurement OSD-E-1151 Starfix.Workbench OSD-E-1160 Starfix.QCEvent OSD-E-1168 Starfix.NG 7.3 Presentation SSD-E-1203 Introduction to Video Commentary OSD-E-1169 Task Information in Starfix.NG OSD-E-1171 Vessel Creation in Starfix.NG OSD-E-1174 Map Creation in Starfix.NG OSD-E-1175 Logging in Starfix.NG OSD-E-1177 Waypoint Creation and Use in Starfix.NG OSD-E-1182 Semi-submersible Rig Move OSD-E-1189 Offshore Survey Business Line OSD-E-1213 Introduction to Report Writing OSD-E-1215 How to Produce a Final Fix Report OSD-E-1216 How to Produce a Mean Position Report OSD-E-1217 Rig Move Reporting OSD-E-1219 Daily Operations Reports OSD-E-1227 Understanding Convergence OSD-E-1222 Good Health and Hygiene OSD-E-1221 Introduction to GLONASS and Starfix G2 OSD-E-1230 Configuration of Starfix.USBL module OSD-E-1254 Seabird 19 Plus CTD ROV Interface OSD-E-1288 Introduction to Boomer Plates PM-E-100 Fugro Project Management Approach PM-E-101 Project Risk Assessment PM-E-103 Earned Value Management SSD-E-1227 Noise Awareness SSD-E-1222 Portable Appliance Testing Awareness SSD-E-1001 Introduction to Fibre Optics SSD-E-1061 Introduction to Electronics SSD-E-1021 Introduction to Hydraulics 1 SSD-E-1022 Introduction to Hydraulics 2 SSD-E-1224 High Pressure Hydraulics Safety SSD-E-1041 Introduction to Electricity Control SSD-E-1061 Introduction to ROV’s SSD-E-1062 Introduction to ROV Data Transmission SSD-E-1063 Introduction to Electrostatic Discharge SSD-E-1081 Introduction to Fault Finding SSD-E-1082 Introduction to Planned Maintenance SEIS-E-101 Geo Celtic Seismic Operations An Introduction to GNSS Novatel SVY-408 Basic Starfix Nav Suite (including Drone) SVY-412 Starfix GPS / DGPS Systems and Software Introduction to Starfix Vessel Editor Building a Wired Network Basic Features of Excel 2003 The Story of Oil & Natural Gas Good Business Acumen EF7.1 Data Communications 1 EF7.2 Data Communications 2 EF9 Meteorological Instruments Introduction to Foundation Types Fugro Anti-Bribery and Corruption Compliance Hydrographic Society HydroFest 2014 Hydrographic Society HydroFest 2015 Publications Creating a Control Point, also on a Budget – LinkedIn - 2015 Automatic Vehicle Locations – Aramco Magazine - 1999 Working Offshore – Fugro Connections Magazine - 2014 RTK on a Budget – LinkedIn – 2015 Memberships Member of the Hydrographic Society Member of Radio Society of Great Britain Member of Royal Institute of Navigation Hobbies and Interests I am an active, licensed radio amateur and have been since 1982, with a particular interest in antenna design. I enjoy playing the guitar and have bass, acoustic, 12 String and steel strung acoustic guitars, as well as keyboards and a violin, and will often sing while I am playing. During the summer I paint still life and landscapes with oils and I am also a keen gardener (fruit and vegetables) and enjoy baking. I read a lot of books (I am a collector of the works of Terry Pratchett) and have written a total of four short stories which have been published for e-reader. Periodically I will also sculpt in modelling clay.