Sherif Wahba Fayek
Al Nahyan Camp, Mouroor Street
Abu Dhabi, UAE Tel: +971501250714
+971558227845
Email: sherif.fayek@esi-steel.com
CAREER
OBJECTIVE
Seeking for a suitable position as electric and automation engineer to provide
my expertise and technical skills developed over fifteen years of working in this
field.
Job Position: -Electrical and Automation Engineer.
WORK
EXPERIENCE
Sep 2001 up till July
2007 Full Time
-Working as electric and automation Engineer in BESHAY STEEL (Egyptian American
Steel Rolling Mills), SIMAC (Member of SMS), the contracted Italian company, designed
and supplied the mill , Capacity 1.2 Million ton / year ,, two lines rebar and one for wire
rode .
-Starting my work in the commissioning period of the factory under supervision of the
Italian engineers and still working in steady state condition to reach the full load capacity.
-Working during this period in the field of hardware equipments and software programs.
Hardware equipment:
#involved in the installing and commission of ABB 33/11 KV.
#involved in the installing and commission of ABB Static Var Compensator (SVC).
#Many types of digital and analog sensors such as proximitys, flow switchs, pressure
switch, photocells, hot metal detector…ext.
#Many types of analog sensors such as flow and pressure transducers, thermocouples,
pyrometers, loop scanners….ext.
#DEMAG overhead cranes.
#D.C motors and its maintenance regarding to brushes, commutator and lubrication.
#A.C motors and its maintenance regarding to greasing.
#Drives of D.C motors (ABB DCS 500) and A.C motors (ABB ACS 600) with strong
dealing with its parameters, control circuit, software programming (CMT) and
communication with PLC.
#Step down transformers 220/11 KV, 11KV/550 V, 11KV/380V with its protections.
Page 1 of 2
12-July 2007 up to now
#Protection panels of transformers which contain circuit brakers, protection relays and
control circuits.
#11 KV power factor and harmonic filters to absorb the third, fifth harmonics.
# # Making tests for medium voltage protection relays (as PR 512) using secondary
injection device.
#Have a strong troubleshooting skills in the hardware and software problems.
#Have a strong maintenance skills in the hardware and software equipments.
Software equipment:
#PLC (Siemens) hardware modules as CPU, communication processor, D/I and A/I
modules, interface modules, repeaters.
#PLC software program (SIMATIC MANAGER step 7), with making a lot of modifications
to improve, stabilize and make full safety to the equipments and operation, these
modifications is made by PLC step 7 ladder diagram and statement list.
-Full installation and commissioning of Siemens Micro-master Drive to control cooling
conveyer with making intercommunication between the drive, PLC and Scada system.
-Full installation and commissioning of many soft-starters to control roller table motors with
making intercommunication between the drive, PLC and Scada system.
#the communication between drives and PLC via profibus modules and fiber optics cables.
#Data transfer from PLC to HMI and vis versa and also making a lot of modifications in
the HMI masks using the Factory Link program.
# Follow up operation parameters at HMI.
# Follow up the sequence using data logger.
-Working as electric and automation supervisor in EMARATE STEEL INDUSTRIES
at UAE responsible of the electrical and automation tasks in rebar and wire rod rolling
mills,
-I was involved in the commissioning of both plants under supervision of the
contracted Italian company “Danilli” which designed and supplied the mills.
-I was involved in commissioning of:
#ABB synchronous motor and ABB ACS 6000.
#SIEMENS MASTER and MICRMASTER DRIVES (hardware and software).
# SIMATIC MANAGER step 7 PLC (hardware and software).
# The PLC and drives networks like profibus and MPI and the interconnection
between it.
# The field devices either digital or analog.
# Cold and hot commissioning.
Page 2 of 2
# Preparing the snag lists in the commissioning procedures and highlighting it.
# Preparing the extra modifications which required from Danilli to improve the
process.
After the mill was handed over completely to our company, I took the following
responsibilities:
-I am responsible of taking the periodic backups of PLC projects, HMI masks, drives
parameters and OWS setup pages.
-Making many software modifications using PLC step 7 and HMI win CC and
communicate each other like:
# Making C-Hook HMI project designed by win-CC program which includes 8 pages
describing all the area process, operation and control.
-Making self-improving in step 7 STL (indirect addressing) and SCL for data
managing system and tracking.
-Supervise the preventive and predictive maintenance jobs related to PLC, Drives,
Motors and filed devices.
-Troubleshooting many different types of problem in electrical, automation and
process fields.
- Following up and analyzing the process sequences using graphical programs like FDA.
- Implementing full safety procedures for all types of tasks in PM or CM jobs.
- Appling and filing work standers and procedures which is related to electrical activities.
-Analyzing the data transfer between level 2 and PLC from PLC side.
EDUCATION
2000
Qualification: B. SC of Electric Machine and Power Engineering, Ain Shams University,
Cairo, Egypt.
Accumulated Grade = Fair
Date of Graduation : 15/7/2000
& Project (harmonic filters and power factor correction)
Grade = V. good.
MISC.INFORMA
TION
Computer Skills: Excellent
Office, CCNA certified
Languages: Arabic:- As a mother tongue English:- V. Good ( Written & spoken)
Page 3 of 2
PERSONAL DATA
Date of Birth: 22/1/1977 ||| Gender: Male ||| Nationality: Egypt
Military Status: final exempted ||| Marital Status: Married
Thank you for your confidential reading
Page 4 of 2

Sherif CV

  • 1.
    Sherif Wahba Fayek AlNahyan Camp, Mouroor Street Abu Dhabi, UAE Tel: +971501250714 +971558227845 Email: sherif.fayek@esi-steel.com CAREER OBJECTIVE Seeking for a suitable position as electric and automation engineer to provide my expertise and technical skills developed over fifteen years of working in this field. Job Position: -Electrical and Automation Engineer. WORK EXPERIENCE Sep 2001 up till July 2007 Full Time -Working as electric and automation Engineer in BESHAY STEEL (Egyptian American Steel Rolling Mills), SIMAC (Member of SMS), the contracted Italian company, designed and supplied the mill , Capacity 1.2 Million ton / year ,, two lines rebar and one for wire rode . -Starting my work in the commissioning period of the factory under supervision of the Italian engineers and still working in steady state condition to reach the full load capacity. -Working during this period in the field of hardware equipments and software programs. Hardware equipment: #involved in the installing and commission of ABB 33/11 KV. #involved in the installing and commission of ABB Static Var Compensator (SVC). #Many types of digital and analog sensors such as proximitys, flow switchs, pressure switch, photocells, hot metal detector…ext. #Many types of analog sensors such as flow and pressure transducers, thermocouples, pyrometers, loop scanners….ext. #DEMAG overhead cranes. #D.C motors and its maintenance regarding to brushes, commutator and lubrication. #A.C motors and its maintenance regarding to greasing. #Drives of D.C motors (ABB DCS 500) and A.C motors (ABB ACS 600) with strong dealing with its parameters, control circuit, software programming (CMT) and communication with PLC. #Step down transformers 220/11 KV, 11KV/550 V, 11KV/380V with its protections. Page 1 of 2
  • 2.
    12-July 2007 upto now #Protection panels of transformers which contain circuit brakers, protection relays and control circuits. #11 KV power factor and harmonic filters to absorb the third, fifth harmonics. # # Making tests for medium voltage protection relays (as PR 512) using secondary injection device. #Have a strong troubleshooting skills in the hardware and software problems. #Have a strong maintenance skills in the hardware and software equipments. Software equipment: #PLC (Siemens) hardware modules as CPU, communication processor, D/I and A/I modules, interface modules, repeaters. #PLC software program (SIMATIC MANAGER step 7), with making a lot of modifications to improve, stabilize and make full safety to the equipments and operation, these modifications is made by PLC step 7 ladder diagram and statement list. -Full installation and commissioning of Siemens Micro-master Drive to control cooling conveyer with making intercommunication between the drive, PLC and Scada system. -Full installation and commissioning of many soft-starters to control roller table motors with making intercommunication between the drive, PLC and Scada system. #the communication between drives and PLC via profibus modules and fiber optics cables. #Data transfer from PLC to HMI and vis versa and also making a lot of modifications in the HMI masks using the Factory Link program. # Follow up operation parameters at HMI. # Follow up the sequence using data logger. -Working as electric and automation supervisor in EMARATE STEEL INDUSTRIES at UAE responsible of the electrical and automation tasks in rebar and wire rod rolling mills, -I was involved in the commissioning of both plants under supervision of the contracted Italian company “Danilli” which designed and supplied the mills. -I was involved in commissioning of: #ABB synchronous motor and ABB ACS 6000. #SIEMENS MASTER and MICRMASTER DRIVES (hardware and software). # SIMATIC MANAGER step 7 PLC (hardware and software). # The PLC and drives networks like profibus and MPI and the interconnection between it. # The field devices either digital or analog. # Cold and hot commissioning. Page 2 of 2
  • 3.
    # Preparing thesnag lists in the commissioning procedures and highlighting it. # Preparing the extra modifications which required from Danilli to improve the process. After the mill was handed over completely to our company, I took the following responsibilities: -I am responsible of taking the periodic backups of PLC projects, HMI masks, drives parameters and OWS setup pages. -Making many software modifications using PLC step 7 and HMI win CC and communicate each other like: # Making C-Hook HMI project designed by win-CC program which includes 8 pages describing all the area process, operation and control. -Making self-improving in step 7 STL (indirect addressing) and SCL for data managing system and tracking. -Supervise the preventive and predictive maintenance jobs related to PLC, Drives, Motors and filed devices. -Troubleshooting many different types of problem in electrical, automation and process fields. - Following up and analyzing the process sequences using graphical programs like FDA. - Implementing full safety procedures for all types of tasks in PM or CM jobs. - Appling and filing work standers and procedures which is related to electrical activities. -Analyzing the data transfer between level 2 and PLC from PLC side. EDUCATION 2000 Qualification: B. SC of Electric Machine and Power Engineering, Ain Shams University, Cairo, Egypt. Accumulated Grade = Fair Date of Graduation : 15/7/2000 & Project (harmonic filters and power factor correction) Grade = V. good. MISC.INFORMA TION Computer Skills: Excellent Office, CCNA certified Languages: Arabic:- As a mother tongue English:- V. Good ( Written & spoken) Page 3 of 2
  • 4.
    PERSONAL DATA Date ofBirth: 22/1/1977 ||| Gender: Male ||| Nationality: Egypt Military Status: final exempted ||| Marital Status: Married Thank you for your confidential reading Page 4 of 2