 Design Yokogawa Prosafe SIL 3 Safety Hardware System for Oil and Gas ESD System
 Development of SIL 3 Programme using Pro-Safe development tool
 Process Graphics Generation based on P&ID in Centum VP DCS System.
 Certified Vijeo Citect Certified Engineer
 Developed PLC applications for Schneider Safety SIL3 PLC applications using Unity Pro
XLS.
 Experience in Quantum, Premium and M340 PLC , Magelis , Kingfisher Toolbox, Toolbox+,
Tbox RTU and ISAGRAF development package.
 Developed RTU application for SCADA Pack RTU using SCADAPack Workbench &
Telepace Studio
 Clear SCADA conversion project from Vijeo Citect.
 Having one and half year experience in Industrial Automation
 Experience in the project engineering document, development, commissioning of Industrial
Automation projects.
 Good Knowledge in Modbus ,Ethernet-IP,DNP3 ,OPC,AS-i communication Protocols
SCADA HMI: Citect SCADA, Clear SCADA, Magelis HMI(Vijeo Designer)
Database: SQL Server, Reporting with Crystal Reports
PLC / Device: Yokogawa Prosafe Safety SIL-3 PLC , Centum FCS DCS
Controller,Schneider-Electric Quantum, Premium, M340 PLC: –
Unity PRO Tbox RTU :– Twinsoft Programming and Configuration
ToolBox+ RTU: -Programming with ISaGRAF workbench
Advantys distributed IO system
Softwares PES 3.1,UnityPro7.0 XLS, Vijeo Historian ,Vijeo Citect SCADA,
Clear SCADA, Advantys ,Toolbox+, Twinsoft, ISaGRAF
development Package.SCADAPack Workbench,Telepace
Studio,SCADAPack Configurator
Vijeo Designer 6.0.
DCS Centum VP DCS, Schneider electric PES3.1 (Process Expert
System) DCS , Honeywell Experion DCS
Site Activities FAT, SAT, Commissioning
Name: Aswin Sha
Position:Automation Engineer
Current Company :Yokogawa Electric
Previous Company :Schneider Electric
Experience:5 years
E-mail: Aswinsha@gmail.com
Mobile: +91-9847153787,+971-568981272
Skill Set
Experience Summary
 Honeywell Experion DCS
 Citect SCADA Certified Engineer
 Energy Management Professional
 DOFS(Details of Functional Safety) for working on SIL 3 Safety systems.
Yokogawa Electric India Limited (Central Engineering Center)
Tenure: Since June 2014 till Now
Position: Safety Systems Engineer
Responsibilities:
 Safety SIL 3 PLC logic Development with Prosafe based on Cause & Effect Document.
 Project Engineering Documentation includes IO Loading ,BOM,FDS,DDS,,O&M, FAT
test Procedures, SAT test procedures
 Conduct FAT along with Client and End User
 Development of SCADA application based on P&ID and its deployment.
 Pre-FAT,FAT Commissioning ,SAT, Handover
 Projects:
Project UPPER ZAKUM UZ-750 Project. UAE
Client/End User Petrofac Emirates /ZADCO (Zakum Development Company)
Products
involved
Yokogawa Centum VP DCS, Prosafe SIL 3 PLC
Team Size 100
Description:
 The project involves the development of the offshore facilities. It includes the laying of
240km of subsea pipelines and its required Control System.
Role:
 Development of Safety PLC application for SIS based on Cause and effect along with
Control Philosophy
 Conduct FAT (on going ) along with Client and End User in Abu Dhabi.
 Coordinate YARD Activities and Startup before shipping to Island.
 Development of Project Documents.
Project ZAULIYAH GAS PLANT PROJECT Oman
Client/End User AL HASSAN ENGINEERING CO. SAOG /PDO
Products
involved
Yokogawa Centum VP DCS, Prosafe SIL 3 PLC
Team Size 5
Professional Experience
Certifications
Description:
 The project involves the development of the Gas Plant Project and its required Control
System.
Role:
 Preparation of SIS H/W engineering deliverables i.e. Typical Loop Drawings, System
Loading calculation, System cable schedule, FDS, Marshalling Cabinet Typical, System
Cabinet Typical, GA/IA drawings, FAT procedure, Heat dissipation & Power Calculation
document , BOM
Project South Pars Gas Field Development, Iran
Client/End User PETRO KARAN SHAFAGH KISH (P.K.S.K) COMPANY
Products
involved
Yokogawa Centum VP DCS, Prosafe SIL 3 PLC
Team Size 10
Description:
 The project involves the development of the South Pars Gas Field Project Iran and its
required Control System.
Role:
 Preparation of SIS H/W engineering deliverables i.e. Typical Loop Drawings, System
Loading calculation, System cable schedule, FDS, Marshalling Cabinet Typical, System
Cabinet Typical, GA/IA drawings, FAT procedure, Heat dissipation & Power Calculation
document, BOM
Schneider Electric (Industry Solutions Back-Office)
Tenure: Since September 2011 June 2014
Position: Automation Engineer
Responsibilities:
 PLC logic Development with UnityPro based on Control philosophy.
 Project Engineering Documentation includes FDS,DDS,IO list ,O&M, FAT test
Procedures, SAT test procedures
 Kingfisher Toolbox+ RTU Logic Development using ISAGRAF development package.
 Tbox RTU, Toolbox RTU Logic development
 Development of SCADA application based on P&ID and its deployment.
 Configuration and Implementation of Vijeo Historian
 Pre-FAT,FAT
 Commissioning ,SAT, Handovers
 Projects:
Project Exxon Mobil Iraq west qurna I - Processing Fuel and Diesel for Gas
Turbine Gen-set –Iraq
Client FLUOR, Houston, US
Products
involved
Quantum Safety PLC, Quantum PLC, Vijeo Citect SCADA
Team Size 3
Description:
 Diesel Pumping Station for Distribution and for the operation of Gas Turbine Generator.
 System Consist of Safety Instrumented System (SIS) controlled with SIL3 Redundant
System with Quantum Redundant IO and Process Control System(PCS) controlled with
Redundant Quantum PLC with Simplex digital & Redundant Analog IO.
 Monitoring and Control using Vijeo Citect 7.2 SCADA.
 Products involved: Quantum SIL3 Certified CPU 140CPU67160S for SIS , Quantum CPU
140CPU67160 for PCS
Role:
 Project Engineering & Documentation includes(FAT & SAT Test Procedure ,O&M Manual
etc)
 Development of Safety PLC application for SIS based on Cause and effect along with
Control Philosophy
 Process Control PLC application for PCS based on control philosophy
Project Quarry Library
Client Schneider Electric-Library Development
Products
involved
Unity Pro ,Vijeo Citect SCADA
Team Size 2
Description:
 Quarry Library enhancement and language conversion
 Quarry Library is targeted for small size quarry
 Development of SCADA and Controller logic development
Role:
 Library documentation
 SCADA application development based on P&ID
Project Ashgal PS5 & PS6 -Pumping Station Qatar
Client Ashgal Qatar
Products
involved
Quantum PLC, Vijeo Citect SCADA,Tbox RTU
Team Size 2
Description:
 Potable and Sewage Pumping station
 System Consist of Quantum PLC for Process Control System and Vijeo Citect SCADA as
monitoring and control system.
 Tbox RTU which communicates with Quantum PLC and send data to Centralized SCADA
 Monitoring and Control using Vijeo Citect 7.2 SCADA.
Role:
 Conducting FAT at Dubai
 PLC application development based on control philosophy
 SCADA application development based on P&ID
Project Khalifa Port -PWPS –Abudhabi
Client Al-Habtoor Contracting, Khalifa Port Industrial Zone, Abudhabi
Products
involved
Quantum PLC,m340 PLC, Kingfisher Toolbox + RTU, Magelis HMI
Team Size 3
Description:
 Potable pumping station project consist of Potable pumps, Fire Pumps and Jockey Pumps
The Project involves PLC , RTU and HMI and application development
 System architecture composed of HMI for local control with PLC/RTU and Central SCADA
for Remote control with Tbox CP32 RTU .
 Products involved: Quantum PLC,m340 PLC, Kingfisher Toolbox+ RTU, Magelis HMI
Role:
 Project Engineering Documentation (FAT & SAT Test Procedure ,O&M Manual etc)
 Development of PLC logic based on Control Philosophy
 RTU Logic based on Control Philosophy
 HMI development based on P&ID
 Pre -FAT,FAT
 Instrumentation ,Commissioning, SAT at Abudhabi
Project Khalifa Port -PWPS -Abudhabi
Client Al-Habtoor Contracting, Khalifa Port Industrial Zone, Abudhabi
Products
involved
Quantum PLC,m340 PLC, Kingfisher Toolbox + RTU, Magelis HMI
Team Size 2
Description:
 Potable pumping station project consist of Potable pumps,Fire Pumps and Jockey Pumps
The Project involves PLC , RTU and HMI and application development
 System architecture composed of HMI for local control with PLC/RTU and Central SCADA
for Remote control with Tbox CP32 RTU .
 Products involved: Quantum PLC,m340 PLC, Kingfisher Toolbox +RTU, Magelis HMI
Role:
 Project Documentation
 Development of PLC ,RTU Logic and HMI application development
 SAT ,Commissioning at Abudhabi
Project Khalifa Port -IWPS -Abudhabi
Client Al-Habtoor Contracting. Khalifa Port Industrial Zone, Abudhabi
Role Logic Development for RTU,PLC, HMI development
Hardware m340 PLC, Magelis HMI
Team Size 2
Description:
 Irrigation water pumping station project consist of Water Pumps ;The Project involves PLC ,
and HMI application development
Products involved: m340 PLC, Magelis HMI
Role:
 Project Documentation
 Development of PLC Logic and HMI application development
 SAT ,Commissioning at Abudhabi
Project C410 Pumping Station- ADSSC Abudhabi
Client ARCO Contractors-ADSSC Abudhabi
Role Logic Development for RTU,PLC, HMI development,
Commissioning
Hardware m340 PLC, Tbox CP32 RTU ,Magelis HMI
Team Size 2
Description:
 Irrigation Pumping Station involving heavy duty Pump sets.
 System architecture composed of HMI for local control with PLC/RTU and Central SCADA
for Remote control with Tbox CP32 RTU .
 PLC and HMI communication using Modbus RTU
Responsibilities:
 Project Documentation
 Development of PLC Logic and HMI application development
 SAT ,Commissioning at Abudhabi
Project Mabani Delma- Abudhabi
Client AECOM Middle East -Abudhabi
Role Logic development ,HMI Development
Hardware Premium PLC ,M340 as RTU, Magelis HMI, Citect SCADA
Team Size 2
Description:
 Pumping Station project using PLC and RTU to communicate to central SCADA and HMI for
local monitoring.
 DNP3 Protocol for communication with central SCADA.
Responsibilities:
 Logic development for Premium and m340 as RTU.
 HMI development
 Execution of FAT, SAT and Commissioning
 Project Documentation
Project Madinat Zayed Abudhabi
Client AECOM Middle East -Abudhabi
Role HMI Development
Hardware Premium PLC ,Kingfisher Toolbox RTU, Magelis HMI, Citect
SCADA
Team Size 2
Description:
 Pumping Station project using PLC and RTU to communicate to central SCADA and HMI for
local monitoring.
Responsibilities:
 HMI development
 Project Documentation
Conversion Projects:
 Converted project from Vijeo Citect to Clear SCADA for Oil and Gas project
 Included rich features of Clear SCADA to enrich its functionality.
 Bachelor in Technology (B.Tech.) in Electrical And Electronics Engineering
from Mahatma Gandhi University through Mar Baselios Christian College of
Engineering and Technology, Kerala in year 2010.
 H.S.E. Completed in year 2006 from Kerala state Board.
 S.S.L.C. Completed in year 2004 from Kerala State Board
Father’s Name : Shaji P.N
Date of Birth : 29/12/1987
Passport Number : H 5631803
Gender : Male
Educational Details
Personal Details

Resume

  • 1.
     Design YokogawaProsafe SIL 3 Safety Hardware System for Oil and Gas ESD System  Development of SIL 3 Programme using Pro-Safe development tool  Process Graphics Generation based on P&ID in Centum VP DCS System.  Certified Vijeo Citect Certified Engineer  Developed PLC applications for Schneider Safety SIL3 PLC applications using Unity Pro XLS.  Experience in Quantum, Premium and M340 PLC , Magelis , Kingfisher Toolbox, Toolbox+, Tbox RTU and ISAGRAF development package.  Developed RTU application for SCADA Pack RTU using SCADAPack Workbench & Telepace Studio  Clear SCADA conversion project from Vijeo Citect.  Having one and half year experience in Industrial Automation  Experience in the project engineering document, development, commissioning of Industrial Automation projects.  Good Knowledge in Modbus ,Ethernet-IP,DNP3 ,OPC,AS-i communication Protocols SCADA HMI: Citect SCADA, Clear SCADA, Magelis HMI(Vijeo Designer) Database: SQL Server, Reporting with Crystal Reports PLC / Device: Yokogawa Prosafe Safety SIL-3 PLC , Centum FCS DCS Controller,Schneider-Electric Quantum, Premium, M340 PLC: – Unity PRO Tbox RTU :– Twinsoft Programming and Configuration ToolBox+ RTU: -Programming with ISaGRAF workbench Advantys distributed IO system Softwares PES 3.1,UnityPro7.0 XLS, Vijeo Historian ,Vijeo Citect SCADA, Clear SCADA, Advantys ,Toolbox+, Twinsoft, ISaGRAF development Package.SCADAPack Workbench,Telepace Studio,SCADAPack Configurator Vijeo Designer 6.0. DCS Centum VP DCS, Schneider electric PES3.1 (Process Expert System) DCS , Honeywell Experion DCS Site Activities FAT, SAT, Commissioning Name: Aswin Sha Position:Automation Engineer Current Company :Yokogawa Electric Previous Company :Schneider Electric Experience:5 years E-mail: Aswinsha@gmail.com Mobile: +91-9847153787,+971-568981272 Skill Set Experience Summary
  • 2.
     Honeywell ExperionDCS  Citect SCADA Certified Engineer  Energy Management Professional  DOFS(Details of Functional Safety) for working on SIL 3 Safety systems. Yokogawa Electric India Limited (Central Engineering Center) Tenure: Since June 2014 till Now Position: Safety Systems Engineer Responsibilities:  Safety SIL 3 PLC logic Development with Prosafe based on Cause & Effect Document.  Project Engineering Documentation includes IO Loading ,BOM,FDS,DDS,,O&M, FAT test Procedures, SAT test procedures  Conduct FAT along with Client and End User  Development of SCADA application based on P&ID and its deployment.  Pre-FAT,FAT Commissioning ,SAT, Handover  Projects: Project UPPER ZAKUM UZ-750 Project. UAE Client/End User Petrofac Emirates /ZADCO (Zakum Development Company) Products involved Yokogawa Centum VP DCS, Prosafe SIL 3 PLC Team Size 100 Description:  The project involves the development of the offshore facilities. It includes the laying of 240km of subsea pipelines and its required Control System. Role:  Development of Safety PLC application for SIS based on Cause and effect along with Control Philosophy  Conduct FAT (on going ) along with Client and End User in Abu Dhabi.  Coordinate YARD Activities and Startup before shipping to Island.  Development of Project Documents. Project ZAULIYAH GAS PLANT PROJECT Oman Client/End User AL HASSAN ENGINEERING CO. SAOG /PDO Products involved Yokogawa Centum VP DCS, Prosafe SIL 3 PLC Team Size 5 Professional Experience Certifications
  • 3.
    Description:  The projectinvolves the development of the Gas Plant Project and its required Control System. Role:  Preparation of SIS H/W engineering deliverables i.e. Typical Loop Drawings, System Loading calculation, System cable schedule, FDS, Marshalling Cabinet Typical, System Cabinet Typical, GA/IA drawings, FAT procedure, Heat dissipation & Power Calculation document , BOM Project South Pars Gas Field Development, Iran Client/End User PETRO KARAN SHAFAGH KISH (P.K.S.K) COMPANY Products involved Yokogawa Centum VP DCS, Prosafe SIL 3 PLC Team Size 10 Description:  The project involves the development of the South Pars Gas Field Project Iran and its required Control System. Role:  Preparation of SIS H/W engineering deliverables i.e. Typical Loop Drawings, System Loading calculation, System cable schedule, FDS, Marshalling Cabinet Typical, System Cabinet Typical, GA/IA drawings, FAT procedure, Heat dissipation & Power Calculation document, BOM Schneider Electric (Industry Solutions Back-Office) Tenure: Since September 2011 June 2014 Position: Automation Engineer Responsibilities:  PLC logic Development with UnityPro based on Control philosophy.  Project Engineering Documentation includes FDS,DDS,IO list ,O&M, FAT test Procedures, SAT test procedures  Kingfisher Toolbox+ RTU Logic Development using ISAGRAF development package.  Tbox RTU, Toolbox RTU Logic development  Development of SCADA application based on P&ID and its deployment.  Configuration and Implementation of Vijeo Historian  Pre-FAT,FAT
  • 4.
     Commissioning ,SAT,Handovers  Projects: Project Exxon Mobil Iraq west qurna I - Processing Fuel and Diesel for Gas Turbine Gen-set –Iraq Client FLUOR, Houston, US Products involved Quantum Safety PLC, Quantum PLC, Vijeo Citect SCADA Team Size 3 Description:  Diesel Pumping Station for Distribution and for the operation of Gas Turbine Generator.  System Consist of Safety Instrumented System (SIS) controlled with SIL3 Redundant System with Quantum Redundant IO and Process Control System(PCS) controlled with Redundant Quantum PLC with Simplex digital & Redundant Analog IO.  Monitoring and Control using Vijeo Citect 7.2 SCADA.  Products involved: Quantum SIL3 Certified CPU 140CPU67160S for SIS , Quantum CPU 140CPU67160 for PCS Role:  Project Engineering & Documentation includes(FAT & SAT Test Procedure ,O&M Manual etc)  Development of Safety PLC application for SIS based on Cause and effect along with Control Philosophy  Process Control PLC application for PCS based on control philosophy Project Quarry Library Client Schneider Electric-Library Development Products involved Unity Pro ,Vijeo Citect SCADA Team Size 2 Description:  Quarry Library enhancement and language conversion  Quarry Library is targeted for small size quarry  Development of SCADA and Controller logic development Role:  Library documentation  SCADA application development based on P&ID
  • 5.
    Project Ashgal PS5& PS6 -Pumping Station Qatar Client Ashgal Qatar Products involved Quantum PLC, Vijeo Citect SCADA,Tbox RTU Team Size 2 Description:  Potable and Sewage Pumping station  System Consist of Quantum PLC for Process Control System and Vijeo Citect SCADA as monitoring and control system.  Tbox RTU which communicates with Quantum PLC and send data to Centralized SCADA  Monitoring and Control using Vijeo Citect 7.2 SCADA. Role:  Conducting FAT at Dubai  PLC application development based on control philosophy  SCADA application development based on P&ID Project Khalifa Port -PWPS –Abudhabi Client Al-Habtoor Contracting, Khalifa Port Industrial Zone, Abudhabi Products involved Quantum PLC,m340 PLC, Kingfisher Toolbox + RTU, Magelis HMI Team Size 3 Description:  Potable pumping station project consist of Potable pumps, Fire Pumps and Jockey Pumps The Project involves PLC , RTU and HMI and application development  System architecture composed of HMI for local control with PLC/RTU and Central SCADA for Remote control with Tbox CP32 RTU .  Products involved: Quantum PLC,m340 PLC, Kingfisher Toolbox+ RTU, Magelis HMI Role:  Project Engineering Documentation (FAT & SAT Test Procedure ,O&M Manual etc)  Development of PLC logic based on Control Philosophy  RTU Logic based on Control Philosophy  HMI development based on P&ID  Pre -FAT,FAT  Instrumentation ,Commissioning, SAT at Abudhabi
  • 6.
    Project Khalifa Port-PWPS -Abudhabi Client Al-Habtoor Contracting, Khalifa Port Industrial Zone, Abudhabi Products involved Quantum PLC,m340 PLC, Kingfisher Toolbox + RTU, Magelis HMI Team Size 2 Description:  Potable pumping station project consist of Potable pumps,Fire Pumps and Jockey Pumps The Project involves PLC , RTU and HMI and application development  System architecture composed of HMI for local control with PLC/RTU and Central SCADA for Remote control with Tbox CP32 RTU .  Products involved: Quantum PLC,m340 PLC, Kingfisher Toolbox +RTU, Magelis HMI Role:  Project Documentation  Development of PLC ,RTU Logic and HMI application development  SAT ,Commissioning at Abudhabi Project Khalifa Port -IWPS -Abudhabi Client Al-Habtoor Contracting. Khalifa Port Industrial Zone, Abudhabi Role Logic Development for RTU,PLC, HMI development Hardware m340 PLC, Magelis HMI Team Size 2 Description:  Irrigation water pumping station project consist of Water Pumps ;The Project involves PLC , and HMI application development Products involved: m340 PLC, Magelis HMI Role:  Project Documentation  Development of PLC Logic and HMI application development  SAT ,Commissioning at Abudhabi Project C410 Pumping Station- ADSSC Abudhabi Client ARCO Contractors-ADSSC Abudhabi Role Logic Development for RTU,PLC, HMI development, Commissioning
  • 7.
    Hardware m340 PLC,Tbox CP32 RTU ,Magelis HMI Team Size 2 Description:  Irrigation Pumping Station involving heavy duty Pump sets.  System architecture composed of HMI for local control with PLC/RTU and Central SCADA for Remote control with Tbox CP32 RTU .  PLC and HMI communication using Modbus RTU Responsibilities:  Project Documentation  Development of PLC Logic and HMI application development  SAT ,Commissioning at Abudhabi Project Mabani Delma- Abudhabi Client AECOM Middle East -Abudhabi Role Logic development ,HMI Development Hardware Premium PLC ,M340 as RTU, Magelis HMI, Citect SCADA Team Size 2 Description:  Pumping Station project using PLC and RTU to communicate to central SCADA and HMI for local monitoring.  DNP3 Protocol for communication with central SCADA. Responsibilities:  Logic development for Premium and m340 as RTU.  HMI development  Execution of FAT, SAT and Commissioning  Project Documentation Project Madinat Zayed Abudhabi Client AECOM Middle East -Abudhabi Role HMI Development Hardware Premium PLC ,Kingfisher Toolbox RTU, Magelis HMI, Citect SCADA Team Size 2 Description:  Pumping Station project using PLC and RTU to communicate to central SCADA and HMI for local monitoring. Responsibilities:
  • 8.
     HMI development Project Documentation Conversion Projects:  Converted project from Vijeo Citect to Clear SCADA for Oil and Gas project  Included rich features of Clear SCADA to enrich its functionality.  Bachelor in Technology (B.Tech.) in Electrical And Electronics Engineering from Mahatma Gandhi University through Mar Baselios Christian College of Engineering and Technology, Kerala in year 2010.  H.S.E. Completed in year 2006 from Kerala state Board.  S.S.L.C. Completed in year 2004 from Kerala State Board Father’s Name : Shaji P.N Date of Birth : 29/12/1987 Passport Number : H 5631803 Gender : Male Educational Details Personal Details