Wael Sayed Abd El hafez Ali is an Egyptian electrical engineer with over 10 years of experience in automation projects in Saudi Arabia. He has extensive experience designing and implementing SCADA and PLC systems for water and wastewater treatment plants. Some of the key projects he has led include automation of the Beash Water Treatment Plant in Jizan, Saudi Arabia and upgrade of the SCADA and communication systems for the Riyadh Qassim Water Transmission pipelines. He is proficient in software such as Wonderware Intouch, Unity Pro, and Schneider Electric's Vijeo Designer.
1. Wael-AlNagar
PERSONAL DETAILS Name Wael Sayed Abd El hafez Ali
Date of Birth 3 /7 / 1985.
Military Service Post poned.
Marital Status Married
Mobile (+966)547290828
Nationality Egyptian
QUALIFICATIONS Degree BSc in Electrical Engineering.
Major Automatic Control& Industrial Electronics.
University Minufia University.
Graduation year 2009
Overall Grade Very Good With Honours.
LANGUAGE SKILLS
Experience
Arabic Mother tongue.
English Very Good.
[1]-Abunayyan Trading Corp. Kindom Of Saudi Arabia 4-4-2013 TILL NOW
Senior Automation Engineer& Site Manager OF SWCC
RIAYADH QASSIM WATER TRANSMISSION SYSTEM LINE A&B
SCADA AND COMMUNICATION SYSTEM UP-GRADATION PROJECT.
1-Technical design control and instrumentation engineer.
2-PLC application design using Unity Pro Schneider Electric,HMI
application design using Vijeo Designer, Basics of Rockwell
Rslogix500 and FactoryTalkView, Semens S7-1200, Step7 Basic
10.5,WINCC 7.4.
3-Wiring diagram designation, for more than 70 control panels
containing (quantum, premium, Modicon M340) PLCs.
4-Old panel desmintling & installation of the new PLCs supervision
keeping the whole system ruining on duty.
5-Commissioning &handling over to the client.
6-Supervision of wiring submitting for the whole control system of
the Project.
7-Tender studying and analyzing.
8-subcontractors management(seven subcontractors),prepare
PO and Contracts.
9-Submitting FDS, getting approval from Client, treating the client
and key stakeholders.
10-supplier and partners agreements.
11.marketing team support.
12.PMP Study.
13- SCADA Development.
14- P&ID, testing & commissioning.
15- Follow Up Fire Alarm, Fire Fitting, Fiber optic ,Pump Vibration
systems and Cathodic protection projects.
Riyadh
KSA
Mobile :(+966) 547290828
E-mail : engwael_sayed@yahoo.com
2. Projects I Executed
16-Automation team leader, design review, Execution Follow Up
17- Material delivery, follow Up.
[2]-SYSTECH (Control System Technology Co. Electrical &Mechanical )
One of MASCO GROUP Kingdom of Saudi Arabia 15-6-2010
Jizan Area Automation Department team leader 4-8-2011 till 10-3-013
Automation Site Engineer. 15-6-2010 to 4-8-2011
1-Experienced in Scada programming using Intouch and ArchestrA.
2-Experienced in WONDERWARE Historian, Active factory.
3-Experienced in PLCs programming ,Unity Pro XL,Towidosuite,
PL7 ,Vijeo Designer and TWinoft Suite.
4-Experienced in programming and installing (Premium ,Quantum
,Twedow,M340) plcs.
5-Experienced in Altistart,Altivare and Tesys-u programming and
installing.
6-Experienced in STB (Remote Ios) advantyes configuration and
Installation
7-Tbox (remote terminal unit) programming using TwinSoft.
8-Ultrasonic level meter, magnetic flowmeters,pneumatic
Valves,auma valves (regulated valves) and chemical’s
Instruments installing and calibration.
9-Extending cables from these instruments to automation panels.
1-Besah Water Treatment Planet (BeashWTP):Its Capacity
80000 m3 /Day,it’s Supplyed by Water from The Beash Damp and
Consists of the control center to supervise and control all the
station Parts (Raw water pumps station,4 clarifiers, Filtration
Building,Chemicals Building and treated water building )
through the scada System. There is 12 Automation panels in
the station, Contain RIOS are communicated to the Preium PLC in
the scada center Using Single mode Optical fiber cables and
TCP/IP.
Hardware: PLC Premium TSX P5734M, Number of IOs 1500.
2 Clients, 2 Redundant servers and one Historian.
Software :Wonderware Application Server 3.1, Intouch 10.1,
Wonderware ActiveFactory V9.2 ,Wonderware Industrial SQl
Server 9 ,OPC Factory server 3.3 and Unity Pro XLV5.
Installation of all Instruments , Automation panels and
Commissioning.
2-Installation of all instruments , Automation Panels ,Commissioning
In four pump stations:-
a-Samta pump Station b-Alsuqiqe Pump Station c-Al Edaby
Pump station d-Aldarb project.
3. Projects was executed I
Improved and I Handed
over
Hardware Used in each project:-
TBOX MS-CPU23, 2 Clients and One historian.
Software in Each Project:-
Wonderware Intouch V10.1,Wonderware Active Factory
ServerV 9.2, Keep Server for Wonderware V4.5 and TwinSoft
SP1 V10.09 ,Wonderware Industrial SQl Server 9.
4-Al Nazheen project :- Consists of three pump stations and two
Remote Flometers .the control center exists in Samta Pumps
Station, Which supervise and control Almajama Pump
station, Altawashy Pump Station and three Remote flow meters
through the Satellite Communications.
The hardware used:M340 plc in control center, 4 Twedow Plcs
one for Almajama pumps stations ,one for Altawshi Pumps station,
and one for each remote flow meter.
1 Client and 1 historian for scada.
The softare used: Wonderware Intouch 10.1, Wonderware
ActiveFactory V9.2 ,Wonderware Industrial SQl Server 9 ,OPC
Factory server 3.3 and Unity Pro XLV5.
5-Jizan-6 pumps station: installation of new automation panels to
control and supervise these station from the scada control center
which exists in Gizan STP Main station Through satellite
communication.
Each pump station contain TBOX LT-300-E PLC as RTU.
The hardware in the main control center in Jizan STP station:
2 clients , one historian and TBOX MS-CPU23 PLC.
The software: Wonderware Intouch V10.1,Wonderware Active
Factory ServerV 9.2, Keep Server for Wonderware V4.5 and
TwinSoft, SP1 V10.09 ,Wonderware Industrial SQl Server 9.
6-Installation of all instruments ,Commissioning, using TBOX MS-
CPU23 In Three projects:-
a-Samta Village project b-Al sadia Project c-Al Shuqiry project.
Jizan WTP Project :consists of 40 deep Wells as the water source,raw
water two tanks, raw water pump station ,filtration building, chemicals
building , RO building and treated water building.
Hardware: Quantum PLC 140 CPU 67160 (P266 CPU Hot- standby),
TSX P57 2634M Premium PlC and TBOX LT-300-E PLC for 40
Deep wells,4 Clients, one Historian, 2 Redundant Servers.
Software :-Wonderware Application Server 3.1 , Intouch 10.1,
Wonderware ActiveFactory9.2 ,Wonderware Industrial SQl
Server 9 ,OPC Factory server 3.3and Unity Pro XLV 5.
The quntum plc control the raw water area , treated area, chemicals area.
The premium plcs one used to control the Filtration Building and the
4. other to control the RO building.
Single core OF cables used to connect the RTUs In 40 deep Wells to the
main control center, between the plcs and RIOs inside the station.
I improved the programs .I was the Automation member In the
Handling over Committee of this project.
[3]-Company: EIAG (For oxygen, nitrog1en and argon gases
generation)
Nacer city-Cairo-Egypt. 5-11-2009
Control &Electrical engineer.
Good experience in electrical panels, pumps, valves,relay control.
Technical Training --Wonderware Training : Certificate in (Intouch10.1)
-- Schneider ElectricTraining: Certificate in unity pro xl
-- Schneider ElectricTraining: M340 PLC
--Siemens :WINCC
-- FAT trip to Germany 11/2014
--PMP Preparation Course 4/2016
Computer Skills -- ICDL (certified).
-- AutoCAD.
-- C, C ++, assembly and Q-basic programming languages.
PERSONAL SKILLS -- Willing to learn, Reliable &Ability to work independently.
-- Ability to work (as a part of a team & under pressure).
-- Motivating teams to achieve their objectives.
-- Good communication skills.
References are available upon request