RESUME
NAME: Kevin Ian LILLY
EDUCATION: Bachelor of Science (Maths)
- University of New South Wales (1976)
Bachelor of Engineering - Civil (Hons)
- University of Newcastle (1982)
Graduate Course in Hydrology
- University of New South Wales (1987)
Steel Design to AS 4100 - Curtin University (1993)
Project Management – EEA Short Course
Master of Project Management Units (2012)
Applied Project Management (HD)
Finance and Accounting (HD)
AFFILIATIONS: Corporate Member, Institution of Engineers, Australia
Chartered Professional Engineer (-2011)
SYNOPSIS: Areas of Experience:
Civil Design Management
Water Corporation water supply and sewerage design.
Resources water supply design.
Concrete and steelwork inspection.
Tailings dam design and project superintendence.
Contract administration.
Project management.
Subdivisional infrastructure design and superintendence;
including contract administration, earthworks, retaining
walls, sewerage, water reticulation, drainage, roads,
landscaping, budget estimation, tendering and sewage
pump stations.
Mining Camp infrastructure design, technical resolution
and superintendence.
CONTACT: civilcontracting@iinet.net.au
Phone: 0414 888 254
Kevin Ian LILLY, Page 2
EMPLOYMENT HISTORY
August 2013 – May 2015 Samsung C&T; EPC Contractor to the Roy Hill Project
Roy Hill Project, Package 3, Site Civil Engineering Manager;
As a member of a talented civil site engineering design team, of six members, site
adjustments were made in Package 3’s Rail Loop and Ore Stockyard civil design consisting
of, but not limited to:
 Earthworks for rail formation to top of sub ballast capping, from Great Northern
Highway CH 17.75km to the Car Dumper Ch 0.0km in rail loop;
 Earthworks and single/two coat sealing of public and private roads;
 Review of piling and concrete design for rail overpass bridge;
 Organisation of Road Safety Audit for private road intersection with Utah Point Road;
 Drainage culvert design review and installation; largest being a 28 barrel DN1500 for
the Turner River’s 1:100yr ARI flooding;
 Piped and channel drainage throughout package;
 Mass balance and material allocation review;
 Construction compliance to design;
 Car Dumper excavation, hyper-saline dewatering, backfilling and water table
recovery reviews;
 Rock protection and Flexmat installation against cyclone wave erosion;
 Ground improvement required for rail and stockyard earthworks construction in PASS
tidal deposit areas;
 Works inspection;
 Interface verbally and formally, in Technical Quiriess, meeting and contractual letters
with:
 Roy Hill’s superintendent;
 Samsung C&T subcontractors;
 third party contractors;
 Samsung C&T SM&P;
 Samsung C&T civil construction team;
 External consultants.
 Undertook formal Safety presentations, particularly related to Physics in safety;
 Formal HAZOP and design reviews.
April 2013-August 2015 Civil Technology Pty Ltd
Project Manager for land subdivisonal development. Earthworks,
Roads, drainage, sewerage and water reticulation design.
Jan 2013- March 2013PIHA
Project Manager for HDPE piping contractor.
Roy Hill Iron Ore Water Supply Tender preparation for a Build Own
Operate Contract. Management of hydraulic design. Scope
confirmation. Bid document preparation and tender negotiations.
Sept 2012- Oct 2012 PIHA
Project Manager
Kevin Ian LILLY, Page 3
Rio Tinto Iron Ore Mine Dewatering Study for HDPE piping
contractor.
Client liaison. Scope confirmation for dewatering. Management of
sub-consultants for electrical engineering and hydraulic analysis.
Overseeing Vendor enquiries and Estimate preparation. Completion
of Study report including, project execution plan, basis of design and
value improvements.
Aug 2011-Aug 2012 FASTJV
Senior Civil Engineer
BHPB Outer Harbour Project Q200: Boodarie, Port Hedland
Ship loading conveyor transfer pad earthworks design. Management
of consultants for scour protection of causeway earthworks in tidal
zone. Tidal waterway crossing optimisation. Environmental group
liaison. Rail car dumper excavations design. Project specific Civil
Specification development. Rail car dumper dewatering system
development. Concrete arch railway crossovers.
Aug 2010-Aug 2011 African Minerals Limited
Lead Civil Engineer-Client Representative
Design implementation of 900 bed Operations Camp and planning
for a 1500 bed extension in AML’s Tonkolili Iron Ore Project, Sierra
Leone including, water treatment plant, sewerage, potable water,
power and comms reticulation, sewage treatment, raw water supply,
drainage, accommodation buildings and central facilities. Planning,
design, and contract award.
Management of consultants for the design of process water pond
concrete weir, raw water dam and tailings storage facility. Site
inspections at Tonkolili for siting of dams.
Management of design consultants for the process water abstraction
and distribution.
April 2009- July 2010 FASTJV
Infrastructure Project Engineer
Site based implementation of BHPB Yandi Non-Process
Infrastructure including, waste stabilisation ponds, water treatment
plant, sewerage, water supply, power and comms reticulation,
sewage pump stations, borefield, drainage, water supply pumps,
water supply disinfection and storage tanks, mining camp
accommodation and central facilities installation. Contract variation
approvals.
May 2008- April 2009 KBR
Senior Project Engineer
Yandi Mine-Construction Camp; Perth based implementation of
Marillana expansion WWTP, WTP installation.
Oct 2006 – May 2008 SKM
Design Manager for PPS.
PPS implements outsourced Water Corporation works for water,
sewerage and sewage pumping stations.
 Yarloop water supply
Kevin Ian LILLY, Page 4
 Hyden water supply
 Koorarawalyee DN800
 Boondi DN800
 Canning Vale #5 Sewage Pumping Station
 Cottesloe Main Sewer Replacement
 York Tank Reroofing
 Toodyay Reticulation
 Toodyay BH Extension DN300
Jan 2006 - Oct 2006 Parsons Brinkerhoff
Design Engineer
Design and Construction Supervision of Dyno Nobel Explosives
Depot, Ravensthorpe Nickel Operation
Oct 2004 – Jan 2006 SKM
Senior Civil Engineer
 Water supply design feasibility Eucla Basin,
 Design Manager Finucane Island Water Recovery Plant
April 2003 – Oct 2004 CIVIL CONSULTANTS PTY LTD
Principal
Civil contracting works, drainage, sewerage, water reticulation, roads
and earthworks construction.
Jul 2001 – April 03 METAGO ENVIRONMENTAL ENGINEERS PTY LTD
Project Superintendent
 Phase 3 Heap Leach Pads, Goldfields Ghana, Tarkwa, Ghana,
42 Hectare Site Contract Value $US9M
 Design and Project Superintendent for tailings dam raise at
Merlin Diamonds, Northern Territory.
 Design and onsite technical advisor for tailings dam and water
reclaim pond Osborne Mines, Queensland.
 Installation supervision of tailings dam embankment
piezometers at Argyle Diamonds, Western Australia.
 Design of Alluvial Tailings Dam No. 4 raise at Argyle
Diamonds, Western Australia.
Dec 2000 – Jul 2001 CIVIL CONSULTANTS PTY LTD
Sep 2000 – Dec 2000 WOODMAN ALLIANCE 21 - PERTH
Nov 1998 – Sep 2000 CIVIL TECH PTY LTD - PERTH
Project Engineer
Sep 1998 – Oct 1998 CIVIL CONSULTANTS PTY LTD - SKARDON RIVER, QLD
Apr 1998 – Aug 1998 AA WILKIE CONSULTING ENGINEER - PERTH
Kevin Ian LILLY, Page 5
Nov 1996 – Feb 1998 WMC RESOURCES LTD
Aug 1995 – Sep 1996 WMC RESOURCES LTD, KWINANANICKEL REFINERY - PERTH
Feb 1995 – Jun 1995 KRUPP ENGINEERS - MACKAY, QLD
May 1994 – Feb 1995 CIVIL CONSULTANTS PTY LTD – PERTH
Nov 1993 – May 1994 AUSTRALIAN CONSTRUCTION SERVICES - PERTH
Oct 1993 – Nov 1993 CMPS & F - PERTH
Apr 1993 – Oct 1993 CCD AUSTRALIA PTY LTD - PERTH
1991 – 1993 WATER AUTHORITY OF WA – PERTH
1991 – 1992 WMC - KAMBALDA, WA
1990 – 1991 CIVILTECH PTY LTD - PERTH
1989 – 1990 AUSTRALIAN GROUNDWATER CONSULTANTS - PERTH
1985 – 1988 MT NEWMAN MINING - NEWMAN, WA

Resume 2013

  • 1.
    RESUME NAME: Kevin IanLILLY EDUCATION: Bachelor of Science (Maths) - University of New South Wales (1976) Bachelor of Engineering - Civil (Hons) - University of Newcastle (1982) Graduate Course in Hydrology - University of New South Wales (1987) Steel Design to AS 4100 - Curtin University (1993) Project Management – EEA Short Course Master of Project Management Units (2012) Applied Project Management (HD) Finance and Accounting (HD) AFFILIATIONS: Corporate Member, Institution of Engineers, Australia Chartered Professional Engineer (-2011) SYNOPSIS: Areas of Experience: Civil Design Management Water Corporation water supply and sewerage design. Resources water supply design. Concrete and steelwork inspection. Tailings dam design and project superintendence. Contract administration. Project management. Subdivisional infrastructure design and superintendence; including contract administration, earthworks, retaining walls, sewerage, water reticulation, drainage, roads, landscaping, budget estimation, tendering and sewage pump stations. Mining Camp infrastructure design, technical resolution and superintendence. CONTACT: civilcontracting@iinet.net.au Phone: 0414 888 254
  • 2.
    Kevin Ian LILLY,Page 2 EMPLOYMENT HISTORY August 2013 – May 2015 Samsung C&T; EPC Contractor to the Roy Hill Project Roy Hill Project, Package 3, Site Civil Engineering Manager; As a member of a talented civil site engineering design team, of six members, site adjustments were made in Package 3’s Rail Loop and Ore Stockyard civil design consisting of, but not limited to:  Earthworks for rail formation to top of sub ballast capping, from Great Northern Highway CH 17.75km to the Car Dumper Ch 0.0km in rail loop;  Earthworks and single/two coat sealing of public and private roads;  Review of piling and concrete design for rail overpass bridge;  Organisation of Road Safety Audit for private road intersection with Utah Point Road;  Drainage culvert design review and installation; largest being a 28 barrel DN1500 for the Turner River’s 1:100yr ARI flooding;  Piped and channel drainage throughout package;  Mass balance and material allocation review;  Construction compliance to design;  Car Dumper excavation, hyper-saline dewatering, backfilling and water table recovery reviews;  Rock protection and Flexmat installation against cyclone wave erosion;  Ground improvement required for rail and stockyard earthworks construction in PASS tidal deposit areas;  Works inspection;  Interface verbally and formally, in Technical Quiriess, meeting and contractual letters with:  Roy Hill’s superintendent;  Samsung C&T subcontractors;  third party contractors;  Samsung C&T SM&P;  Samsung C&T civil construction team;  External consultants.  Undertook formal Safety presentations, particularly related to Physics in safety;  Formal HAZOP and design reviews. April 2013-August 2015 Civil Technology Pty Ltd Project Manager for land subdivisonal development. Earthworks, Roads, drainage, sewerage and water reticulation design. Jan 2013- March 2013PIHA Project Manager for HDPE piping contractor. Roy Hill Iron Ore Water Supply Tender preparation for a Build Own Operate Contract. Management of hydraulic design. Scope confirmation. Bid document preparation and tender negotiations. Sept 2012- Oct 2012 PIHA Project Manager
  • 3.
    Kevin Ian LILLY,Page 3 Rio Tinto Iron Ore Mine Dewatering Study for HDPE piping contractor. Client liaison. Scope confirmation for dewatering. Management of sub-consultants for electrical engineering and hydraulic analysis. Overseeing Vendor enquiries and Estimate preparation. Completion of Study report including, project execution plan, basis of design and value improvements. Aug 2011-Aug 2012 FASTJV Senior Civil Engineer BHPB Outer Harbour Project Q200: Boodarie, Port Hedland Ship loading conveyor transfer pad earthworks design. Management of consultants for scour protection of causeway earthworks in tidal zone. Tidal waterway crossing optimisation. Environmental group liaison. Rail car dumper excavations design. Project specific Civil Specification development. Rail car dumper dewatering system development. Concrete arch railway crossovers. Aug 2010-Aug 2011 African Minerals Limited Lead Civil Engineer-Client Representative Design implementation of 900 bed Operations Camp and planning for a 1500 bed extension in AML’s Tonkolili Iron Ore Project, Sierra Leone including, water treatment plant, sewerage, potable water, power and comms reticulation, sewage treatment, raw water supply, drainage, accommodation buildings and central facilities. Planning, design, and contract award. Management of consultants for the design of process water pond concrete weir, raw water dam and tailings storage facility. Site inspections at Tonkolili for siting of dams. Management of design consultants for the process water abstraction and distribution. April 2009- July 2010 FASTJV Infrastructure Project Engineer Site based implementation of BHPB Yandi Non-Process Infrastructure including, waste stabilisation ponds, water treatment plant, sewerage, water supply, power and comms reticulation, sewage pump stations, borefield, drainage, water supply pumps, water supply disinfection and storage tanks, mining camp accommodation and central facilities installation. Contract variation approvals. May 2008- April 2009 KBR Senior Project Engineer Yandi Mine-Construction Camp; Perth based implementation of Marillana expansion WWTP, WTP installation. Oct 2006 – May 2008 SKM Design Manager for PPS. PPS implements outsourced Water Corporation works for water, sewerage and sewage pumping stations.  Yarloop water supply
  • 4.
    Kevin Ian LILLY,Page 4  Hyden water supply  Koorarawalyee DN800  Boondi DN800  Canning Vale #5 Sewage Pumping Station  Cottesloe Main Sewer Replacement  York Tank Reroofing  Toodyay Reticulation  Toodyay BH Extension DN300 Jan 2006 - Oct 2006 Parsons Brinkerhoff Design Engineer Design and Construction Supervision of Dyno Nobel Explosives Depot, Ravensthorpe Nickel Operation Oct 2004 – Jan 2006 SKM Senior Civil Engineer  Water supply design feasibility Eucla Basin,  Design Manager Finucane Island Water Recovery Plant April 2003 – Oct 2004 CIVIL CONSULTANTS PTY LTD Principal Civil contracting works, drainage, sewerage, water reticulation, roads and earthworks construction. Jul 2001 – April 03 METAGO ENVIRONMENTAL ENGINEERS PTY LTD Project Superintendent  Phase 3 Heap Leach Pads, Goldfields Ghana, Tarkwa, Ghana, 42 Hectare Site Contract Value $US9M  Design and Project Superintendent for tailings dam raise at Merlin Diamonds, Northern Territory.  Design and onsite technical advisor for tailings dam and water reclaim pond Osborne Mines, Queensland.  Installation supervision of tailings dam embankment piezometers at Argyle Diamonds, Western Australia.  Design of Alluvial Tailings Dam No. 4 raise at Argyle Diamonds, Western Australia. Dec 2000 – Jul 2001 CIVIL CONSULTANTS PTY LTD Sep 2000 – Dec 2000 WOODMAN ALLIANCE 21 - PERTH Nov 1998 – Sep 2000 CIVIL TECH PTY LTD - PERTH Project Engineer Sep 1998 – Oct 1998 CIVIL CONSULTANTS PTY LTD - SKARDON RIVER, QLD Apr 1998 – Aug 1998 AA WILKIE CONSULTING ENGINEER - PERTH
  • 5.
    Kevin Ian LILLY,Page 5 Nov 1996 – Feb 1998 WMC RESOURCES LTD Aug 1995 – Sep 1996 WMC RESOURCES LTD, KWINANANICKEL REFINERY - PERTH Feb 1995 – Jun 1995 KRUPP ENGINEERS - MACKAY, QLD May 1994 – Feb 1995 CIVIL CONSULTANTS PTY LTD – PERTH Nov 1993 – May 1994 AUSTRALIAN CONSTRUCTION SERVICES - PERTH Oct 1993 – Nov 1993 CMPS & F - PERTH Apr 1993 – Oct 1993 CCD AUSTRALIA PTY LTD - PERTH 1991 – 1993 WATER AUTHORITY OF WA – PERTH 1991 – 1992 WMC - KAMBALDA, WA 1990 – 1991 CIVILTECH PTY LTD - PERTH 1989 – 1990 AUSTRALIAN GROUNDWATER CONSULTANTS - PERTH 1985 – 1988 MT NEWMAN MINING - NEWMAN, WA