SlideShare a Scribd company logo
CIVIL
ENGINEERING
www.vkhp.co.uk
vkhp-consulting is a firm of civil and structural
engineers and surveyors operating nationally
and internationally from our offices in
Tunbridge Wells, Kent, Dorking in Surrey and
Storrington, West Sussex.
We wish to take the opportunity to present
our Civil Engineering department. Our Civil
Engineering team provides expert advice
on highways, drainage and external works
including paving, finishes and retaining walls.
The practice regularly provides advice on
flood risks, including the production of Flood
Risk Assessments and the implementation of
SUDS recommendations for sustainable urban
drainage systems.
Where a property has been designated to
a minimum Code for Sustainable Homes
or BREEAM standard, the team produces
calculations and statements supporting the
application to ensure the maximum number
of points are obtained in the SUR 1 and
POL 3 categories.
vkhp prepares designs, details and
specifications for foul / surface water drainage,
attenuation and distribution for a variety of
INTRODUCTION
projects from the smallest residential scheme
through to large housing estates, commercial
and industrial developments. Additionally we
have a wealth of experience negotiating with
Councils, utility and water companies.
When a project includes a public sewer which
can include a drain serving a neighbour,
recent changes to legislation mean that Build-
Over Agreements have to be agreed with the
water company before site work can start.
Often contractors miss this requirement until
construction has started. So if there is a sewer
serving the site, early involvement allows an
efficient course of action to be planned with
delays minimised.
Our services can be tailored to suit each of the
key stages of a project:
•	 At project feasibility stage
•	 Up to Planning Application stage
•	 During Detailed Design
PRELIMINARY SITE FEASIBILITY REPORTS
These are preliminary studies undertaken in
the very early stage of a project and tend to be
carried out when a project is large or complex,
or where there is some doubt or controversy
regarding the proposed development. If an
environmental impact assessment (EIA) is
required, this may involve assessments best
undertaken as part of feasibility studies.
SITE ACCESSIBILITY AUDITS
These Audits carried out at the earliest stage of
a project relate to highways and transportation
issues, typically in the first instance the viability
of connecting to the road network. Matters
such as visibility splays for pedestrians and
vehicles are covered, together with cycle, bus
and rail transport accessibility.
UTILITY OVERVIEWS
Is the site likely to be served adequately by
drainage, water supply, gas and electricity
supplies including broadband internet
and mobile telecommunications services?
Answering this question forms the basis of
the Overview in order to establish the quality
of anticipated services and what might be
expected in the future as part of utility company
development programmes
AT PROJECT FEASIBILITY STAGE
CONDITIONS ASSESSMENTS
A thorough investigation and assessment of
ground conditions and stability is an essential
stage of any project in order to determine
issues such as:
•	 Whether a site is suitable
•	 Where the best place to locate any buildings
or infrastructure might be
•	 Types and sizes of any foundations
DRAINAGE AND FLOODING ASSESSMENTS
•	 A Flood Risk Assessment is a requirement
of all planning applications for major
developments and developments proposed
in areas at risk of flooding. A Flood Risk
Assessment may also be requested for sites
in a low risk flood zone where a risk from
another source is identified such as surface
water.
•	 Site specific Flood Risk Assessments, for
all types of developments, in all Flood
Zones countrywide, in accordance with
the requirements of the National Planning
Policy Framework, TAN 15 (Wales) and the
detailed guidelines set out in CIRIA Report
624. This work is done for all types of
developments from single units through to
major residential, office, retail and industrial
developments
When a project is proposed, an important first step towards making it happen
is to assess the value, plausibility and potential of the work. A feasibility study
involves an in-depth exploration that looks at every aspect, aiming to generate
an objective picture of cost, benefits and risks before going ahead, essentially
to determine whether or not it’s realistic.
TRANSPORTATION PLANNING
Is the process of defining policies, goals,
investments and designs to prepare for
the needs to move people and goods
to destinations. It involves the input of
stakeholders including government agencies,
the public and private businesses.
UTILITY COORDINATION
Utility coordination comprises organising
electricity, cable telecommunications, water,
gas, drainage and sewerage installation.
SURFACE WATER AND FOUL WATER
DRAINAGE STRATEGY
Planning applications for major developments
are required to submit a Sustainable Drainage
Strategy showing how sustainable drainage
systems (SUDS) will be used, it includes
determining methods of sewage disposal from
sites.
FLOOD RISK ASSESSMENTS (FRA)
The FRA determines the chance of flooding
from all flooding mechanisms, identifying
mitigation measures and advising on actions to
be taken when flooding occurs due to:
•	 Groundwater, vadose water and surface
water
•	 Burst water mains, canals, rivers, streams,
watercourses, sewers
GEO-ENVIRONMENTAL ASSESSMENT
An assessment of ground conditions for
projects includes geology, hydrology,
hydrogeology and soil conditions of a site
including contaminated land involving:
•	 outline foundation assessments, soil
sampling, remediation method statement
•	 chemical and geotechnical testing, risk
assessments of soil and ground water
UP TO PLANNING APPLICATION
ECOLOGICAL ASSESSMENT (EA) – BIRD,
BADGER, LIZARD AND HABITAT SURVEYS
This is the monitoring of ecological
resources to discover current and changing
conditions, being required components of
hazardous waste site investigations.
INVASIVE SPECIES (KNOTWEED, GIANT
HOGWEED) CONSULTANCY AND
ERADICATION
If there are invasive species on your site
we have the necessary experience and
expertise to advise of legal and commercial
implications of the issue.
LAND AND ARBORICULTURAL SURVEYS
What is the extent of the site? What
services, structures, trees and significant
features are on it? Are there trees and
of which species? Will the trees cause
subsidence affecting the design of
foundations? Where are the utility services?
INFILTRATION TESTING (SOAKAWAYS)
Soil percolation tests are required to
determine the absorption rate of soils
for the design of soakaways. Percolation
testing is observing how quickly a known
volume of water dissipates into the subsoil
of a hole of known surface area.
CONTAMINATED LAND ASSESSMENT
Contaminated land has substances in
or under it hazardous to health or the
environment. It includes mining, chemical/
oil spills and waste sites and can occur
naturally as a result of the geology of the
area or through agricultural/industrial use.
Making a Planning Application and gaining Planning Permission is important,
often making the difference between whether or not a project proceeds to
design. Many clients will be unwilling to commit to detailed design until they
have achieved a Planning Permission.
SLOPE STABILITY
Slope stability is the potential of soil covered slopes to
withstand and undergo movement. Stability is determined by
the balance of shear stress and shear strength.
SOAKAWAY DESIGN
Soakaways have been the traditional way to dispose of storm
water from buildings and paved areas remote from a public
sewer or watercourse. In recent years, soakaways have been
used within urban, fully-skewered areas to limit the impact on
discharge of new upstream building works and to avoid costs of
sewer upgrading outside a development.
DRAINAGE DESIGN
There are numerous permutations for drainage design and
optimising the solution can have a significant impact on
development costs and opportunities.
HIGHWAYS DESIGN
This work must take into account future traffic flows, the design
of highway intersections/interchanges, geometric alignment
and design, highway pavement materials and design, structural
design of pavement thickness, and pavement maintenance.
SWEPT PATH (TURNING CIRCLE)
Swept Path or vehicle tracking is a comprehensive
transportation analysis and design solution, used to evaluate
vehicle movements where space constraints are an issue.
CUT AND FILL / VOLUMES
Optimising cut and fill earthwork volumes created through the
moving or processing of parts of a site is an important aspect of
civil engineering.
BASEMENT IMPACT ASSESSMENT (BIA)
The Utilisation of basement opportunities for new and
refurbished developments is increasingly common.
DETAILED DESIGN
OTHER AREAS OF EXPERTISE
At vkhp-consulting, we offer design services to all sectors
of construction for projects of all sizes. With an expertise in
high quality, one off residential properties in the southeast,
we also have an outstanding reputation for commercial, and
public projects.
We are specialists in basement design, ground movement and
subsidence, and all aspects of insurance claims following damage
from escape of water, fire, flood, impact and storm. We act for
loss adjusters, insurance companies, banks and private clients. We
are also members of the Faculty of Party Wall Surveyors and can
provide expert advice on the Party Wall Act 1996.
Visit our website for more information on the design services we
can offer.
CONTACT US:
info@vkhp.co.uk
Tunbridge Wells: 01892 521841
Dorking: 01306 881012
Storrington: 01903 740090
www.vkhp.co.uk
@vkhpconsulting
/vkhpconsulting
vkhp consulting Ltd

More Related Content

What's hot

Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Dr Orhan Degermenci
 
Site analysis and documentation
Site analysis and documentation Site analysis and documentation
Site analysis and documentation Lawin Langat
 
James R Smith Resume May-2015
James R Smith Resume May-2015James R Smith Resume May-2015
James R Smith Resume May-2015Jim Smith
 
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015Mohd Murtaza
 
Wilbur Sweet - 2016
Wilbur Sweet - 2016Wilbur Sweet - 2016
Wilbur Sweet - 2016Wilbur Sweet
 
B Levitt Resume 03_16_2
B Levitt Resume 03_16_2B Levitt Resume 03_16_2
B Levitt Resume 03_16_2Brian Levitt
 
Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)Dr Orhan Degermenci
 
IRJET- Selection of Appropriate Technologies in Building Constructions
IRJET- Selection of Appropriate Technologies in Building ConstructionsIRJET- Selection of Appropriate Technologies in Building Constructions
IRJET- Selection of Appropriate Technologies in Building ConstructionsIRJET Journal
 
M0026_9 Brownfield brochure_email
M0026_9 Brownfield brochure_emailM0026_9 Brownfield brochure_email
M0026_9 Brownfield brochure_emailDavid Coulter
 

What's hot (16)

Land surveyor
Land surveyorLand surveyor
Land surveyor
 
EWRES-Group Statement Of Qualifications
EWRES-Group Statement Of QualificationsEWRES-Group Statement Of Qualifications
EWRES-Group Statement Of Qualifications
 
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
 
Cv career history
Cv   career historyCv   career history
Cv career history
 
Site analysis and documentation
Site analysis and documentation Site analysis and documentation
Site analysis and documentation
 
James R Smith Resume May-2015
James R Smith Resume May-2015James R Smith Resume May-2015
James R Smith Resume May-2015
 
C2 sustaiability 8 jan 08
C2 sustaiability   8 jan 08C2 sustaiability   8 jan 08
C2 sustaiability 8 jan 08
 
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
 
Nykilde geoweb channel protection design package
Nykilde geoweb channel protection design packageNykilde geoweb channel protection design package
Nykilde geoweb channel protection design package
 
ramCV
ramCVramCV
ramCV
 
Wilbur Sweet - 2016
Wilbur Sweet - 2016Wilbur Sweet - 2016
Wilbur Sweet - 2016
 
B Levitt Resume 03_16_2
B Levitt Resume 03_16_2B Levitt Resume 03_16_2
B Levitt Resume 03_16_2
 
Kpr resume tunnel engineer
Kpr resume tunnel engineerKpr resume tunnel engineer
Kpr resume tunnel engineer
 
Cv mr. orhan degermenci (lead pipeline engineer)
Cv   mr. orhan degermenci (lead pipeline engineer)Cv   mr. orhan degermenci (lead pipeline engineer)
Cv mr. orhan degermenci (lead pipeline engineer)
 
IRJET- Selection of Appropriate Technologies in Building Constructions
IRJET- Selection of Appropriate Technologies in Building ConstructionsIRJET- Selection of Appropriate Technologies in Building Constructions
IRJET- Selection of Appropriate Technologies in Building Constructions
 
M0026_9 Brownfield brochure_email
M0026_9 Brownfield brochure_emailM0026_9 Brownfield brochure_email
M0026_9 Brownfield brochure_email
 

Viewers also liked

Marino, Marissa - 595 Hamro- Winter 16
Marino, Marissa - 595 Hamro- Winter 16Marino, Marissa - 595 Hamro- Winter 16
Marino, Marissa - 595 Hamro- Winter 16Marissa Marino
 
Trabajo informatica
Trabajo informaticaTrabajo informatica
Trabajo informaticaalbazotal
 
Acccident & behaviour
Acccident & behaviourAcccident & behaviour
Acccident & behaviouredibayu
 
non-obviousness and the patenting process
non-obviousness and the patenting processnon-obviousness and the patenting process
non-obviousness and the patenting processwelcometofacebook
 
201412_cfpb_reports_consumer-credit-medical-and-non-medical-collections
201412_cfpb_reports_consumer-credit-medical-and-non-medical-collections201412_cfpb_reports_consumer-credit-medical-and-non-medical-collections
201412_cfpb_reports_consumer-credit-medical-and-non-medical-collectionsMichael Thompson
 
L'estampe au milieu du XIXe siècle : l'eau-forte et le bois de bout
L'estampe au milieu du XIXe siècle : l'eau-forte et le bois de boutL'estampe au milieu du XIXe siècle : l'eau-forte et le bois de bout
L'estampe au milieu du XIXe siècle : l'eau-forte et le bois de boutJohanna Daniel
 
5 s for housekeeping and workplace management
5 s for housekeeping and workplace management5 s for housekeeping and workplace management
5 s for housekeeping and workplace managementKamlesh Hariyani
 
ISS Facility Services Intro_201602
ISS Facility Services Intro_201602ISS Facility Services Intro_201602
ISS Facility Services Intro_201602Brenda Lin
 
How Ellen Pao became Reddit’s Lee Harvey Oswald
How Ellen Pao became Reddit’s  Lee Harvey OswaldHow Ellen Pao became Reddit’s  Lee Harvey Oswald
How Ellen Pao became Reddit’s Lee Harvey OswaldJason Fernandes
 
Can Samsung stop the exodus?
Can Samsung stop the exodus?Can Samsung stop the exodus?
Can Samsung stop the exodus?Jason Fernandes
 

Viewers also liked (17)

Marino, Marissa - 595 Hamro- Winter 16
Marino, Marissa - 595 Hamro- Winter 16Marino, Marissa - 595 Hamro- Winter 16
Marino, Marissa - 595 Hamro- Winter 16
 
Trabajo informatica
Trabajo informaticaTrabajo informatica
Trabajo informatica
 
PROFILE-1
PROFILE-1PROFILE-1
PROFILE-1
 
Acccident & behaviour
Acccident & behaviourAcccident & behaviour
Acccident & behaviour
 
Etani cosmetics www.etani.sk
Etani cosmetics www.etani.skEtani cosmetics www.etani.sk
Etani cosmetics www.etani.sk
 
Busques Finançament 2015 - ICF
Busques Finançament 2015 - ICFBusques Finançament 2015 - ICF
Busques Finançament 2015 - ICF
 
Erasmus parents' survey
Erasmus parents' surveyErasmus parents' survey
Erasmus parents' survey
 
Ppt01
Ppt01Ppt01
Ppt01
 
2.Profile
2.Profile2.Profile
2.Profile
 
Certificates
CertificatesCertificates
Certificates
 
non-obviousness and the patenting process
non-obviousness and the patenting processnon-obviousness and the patenting process
non-obviousness and the patenting process
 
201412_cfpb_reports_consumer-credit-medical-and-non-medical-collections
201412_cfpb_reports_consumer-credit-medical-and-non-medical-collections201412_cfpb_reports_consumer-credit-medical-and-non-medical-collections
201412_cfpb_reports_consumer-credit-medical-and-non-medical-collections
 
L'estampe au milieu du XIXe siècle : l'eau-forte et le bois de bout
L'estampe au milieu du XIXe siècle : l'eau-forte et le bois de boutL'estampe au milieu du XIXe siècle : l'eau-forte et le bois de bout
L'estampe au milieu du XIXe siècle : l'eau-forte et le bois de bout
 
5 s for housekeeping and workplace management
5 s for housekeeping and workplace management5 s for housekeeping and workplace management
5 s for housekeeping and workplace management
 
ISS Facility Services Intro_201602
ISS Facility Services Intro_201602ISS Facility Services Intro_201602
ISS Facility Services Intro_201602
 
How Ellen Pao became Reddit’s Lee Harvey Oswald
How Ellen Pao became Reddit’s  Lee Harvey OswaldHow Ellen Pao became Reddit’s  Lee Harvey Oswald
How Ellen Pao became Reddit’s Lee Harvey Oswald
 
Can Samsung stop the exodus?
Can Samsung stop the exodus?Can Samsung stop the exodus?
Can Samsung stop the exodus?
 

Similar to VKHP_Civil_Brochure_WEB

Why You Need Site Surveying for Your Construction Project?
Why You Need Site Surveying for Your Construction Project?Why You Need Site Surveying for Your Construction Project?
Why You Need Site Surveying for Your Construction Project?Aussie Hydro-Vac Services
 
Structerre Commercial & Infrastructure
Structerre Commercial & Infrastructure Structerre Commercial & Infrastructure
Structerre Commercial & Infrastructure structerreci
 
Scope of civil engg_v3.pptx
Scope of civil engg_v3.pptxScope of civil engg_v3.pptx
Scope of civil engg_v3.pptxPreyaRahul
 
Chee Wong - CV DEC2016
Chee Wong - CV DEC2016Chee Wong - CV DEC2016
Chee Wong - CV DEC2016Chee Wong
 
Andrew Douglas_Comprehensive
Andrew Douglas_ComprehensiveAndrew Douglas_Comprehensive
Andrew Douglas_ComprehensiveAndrew Douglas
 
Hydrology_and _Hydrogeology_Leaflet_Highres
Hydrology_and _Hydrogeology_Leaflet_HighresHydrology_and _Hydrogeology_Leaflet_Highres
Hydrology_and _Hydrogeology_Leaflet_HighresMatthew Hopkins
 
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...Nicholas Phelan
 
Construction Monitoring
Construction MonitoringConstruction Monitoring
Construction Monitoringnrsiwat
 
International Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfInternational Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfzubeditufail
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15Greg Clifford
 
Site civil engineer fiazuddin
Site civil engineer fiazuddinSite civil engineer fiazuddin
Site civil engineer fiazuddinFiazuddin Memon
 
Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.Joseph Raftery
 
Leaflet contaminated land management
Leaflet contaminated land managementLeaflet contaminated land management
Leaflet contaminated land managementHenk Kuik
 

Similar to VKHP_Civil_Brochure_WEB (20)

Wwdcs new
Wwdcs newWwdcs new
Wwdcs new
 
Why You Need Site Surveying for Your Construction Project?
Why You Need Site Surveying for Your Construction Project?Why You Need Site Surveying for Your Construction Project?
Why You Need Site Surveying for Your Construction Project?
 
Structerre Commercial & Infrastructure
Structerre Commercial & Infrastructure Structerre Commercial & Infrastructure
Structerre Commercial & Infrastructure
 
GP Graphic
GP GraphicGP Graphic
GP Graphic
 
Scope of civil engg_v3.pptx
Scope of civil engg_v3.pptxScope of civil engg_v3.pptx
Scope of civil engg_v3.pptx
 
ECoW_Leaflet_HighRes
ECoW_Leaflet_HighResECoW_Leaflet_HighRes
ECoW_Leaflet_HighRes
 
Chee Wong - CV DEC2016
Chee Wong - CV DEC2016Chee Wong - CV DEC2016
Chee Wong - CV DEC2016
 
Andrew Douglas_Comprehensive
Andrew Douglas_ComprehensiveAndrew Douglas_Comprehensive
Andrew Douglas_Comprehensive
 
Esteban Raganit_2016
Esteban Raganit_2016Esteban Raganit_2016
Esteban Raganit_2016
 
Hydrology_and _Hydrogeology_Leaflet_Highres
Hydrology_and _Hydrogeology_Leaflet_HighresHydrology_and _Hydrogeology_Leaflet_Highres
Hydrology_and _Hydrogeology_Leaflet_Highres
 
CV_2016
CV_2016CV_2016
CV_2016
 
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
Undergraduate Senior Design Brief - Climate Change Impact Assesment - Infrast...
 
Construction Monitoring
Construction MonitoringConstruction Monitoring
Construction Monitoring
 
International Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdfInternational Environmental Impact Assessment - Atkins.pdf
International Environmental Impact Assessment - Atkins.pdf
 
P Kennedy CV Nov 2016
P Kennedy CV Nov 2016P Kennedy CV Nov 2016
P Kennedy CV Nov 2016
 
G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15G_Clifford_resume_Feb 15
G_Clifford_resume_Feb 15
 
Site civil engineer fiazuddin
Site civil engineer fiazuddinSite civil engineer fiazuddin
Site civil engineer fiazuddin
 
CV Andrew Hall
CV Andrew HallCV Andrew Hall
CV Andrew Hall
 
Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.
 
Leaflet contaminated land management
Leaflet contaminated land managementLeaflet contaminated land management
Leaflet contaminated land management
 

VKHP_Civil_Brochure_WEB

  • 2. vkhp-consulting is a firm of civil and structural engineers and surveyors operating nationally and internationally from our offices in Tunbridge Wells, Kent, Dorking in Surrey and Storrington, West Sussex. We wish to take the opportunity to present our Civil Engineering department. Our Civil Engineering team provides expert advice on highways, drainage and external works including paving, finishes and retaining walls. The practice regularly provides advice on flood risks, including the production of Flood Risk Assessments and the implementation of SUDS recommendations for sustainable urban drainage systems. Where a property has been designated to a minimum Code for Sustainable Homes or BREEAM standard, the team produces calculations and statements supporting the application to ensure the maximum number of points are obtained in the SUR 1 and POL 3 categories. vkhp prepares designs, details and specifications for foul / surface water drainage, attenuation and distribution for a variety of INTRODUCTION projects from the smallest residential scheme through to large housing estates, commercial and industrial developments. Additionally we have a wealth of experience negotiating with Councils, utility and water companies. When a project includes a public sewer which can include a drain serving a neighbour, recent changes to legislation mean that Build- Over Agreements have to be agreed with the water company before site work can start. Often contractors miss this requirement until construction has started. So if there is a sewer serving the site, early involvement allows an efficient course of action to be planned with delays minimised. Our services can be tailored to suit each of the key stages of a project: • At project feasibility stage • Up to Planning Application stage • During Detailed Design
  • 3.
  • 4. PRELIMINARY SITE FEASIBILITY REPORTS These are preliminary studies undertaken in the very early stage of a project and tend to be carried out when a project is large or complex, or where there is some doubt or controversy regarding the proposed development. If an environmental impact assessment (EIA) is required, this may involve assessments best undertaken as part of feasibility studies. SITE ACCESSIBILITY AUDITS These Audits carried out at the earliest stage of a project relate to highways and transportation issues, typically in the first instance the viability of connecting to the road network. Matters such as visibility splays for pedestrians and vehicles are covered, together with cycle, bus and rail transport accessibility. UTILITY OVERVIEWS Is the site likely to be served adequately by drainage, water supply, gas and electricity supplies including broadband internet and mobile telecommunications services? Answering this question forms the basis of the Overview in order to establish the quality of anticipated services and what might be expected in the future as part of utility company development programmes AT PROJECT FEASIBILITY STAGE CONDITIONS ASSESSMENTS A thorough investigation and assessment of ground conditions and stability is an essential stage of any project in order to determine issues such as: • Whether a site is suitable • Where the best place to locate any buildings or infrastructure might be • Types and sizes of any foundations DRAINAGE AND FLOODING ASSESSMENTS • A Flood Risk Assessment is a requirement of all planning applications for major developments and developments proposed in areas at risk of flooding. A Flood Risk Assessment may also be requested for sites in a low risk flood zone where a risk from another source is identified such as surface water. • Site specific Flood Risk Assessments, for all types of developments, in all Flood Zones countrywide, in accordance with the requirements of the National Planning Policy Framework, TAN 15 (Wales) and the detailed guidelines set out in CIRIA Report 624. This work is done for all types of developments from single units through to major residential, office, retail and industrial developments When a project is proposed, an important first step towards making it happen is to assess the value, plausibility and potential of the work. A feasibility study involves an in-depth exploration that looks at every aspect, aiming to generate an objective picture of cost, benefits and risks before going ahead, essentially to determine whether or not it’s realistic.
  • 5. TRANSPORTATION PLANNING Is the process of defining policies, goals, investments and designs to prepare for the needs to move people and goods to destinations. It involves the input of stakeholders including government agencies, the public and private businesses. UTILITY COORDINATION Utility coordination comprises organising electricity, cable telecommunications, water, gas, drainage and sewerage installation. SURFACE WATER AND FOUL WATER DRAINAGE STRATEGY Planning applications for major developments are required to submit a Sustainable Drainage Strategy showing how sustainable drainage systems (SUDS) will be used, it includes determining methods of sewage disposal from sites. FLOOD RISK ASSESSMENTS (FRA) The FRA determines the chance of flooding from all flooding mechanisms, identifying mitigation measures and advising on actions to be taken when flooding occurs due to: • Groundwater, vadose water and surface water • Burst water mains, canals, rivers, streams, watercourses, sewers GEO-ENVIRONMENTAL ASSESSMENT An assessment of ground conditions for projects includes geology, hydrology, hydrogeology and soil conditions of a site including contaminated land involving: • outline foundation assessments, soil sampling, remediation method statement • chemical and geotechnical testing, risk assessments of soil and ground water UP TO PLANNING APPLICATION ECOLOGICAL ASSESSMENT (EA) – BIRD, BADGER, LIZARD AND HABITAT SURVEYS This is the monitoring of ecological resources to discover current and changing conditions, being required components of hazardous waste site investigations. INVASIVE SPECIES (KNOTWEED, GIANT HOGWEED) CONSULTANCY AND ERADICATION If there are invasive species on your site we have the necessary experience and expertise to advise of legal and commercial implications of the issue. LAND AND ARBORICULTURAL SURVEYS What is the extent of the site? What services, structures, trees and significant features are on it? Are there trees and of which species? Will the trees cause subsidence affecting the design of foundations? Where are the utility services? INFILTRATION TESTING (SOAKAWAYS) Soil percolation tests are required to determine the absorption rate of soils for the design of soakaways. Percolation testing is observing how quickly a known volume of water dissipates into the subsoil of a hole of known surface area. CONTAMINATED LAND ASSESSMENT Contaminated land has substances in or under it hazardous to health or the environment. It includes mining, chemical/ oil spills and waste sites and can occur naturally as a result of the geology of the area or through agricultural/industrial use. Making a Planning Application and gaining Planning Permission is important, often making the difference between whether or not a project proceeds to design. Many clients will be unwilling to commit to detailed design until they have achieved a Planning Permission.
  • 6. SLOPE STABILITY Slope stability is the potential of soil covered slopes to withstand and undergo movement. Stability is determined by the balance of shear stress and shear strength. SOAKAWAY DESIGN Soakaways have been the traditional way to dispose of storm water from buildings and paved areas remote from a public sewer or watercourse. In recent years, soakaways have been used within urban, fully-skewered areas to limit the impact on discharge of new upstream building works and to avoid costs of sewer upgrading outside a development. DRAINAGE DESIGN There are numerous permutations for drainage design and optimising the solution can have a significant impact on development costs and opportunities. HIGHWAYS DESIGN This work must take into account future traffic flows, the design of highway intersections/interchanges, geometric alignment and design, highway pavement materials and design, structural design of pavement thickness, and pavement maintenance. SWEPT PATH (TURNING CIRCLE) Swept Path or vehicle tracking is a comprehensive transportation analysis and design solution, used to evaluate vehicle movements where space constraints are an issue. CUT AND FILL / VOLUMES Optimising cut and fill earthwork volumes created through the moving or processing of parts of a site is an important aspect of civil engineering. BASEMENT IMPACT ASSESSMENT (BIA) The Utilisation of basement opportunities for new and refurbished developments is increasingly common. DETAILED DESIGN OTHER AREAS OF EXPERTISE At vkhp-consulting, we offer design services to all sectors of construction for projects of all sizes. With an expertise in high quality, one off residential properties in the southeast, we also have an outstanding reputation for commercial, and public projects. We are specialists in basement design, ground movement and subsidence, and all aspects of insurance claims following damage from escape of water, fire, flood, impact and storm. We act for loss adjusters, insurance companies, banks and private clients. We are also members of the Faculty of Party Wall Surveyors and can provide expert advice on the Party Wall Act 1996. Visit our website for more information on the design services we can offer. CONTACT US: info@vkhp.co.uk Tunbridge Wells: 01892 521841 Dorking: 01306 881012 Storrington: 01903 740090 www.vkhp.co.uk @vkhpconsulting /vkhpconsulting vkhp consulting Ltd