SlideShare a Scribd company logo
1 of 20
Download to read offline
urbandevelopment capability




w w w. m e i n h a rd t g ro u p . c o m
tablEoF cOntEnts



                                  CompanY proFIle ........................................................... 1

                                  total InteGrated solutIons ..................................... 2

                                  1.     Infrastructure and environment .............................. 3

                                  2.     urban land development ......................................... 4
                                  2.1    Relevant Project Experience ............................................................ 6

                                  urban renewal & public realm awarded projects .......... 17




| urban development CapabIlItY statement |
cOmpanyPRofilE


                                  Meinhardt Consulting Engineers was     meinhardt’s project consulting services
                                  established in Australia in 1955 and   focus on key market sectors including:
                                  now operates in 12 countries over
                                                                         prOpErty
                                  four continents.
                                                                         >     urban land Development
                                  We are recognised as a leading
                                  global provider of planning,           >     buildings
                                  engineering and technology services.   >     industrial
                                                                         >     leisure & recreation
                                                                         >     retail
                                                                         >     EsD/sustainability
                                                                         >     planning
                                                                         >     statutory & strategic
                                                                         EnVirOnmEnt
                                                                         >     Waste management
                                                                         >     Hydrogeology
                                                                         >     contaminated soil
                                                                         >     Water Quality
                                                                         >     Environment planning
                                                                         transpOrt
                                                                         >     aviation
                                                                         >     road
                                                                         >     rail
                                                                         the scope of services offered includes
                                                                         master planning, feasibility studies,
                                                                         benchmarking, energy audits, design,
                                                                         documentation, tendering,
                                                                         supervision during construction,
                                                                         commissioning, post contract evaluation
                                                                         and asset management.
                                                                         these services are provided by our
                                                                         offices throughout Australia, Asia,
                                                                         united Kingdom and the us
| urban development CapabIlItY statement p. 1 |
tOtalInteGrated sOlutiOns


                                  meinhardt is one of the very few           solution that has the flexibility to cater
                                  multi-disciplinary firms operating on      for changing conditions and provide
                                  a global basis. Our engineers work in      “added value” to the client.
                                  an integrated environment and hence
                                                                             the meinhardt Group maintains a
                                  appreciate the interfacing requirements
                                                                             centralised technology and knowledge
                                  of all disciplines. integration has been
                                                                             base such as information technology,
                                  demonstrated to benefit our clients by
                                                                             technical development, leading edge
                                  ensuring solutions are fully coordinated
                                                                             design solutions just to name a few.
                                  and holistic.
                                                                             as a result of this structure our various
                                  as a multi-disciplinary practice we
                                                                             disciplines can access and share all
                                  provide a total engineering team
                                                                             the knowledge and technology gained
                                  approach to all aspects of engineering
                                                                             and/or developed by the offices at the
                                  including building services, civil,
                                                                             various geographical locations.
                                  structural, facade, environmental and
                                  infrastructure.                            this also enables us to readily
                                                                             undertake national and international
                                  Our philosophy is simple: our clients’
                                                                             projects in a single or multi-project office
                                  needs are paramount. yet determining
                                                                             environment.
                                  those needs is rarely a simple task.
                                  in order to produce the ultimate           Further details in the diversity of the
                                  engineering solution, we take the time     meinhardt Group can be found on our
                                  to understand our clients’ business and    Group website –
                                  all relevant factors. the outcome is a     www.meinhardtgroup.com.




| urban development CapabIlItY statement p. 2 |
1.        inFrastructurE&
                                            envIronment


                                  meinhardt has successfully built up         meinhardt’s client-focused commitment
                                  their infrastructure and Environmental      and long and distinguished experience
                                  business worldwide and now                  in public works and private infrastructure
                                  designs and manages large civil and         provide our clients with confidence that
                                  infrastructure project for Government,      dependable yet state-of-the art solutions
                                  institutional, private sector and aid       to today’s projects will be achieved, on
                                  agency clients. many of these are           time, and on budget.
                                  multi-disciplinary projects in which we
                                  engage the best international expertise
                                  appropriate for the project and location.
                                  Our infrastructure and Environmental
                                  teams are integrated internationally
                                  and each office draws upon staff and
                                  expertise from other to supplement
                                  as needed. through this approach
                                  meinhardt has built an enviable
                                  international record in infrastructure,
                                  civil and environmental work.




| urban development CapabIlItY statement p. 3 |
2.         urbanland dEvEloPMEnt


                                  meinhardt is committed to ensuring our         meinhardt provide supplementary
                                  clients gain maximum value from their          strengths in:
                                  assets, while minimising the overall
                                                                                 >      Environmental Engineering
                                  costs. We can take care of all aspects of
                                  your urban and land development, from          >      Water resources
                                  the initial feasibility, outline development   >      Golf course Engineering
                                  plans and environmental impact studies
                                                                                 >      landscape architecture
                                  to full design and project management.
                                                                                        Engineering
                                  meinhardt’s track record in land
                                                                                 Our design teams are regularly invited
                                  development extends from commercial
                                                                                 to provide engineering solutions to
                                  projects such as the Fort bonifacio
                                                                                 landscape and golf course architects
                                  Global city (philippines) and bintan
                                                                                 where sensitivity to the final built form
                                  island international resort (indonesia),
                                                                                 is paramount.
                                  to Earth sanctuaries Eco-tourism
                                  resort (Victoria, australia) and
                                  numerous residential land sub-divisions
                                  throughout australia and across asia.
                                  a successful land development
                                  project requires a point of difference
                                  to maximise land value. Meinhardt
                                  has a commitment to providing
                                  environmentally sensitive engineering
                                  solutions to maximise aesthetic value.
                                  to service our land development
                                  projects,




| urban development CapabIlItY statement p. 4 |
2.1 RELEVANTproJeCt EXpEriEncE




Greenvale                                  Mosaic living, lalor                      Silverwoods Yarrawonga

this 500Ha site will continue              mosaic living is a staged 475 lot         silverwoods is an iconic residential
development over the next 10 years         residential infill development located    and recreational development
on 4 different fronts with linkages        on 57 hectares of the former lalor        occupying 160 hectares on the bank
to all residential and recreational        Public Golf Course approximately 17       of lake mulwala. the development will
developments surrounding the               kilometres north of the melbourne         provide a thomson perrett designed
Greenvale reservoir. the sub-              cbD. mosaic has been planned              championship golf course, clubhouse,
divisional development incorporates        around a “piazza” in the centre of        hotel, serviced apartments and a
4,000 housing lots, schools, retail        the development which incorporates        minimum of 850 residential allotments.
precinct, child care, medical and aged     shops and cafes and provides a hub for
                                                                                     meinhardt is preparing the site master
care facilities.                           the community to interact. mosaic is
                                                                                     plan to take into account the sensitive
                                           delivering a retirement Village and two
meinhardt is the principal consultant,                                               environmental issues and to undertake
                                           football ovals and landscaped public
providing engineering planning,                                                      detailed design, documentation and
                                           open space for walking tracks and
complete design and documentation,                                                   construction management of the civil
                                           outdoor activities.
construction management and contract                                                 infrastructure for the residential and golf
management services for the full project   Habitat zones for the endangered          elements.
development.                               growling grass frog are to be provided
                                                                                     Services offered include:
                                           along with the provision of a wetland /
urban development and infrastructure                                                 >    civil engineering for bulk
                                           retarding basin system to manage storm
engineering works include bulk                                                            earthworks, pavement,
                                           water generated by the development.
earthworks, road works, sewerage,                                                         sewer, water and storm water
water reticulation, electrical and         meinhardt has been engaged to                  management.
telecommunications networks.               provide:
                                                                                     >    Water sensitive urban Design.
Drainage works include the creation        >    civil engineering for bulk
of the reservoir protection bund, pipe                                               >    Environmental management
                                                earthworks, pavement,
networks, retarding basins, wetlands                                                      strategies and monitoring.
                                           >    sewer, water and storm water
and water sensitive urban design.                                                    >    Hydrogeological investigations.
                                                management.
location: victoria, Australia                                                        >    relevant authority approvals.
                                           >    Water sensitive urban Design
                                                (WsuD) implementation.               location: victoria, Australia
                                           >    Environmental investigations and
                                                remediation monitoring.
                                           >    relevant authority approvals.
                                           >    construction management.
                                           location: victoria, Australia



| urban land development CapabIlItY statement p. 5 |
2.1 RELEVANTproJeCt EXpEriEncE




Cornell’s Hill Estate                      the oaks, Cessnock                            toolern Structure Plan,

meinhardt has been engaged for the          the redevelopment of the cessnock            the toolern structure plan is the largest
design and construction management         Golf club located in the Hunter Valley        strategic planning project undertaken
of the internal and external civil         of new south Wales will deliver a             within melbourne’s growth areas.
infrastructure. cornell’s Hill Estate is   residential and recreational estate           the toolern Growth area is located
located approximately 30km north of        comprising a Jack newton designed             in the shire of melton and covers
melbourne at the north-west corner of      championship golf course, clubhouse           approximately 2,400 hectares to the
yan yean road and cookes road in           and hotel. the development is sited           south east of the melton township.
Doreen within the city of Whittlesea.      on approximately 77 hectares and              toolern is projected to provide
                                           will incorporate a minimum of 150             approximately 24,000 new dwellings
This 21ha site comprises of 225 lots
                                           residential allotments within the             for 60,000 new residents over the next
and 1.0ha reserve. The estate will be
                                           golf course.                                  20 years along with 500 hectares of
developed in five stages. Meinhardt
                                                                                         employment land.
was engaged by the developer GEO           meinhardt has been appointed
properties pty ltd as consultants          to prepare the storm water                    meinhardt were engaged as the
on Stages 1 & 2 and major external         management strategy for the site              engineering consultant to support the
infrastructure works. Stages 1 &           to take into account the numerous             macroplan australia lead project team
2 comprises of approximately 95            environmental issues and to undertake         to provide strategic advice regarding the
lots ranging from 600 sqm to 1300          detailed design, documentation and            provision of services infrastructure to
sqm. subdivision works included            construction management of the civil          the study area.
construction of roads, drainage,           infrastructure for the residential and golf
                                                                                         Our role required high level liaison
sewerage, water mains, electricity, gas,   course elements.
                                                                                         with the consultant team and relevant
telecommunication and retaining walls.
                                           services offered include:                     stakeholders to identify the proposed
External works included 1.2km of           >    storm water modeling                     location and size of trunk roads, water,
melbourne Water main Drainage works                                                      sewer, electricity, communications
                                           >    civil engineering for bulk
pipe size ranging from 1050 dia to 1650                                                  and storm water assets and to provide
                                                earthworks, pavement,
dia, approx 900m of 225 dia reticulation                                                 indicative construction cost estimates
                                                sewer, water and storm water
sewer and 1km of Yarra Valley Water                                                      to assist with the preparation of the
                                                management.
branch sewer. Works also included                                                        toolern development contributions plan.
upsizing of approx 1km of existing         >     Water sensitive urban Design
                                                (WsuD) implementation.                   location: Melton South
150 dia water main to 225 dia along
yan yean road and reconstruction of        >    Environmental management
cookes road.                                    strategies and monitoring.
location: doreen, Australia                >    relevant authority approvals.
                                           >    construction management..
                                           location: Cessnock, Sydney


| urban land development CapabIlItY statement p. 6 |
2.1 RELEVANTproJeCt EXpEriEncE




Waterfront City docklands                  la Perouse                                 Hervey Bay

Waterfront City is a 19.3-hectare parcel   This 178 Lot Australand development        Hervey bay is a 450 hectare multi-
of land comprising a unique and scarce     integrates earthworks design               use resort situated in Hervey bay,
water frontage to Victoria Harbour and     (180,000m3) with golf course lake/         Queensland. the development
a strong 550m presence to Footscray        mounding to lift the proposed              comprises of:
road. meinhardt has already been           development above the1 in 100 year
                                                                                      A 5-6 star and a 3-4 star resorts
commissioned by the developer to           flood plain. Water sensitive urban
                                                                                      complex including accommodation,
provide multi-disciplinary engineering     design features include wetlands,
                                                                                      apartments, restaurants, bar and
services for the project.                  grassed swales, and separating roof
                                                                                      other facilities including a 18 hole
                                           and road drainage paths. The existing
 meinhardt will undertake full                                                        championship private and public golf
                                           swampy natural ground slow settlement
consultancy services for:                                                             courses with pro shop, driving range
                                           rate significantly increased through the
>    infrastructure                                                                   and practice green, water theme park,
                                           provision of 37,000 wick drains and a
                                                                                      football / multi purpose stadium and
>    Environment -                         horizontal sand drainage medium with
                                                                                      local retail village.
>    Fire                                  geotextile reinforcement.Clerk of Works
                                           & superintendency of the site was also     meinhardt has been appointed to
>    Hydraulics.
                                           undertaken by meinhardt.                   prepare a preliminary development plan
the development will incorporate                                                      for the site and also a development
                                           location: victoria, Australia
a waterfront piazza public marina                                                     definition report to allow for a detailed
boutique residential accommodation                                                    master plan study to be developed.
retail waterfront restaurants and bars
                                                                                      location: Queensland, Australia
a high level of landscaping and open
public space and an entertainment
precinct. this appointment follows
on from our recent engagement as
Environmental assessor on the project.
the project will be developed in stages
over some 8-10 years
location: Melbourne, Australia




| urban land development CapabIlItY statement p. 7 |
2.1 RELEVANTproJeCt EXpEriEncE




Essendon fields - Urban                     Royal Rehabilitation Centre, Ryde            Carlton United Brewery
Regeneration
                                            royal rehabilitation centre have             meinhardt were engaged to assist in
Essendon airport pty ltd, a joint venture   proposed to consolidate their facilities     the tender bid phase for the purchase
between Linfox Property Group and the       on their existing 19 hectare site to a new   of the site. in particular meinhardt were
becton Group, has appointed meinhardt       facility on a 2 hectare parcel of land on    responsible for verifying the concept
as principal consultant to assist in the    the site. as such it is proposed that the    design and revising design concepts for
preparation and implementation of the       remaining 17 hectares be redeveloped         the development which comprises a 6ha
Essendon airport redevelopment master       into a mixture of high, median               mixed residential, retail and commercial
plan. this includes a regeneration          residential apartments and townhouses        development with new roads, services
of approximately 70 Ha in the               with up to 690 dwellings, as well as         and central park. On completion the
northwestern sector of the site as a high   new community facilities such as gym,        development will comprise about 1600
quality commercial establishment.           swimming pool and community centre.          apartments, 89,000m2 of commercial
                                            as part of these works                       and retail space.
meinhardt is providing the following
services:                                   it is proposed that the land will be         in reviewing the development
                                            subdivided and new roads, stormwater         masterplan for the prospective
>     Environmental monitoring and
                                            detention basin, utility services and        purchaser meinhardt were responsible
      management strategies;
                                            parks will be provided.                      for concept design of stormwater
>     civil engineering for pavements,
                                            meinhardt were engaged to review the         drainage, WsuD, detention and
      sewer, water and stormwater
                                            master plan and undertake engineering        treatment systems as well as evaluation
      management;
                                            Da design for road, drainage and             of the road geometry, service corridor
>     Water sensitive urban Design                                                       planning and preliminary sizing and
                                            infrastructure works including major
      (WsuD) implementation;                                                             design of electrical, telecommunications
                                            intersections with Victoria road and
>     services engineering for electrical   a pedestrian bridge over Victoria            and hydraulic services. in addition
      and gas reticulation;                 road. in addition meinhardt were             meinhardt have undertaken a
>     specialist services including EsD     responsible in identifying the location      preliminary review of the contamination
      and fire services;                    of existing services on and adjacent         issues on site and provide advice
                                            to the site as well as determining what      how these works will impact on the
location: Melbourne, Australia                                                           development and how the site can be
                                            additional lead-in works are required
                                            for development of the site. as a result     remediated
                                            of these investigations it was revealed      location: Chippendale, nSW
                                            that substantial services upgrades are
                                            required offsite.
                                            location: Sydney, Australia




| urban land development CapabIlItY statement p. 8 |
2.1 RELEVANTproJeCt EXpEriEncE




Stamford Apartments                         Storm Retirement village                  Carnegie Cove

stamford have proposed to build a           meinhardt have been engaged to            carnegie cove is an integrated golf
residential apartment tower and retail      undertake the concept and detail design   course and residential subdivision
centre in Gloucester street sydney. part    of the civil and stormwater works for     located on the north coast of new south
of this work involves the construction      the proposed retirement village. the      Wales. Significant Environmental and
of 2 levels of basement car parking         development is to comprise a 125 bed      planning studies were undertaken
which will extend under the adjacent        hostel and 54 self car units set on a     to protect the local flora and fauna.
cumberland street. as such it is            6 ha site.                                reclaimed water for irrigation is sourced
proposed to excavate Cumberland                                                       from the existing township scheme.
                                            meinhardt were responsible for road
street to construct these works and         and earthworks design as well as site     location: Bonny Hill, nSW
then reconstruct the road to the new        stormwater drainage and detention.
levels to suit the development and site
constraints.                                as the site was subject to substantial
                                            flooding it was necessary to design a
meinhardt were engaged to undertake         stormwater detention system which
the detail design of both the structural    was above the flood impacts of the
and civil works on the project. in          surrounding areas.
particular the civil works comprised
                                            location: Sydney, nSW
the redesign of a 250m section of
Cumberland Street between Essex
street and Grosvenor street. this
section of road is subject to flooding
due to a trapped low point in the road
which resulted in flooding to an adjacent
building. as a result of reconstructing
the road, meinhardt proposed the road
to be regraded to minimise the trapped
low point and remove the risk of future
flooding of the building. In addition
meinhardt were responsible for the
design road and drainage works and
coordinate services in the new road
construction.
location: the Rocks, nSW




| urban land development CapabIlItY statement p. 9 |
2.1 RELEVANTproJeCt EXpEriEncE




Greens Beach Golf Club inc                  Croydon Golf Club Relocation             Whittlesea Golf Course

Greens beach is to be a world-class         meinhardt have provided environmental    the proposed Whittlesea Golf
golf, recreation and residential facility   and infrastructure advice for the        Course will be the first new 18-hole
located on existing golf course land        proposed relocation of croydon Golf      championship grade public Golf course
situated at Greens beach, tasmania.         course to a new site in yering. Works    to be developed in melbourne in more
the thomson perrett designed                during the preliminary and planning      that 15 years.
18-hole golf course is to include a new     stages included:
                                                                                     meinhardt have been commissioned
clubhouse, 230 fully serviced housing       >    advice on service options           by the city of Whittlesea and Graeme
lots and 32 serviced villa units.                including use of reclaimed water    marsh Golf Design to provide all
meinhardt has been appointed to assist           for irrigation                      engineering services relating to the Golf
in the preparation of the site master       >    Phase 1 Environmental Site          course design. the site is located in an
plan to take into account the sensitive          assessment                          area of State Environmental significance
environmental issues and to undertake       >    investigation of soils and          with development being controlled
detailed design and documentation                groundwater studies of fauna and    by environmental and archaeological
of the civil infrastructure for the              flora on the site and in adjacent   overlays defined in the City of
development.                                     waterways                           Whittlesea planning scheme.
services offered include:                   >    Environment improvement plan        the site is dissected by a
>    Environmental monitoring and                for use of reclaimed water for      natural waterway. Hydraulic and
     management strategies;                      irrigation                          hydrogeological modelling and a site
                                            >    Environmental management plans      Environmental management plan will
>    Hydrogeological engineering;
                                                 for construction and operation      ensure minimal environmental impact
>    civil engineering for bulk                                                      on the waterway. Treated effluent from
     earthworks, pavement,                  >    a referral to the Department of
                                                                                     yarra Valley Water will be used for
     sewer, water and stormwater                 Environment and Heritage under
                                                                                     irrigation.
     management;                                 the Environment protection and
                                                 biodiversity conservation act.      meinhardt are also providing all
>    Water sensitive urban Design
                                                                                     structural and building services
     (WsuD) implementation;                 location: victoria, Australia
                                                                                     Engineering for the new clubhouse.
location: tasmania, Australia
                                                                                     location: victoria, Australia




| urban land development CapabIlItY statement p. 10 |
2.1 RELEVANTproJeCt EXpEriEncE




Golfam Golf Course, Penrith                  Chirnside Park Activity Centre: Urban     Australia Gardens
                                             design Master Plan
Golfam obtained development consent                                                    the rGb’s australia Garden
from penrith city council to construct       meinhardt is currently engaged by yarra   cranbourne is the largest public park
the panthers Golf course, penrith. the       ranges shire to provide sustainable       development in Victoria in 120 years.
proposed works included modifications        engineering solutions for the soon to     meinhardt close association with
to peach tree creek as well as the           be released chirnside park activity       landscape architect taylor cullity and
construction of permanent water bodies       centre master plan. the master            lethlean has allowed a number of
within the immediate vicinity of the         plan is to provide a thriving mixed-      innovative designs that emphasis an
creek.                                       use centre, comprising a full range       ‘invisible’ approach to infrastructure.
                                             of retailing, entertainment functions,
the works completed on site to date                                                    Hydrogeology has been the key to the
                                             professional services and community
varies from the originally approved                                                    site where natural groundwater level
                                             facilities incorporating a diversity of
works. as such, it has been requested                                                  modelling has determined planting
                                             medium and higher density residential
by council that investigations be                                                      regimes and water body extents. Our
                                             living opportunities that provide added
performed regarding the impact of the                                                  in-house expertise in environmental and
                                             vibrancy to the centre.
as built works on the site hydraulics                                                  hydrogeological design has been greatly
and flooding, with respect to the original   meinhardt is providing inputs for the     appreciated by tcl & rbG design
concept.                                     incorporation of Water sensitive urban    teams.
                                             Design (WsuD) and stormwater
Following construction meinhardt were                                                  location: victoria, Australia
                                             management, collection and re-use into
engaged by Golfam to undertake a
                                             the master plan.
review of the as built levels to determine
the following:                               location: Chirnside Park, Australia
>     Where site levels are higher/lower
      than the proposed design levels
>     Extent of departure from original
      design (including cut and fill
      volumes)
>     likely effect of works on the
      floodwaters, flood levels and
>     compare the pre-developed to the
      post-developed levels.
>     Identify areas where significant
      change in level has occurred and
location: Sydney, Australia




| urban land development CapabIlItY statement p. 11 |
2.1 RELEVANTproJeCt EXpEriEncE




Craigieburn Bypass                            Essendon fields - northern Access             City link Project

the abigroup is carrying out the              Within Victoria, miE are currently            The $1.8 Billion City Link Project
construction of a freeway connection          providing full consultancy services for       consists of approximately 22km of
from the northern ring road to the            the planning, development and delivery        freeway cutting through the heart
Hume Freeway bypassing craigieburn.           of the twelve million dollar northern         of melbourne. the project joins
abi Group engaged meinhardt                   access road project on behalf of              three of melbourne’s largest arterial
to document several impressive                Vicroads, who will become the eventual        freeways consisting of two tunnels and
architectural features that are to be         asset owner, and Essendon airport.            numerous bridges and many km of
incorporated into the freeway link                                                          elevated freeway. services provided by
                                              this project involves duplicated
                                                                                            meinhardt included:
these include a sweeping curtain wall         elevated carriageways across the
leading into a half circle pedestrian         tullamarine Freeway between airport           >    Environmental auditing of
bridge crossing the freeway, also a           West and Essendon airport, and new                 construction sites.
series of 10m louvers that rotate in plan     freeway exit and entry ramps. VicRoads        >    preparation and review of site
and in elevation to give a variety of         will become the asset owners at the                Environmental action plans (Eap)
visual effects to the driver. there is also   culmination of the defects liability period        and Environmental management
an acrylic scrim wall, which will be lit      managed by miE. the design and                     plans (Emp).
underneath to highlight a sand blasted        construct contract is being delivered by      >    monitoring of wastewater disposal
pattern.                                      abigroup in accordance with Vicroads               from site
                                              standard specifications
Vicroads engaged taylor and cullity                                                         Due to the city link project remaining
lethlean along with meinhardt at the          location: Melbourne, Australia                in the public spotlight throughout all
tender development stage to provide                                                         stages, meinhardt assisted the lead
an exciting group of elements along                                                         contractor in providing a state of the
the freeway. these features will set this                                                   art environmental management system
road apart but also provide function in                                                     throughout the projects construction.
protecting neighbouring properties from
road-generated noise.                                                                       location: Melbourne, Australia .

location: victoria, Australia




| urban land development CapabIlItY statement p. 12 |
2.1 RELEVANTproJeCt EXpEriEncE




Geelong Waterfront- Carousal                 Melbourne Showgrounds                      Sandhurst Club development
Pavilion
                                             the project involved engineering           the sandhurst club is located on
meinhardt were the structural engineers      masterplan for a $100 million              thompsons road, skye, in melbourne’s
for the carousel building, an integral       dollar upgrade of existing facilities      southeastern suburbs. the master
part of the Geelong Waterfront               incorporating a four storey office         planned development occupying 320
redevelopment that houses an operating       complex, 7000 seat sports stadium,         hectares offers 2 thomson perrett
19th century steam carousel. It is a steel   exhibition hall of 20,000 square metres,   designed championship golf courses,
and glass building with an interesting       and kilometers of internal site utility    associated club facilities, 1850
roof shape with the steel frame of the       reticulation                               residential allotments and extensive
building consisting of six ‘umbrella’                                                   landscaped tracts. Future expansion
                                             location: Melbourne, Australia
frames each measuring 12x12 meters                                                      to the club precinct over the next 5 to
in a 3x2 array. The steel structure is                                                  8 years will include a health club, hotel
exposed and utilizes a wide range of                                                    and business centre, childcare centre
hollow sections. the main arms of                                                       and the national headquarters of the
the umbrellas are sculpted fabricated                                                   professional Golfers association of
boxes. The structure of the pavilion is                                                 australia.
a classic example of how steel can cost
                                                                                        meinhardt has been appointed to
effectively form the basis of a visually
                                                                                        provide civil and environmental services
striking building.
                                                                                        to assist in the development of the
location: victoria, Australia                                                           site master plan and preparation of
                                                                                        associated construction cost estimates.
                                                                                        the sandhurst club has recently been
                                                                                        awarded the urban Development
                                                                                        institute of australia national award.
                                                                                        location: victoria, Australia




| urban land development CapabIlItY statement p. 13 |
2.1 RELEVANTproJeCt EXpEriEncE




Waterfront City – Environmental         Rose Grange                                former Herald & Weekly times
                                                                                   Building
meinhardt was appointed by Waterfront   meinhardt infrastructure & Environment
city Developments, a joint venture      were engaged to undertake an               meinhardt has been appointed by
between inG real Estate and the         environmental site assessment for a        australian super Developments as the
lewis land Group, as the contaminated   large residential developmental site,      contaminated land consultant for the
land consultant for the proposed        for the Dennis Family corporation.         redevelopment of the former Herald &
Waterfront city site at Docklands in    the proposed development consisted         Weekly times building.
melbourne.                              predominantly of commercial, residential
                                                                                   the site is being redeveloped for high
                                        purposes as individual subdivisions and
meinhardt was commissioned to                                                      density residential and commercial
                                        a retirement village.
undertake the following:                                                           use. meinhardt were commissioned to
>   Due diligence advice during the     The site was approximately 6 ha            undertake the following:
    developer bidding phase including   in area. it has reported elevated          >    Detailed soil environmental site
    financial liabilities assessment    concentrations of certain environmental         assessment
    associated with contaminated land   contaminants in surface soils resulting
                                                                                   >    Validation of in-situ soils following
    issues;                             from historical land use. meinhardt was
                                                                                        the removal of underground tanks
                                        engaged to remediate the site and an
>   Detailed soil and groundwater                                                       and ink pipework;
                                        Epa appointed auditor is overseeing the
    environmental site assessment;                                                 >    Development of soil disposal and
                                        remediation.
>   acid sulfate soil assessment;                                                       tank extraction guidelines for
                                        meinhardt were engaged to undertake             building contractors;
>   Geophysical survey to locate
                                        soil sampling, assessment and site
    previously unidentified                                                        >    preparation of environmental
                                        remediation.
    underground storage tanks;                                                          management plans including a site
>   Excavation and disposal of          location: victoria, Australia                   Environmental management plan
    approximately 30 underground fuel                                                   (sEmp) for construction works,
    storage tanks;                                                                      an acid sulfate soil management
                                                                                        plan and a Groundwater Quality
location: Melbourne, Australia                                                          management plan.
                                                                                   location: Melbourne, Australia




| urban land development CapabIlItY statement p. 14 |
2.1 RELEVANTproJeCt EXpEriEncE




Bintan Beach international Resort &        fort Bonifacio Global City                 defence Housing - islamabad
Waste Management Strategy
                                           master civil Engineering coordinators      the project comprises a new
The project comprises a 23 000             for the ongoing construction of manila’s   development of 1500-acre Phase-I
Hectare (1/3 size of Singapore)            new 440 Ha central business District       Extension and redevelopment of
“mega-resort” on bintan island.            for Fort bonafacio Development             900-acre existing Phase-I in Defence
meinhardt (singapore) is responsible       corporation.                               Housing, islamabad. the project
for the masterplanning , design,                                                      is envisaged to be a high-class
                                           the project involves supplying a
documentation, construction phase                                                     development comprising residential and
                                           team of engineers, draftsperson, and
services and overall coordination of the                                              commercial plots, public amenities like
                                           GIS expertise to coordinate local
infrastructure services. infrastructure                                               schools, colleges, parks, playgrounds,
                                           and international consultants and
includes roads, water supply, waste                                                   stadiums, sports complex, town halls,
                                           contractors to facilitate coordinated
management, stormwater, power                                                         community centres, club houses,
                                           plans and construction staging of this
and communications. the project                                                       libraries, mosques, utility buildings and
                                           Greenfield site
also involved a detailed review of                                                    other ancillary facilities.
solid Waste management systems             location: Manila, Phillipines
                                                                                      meinhardt is responsible for complete
to ensure the development of World                                                    project management, town/ master
class facilities. the ultimate resort                                                 planning of the Development, Detailed
masterplan comprises in excess of                                                     infrastructure Engineering Design
22 000 Ha with a projected 680 000                                                    (roads, Water supply, sewerage,
equivalent population.                                                                Drainage, Electricity, telephone, etc.),
location: Bintan island, indonesia                                                    Detailed architectural & Engineering
                                                                                      (civil, structural, mechanical, plumbing,
                                                                                      Electrical, Fire services), Design of
                                                                                      amenities and Detailed supervision
                                                                                      during construction
                                                                                      location: islamabad, Pakistan




| urban land development CapabIlItY statement p. 15 |
2.1 RELEVANTproJeCt EXpEriEncE




Hong Kong Park                              Golden Palms Residential Estate-            lake City

meinhardt is the structural consultant      Golden palms is one of the most             Lake City is a 1700 acres resort /
of this leisure park, which is on part of   prominent projects recently launched        residential development planned on
the previous Victoria barracks. major       in Gwadar – the new port city of            the verdant outskirts of lahore city.
structures within the park area are         pakistan. it is situated at the Western     the proposed project, conceived in
Green House, indoor Games Hall,             end of the city overlooking the Gwadar      two phases, bella Vista and bella
sculpture, ceramics and print centre,       West bay. this prestigious residential      Verde, is planned around an 18-hole
Garden plaza, lakes, etc. the site area     development, spanning 1000 acres            regulation Golf course with the course
is approx. 100,000m2.                       along the pristine waters of the Gwadar     greens meandering and interspersed
                                            beach, promises an exclusive lifestyle      amidst luxury villas with Mediterranean
location: Hong Kong, Hong Kong
                                            with its breathtaking vistas and wealth     accents. meandering water channels
                                            of quality amenities i.e. hotel, shopping   and fountains interlace the scheme
                                            plaza, community centers, sports            weaving this exclusive development
                                            facilities, urban parks and piazzas and     into the rural landscape reminiscent of
                                            ancillary facilities including a water      the agricultural and cultural heritage of
                                            desalination plant.                         lahore. this self-contained community
                                                                                        also offers its residents a world-class
                                            meinhardt are the principal consultants
                                                                                        country club, shopping malls, stadium,
                                            - providing master planning,
                                                                                        schools, hospitals, mosques, town
                                            architecture, infrastructure engineering,
                                                                                        centers and commercial districts.
                                            and project / construction management
                                            services. infrastructure planning and       location: lahore, Pakistan
                                            design include earthworks, roads,
                                            bridges, culverts, under/over-passes,
                                            water supply, sewerage, drainage,
                                            electrical and telecommunication
                                            networks.
                                            location: Gwadar, Pakistan




| urban land development CapabIlItY statement p. 16 |
2.1 RELEVANTproJeCt EXpEriEncE




Shanghai tianma Golf and Country           Sunnyville Residential & Golf Course         the lagoons dubai
Club                                       development
                                                                                        meinhardt singapore were appointed
the project involved the development       Sunnyville involves the conversion of 98     as the principal consultant for the
of a 36 hole golf course integrated with   hectares of fishponds built on alluvial      lagoons - la Ville contemporaine area
a 39 Ha lake system of depth greater       mudflats into a high class residential       2 (Contract No. DIP-0410.B.03b). The
than 6 metres. Surrounding canals          and golf course development. the site        mixed-use development, developed by
connect to the lakes through mechanical    formation includes the importation of        the prominent sama Dubai Group, is
inlet and outlet structures. irrigation    4.5 million m³ river sand from mainland      part of the multi-billlion “the lagoons”
requirements are serviced from the lake.   china to the site, spreading and             project in Dubai. the project (area 2)
                                           compacting over the existing marine          comprises 28 blocks of 10-20 storey
location: Shanghai, China
                                           layers then improving the ground by          towers for retail and residential usage
>                                          combinations of stone columns and            with full amenities for luxurious and
                                           surcharge for housing areas (1500 units      modern living standard. total cFa is
                                           in 2 to 8 storey precast buildings on raft   approx. 11 million sqf
                                           foundations) and vertical drains and
                                                                                        location: dubai, UAE
                                           surcharge for roads and service areas.
                                           the project includes trials on stone
                                           columns to confirm design assumptions
                                           to buildings Department for this
                                           innovative form of ground improvement.
                                           The layout includes 12 hectares of
                                           wetland features including meandering
                                           channels linking upper and lower lakes.
                                           the development has been graded
                                           to create a retarding basin to reduce
                                           drainage impact on the adjoining Kam
                                           tin and shan pui rivers in high rainfall
                                           events.
                                           location: new territories, Hong Kong




| urban land development CapabIlItY statement p. 17 |
urbanrenewal & publicrealm
                                           aWarDEDproJeCts


Since 1998, Meinhardt’s Urban Renewal      >   australian institute of landscape   >   cement and concrete
/ Streetcape projects have won 15              architects Victorian and                association of australia awards.
awards at an international, national and       tasmanian state awards.                 best overall projects for
state level:                                   Landscape Excellence Award for          Waterfront Geelong, Vic (2001)
>     Washington Waterfront centre             steampacket place, Waterfront       >   cement and concrete
      (international) annual Honor             Geelong, Vic (2001)                     association of australia awards
      award for Waterfront Geelong,        >   australian institute of landscape       for innovative and creative use of
      Vic (2002)                               architects Victorian and                concrete for Waterfront Geelong,
>     planning institute of landscape          tasmanian state awards. award           Vic. (2001)
      architects (national), Overall           of commendation, city Design        >   australian institute of landscape
      Landscape Excellence Award for           category for moreland northern          architects national project award
      Waterfront Geelong, Vic (2002)           plaza, moreland council civic           masterplanning category for
                                               Centre, Vic (2001)
>     australian institute of landscape                                            >   the australian Garden,
      architects (national), Overall       >   australian institute of landscape       Vic (1998)
      Landscape Excellence Award for           architects Victorian and
                                               tasmanian state. award of           >   urban Development institute of
      steampacket place, Waterfront                                                    australia (uDia) – Environmental
      Geelong, Vic (2002)                      merit, civic Design category for
                                               steampacket place, Waterfront           Excellence for Rose Grange,
>     australian institute of landscape        Geelong, Vic (2001)                     Vic (2004)
      architects national project
      award. public spaces. category       >   australian institute of landscape
      for steampacket place,                   architects Victorian and
      Waterfront Geelong, Vic (2002)           tasmanian state. award of
                                               commendation, building setting
>     australian institute of landscape        category for catholic theology
      architects national project              college, Vic
      award. Open spaces and
      recreation award for carlton         >   australian institute of landscape
      Gardens playground, Vic (2002)           Victorian and tasmanian state
                                               awards. award of merit, Open
>     australian institute of landscape        space and recreation category
      architects national award of             for carlton Gardens playground,
      Merit. Building Context category         Vic. (2001)
      for Forest Gallery, museum of
      Victoria. Vic (2002)                 >   cement and concrete
                                               association of australia
                                               streetsmart awards. pedestrian
                                               precincts award for steampacket
                                               place, Waterfront Geelong, Vic


| urban development CapabIlItY statement p. 18 |

More Related Content

What's hot

Waste Management Capability
Waste Management CapabilityWaste Management Capability
Waste Management Capabilityhamadagkhater
 
Energy from Waste and Low Carbon Energy Capability Statement
Energy from Waste and Low Carbon Energy Capability StatementEnergy from Waste and Low Carbon Energy Capability Statement
Energy from Waste and Low Carbon Energy Capability StatementMatthew Hicks
 
perini 2005_Second_Century
perini  2005_Second_Centuryperini  2005_Second_Century
perini 2005_Second_Centuryfinance50
 
Bestwork Company Profile
Bestwork Company ProfileBestwork Company Profile
Bestwork Company ProfileLEVIPANOL
 
Sgp External Sgp Presentation Xing Linkedin
Sgp External Sgp Presentation Xing LinkedinSgp External Sgp Presentation Xing Linkedin
Sgp External Sgp Presentation Xing Linkedinlivia_freudl
 
Graham Building The Future
Graham Building The FutureGraham Building The Future
Graham Building The Futuremcgrawrpm
 
ACS healthcare presentation for ipad
ACS healthcare presentation for ipad ACS healthcare presentation for ipad
ACS healthcare presentation for ipad In Out Creatives
 
TAI Onsite Staffing
TAI Onsite StaffingTAI Onsite Staffing
TAI Onsite Staffingelyarrick
 
Smart City ICT
Smart City ICTSmart City ICT
Smart City ICTPaul Goff
 
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011Hans Goetze
 
studioARCH e-Brochure 2010
studioARCH   e-Brochure 2010studioARCH   e-Brochure 2010
studioARCH e-Brochure 2010Joe Alam
 
Lean Construction - Introduction
Lean Construction - IntroductionLean Construction - Introduction
Lean Construction - Introductiontabdelhamid
 

What's hot (17)

Waste Management Capability
Waste Management CapabilityWaste Management Capability
Waste Management Capability
 
Energy from Waste and Low Carbon Energy Capability Statement
Energy from Waste and Low Carbon Energy Capability StatementEnergy from Waste and Low Carbon Energy Capability Statement
Energy from Waste and Low Carbon Energy Capability Statement
 
perini 2005_Second_Century
perini  2005_Second_Centuryperini  2005_Second_Century
perini 2005_Second_Century
 
Esound Brochure
Esound BrochureEsound Brochure
Esound Brochure
 
Bestwork Company Profile
Bestwork Company ProfileBestwork Company Profile
Bestwork Company Profile
 
Sgp External Sgp Presentation Xing Linkedin
Sgp External Sgp Presentation Xing LinkedinSgp External Sgp Presentation Xing Linkedin
Sgp External Sgp Presentation Xing Linkedin
 
Graham Building The Future
Graham Building The FutureGraham Building The Future
Graham Building The Future
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
ACS healthcare presentation for ipad
ACS healthcare presentation for ipad ACS healthcare presentation for ipad
ACS healthcare presentation for ipad
 
TAI Onsite Staffing
TAI Onsite StaffingTAI Onsite Staffing
TAI Onsite Staffing
 
Smart City ICT
Smart City ICTSmart City ICT
Smart City ICT
 
SG&A Firm Overview 0511
SG&A Firm Overview 0511SG&A Firm Overview 0511
SG&A Firm Overview 0511
 
UPES Placement Brochure (Oil & Gas - Upstream 2009-10)
UPES Placement Brochure (Oil & Gas - Upstream 2009-10)UPES Placement Brochure (Oil & Gas - Upstream 2009-10)
UPES Placement Brochure (Oil & Gas - Upstream 2009-10)
 
UPES Placement Brochure (Oil & Gas - Downstream 2009-10)
UPES Placement Brochure (Oil & Gas - Downstream 2009-10)UPES Placement Brochure (Oil & Gas - Downstream 2009-10)
UPES Placement Brochure (Oil & Gas - Downstream 2009-10)
 
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011Hans Goetze Cv Project Director Portfolio Large Ici  14oct2011
Hans Goetze Cv Project Director Portfolio Large Ici 14oct2011
 
studioARCH e-Brochure 2010
studioARCH   e-Brochure 2010studioARCH   e-Brochure 2010
studioARCH e-Brochure 2010
 
Lean Construction - Introduction
Lean Construction - IntroductionLean Construction - Introduction
Lean Construction - Introduction
 

Viewers also liked

Health Care Capability 2010 Final Small
Health Care Capability 2010 Final SmallHealth Care Capability 2010 Final Small
Health Care Capability 2010 Final Smallhamadagkhater
 
01. Aviation Capability Rev 2
01. Aviation Capability   Rev 201. Aviation Capability   Rev 2
01. Aviation Capability Rev 2hamadagkhater
 
09. Transportation Freeways & Urban Roads Capability Statement
09. Transportation   Freeways & Urban Roads Capability Statement09. Transportation   Freeways & Urban Roads Capability Statement
09. Transportation Freeways & Urban Roads Capability Statementhamadagkhater
 
08. Planning Capability Statement
08. Planning Capability Statement08. Planning Capability Statement
08. Planning Capability Statementhamadagkhater
 
03. Environmental Sustainable Design Capability (Esd)
03. Environmental Sustainable Design Capability (Esd)03. Environmental Sustainable Design Capability (Esd)
03. Environmental Sustainable Design Capability (Esd)hamadagkhater
 
11. Waste Management Capability
11. Waste Management Capability11. Waste Management Capability
11. Waste Management Capabilityhamadagkhater
 
05. Mena Healthcare Capability Rev 2
05. Mena Healthcare Capability Rev  205. Mena Healthcare Capability Rev  2
05. Mena Healthcare Capability Rev 2hamadagkhater
 
Transportation Freeways & Urban Roads Capability Statement
Transportation   Freeways & Urban Roads Capability StatementTransportation   Freeways & Urban Roads Capability Statement
Transportation Freeways & Urban Roads Capability Statementhamadagkhater
 
Earthquake resistant structure
Earthquake resistant structureEarthquake resistant structure
Earthquake resistant structurevikskyn
 

Viewers also liked (10)

Health Care Capability 2010 Final Small
Health Care Capability 2010 Final SmallHealth Care Capability 2010 Final Small
Health Care Capability 2010 Final Small
 
01. Aviation Capability Rev 2
01. Aviation Capability   Rev 201. Aviation Capability   Rev 2
01. Aviation Capability Rev 2
 
09. Transportation Freeways & Urban Roads Capability Statement
09. Transportation   Freeways & Urban Roads Capability Statement09. Transportation   Freeways & Urban Roads Capability Statement
09. Transportation Freeways & Urban Roads Capability Statement
 
08. Planning Capability Statement
08. Planning Capability Statement08. Planning Capability Statement
08. Planning Capability Statement
 
03. Environmental Sustainable Design Capability (Esd)
03. Environmental Sustainable Design Capability (Esd)03. Environmental Sustainable Design Capability (Esd)
03. Environmental Sustainable Design Capability (Esd)
 
11. Waste Management Capability
11. Waste Management Capability11. Waste Management Capability
11. Waste Management Capability
 
05. Mena Healthcare Capability Rev 2
05. Mena Healthcare Capability Rev  205. Mena Healthcare Capability Rev  2
05. Mena Healthcare Capability Rev 2
 
Webinar: Oncology Care Model - Payer Participation
Webinar: Oncology Care Model - Payer ParticipationWebinar: Oncology Care Model - Payer Participation
Webinar: Oncology Care Model - Payer Participation
 
Transportation Freeways & Urban Roads Capability Statement
Transportation   Freeways & Urban Roads Capability StatementTransportation   Freeways & Urban Roads Capability Statement
Transportation Freeways & Urban Roads Capability Statement
 
Earthquake resistant structure
Earthquake resistant structureEarthquake resistant structure
Earthquake resistant structure
 

Similar to 10. Urban Development Capability Statement

Planning Capability Statement
Planning Capability StatementPlanning Capability Statement
Planning Capability Statementhamadagkhater
 
Cic co.portfolio-condensed[1]-010911
Cic co.portfolio-condensed[1]-010911Cic co.portfolio-condensed[1]-010911
Cic co.portfolio-condensed[1]-010911REDceo.net
 
CV Ashfaq Sept. 2015 -BLDGS, INFRA STRS.
CV  Ashfaq Sept. 2015 -BLDGS, INFRA STRS.CV  Ashfaq Sept. 2015 -BLDGS, INFRA STRS.
CV Ashfaq Sept. 2015 -BLDGS, INFRA STRS.Mohammad Ashfaq
 
Ultra Systems Transportation
Ultra Systems TransportationUltra Systems Transportation
Ultra Systems TransportationBetsy A. Lindsay
 
Company Profile Principio Eng July 10
Company Profile Principio Eng July 10Company Profile Principio Eng July 10
Company Profile Principio Eng July 10creymicolau
 
technark Company Profile-JUNE 2015
technark Company Profile-JUNE 2015technark Company Profile-JUNE 2015
technark Company Profile-JUNE 2015Jahangir Khan
 
Project management(roro)
Project management(roro)Project management(roro)
Project management(roro)AwZhiXuan
 
Meinhardt Capability Brochure 2010 Lowres
Meinhardt Capability Brochure 2010 LowresMeinhardt Capability Brochure 2010 Lowres
Meinhardt Capability Brochure 2010 Lowresgbowery
 
Meinhardt Capability Brochure 2010
Meinhardt Capability Brochure 2010Meinhardt Capability Brochure 2010
Meinhardt Capability Brochure 2010hamadagkhater
 
Modular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The MasterclassModular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The MasterclassGPTraining
 
Peter deBoeck CV August 2015
Peter deBoeck CV August 2015Peter deBoeck CV August 2015
Peter deBoeck CV August 2015Peter deBoeck
 
UltraSystems Masterplanning SOQ
UltraSystems Masterplanning SOQUltraSystems Masterplanning SOQ
UltraSystems Masterplanning SOQBetsy A. Lindsay
 
Specialized allied services
Specialized allied servicesSpecialized allied services
Specialized allied servicesKatrina Bibe
 
Quantity surveyingguide
Quantity surveyingguideQuantity surveyingguide
Quantity surveyingguideimmortal_marx
 
PROPOSED STATE ROAD CORPORATION
PROPOSED STATE ROAD CORPORATIONPROPOSED STATE ROAD CORPORATION
PROPOSED STATE ROAD CORPORATIONSaumil Sharma
 
Competentia Presentation
Competentia PresentationCompetentia Presentation
Competentia Presentationkingk99
 

Similar to 10. Urban Development Capability Statement (20)

Planning Capability Statement
Planning Capability StatementPlanning Capability Statement
Planning Capability Statement
 
Cic co.portfolio-condensed[1]-010911
Cic co.portfolio-condensed[1]-010911Cic co.portfolio-condensed[1]-010911
Cic co.portfolio-condensed[1]-010911
 
CV Ashfaq Sept. 2015 -BLDGS, INFRA STRS.
CV  Ashfaq Sept. 2015 -BLDGS, INFRA STRS.CV  Ashfaq Sept. 2015 -BLDGS, INFRA STRS.
CV Ashfaq Sept. 2015 -BLDGS, INFRA STRS.
 
Ultra Systems Transportation
Ultra Systems TransportationUltra Systems Transportation
Ultra Systems Transportation
 
Company Profile Principio Eng July 10
Company Profile Principio Eng July 10Company Profile Principio Eng July 10
Company Profile Principio Eng July 10
 
technark Company Profile-JUNE 2015
technark Company Profile-JUNE 2015technark Company Profile-JUNE 2015
technark Company Profile-JUNE 2015
 
ICUC
ICUCICUC
ICUC
 
Project management(roro)
Project management(roro)Project management(roro)
Project management(roro)
 
Meinhardt Capability Brochure 2010 Lowres
Meinhardt Capability Brochure 2010 LowresMeinhardt Capability Brochure 2010 Lowres
Meinhardt Capability Brochure 2010 Lowres
 
Meinhardt Capability Brochure 2010
Meinhardt Capability Brochure 2010Meinhardt Capability Brochure 2010
Meinhardt Capability Brochure 2010
 
Wwdcs new
Wwdcs newWwdcs new
Wwdcs new
 
Modular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The MasterclassModular Construction and Prefabrication: The Masterclass
Modular Construction and Prefabrication: The Masterclass
 
Peter deBoeck CV August 2015
Peter deBoeck CV August 2015Peter deBoeck CV August 2015
Peter deBoeck CV August 2015
 
UltraSystems Masterplanning SOQ
UltraSystems Masterplanning SOQUltraSystems Masterplanning SOQ
UltraSystems Masterplanning SOQ
 
WIND SOQ
WIND SOQWIND SOQ
WIND SOQ
 
Specialized allied services
Specialized allied servicesSpecialized allied services
Specialized allied services
 
Quantity surveyingguide
Quantity surveyingguideQuantity surveyingguide
Quantity surveyingguide
 
SOLAR SOQ
SOLAR SOQSOLAR SOQ
SOLAR SOQ
 
PROPOSED STATE ROAD CORPORATION
PROPOSED STATE ROAD CORPORATIONPROPOSED STATE ROAD CORPORATION
PROPOSED STATE ROAD CORPORATION
 
Competentia Presentation
Competentia PresentationCompetentia Presentation
Competentia Presentation
 

10. Urban Development Capability Statement

  • 1. urbandevelopment capability w w w. m e i n h a rd t g ro u p . c o m
  • 2. tablEoF cOntEnts CompanY proFIle ........................................................... 1 total InteGrated solutIons ..................................... 2 1. Infrastructure and environment .............................. 3 2. urban land development ......................................... 4 2.1 Relevant Project Experience ............................................................ 6 urban renewal & public realm awarded projects .......... 17 | urban development CapabIlItY statement |
  • 3. cOmpanyPRofilE Meinhardt Consulting Engineers was meinhardt’s project consulting services established in Australia in 1955 and focus on key market sectors including: now operates in 12 countries over prOpErty four continents. > urban land Development We are recognised as a leading global provider of planning, > buildings engineering and technology services. > industrial > leisure & recreation > retail > EsD/sustainability > planning > statutory & strategic EnVirOnmEnt > Waste management > Hydrogeology > contaminated soil > Water Quality > Environment planning transpOrt > aviation > road > rail the scope of services offered includes master planning, feasibility studies, benchmarking, energy audits, design, documentation, tendering, supervision during construction, commissioning, post contract evaluation and asset management. these services are provided by our offices throughout Australia, Asia, united Kingdom and the us | urban development CapabIlItY statement p. 1 |
  • 4. tOtalInteGrated sOlutiOns meinhardt is one of the very few solution that has the flexibility to cater multi-disciplinary firms operating on for changing conditions and provide a global basis. Our engineers work in “added value” to the client. an integrated environment and hence the meinhardt Group maintains a appreciate the interfacing requirements centralised technology and knowledge of all disciplines. integration has been base such as information technology, demonstrated to benefit our clients by technical development, leading edge ensuring solutions are fully coordinated design solutions just to name a few. and holistic. as a result of this structure our various as a multi-disciplinary practice we disciplines can access and share all provide a total engineering team the knowledge and technology gained approach to all aspects of engineering and/or developed by the offices at the including building services, civil, various geographical locations. structural, facade, environmental and infrastructure. this also enables us to readily undertake national and international Our philosophy is simple: our clients’ projects in a single or multi-project office needs are paramount. yet determining environment. those needs is rarely a simple task. in order to produce the ultimate Further details in the diversity of the engineering solution, we take the time meinhardt Group can be found on our to understand our clients’ business and Group website – all relevant factors. the outcome is a www.meinhardtgroup.com. | urban development CapabIlItY statement p. 2 |
  • 5. 1. inFrastructurE& envIronment meinhardt has successfully built up meinhardt’s client-focused commitment their infrastructure and Environmental and long and distinguished experience business worldwide and now in public works and private infrastructure designs and manages large civil and provide our clients with confidence that infrastructure project for Government, dependable yet state-of-the art solutions institutional, private sector and aid to today’s projects will be achieved, on agency clients. many of these are time, and on budget. multi-disciplinary projects in which we engage the best international expertise appropriate for the project and location. Our infrastructure and Environmental teams are integrated internationally and each office draws upon staff and expertise from other to supplement as needed. through this approach meinhardt has built an enviable international record in infrastructure, civil and environmental work. | urban development CapabIlItY statement p. 3 |
  • 6. 2. urbanland dEvEloPMEnt meinhardt is committed to ensuring our meinhardt provide supplementary clients gain maximum value from their strengths in: assets, while minimising the overall > Environmental Engineering costs. We can take care of all aspects of your urban and land development, from > Water resources the initial feasibility, outline development > Golf course Engineering plans and environmental impact studies > landscape architecture to full design and project management. Engineering meinhardt’s track record in land Our design teams are regularly invited development extends from commercial to provide engineering solutions to projects such as the Fort bonifacio landscape and golf course architects Global city (philippines) and bintan where sensitivity to the final built form island international resort (indonesia), is paramount. to Earth sanctuaries Eco-tourism resort (Victoria, australia) and numerous residential land sub-divisions throughout australia and across asia. a successful land development project requires a point of difference to maximise land value. Meinhardt has a commitment to providing environmentally sensitive engineering solutions to maximise aesthetic value. to service our land development projects, | urban development CapabIlItY statement p. 4 |
  • 7. 2.1 RELEVANTproJeCt EXpEriEncE Greenvale Mosaic living, lalor Silverwoods Yarrawonga this 500Ha site will continue mosaic living is a staged 475 lot silverwoods is an iconic residential development over the next 10 years residential infill development located and recreational development on 4 different fronts with linkages on 57 hectares of the former lalor occupying 160 hectares on the bank to all residential and recreational Public Golf Course approximately 17 of lake mulwala. the development will developments surrounding the kilometres north of the melbourne provide a thomson perrett designed Greenvale reservoir. the sub- cbD. mosaic has been planned championship golf course, clubhouse, divisional development incorporates around a “piazza” in the centre of hotel, serviced apartments and a 4,000 housing lots, schools, retail the development which incorporates minimum of 850 residential allotments. precinct, child care, medical and aged shops and cafes and provides a hub for meinhardt is preparing the site master care facilities. the community to interact. mosaic is plan to take into account the sensitive delivering a retirement Village and two meinhardt is the principal consultant, environmental issues and to undertake football ovals and landscaped public providing engineering planning, detailed design, documentation and open space for walking tracks and complete design and documentation, construction management of the civil outdoor activities. construction management and contract infrastructure for the residential and golf management services for the full project Habitat zones for the endangered elements. development. growling grass frog are to be provided Services offered include: along with the provision of a wetland / urban development and infrastructure > civil engineering for bulk retarding basin system to manage storm engineering works include bulk earthworks, pavement, water generated by the development. earthworks, road works, sewerage, sewer, water and storm water water reticulation, electrical and meinhardt has been engaged to management. telecommunications networks. provide: > Water sensitive urban Design. Drainage works include the creation > civil engineering for bulk of the reservoir protection bund, pipe > Environmental management earthworks, pavement, networks, retarding basins, wetlands strategies and monitoring. > sewer, water and storm water and water sensitive urban design. > Hydrogeological investigations. management. location: victoria, Australia > relevant authority approvals. > Water sensitive urban Design (WsuD) implementation. location: victoria, Australia > Environmental investigations and remediation monitoring. > relevant authority approvals. > construction management. location: victoria, Australia | urban land development CapabIlItY statement p. 5 |
  • 8. 2.1 RELEVANTproJeCt EXpEriEncE Cornell’s Hill Estate the oaks, Cessnock toolern Structure Plan, meinhardt has been engaged for the the redevelopment of the cessnock the toolern structure plan is the largest design and construction management Golf club located in the Hunter Valley strategic planning project undertaken of the internal and external civil of new south Wales will deliver a within melbourne’s growth areas. infrastructure. cornell’s Hill Estate is residential and recreational estate the toolern Growth area is located located approximately 30km north of comprising a Jack newton designed in the shire of melton and covers melbourne at the north-west corner of championship golf course, clubhouse approximately 2,400 hectares to the yan yean road and cookes road in and hotel. the development is sited south east of the melton township. Doreen within the city of Whittlesea. on approximately 77 hectares and toolern is projected to provide will incorporate a minimum of 150 approximately 24,000 new dwellings This 21ha site comprises of 225 lots residential allotments within the for 60,000 new residents over the next and 1.0ha reserve. The estate will be golf course. 20 years along with 500 hectares of developed in five stages. Meinhardt employment land. was engaged by the developer GEO meinhardt has been appointed properties pty ltd as consultants to prepare the storm water meinhardt were engaged as the on Stages 1 & 2 and major external management strategy for the site engineering consultant to support the infrastructure works. Stages 1 & to take into account the numerous macroplan australia lead project team 2 comprises of approximately 95 environmental issues and to undertake to provide strategic advice regarding the lots ranging from 600 sqm to 1300 detailed design, documentation and provision of services infrastructure to sqm. subdivision works included construction management of the civil the study area. construction of roads, drainage, infrastructure for the residential and golf Our role required high level liaison sewerage, water mains, electricity, gas, course elements. with the consultant team and relevant telecommunication and retaining walls. services offered include: stakeholders to identify the proposed External works included 1.2km of > storm water modeling location and size of trunk roads, water, melbourne Water main Drainage works sewer, electricity, communications > civil engineering for bulk pipe size ranging from 1050 dia to 1650 and storm water assets and to provide earthworks, pavement, dia, approx 900m of 225 dia reticulation indicative construction cost estimates sewer, water and storm water sewer and 1km of Yarra Valley Water to assist with the preparation of the management. branch sewer. Works also included toolern development contributions plan. upsizing of approx 1km of existing > Water sensitive urban Design (WsuD) implementation. location: Melton South 150 dia water main to 225 dia along yan yean road and reconstruction of > Environmental management cookes road. strategies and monitoring. location: doreen, Australia > relevant authority approvals. > construction management.. location: Cessnock, Sydney | urban land development CapabIlItY statement p. 6 |
  • 9. 2.1 RELEVANTproJeCt EXpEriEncE Waterfront City docklands la Perouse Hervey Bay Waterfront City is a 19.3-hectare parcel This 178 Lot Australand development Hervey bay is a 450 hectare multi- of land comprising a unique and scarce integrates earthworks design use resort situated in Hervey bay, water frontage to Victoria Harbour and (180,000m3) with golf course lake/ Queensland. the development a strong 550m presence to Footscray mounding to lift the proposed comprises of: road. meinhardt has already been development above the1 in 100 year A 5-6 star and a 3-4 star resorts commissioned by the developer to flood plain. Water sensitive urban complex including accommodation, provide multi-disciplinary engineering design features include wetlands, apartments, restaurants, bar and services for the project. grassed swales, and separating roof other facilities including a 18 hole and road drainage paths. The existing meinhardt will undertake full championship private and public golf swampy natural ground slow settlement consultancy services for: courses with pro shop, driving range rate significantly increased through the > infrastructure and practice green, water theme park, provision of 37,000 wick drains and a football / multi purpose stadium and > Environment - horizontal sand drainage medium with local retail village. > Fire geotextile reinforcement.Clerk of Works & superintendency of the site was also meinhardt has been appointed to > Hydraulics. undertaken by meinhardt. prepare a preliminary development plan the development will incorporate for the site and also a development location: victoria, Australia a waterfront piazza public marina definition report to allow for a detailed boutique residential accommodation master plan study to be developed. retail waterfront restaurants and bars location: Queensland, Australia a high level of landscaping and open public space and an entertainment precinct. this appointment follows on from our recent engagement as Environmental assessor on the project. the project will be developed in stages over some 8-10 years location: Melbourne, Australia | urban land development CapabIlItY statement p. 7 |
  • 10. 2.1 RELEVANTproJeCt EXpEriEncE Essendon fields - Urban Royal Rehabilitation Centre, Ryde Carlton United Brewery Regeneration royal rehabilitation centre have meinhardt were engaged to assist in Essendon airport pty ltd, a joint venture proposed to consolidate their facilities the tender bid phase for the purchase between Linfox Property Group and the on their existing 19 hectare site to a new of the site. in particular meinhardt were becton Group, has appointed meinhardt facility on a 2 hectare parcel of land on responsible for verifying the concept as principal consultant to assist in the the site. as such it is proposed that the design and revising design concepts for preparation and implementation of the remaining 17 hectares be redeveloped the development which comprises a 6ha Essendon airport redevelopment master into a mixture of high, median mixed residential, retail and commercial plan. this includes a regeneration residential apartments and townhouses development with new roads, services of approximately 70 Ha in the with up to 690 dwellings, as well as and central park. On completion the northwestern sector of the site as a high new community facilities such as gym, development will comprise about 1600 quality commercial establishment. swimming pool and community centre. apartments, 89,000m2 of commercial as part of these works and retail space. meinhardt is providing the following services: it is proposed that the land will be in reviewing the development subdivided and new roads, stormwater masterplan for the prospective > Environmental monitoring and detention basin, utility services and purchaser meinhardt were responsible management strategies; parks will be provided. for concept design of stormwater > civil engineering for pavements, meinhardt were engaged to review the drainage, WsuD, detention and sewer, water and stormwater master plan and undertake engineering treatment systems as well as evaluation management; Da design for road, drainage and of the road geometry, service corridor > Water sensitive urban Design planning and preliminary sizing and infrastructure works including major (WsuD) implementation; design of electrical, telecommunications intersections with Victoria road and > services engineering for electrical a pedestrian bridge over Victoria and hydraulic services. in addition and gas reticulation; road. in addition meinhardt were meinhardt have undertaken a > specialist services including EsD responsible in identifying the location preliminary review of the contamination and fire services; of existing services on and adjacent issues on site and provide advice to the site as well as determining what how these works will impact on the location: Melbourne, Australia development and how the site can be additional lead-in works are required for development of the site. as a result remediated of these investigations it was revealed location: Chippendale, nSW that substantial services upgrades are required offsite. location: Sydney, Australia | urban land development CapabIlItY statement p. 8 |
  • 11. 2.1 RELEVANTproJeCt EXpEriEncE Stamford Apartments Storm Retirement village Carnegie Cove stamford have proposed to build a meinhardt have been engaged to carnegie cove is an integrated golf residential apartment tower and retail undertake the concept and detail design course and residential subdivision centre in Gloucester street sydney. part of the civil and stormwater works for located on the north coast of new south of this work involves the construction the proposed retirement village. the Wales. Significant Environmental and of 2 levels of basement car parking development is to comprise a 125 bed planning studies were undertaken which will extend under the adjacent hostel and 54 self car units set on a to protect the local flora and fauna. cumberland street. as such it is 6 ha site. reclaimed water for irrigation is sourced proposed to excavate Cumberland from the existing township scheme. meinhardt were responsible for road street to construct these works and and earthworks design as well as site location: Bonny Hill, nSW then reconstruct the road to the new stormwater drainage and detention. levels to suit the development and site constraints. as the site was subject to substantial flooding it was necessary to design a meinhardt were engaged to undertake stormwater detention system which the detail design of both the structural was above the flood impacts of the and civil works on the project. in surrounding areas. particular the civil works comprised location: Sydney, nSW the redesign of a 250m section of Cumberland Street between Essex street and Grosvenor street. this section of road is subject to flooding due to a trapped low point in the road which resulted in flooding to an adjacent building. as a result of reconstructing the road, meinhardt proposed the road to be regraded to minimise the trapped low point and remove the risk of future flooding of the building. In addition meinhardt were responsible for the design road and drainage works and coordinate services in the new road construction. location: the Rocks, nSW | urban land development CapabIlItY statement p. 9 |
  • 12. 2.1 RELEVANTproJeCt EXpEriEncE Greens Beach Golf Club inc Croydon Golf Club Relocation Whittlesea Golf Course Greens beach is to be a world-class meinhardt have provided environmental the proposed Whittlesea Golf golf, recreation and residential facility and infrastructure advice for the Course will be the first new 18-hole located on existing golf course land proposed relocation of croydon Golf championship grade public Golf course situated at Greens beach, tasmania. course to a new site in yering. Works to be developed in melbourne in more the thomson perrett designed during the preliminary and planning that 15 years. 18-hole golf course is to include a new stages included: meinhardt have been commissioned clubhouse, 230 fully serviced housing > advice on service options by the city of Whittlesea and Graeme lots and 32 serviced villa units. including use of reclaimed water marsh Golf Design to provide all meinhardt has been appointed to assist for irrigation engineering services relating to the Golf in the preparation of the site master > Phase 1 Environmental Site course design. the site is located in an plan to take into account the sensitive assessment area of State Environmental significance environmental issues and to undertake > investigation of soils and with development being controlled detailed design and documentation groundwater studies of fauna and by environmental and archaeological of the civil infrastructure for the flora on the site and in adjacent overlays defined in the City of development. waterways Whittlesea planning scheme. services offered include: > Environment improvement plan the site is dissected by a > Environmental monitoring and for use of reclaimed water for natural waterway. Hydraulic and management strategies; irrigation hydrogeological modelling and a site > Environmental management plans Environmental management plan will > Hydrogeological engineering; for construction and operation ensure minimal environmental impact > civil engineering for bulk on the waterway. Treated effluent from earthworks, pavement, > a referral to the Department of yarra Valley Water will be used for sewer, water and stormwater Environment and Heritage under irrigation. management; the Environment protection and biodiversity conservation act. meinhardt are also providing all > Water sensitive urban Design structural and building services (WsuD) implementation; location: victoria, Australia Engineering for the new clubhouse. location: tasmania, Australia location: victoria, Australia | urban land development CapabIlItY statement p. 10 |
  • 13. 2.1 RELEVANTproJeCt EXpEriEncE Golfam Golf Course, Penrith Chirnside Park Activity Centre: Urban Australia Gardens design Master Plan Golfam obtained development consent the rGb’s australia Garden from penrith city council to construct meinhardt is currently engaged by yarra cranbourne is the largest public park the panthers Golf course, penrith. the ranges shire to provide sustainable development in Victoria in 120 years. proposed works included modifications engineering solutions for the soon to meinhardt close association with to peach tree creek as well as the be released chirnside park activity landscape architect taylor cullity and construction of permanent water bodies centre master plan. the master lethlean has allowed a number of within the immediate vicinity of the plan is to provide a thriving mixed- innovative designs that emphasis an creek. use centre, comprising a full range ‘invisible’ approach to infrastructure. of retailing, entertainment functions, the works completed on site to date Hydrogeology has been the key to the professional services and community varies from the originally approved site where natural groundwater level facilities incorporating a diversity of works. as such, it has been requested modelling has determined planting medium and higher density residential by council that investigations be regimes and water body extents. Our living opportunities that provide added performed regarding the impact of the in-house expertise in environmental and vibrancy to the centre. as built works on the site hydraulics hydrogeological design has been greatly and flooding, with respect to the original meinhardt is providing inputs for the appreciated by tcl & rbG design concept. incorporation of Water sensitive urban teams. Design (WsuD) and stormwater Following construction meinhardt were location: victoria, Australia management, collection and re-use into engaged by Golfam to undertake a the master plan. review of the as built levels to determine the following: location: Chirnside Park, Australia > Where site levels are higher/lower than the proposed design levels > Extent of departure from original design (including cut and fill volumes) > likely effect of works on the floodwaters, flood levels and > compare the pre-developed to the post-developed levels. > Identify areas where significant change in level has occurred and location: Sydney, Australia | urban land development CapabIlItY statement p. 11 |
  • 14. 2.1 RELEVANTproJeCt EXpEriEncE Craigieburn Bypass Essendon fields - northern Access City link Project the abigroup is carrying out the Within Victoria, miE are currently The $1.8 Billion City Link Project construction of a freeway connection providing full consultancy services for consists of approximately 22km of from the northern ring road to the the planning, development and delivery freeway cutting through the heart Hume Freeway bypassing craigieburn. of the twelve million dollar northern of melbourne. the project joins abi Group engaged meinhardt access road project on behalf of three of melbourne’s largest arterial to document several impressive Vicroads, who will become the eventual freeways consisting of two tunnels and architectural features that are to be asset owner, and Essendon airport. numerous bridges and many km of incorporated into the freeway link elevated freeway. services provided by this project involves duplicated meinhardt included: these include a sweeping curtain wall elevated carriageways across the leading into a half circle pedestrian tullamarine Freeway between airport > Environmental auditing of bridge crossing the freeway, also a West and Essendon airport, and new construction sites. series of 10m louvers that rotate in plan freeway exit and entry ramps. VicRoads > preparation and review of site and in elevation to give a variety of will become the asset owners at the Environmental action plans (Eap) visual effects to the driver. there is also culmination of the defects liability period and Environmental management an acrylic scrim wall, which will be lit managed by miE. the design and plans (Emp). underneath to highlight a sand blasted construct contract is being delivered by > monitoring of wastewater disposal pattern. abigroup in accordance with Vicroads from site standard specifications Vicroads engaged taylor and cullity Due to the city link project remaining lethlean along with meinhardt at the location: Melbourne, Australia in the public spotlight throughout all tender development stage to provide stages, meinhardt assisted the lead an exciting group of elements along contractor in providing a state of the the freeway. these features will set this art environmental management system road apart but also provide function in throughout the projects construction. protecting neighbouring properties from road-generated noise. location: Melbourne, Australia . location: victoria, Australia | urban land development CapabIlItY statement p. 12 |
  • 15. 2.1 RELEVANTproJeCt EXpEriEncE Geelong Waterfront- Carousal Melbourne Showgrounds Sandhurst Club development Pavilion the project involved engineering the sandhurst club is located on meinhardt were the structural engineers masterplan for a $100 million thompsons road, skye, in melbourne’s for the carousel building, an integral dollar upgrade of existing facilities southeastern suburbs. the master part of the Geelong Waterfront incorporating a four storey office planned development occupying 320 redevelopment that houses an operating complex, 7000 seat sports stadium, hectares offers 2 thomson perrett 19th century steam carousel. It is a steel exhibition hall of 20,000 square metres, designed championship golf courses, and glass building with an interesting and kilometers of internal site utility associated club facilities, 1850 roof shape with the steel frame of the reticulation residential allotments and extensive building consisting of six ‘umbrella’ landscaped tracts. Future expansion location: Melbourne, Australia frames each measuring 12x12 meters to the club precinct over the next 5 to in a 3x2 array. The steel structure is 8 years will include a health club, hotel exposed and utilizes a wide range of and business centre, childcare centre hollow sections. the main arms of and the national headquarters of the the umbrellas are sculpted fabricated professional Golfers association of boxes. The structure of the pavilion is australia. a classic example of how steel can cost meinhardt has been appointed to effectively form the basis of a visually provide civil and environmental services striking building. to assist in the development of the location: victoria, Australia site master plan and preparation of associated construction cost estimates. the sandhurst club has recently been awarded the urban Development institute of australia national award. location: victoria, Australia | urban land development CapabIlItY statement p. 13 |
  • 16. 2.1 RELEVANTproJeCt EXpEriEncE Waterfront City – Environmental Rose Grange former Herald & Weekly times Building meinhardt was appointed by Waterfront meinhardt infrastructure & Environment city Developments, a joint venture were engaged to undertake an meinhardt has been appointed by between inG real Estate and the environmental site assessment for a australian super Developments as the lewis land Group, as the contaminated large residential developmental site, contaminated land consultant for the land consultant for the proposed for the Dennis Family corporation. redevelopment of the former Herald & Waterfront city site at Docklands in the proposed development consisted Weekly times building. melbourne. predominantly of commercial, residential the site is being redeveloped for high purposes as individual subdivisions and meinhardt was commissioned to density residential and commercial a retirement village. undertake the following: use. meinhardt were commissioned to > Due diligence advice during the The site was approximately 6 ha undertake the following: developer bidding phase including in area. it has reported elevated > Detailed soil environmental site financial liabilities assessment concentrations of certain environmental assessment associated with contaminated land contaminants in surface soils resulting > Validation of in-situ soils following issues; from historical land use. meinhardt was the removal of underground tanks engaged to remediate the site and an > Detailed soil and groundwater and ink pipework; Epa appointed auditor is overseeing the environmental site assessment; > Development of soil disposal and remediation. > acid sulfate soil assessment; tank extraction guidelines for meinhardt were engaged to undertake building contractors; > Geophysical survey to locate soil sampling, assessment and site previously unidentified > preparation of environmental remediation. underground storage tanks; management plans including a site > Excavation and disposal of location: victoria, Australia Environmental management plan approximately 30 underground fuel (sEmp) for construction works, storage tanks; an acid sulfate soil management plan and a Groundwater Quality location: Melbourne, Australia management plan. location: Melbourne, Australia | urban land development CapabIlItY statement p. 14 |
  • 17. 2.1 RELEVANTproJeCt EXpEriEncE Bintan Beach international Resort & fort Bonifacio Global City defence Housing - islamabad Waste Management Strategy master civil Engineering coordinators the project comprises a new The project comprises a 23 000 for the ongoing construction of manila’s development of 1500-acre Phase-I Hectare (1/3 size of Singapore) new 440 Ha central business District Extension and redevelopment of “mega-resort” on bintan island. for Fort bonafacio Development 900-acre existing Phase-I in Defence meinhardt (singapore) is responsible corporation. Housing, islamabad. the project for the masterplanning , design, is envisaged to be a high-class the project involves supplying a documentation, construction phase development comprising residential and team of engineers, draftsperson, and services and overall coordination of the commercial plots, public amenities like GIS expertise to coordinate local infrastructure services. infrastructure schools, colleges, parks, playgrounds, and international consultants and includes roads, water supply, waste stadiums, sports complex, town halls, contractors to facilitate coordinated management, stormwater, power community centres, club houses, plans and construction staging of this and communications. the project libraries, mosques, utility buildings and Greenfield site also involved a detailed review of other ancillary facilities. solid Waste management systems location: Manila, Phillipines meinhardt is responsible for complete to ensure the development of World project management, town/ master class facilities. the ultimate resort planning of the Development, Detailed masterplan comprises in excess of infrastructure Engineering Design 22 000 Ha with a projected 680 000 (roads, Water supply, sewerage, equivalent population. Drainage, Electricity, telephone, etc.), location: Bintan island, indonesia Detailed architectural & Engineering (civil, structural, mechanical, plumbing, Electrical, Fire services), Design of amenities and Detailed supervision during construction location: islamabad, Pakistan | urban land development CapabIlItY statement p. 15 |
  • 18. 2.1 RELEVANTproJeCt EXpEriEncE Hong Kong Park Golden Palms Residential Estate- lake City meinhardt is the structural consultant Golden palms is one of the most Lake City is a 1700 acres resort / of this leisure park, which is on part of prominent projects recently launched residential development planned on the previous Victoria barracks. major in Gwadar – the new port city of the verdant outskirts of lahore city. structures within the park area are pakistan. it is situated at the Western the proposed project, conceived in Green House, indoor Games Hall, end of the city overlooking the Gwadar two phases, bella Vista and bella sculpture, ceramics and print centre, West bay. this prestigious residential Verde, is planned around an 18-hole Garden plaza, lakes, etc. the site area development, spanning 1000 acres regulation Golf course with the course is approx. 100,000m2. along the pristine waters of the Gwadar greens meandering and interspersed beach, promises an exclusive lifestyle amidst luxury villas with Mediterranean location: Hong Kong, Hong Kong with its breathtaking vistas and wealth accents. meandering water channels of quality amenities i.e. hotel, shopping and fountains interlace the scheme plaza, community centers, sports weaving this exclusive development facilities, urban parks and piazzas and into the rural landscape reminiscent of ancillary facilities including a water the agricultural and cultural heritage of desalination plant. lahore. this self-contained community also offers its residents a world-class meinhardt are the principal consultants country club, shopping malls, stadium, - providing master planning, schools, hospitals, mosques, town architecture, infrastructure engineering, centers and commercial districts. and project / construction management services. infrastructure planning and location: lahore, Pakistan design include earthworks, roads, bridges, culverts, under/over-passes, water supply, sewerage, drainage, electrical and telecommunication networks. location: Gwadar, Pakistan | urban land development CapabIlItY statement p. 16 |
  • 19. 2.1 RELEVANTproJeCt EXpEriEncE Shanghai tianma Golf and Country Sunnyville Residential & Golf Course the lagoons dubai Club development meinhardt singapore were appointed the project involved the development Sunnyville involves the conversion of 98 as the principal consultant for the of a 36 hole golf course integrated with hectares of fishponds built on alluvial lagoons - la Ville contemporaine area a 39 Ha lake system of depth greater mudflats into a high class residential 2 (Contract No. DIP-0410.B.03b). The than 6 metres. Surrounding canals and golf course development. the site mixed-use development, developed by connect to the lakes through mechanical formation includes the importation of the prominent sama Dubai Group, is inlet and outlet structures. irrigation 4.5 million m³ river sand from mainland part of the multi-billlion “the lagoons” requirements are serviced from the lake. china to the site, spreading and project in Dubai. the project (area 2) compacting over the existing marine comprises 28 blocks of 10-20 storey location: Shanghai, China layers then improving the ground by towers for retail and residential usage > combinations of stone columns and with full amenities for luxurious and surcharge for housing areas (1500 units modern living standard. total cFa is in 2 to 8 storey precast buildings on raft approx. 11 million sqf foundations) and vertical drains and location: dubai, UAE surcharge for roads and service areas. the project includes trials on stone columns to confirm design assumptions to buildings Department for this innovative form of ground improvement. The layout includes 12 hectares of wetland features including meandering channels linking upper and lower lakes. the development has been graded to create a retarding basin to reduce drainage impact on the adjoining Kam tin and shan pui rivers in high rainfall events. location: new territories, Hong Kong | urban land development CapabIlItY statement p. 17 |
  • 20. urbanrenewal & publicrealm aWarDEDproJeCts Since 1998, Meinhardt’s Urban Renewal > australian institute of landscape > cement and concrete / Streetcape projects have won 15 architects Victorian and association of australia awards. awards at an international, national and tasmanian state awards. best overall projects for state level: Landscape Excellence Award for Waterfront Geelong, Vic (2001) > Washington Waterfront centre steampacket place, Waterfront > cement and concrete (international) annual Honor Geelong, Vic (2001) association of australia awards award for Waterfront Geelong, > australian institute of landscape for innovative and creative use of Vic (2002) architects Victorian and concrete for Waterfront Geelong, > planning institute of landscape tasmanian state awards. award Vic. (2001) architects (national), Overall of commendation, city Design > australian institute of landscape Landscape Excellence Award for category for moreland northern architects national project award Waterfront Geelong, Vic (2002) plaza, moreland council civic masterplanning category for Centre, Vic (2001) > australian institute of landscape > the australian Garden, architects (national), Overall > australian institute of landscape Vic (1998) Landscape Excellence Award for architects Victorian and tasmanian state. award of > urban Development institute of steampacket place, Waterfront australia (uDia) – Environmental Geelong, Vic (2002) merit, civic Design category for steampacket place, Waterfront Excellence for Rose Grange, > australian institute of landscape Geelong, Vic (2001) Vic (2004) architects national project award. public spaces. category > australian institute of landscape for steampacket place, architects Victorian and Waterfront Geelong, Vic (2002) tasmanian state. award of commendation, building setting > australian institute of landscape category for catholic theology architects national project college, Vic award. Open spaces and recreation award for carlton > australian institute of landscape Gardens playground, Vic (2002) Victorian and tasmanian state awards. award of merit, Open > australian institute of landscape space and recreation category architects national award of for carlton Gardens playground, Merit. Building Context category Vic. (2001) for Forest Gallery, museum of Victoria. Vic (2002) > cement and concrete association of australia streetsmart awards. pedestrian precincts award for steampacket place, Waterfront Geelong, Vic | urban development CapabIlItY statement p. 18 |