Visual Management Standards
Goal :
 Can acknowledge the normal status and abnormal status immediately and visually
 Share the problem occurring in the workplace / plant among everyone for a quick reaction
Visual Management Standards
Subject
of Application
Principles Item (Examples)
Facilities / Machines
Management activities that make facilities to malfunction less and
well performing
Warning light Management
To show Equipment downtime status
To check Facilities Management
Direction indicator (Fluid flow, Direction of rotation)
Indicate management limit of gauge
Opening / Closing Identification mark of Valve
Work Method
To Induce and check that the Site Worker Observe Standard Work
Method
Standard work guidelines (Do’s & Don’ts)
Skill Certification status of operator
Standardized procedure
Product
To check Whether the product is defective or not and whether the
product is surplus or deficient
Whether the product is defective or not
Stock propriety
Delayed, undelivered items
Identification mark of product and stock
Address, Layout
Information To check Product Information of Performance preparing for target
Production Performance Status Management Board
Notice Management Board (except SW)
Identification of Special Characteristics Process
Safety /environment
management
Management activities that identify Work environment from
Danger
Safety Identification of Pedestrians
Type Facilities / Machines Item Warning or Andon light
Use To early detect facilities condition (check whether or not facilities are OK)
Example
&
Standard
* Standard for warning light (Three warning light)
Where • Machines / Equipments
Responsibility • Production Engineer, Maintenance Engineer
Condition
Three warning light
Example
Green Red Yellow
Automatic ON OFF OFF Normal operation
Manual OFF OFF ON
Model change(Job set up), Maintenance
inspection, Setting, Out of parts
Warning OFF ON OFF
Tool damaged, Malfunction, Shortage of oil,
Hydraulic & Pneumatic system error, etc
Visual Management Standards
Type Facilities / Machines Item Indicate management limit of gauge
Use The purpose of gauge limit marking is that anyone can check easily and take measure when pressure is abnormal.
Example
&
Standard
* Indicate management limit of gauge
Where
• Every Facility Equipped with Gauge
• Attached standard of Name Plate : Routine inspection items required. Other items are optional
Responsibility • Production Engineer, Maintenance Engineer
Visual Management Standards
★ Name Plate will be attached at hole using ring.
셋팅값
MIN
MAX
④
③
1) Pressure value,
Pressure Point
: permanent pen (Black)
2) Pressure units
: permanent pen(Black)
or label
①
②
• How to indicate gauge
① Limit : Display to Color Zone ② Management range (Green/Red)
(Change color Blue→Green when new application)
③ Name Plate( Material : Al ) ④ Hole (8㎜×3㎜)
Visual management standards.pptx

More Related Content

Similar to Visual management standards.pptx

Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)
Malla Reddy College of Pharmacy
 
Qa.spc
Qa.spcQa.spc
calibrationintervalspresentation.pdf
calibrationintervalspresentation.pdfcalibrationintervalspresentation.pdf
calibrationintervalspresentation.pdf
AbdulSalamSagir1
 
FAILURE MODE EFFECT ANALYSIS
FAILURE MODE EFFECT ANALYSISFAILURE MODE EFFECT ANALYSIS
FAILURE MODE EFFECT ANALYSIS
ANOOPA NARAYANAN
 
Procedure 1
Procedure 1Procedure 1
Procedure 1
Jenifer Loud
 
CONDITION MONITORING
CONDITION MONITORINGCONDITION MONITORING
CONDITION MONITORING
laxtwinsme
 
fmea-130116034507-phpapp01.pdf
fmea-130116034507-phpapp01.pdffmea-130116034507-phpapp01.pdf
fmea-130116034507-phpapp01.pdf
Rajendran C
 
Risk management in complex changeovers through cfmea
Risk management in complex changeovers through cfmeaRisk management in complex changeovers through cfmea
Risk management in complex changeovers through cfmea
Dr. Bikram Jit Singh
 
Process Instrument LC1
Process  Instrument LC1Process  Instrument LC1
Process Instrument LC1
marcoReud
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag Out
Julian Kalac P.Eng
 
Tpm
TpmTpm
BBA504.pptx
BBA504.pptxBBA504.pptx
BBA504.pptx
princeroy73
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdf
PrabagaraneRamachand1
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdf
PrabagaraneRamachand1
 
Planned preventive maintenance report
Planned preventive maintenance reportPlanned preventive maintenance report
Planned preventive maintenance report
babarsaleeem11
 
line clearance.ppt
line clearance.pptline clearance.ppt
line clearance.ppt
PharmasquireMedics
 
BLUE BELT -NIBM.pp
BLUE BELT  -NIBM.ppBLUE BELT  -NIBM.pp
BLUE BELT -NIBM.pp
dushyanthameegama
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
Anand Subramaniam
 
tpm olisa vincent
tpm olisa vincenttpm olisa vincent
Leading Indicator Program OverView Rev A
Leading  Indicator Program OverView Rev ALeading  Indicator Program OverView Rev A
Leading Indicator Program OverView Rev A
Phil Rochette
 

Similar to Visual management standards.pptx (20)

Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)Equipment validation of tablet compression ( machine)
Equipment validation of tablet compression ( machine)
 
Qa.spc
Qa.spcQa.spc
Qa.spc
 
calibrationintervalspresentation.pdf
calibrationintervalspresentation.pdfcalibrationintervalspresentation.pdf
calibrationintervalspresentation.pdf
 
FAILURE MODE EFFECT ANALYSIS
FAILURE MODE EFFECT ANALYSISFAILURE MODE EFFECT ANALYSIS
FAILURE MODE EFFECT ANALYSIS
 
Procedure 1
Procedure 1Procedure 1
Procedure 1
 
CONDITION MONITORING
CONDITION MONITORINGCONDITION MONITORING
CONDITION MONITORING
 
fmea-130116034507-phpapp01.pdf
fmea-130116034507-phpapp01.pdffmea-130116034507-phpapp01.pdf
fmea-130116034507-phpapp01.pdf
 
Risk management in complex changeovers through cfmea
Risk management in complex changeovers through cfmeaRisk management in complex changeovers through cfmea
Risk management in complex changeovers through cfmea
 
Process Instrument LC1
Process  Instrument LC1Process  Instrument LC1
Process Instrument LC1
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag Out
 
Tpm
TpmTpm
Tpm
 
BBA504.pptx
BBA504.pptxBBA504.pptx
BBA504.pptx
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdf
 
Part 3 - Mfg excellence thr TPS (1).pdf
Part 3 - Mfg excellence thr TPS  (1).pdfPart 3 - Mfg excellence thr TPS  (1).pdf
Part 3 - Mfg excellence thr TPS (1).pdf
 
Planned preventive maintenance report
Planned preventive maintenance reportPlanned preventive maintenance report
Planned preventive maintenance report
 
line clearance.ppt
line clearance.pptline clearance.ppt
line clearance.ppt
 
BLUE BELT -NIBM.pp
BLUE BELT  -NIBM.ppBLUE BELT  -NIBM.pp
BLUE BELT -NIBM.pp
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
tpm olisa vincent
tpm olisa vincenttpm olisa vincent
tpm olisa vincent
 
Leading Indicator Program OverView Rev A
Leading  Indicator Program OverView Rev ALeading  Indicator Program OverView Rev A
Leading Indicator Program OverView Rev A
 

More from BalaBalaji45

TPM-new.ppt
TPM-new.pptTPM-new.ppt
TPM-new.ppt
BalaBalaji45
 
CNC Programmer cum Operator.pdf
CNC Programmer cum Operator.pdfCNC Programmer cum Operator.pdf
CNC Programmer cum Operator.pdf
BalaBalaji45
 
3.Work ethics and socialisation.pptx
3.Work ethics and socialisation.pptx3.Work ethics and socialisation.pptx
3.Work ethics and socialisation.pptx
BalaBalaji45
 
TBM.pptx
TBM.pptxTBM.pptx
TBM.pptx
BalaBalaji45
 
ManpowerPlanning.pptx
ManpowerPlanning.pptxManpowerPlanning.pptx
ManpowerPlanning.pptx
BalaBalaji45
 
F.O.Enemuoh (1).pdf
F.O.Enemuoh (1).pdfF.O.Enemuoh (1).pdf
F.O.Enemuoh (1).pdf
BalaBalaji45
 
MAINTENANCE.ppt
MAINTENANCE.pptMAINTENANCE.ppt
MAINTENANCE.ppt
BalaBalaji45
 

More from BalaBalaji45 (7)

TPM-new.ppt
TPM-new.pptTPM-new.ppt
TPM-new.ppt
 
CNC Programmer cum Operator.pdf
CNC Programmer cum Operator.pdfCNC Programmer cum Operator.pdf
CNC Programmer cum Operator.pdf
 
3.Work ethics and socialisation.pptx
3.Work ethics and socialisation.pptx3.Work ethics and socialisation.pptx
3.Work ethics and socialisation.pptx
 
TBM.pptx
TBM.pptxTBM.pptx
TBM.pptx
 
ManpowerPlanning.pptx
ManpowerPlanning.pptxManpowerPlanning.pptx
ManpowerPlanning.pptx
 
F.O.Enemuoh (1).pdf
F.O.Enemuoh (1).pdfF.O.Enemuoh (1).pdf
F.O.Enemuoh (1).pdf
 
MAINTENANCE.ppt
MAINTENANCE.pptMAINTENANCE.ppt
MAINTENANCE.ppt
 

Recently uploaded

原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样
原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样
原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样
utuvvas
 
Here's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDsHere's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDs
jennifermiller8137
 
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
afkxen
 
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
afkxen
 
Dahua Security Camera System Guide esetia
Dahua Security Camera System Guide esetiaDahua Security Camera System Guide esetia
Dahua Security Camera System Guide esetia
Esentia Systems
 
EV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker JamiesonEV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker Jamieson
Forth
 
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
ggany
 
Charging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinCharging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
Charging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
Forth
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
g1inbfro
 
Charging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinCharging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
Charging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
Forth
 
Catalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptxCatalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptx
Blue Star Brothers
 
Charging Fueling & Infrastructure (CFI) Program by Kevin Miller
Charging Fueling & Infrastructure (CFI) Program  by Kevin MillerCharging Fueling & Infrastructure (CFI) Program  by Kevin Miller
Charging Fueling & Infrastructure (CFI) Program by Kevin Miller
Forth
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
u2cz10zq
 
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
78tq3hi2
 
EV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin DonnellyEV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin Donnelly
Forth
 
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
MarynaYurchenko2
 
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
78tq3hi2
 
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitExpanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Forth
 

Recently uploaded (18)

原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样
原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样
原版定做(mmu学位证书)英国曼彻斯特城市大学毕业证本科文凭原版一模一样
 
Here's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDsHere's Why Every Semi-Truck Should Have ELDs
Here's Why Every Semi-Truck Should Have ELDs
 
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
一比一原版(Columbia文凭证书)哥伦比亚大学毕业证如何办理
 
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
一比一原版(WashU文凭证书)圣路易斯华盛顿大学毕业证如何办理
 
Dahua Security Camera System Guide esetia
Dahua Security Camera System Guide esetiaDahua Security Camera System Guide esetia
Dahua Security Camera System Guide esetia
 
EV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker JamiesonEV Charging at MFH Properties by Whitaker Jamieson
EV Charging at MFH Properties by Whitaker Jamieson
 
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
按照学校原版(UniSA文凭证书)南澳大学毕业证快速办理
 
Charging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinCharging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
Charging Fueling & Infrastructure (CFI) Program Resources by Cat Plein
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
 
Charging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinCharging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
Charging and Fueling Infrastructure Grant: Round 2 by Brandt Hertenstein
 
Catalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptxCatalytic Converter theft prevention - NYC.pptx
Catalytic Converter theft prevention - NYC.pptx
 
Charging Fueling & Infrastructure (CFI) Program by Kevin Miller
Charging Fueling & Infrastructure (CFI) Program  by Kevin MillerCharging Fueling & Infrastructure (CFI) Program  by Kevin Miller
Charging Fueling & Infrastructure (CFI) Program by Kevin Miller
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证如何办理
 
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
快速办理(napier毕业证书)英国龙比亚大学毕业证在读证明一模一样
 
EV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin DonnellyEV Charging at Multifamily Properties by Kevin Donnelly
EV Charging at Multifamily Properties by Kevin Donnelly
 
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
53286592-Global-Entrepreneurship-and-the-Successful-Growth-Strategies-of-Earl...
 
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
原版制作(Exeter毕业证书)埃克塞特大学毕业证完成信一模一样
 
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitExpanding Access to Affordable At-Home EV Charging by Vanessa Warheit
Expanding Access to Affordable At-Home EV Charging by Vanessa Warheit
 

Visual management standards.pptx

  • 1. Visual Management Standards Goal :  Can acknowledge the normal status and abnormal status immediately and visually  Share the problem occurring in the workplace / plant among everyone for a quick reaction
  • 2. Visual Management Standards Subject of Application Principles Item (Examples) Facilities / Machines Management activities that make facilities to malfunction less and well performing Warning light Management To show Equipment downtime status To check Facilities Management Direction indicator (Fluid flow, Direction of rotation) Indicate management limit of gauge Opening / Closing Identification mark of Valve Work Method To Induce and check that the Site Worker Observe Standard Work Method Standard work guidelines (Do’s & Don’ts) Skill Certification status of operator Standardized procedure Product To check Whether the product is defective or not and whether the product is surplus or deficient Whether the product is defective or not Stock propriety Delayed, undelivered items Identification mark of product and stock Address, Layout Information To check Product Information of Performance preparing for target Production Performance Status Management Board Notice Management Board (except SW) Identification of Special Characteristics Process Safety /environment management Management activities that identify Work environment from Danger Safety Identification of Pedestrians
  • 3. Type Facilities / Machines Item Warning or Andon light Use To early detect facilities condition (check whether or not facilities are OK) Example & Standard * Standard for warning light (Three warning light) Where • Machines / Equipments Responsibility • Production Engineer, Maintenance Engineer Condition Three warning light Example Green Red Yellow Automatic ON OFF OFF Normal operation Manual OFF OFF ON Model change(Job set up), Maintenance inspection, Setting, Out of parts Warning OFF ON OFF Tool damaged, Malfunction, Shortage of oil, Hydraulic & Pneumatic system error, etc Visual Management Standards
  • 4. Type Facilities / Machines Item Indicate management limit of gauge Use The purpose of gauge limit marking is that anyone can check easily and take measure when pressure is abnormal. Example & Standard * Indicate management limit of gauge Where • Every Facility Equipped with Gauge • Attached standard of Name Plate : Routine inspection items required. Other items are optional Responsibility • Production Engineer, Maintenance Engineer Visual Management Standards ★ Name Plate will be attached at hole using ring. 셋팅값 MIN MAX ④ ③ 1) Pressure value, Pressure Point : permanent pen (Black) 2) Pressure units : permanent pen(Black) or label ① ② • How to indicate gauge ① Limit : Display to Color Zone ② Management range (Green/Red) (Change color Blue→Green when new application) ③ Name Plate( Material : Al ) ④ Hole (8㎜×3㎜)