Daily Production Management
“5 Tips to Maintain Stability & Exclusion of
Abnormality”
1. Implement 5S
5S is one of the most widely adopted techniques from the lean
manufacturing. 5S is a "foundational" lean management (waste
removing) concept, as it establishes the operational stability required for
making and sustaining continuous improvements.
1. Sort: Separate what is needed and what is not
needed, and keep only those things that are needed in
the workplace. Discard unnecessary items.
2. Set-In-Order: Neatly place and identify needed work
items. Designate a place for everything so that anyone
can find it. Always put things back in their designated
spots.
3. Shine: Clean up thoroughly and take measures
against the sources of dust, leakage of oil, etc.
4. Standardize: Maintain 5 S’s by indicating the rules in
visible forms.
5. Sustain: Guide the people never to allow a violation of
the rule. Maintain and practice the first four S’s.
Points of 5S’s
2. Implement Visual Control
Purpose of
Visual
Control
• Visual control
methods aim to
increase the
efficiency and
effectiveness of
a process by
making the
steps in that
process more
visible.
Requirements for Visual Control
1. Make control items and criteria clear
2. Make everyone instantly recognize the
situation. Normally called “visual
expression.”
Points of Visual Control
1. Abnormalities and problems to be instantly
identified with the item on the spot
• Control criteria are incorporated in the things
on the spot
• Conventional visual control
2. The status of control to be identified at a glance
with the things on the spot
• Control on 5M conditions and characteristics
visually identified
3. Observance of rules and standards visually
identified, including the checking by manager
3. Observing & Enforcement of
Standard
Points of Observance and
Enforcement of Standard
Clarificationofrolesand
responsibilities
Devicestoimprovedifficult
works
Devicestomakenormalconditions
andabnormalitiesvisuallyidentifiable
Standard
Observance and enforcement of
Observance and enforcement of
Observance and enforcement of
Securingbasicquality
100%assurance
working standard
working standard
working standard
Improvement to enable observance and
enforcement
Enhancement of quality consciousness for
observance and enforcement of standards
Three Standards at The Production
Site
Standard Operation Confirmation of Quality Remedies of Abnormalities
 Production Standard
 Operation Standard
 One Operation, One Production
 First In, First Out
 Daily Check of Facilities, Jigs
and Tools
 Control of Manufacturing
Conditions
 Safety Standard
 Recording of Production and
Material Use Histories
 Identification and Classifications
by Lots
 Working Qualification System
 Rules on Special Process
 Inspection Standard
 Rules on Self Check of The
Process
 Rules on third-party confirmation
 Rules on Daily Checking of
Measuring Instruments
 Rules on Quality Confirmation at
The Time Set-Up or Equipment
Abnormalities
 Rules on Quality Confirmation at
The Time Renewal or
Improvement of Equipment and
Tools
 Rules on Control of Measuring
Instruments
 Definition of Abnormalities
 Rules on Remedies for
Abnormalities
 “Go to The Jobsite, See The
Object, and Confirm The
Phenomenon Immediately”
 Rules on Control of
Changed Points
 Judgment of The Lots and
Taking Measures Against
The Defect Product
Promotion of Observance and
Enforcement of Standards
Review and
Improvement
Set Up the
Right
Standards
Sort Out the
Work Hard To
Do or Standards
Difficult To
Observe, &
Propose
Improvements
Observe the
Standards
Securely
(Confirm
Secure
Observance of
Standards)
- Create the Climate of the Jobsite Strict on Fundamentals
Firmly Observe What was Determined
Always Follow the Right Procedures When Changing Rules
Build Up
Dependable
Qualities
Points to be Noticed in Establishing
Standards
1. Focus on the necessary rules.
 Is it really necessary? (Not influenced by nominal
principles or preoccupations)
 Can it be done by the hardware? (By
automatization or failsafe devices)
2. Make clear the objectives, scope of work, sharing
the roles, responsibilities and authorizations.
3. Make clear the risks if the rules are not observed.
4. Reflect the opinion of the operators.
5. Avoid vague expressions
6. Make the points clear.
14
Managers and supervisors
Make standards that can be observed
Revision of the
standards
Study the improvement of standards
Sort out the points by observation of
jobsite
Operators
Observe the right methods
Implementation
Propose improvement of
the standards that are hard
to be observed
1. Is the work done according to the right procedure?
2. Are points of work observed?
3. Are there any work hard to do or standards difficult to
observe?
The Roles of the Operators and
Supervisors in Rotating the PDCA Cycle
Devices to make off-standards
apparent
Third-party confirmation
(Confirmation of the state of
confirmation)
Building up the
quality
(Causes)
 Failsafe devices
 Alarm devices work when condition not fulfilled
 Automatic shutdown of equipment
 Standardization of the place and manner of
storage
 Effective use of computers
 Checking of production records
 Checking by patrol
 Indication of standard passage
 Simplification and standardization of work
 Shortening the cycle by “one-piece-at-a-
time system
Confirmation
of quality
(Results)
 Equipment for 100% inspection
 Failsafe devices
 Computer checking
 Comparison with actual checking
 Graphic management
 Automatic shutdown of equipment
 Retaining of actual product
 Inspection records
 Checking by patrol
 Audit (Not double-checks)
Framework to Identify Off-Standards
4. Implement Failsafe Devices
Fact: People Make Mistakes.
A good failsafe device makes it impossible to make a
mistake.
Points to be Noticed on Failsafe
Devices
• Checking of the functions of failsafe devices is
necessary (at regular intervals)
• Design the process upon full understanding of
actual situation of the jobsite (work)
• Reflect the opinions from the jobsite to avoid
unnecessary difficulties of work
• Let the operators well understand the significance
of failsafe devices
Abnormality is the condition different from
normal, but not necessarily troubles or
defects.
Select and put out acceptable products
only
Right treatment for finished products.
Preventive measures against possible
claims.
The group is
in trouble!
Combine all the
technologies and
skills
5. Abnormality Control
Heavy injury Claim
<Latent>
Slight injury
Near miss or
near accident
Defects
Quality
abnormalities
 Insufficient enforcement of standards
 Insufficient establishment of rules
 Insufficient horizontal deployment of know-how
 Insufficient succession of technologies
Identification of
potential defects is
the points (just as
with safety)
<Apparent> (Safety) (Quality)
<Latent>
Causes of Quality & Safety Defect
Detection of abnormalities and remedies
Early detection of
abnormalities
Quick judgment and
countermeasures
Rules of remedies for abnormalities
Atmosphere of jobsite to make reporting
customary
Enhancement of abilities to detect
abnormalities
Abnormalities are: conditions different from
normal
 Work cannot be done in accordance with
standards.
 Inexperienced defects occurred
 Conditions of materials or equipment differ
from normal
 Continuous defects occurred
 The results went off the control limit.
(Control chart, etc.)
Points of Abnormality Control
- Off-specification products - Out of controlled conditions
- Off-company-rule products* but within - Quality different from normal
official specifications - Quality abnormalities
- Off-specification products but accepted - Abnormalities in 5 M’s with
by the customer equipment, materials, etc
Defects are
Waiver concessions
are
Manners of occurrence,
Characteristics and appearance,
Beyond control limits
Manners of occurrence
Beyond control limits
*Company rules: Established on the basis of
process
Abnormalities are
Defects and Abnormalities
Abnormality control by control chart
A control chart is a time series linear graph representing data with
specific control lines, in order to see if the processes are in stable
condition (whether there are abnormalities) or to maintain the processes
in stable condition.
Upper control limit (UCL)
Center line (CL)
Lower control limit (LCL)
Early Detection of Abnormalities
Qualitative characteristics cannot be
controlled by control charts.
Enhancement of the abilities to detect
abnormalities of the forefront
operators
Detecting
Abnormalities
 Abnormalities are the differences in sound, colour, touch,
smell, temperature, etc. from normal.
 Repeated education on abnormalities.
 Example of identifying a problem by detection of abnormalities
A part-timer identified the change in material quality of piston
sealing by a slight difference of touch
Education on Abnormalities
1. Definition of abnormalities and education on them
o Clarification of rules of measures and easy-to-see
indication
o Enhancement of abilities to detect abnormalities
o Simulated training on measure for abnormalities
2. Enforcement of rules on irregularity measures for
abnormalities
o Report: Quick report to the superiors
o Notification: Information to the previous and next
processes, relevant divisions, customers, etc.
o Consultation: Emergency measures for the
abnormalities and prevention of recurrence
3. Making the framework for recurrence prevention of
abnormalities
Rules on Abnormalities
Upon detecting or perceiving abnormalities either in own process or in other
processes, report to the superiors and notify the inspection division for prompt
remedies.
Upon detecting or perceiving abnormalities of equipment which may lead to quality
defects, report to the superiors for the prevention of defects.
Aim
1. Out line of the system 2. Route of application
1) Targets
I. Defects of parts purchased
II. Defects of preceding processes
III.Troubles with equipment
Operators (Report to the superiors)
Managers Notification and processing
Drafting of the application
Manager of the QA Department
(Examination)
An abnormality was detected or perceived by the
efforts of the employees, appropriate measures
were taken by the organization and quality defects
were prevented
Commendation System for Detection of
Abnormalities
Report (1) Quickly to the superiors
(2) Notify relevant parties in precedent and
following processes
2. Identification of abnormal situation (1) Comparison with previous level
- Rough analysis of the phenomenon (2) Comparison with non-defective
products
(3) Observation of the defectives, Micro
analysis
3. Identification of the lots (1) Tracing the background of production
and material
4. Measures taken to the specified goods (1) Production shutdown
(2) Separation of the specified goods
(3) Judgements as lots
(4) Arrangement of substitutes, observing
the delivery time
(5) Treatment: Disposal, selection, reworks
5. Measures taken to the processes and design (1) Detailed analysis of the phenomenon
- Identification of the cause
(2) Investigation of the cause
(3) Emergency measures: Target subject and
similar product. Both for occurrence and
outflow
(4) Permanent measures: Target subject and
similar product. Both for occurrence and
outflow
5M: Equipment (Machine) + 1D: Design
Materials and parts (Material)
Production standards (Method)
Skill, human factors (Man)
Measurement, inspection (Measurement)
Quick Judgment and Measures
That’s a Wrap!
Feel free to contact:
 Antonius P. Bramono e: pbramono@gmail.com
Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abnormality

More Related Content

What's hot

Muda,Mura & Muri
Muda,Mura & MuriMuda,Mura & Muri
Muda,Mura & Murimanijayjay
 
5 S – A Program To Improve Project
5 S – A Program To Improve Project5 S – A Program To Improve Project
5 S – A Program To Improve ProjectIsidro Sid Calayag
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities博行 門眞
 
5S: Awareness & Implementation
5S: Awareness & Implementation5S: Awareness & Implementation
5S: Awareness & ImplementationMira Anuar
 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementationsudarshan jadwal
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)Zeeshan Syed
 
5S AWARNESS TRAINING PROGRAM
5S AWARNESS  TRAINING  PROGRAM5S AWARNESS  TRAINING  PROGRAM
5S AWARNESS TRAINING PROGRAMDEEPAK SAHOO
 
Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturinglakshya bhardwaj
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_previewJaroslaw Gadek, MBA
 
OPL - One Point Lesson
OPL - One Point LessonOPL - One Point Lesson
OPL - One Point Lesson5S BALAMURUGAN
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozenavijit biswas
 
List of mandatory IATF 16949 documents
List of mandatory IATF 16949 documents List of mandatory IATF 16949 documents
List of mandatory IATF 16949 documents Global Manager Group
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive MaintenanceRAHMAT EIE
 
6 s visual management
6 s  visual management6 s  visual management
6 s visual managementTesltra
 

What's hot (20)

Muda,Mura & Muri
Muda,Mura & MuriMuda,Mura & Muri
Muda,Mura & Muri
 
5 S – A Program To Improve Project
5 S – A Program To Improve Project5 S – A Program To Improve Project
5 S – A Program To Improve Project
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
 
Visual Control and Management : Manufacturing Management
Visual Control and Management : Manufacturing ManagementVisual Control and Management : Manufacturing Management
Visual Control and Management : Manufacturing Management
 
5S: Awareness & Implementation
5S: Awareness & Implementation5S: Awareness & Implementation
5S: Awareness & Implementation
 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)
 
5S AWARNESS TRAINING PROGRAM
5S AWARNESS  TRAINING  PROGRAM5S AWARNESS  TRAINING  PROGRAM
5S AWARNESS TRAINING PROGRAM
 
Timwoods- Lean Manufacturing
Timwoods- Lean ManufacturingTimwoods- Lean Manufacturing
Timwoods- Lean Manufacturing
 
5s and kaizen
5s and kaizen5s and kaizen
5s and kaizen
 
5 S and KAIZEN
5 S and KAIZEN5 S and KAIZEN
5 S and KAIZEN
 
8 muda waste_identifying_preview
8 muda waste_identifying_preview8 muda waste_identifying_preview
8 muda waste_identifying_preview
 
OPL - One Point Lesson
OPL - One Point LessonOPL - One Point Lesson
OPL - One Point Lesson
 
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu HozenAim of tpm 16 losses/7 Steps of Jhisu Hozen
Aim of tpm 16 losses/7 Steps of Jhisu Hozen
 
List of mandatory IATF 16949 documents
List of mandatory IATF 16949 documents List of mandatory IATF 16949 documents
List of mandatory IATF 16949 documents
 
Spc training
Spc training Spc training
Spc training
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive Maintenance
 
6 s visual management
6 s  visual management6 s  visual management
6 s visual management
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
DOJO Slide.pdf
DOJO  Slide.pdfDOJO  Slide.pdf
DOJO Slide.pdf
 

Viewers also liked

Developing Creative Employees Through QCC
Developing Creative Employees Through QCCDeveloping Creative Employees Through QCC
Developing Creative Employees Through QCCAntonius Pompi Bramono
 
10 reasons to invest in a Quality Management System
10 reasons to invest in a Quality Management System10 reasons to invest in a Quality Management System
10 reasons to invest in a Quality Management SystemAntonius Pompi Bramono
 
G: Problem solving step #6- evaluate
G: Problem solving step #6- evaluateG: Problem solving step #6- evaluate
G: Problem solving step #6- evaluateRobyn Cook-Ritchie
 
F: Problem solving step #5 -implement
F: Problem solving step #5 -implementF: Problem solving step #5 -implement
F: Problem solving step #5 -implementRobyn Cook-Ritchie
 
D: Problem solving step #3- brainstorm
D: Problem solving step #3- brainstormD: Problem solving step #3- brainstorm
D: Problem solving step #3- brainstormRobyn Cook-Ritchie
 
Lloyd's register industrial training
Lloyd's register industrial trainingLloyd's register industrial training
Lloyd's register industrial trainingMohd Syahmi Nuruddin
 
Noise and vibrations in the petroleum industry
Noise and vibrations in the petroleum industryNoise and vibrations in the petroleum industry
Noise and vibrations in the petroleum industryLloyd's Register Energy
 
QCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAIN
QCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAINQCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAIN
QCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAINRiya Jain
 
Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...
Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...
Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...KaiNexus
 
Ps session 1 introduction to problem solving
Ps session 1 introduction to problem solvingPs session 1 introduction to problem solving
Ps session 1 introduction to problem solvingRobyn Cook-Ritchie
 
How the 5 S system can make a workplace more efficient - Root out waste and s...
How the 5 S system can make a workplace more efficient - Root out waste and s...How the 5 S system can make a workplace more efficient - Root out waste and s...
How the 5 S system can make a workplace more efficient - Root out waste and s...The Pathway Group
 
Presentation - introduction to 5S
Presentation - introduction to 5SPresentation - introduction to 5S
Presentation - introduction to 5SJan Sabat
 

Viewers also liked (20)

Developing Creative Employees Through QCC
Developing Creative Employees Through QCCDeveloping Creative Employees Through QCC
Developing Creative Employees Through QCC
 
Improving Workplace by 5S
Improving Workplace by 5SImproving Workplace by 5S
Improving Workplace by 5S
 
10 reasons to invest in a Quality Management System
10 reasons to invest in a Quality Management System10 reasons to invest in a Quality Management System
10 reasons to invest in a Quality Management System
 
G: Problem solving step #6- evaluate
G: Problem solving step #6- evaluateG: Problem solving step #6- evaluate
G: Problem solving step #6- evaluate
 
F: Problem solving step #5 -implement
F: Problem solving step #5 -implementF: Problem solving step #5 -implement
F: Problem solving step #5 -implement
 
D: Problem solving step #3- brainstorm
D: Problem solving step #3- brainstormD: Problem solving step #3- brainstorm
D: Problem solving step #3- brainstorm
 
What does quality means
What does quality meansWhat does quality means
What does quality means
 
Suggestions for continual improvement
Suggestions for continual improvementSuggestions for continual improvement
Suggestions for continual improvement
 
Lloyd's register industrial training
Lloyd's register industrial trainingLloyd's register industrial training
Lloyd's register industrial training
 
5S Project
5S Project5S Project
5S Project
 
Creating A Culture of Quality
Creating A Culture of QualityCreating A Culture of Quality
Creating A Culture of Quality
 
Noise and vibrations in the petroleum industry
Noise and vibrations in the petroleum industryNoise and vibrations in the petroleum industry
Noise and vibrations in the petroleum industry
 
PELATIHAN IMPLEMENTASI 5S DI DALAM PERUSAHAAN
PELATIHAN IMPLEMENTASI 5S DI DALAM PERUSAHAANPELATIHAN IMPLEMENTASI 5S DI DALAM PERUSAHAAN
PELATIHAN IMPLEMENTASI 5S DI DALAM PERUSAHAAN
 
QCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAIN
QCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAINQCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAIN
QCL-14-v3 5s OF FUN N FROLIC CANTEEN BANASTHALI VIDYAPITH RIYA JAIN
 
Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...
Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...
Daily Lean Management with KaiNexus: From Huddle Boards to Web-Based Technolo...
 
Ps session 1 introduction to problem solving
Ps session 1 introduction to problem solvingPs session 1 introduction to problem solving
Ps session 1 introduction to problem solving
 
KAIZEN Updated 030507
KAIZEN Updated 030507KAIZEN Updated 030507
KAIZEN Updated 030507
 
How the 5 S system can make a workplace more efficient - Root out waste and s...
How the 5 S system can make a workplace more efficient - Root out waste and s...How the 5 S system can make a workplace more efficient - Root out waste and s...
How the 5 S system can make a workplace more efficient - Root out waste and s...
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Presentation - introduction to 5S
Presentation - introduction to 5SPresentation - introduction to 5S
Presentation - introduction to 5S
 

Similar to Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abnormality

Planned preventive maintenance report
Planned preventive maintenance reportPlanned preventive maintenance report
Planned preventive maintenance reportbabarsaleeem11
 
operator -self inspection.pdf
operator -self inspection.pdfoperator -self inspection.pdf
operator -self inspection.pdfUlhasKavathekar
 
Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...
Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...
Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...SaumyaGunawardana
 
Autonomous_Maintenance_Part_1.pptx
Autonomous_Maintenance_Part_1.pptxAutonomous_Maintenance_Part_1.pptx
Autonomous_Maintenance_Part_1.pptxssuser6cedd3
 
Managerial and Technical skills of supervisors
Managerial and Technical skills of supervisorsManagerial and Technical skills of supervisors
Managerial and Technical skills of supervisorsNabila Naik
 
Managing non conformance colonel sri(titto sunny)
Managing non conformance colonel sri(titto sunny)Managing non conformance colonel sri(titto sunny)
Managing non conformance colonel sri(titto sunny)Traum Academy
 
cGMP / Sai sasidhar.ch
cGMP / Sai sasidhar.chcGMP / Sai sasidhar.ch
cGMP / Sai sasidhar.chsai sasidhar
 
Quality and control Management
Quality and control Management Quality and control Management
Quality and control Management sharyarnawaz
 
Preventive and Predictive maintenance.ppt
Preventive and Predictive maintenance.pptPreventive and Predictive maintenance.ppt
Preventive and Predictive maintenance.pptMamoonurrasheed9
 
Quality Course 1
Quality Course 1Quality Course 1
Quality Course 1Fin1
 
good manufacturing practices presentation
good manufacturing practices presentationgood manufacturing practices presentation
good manufacturing practices presentationUltratech4
 
GMP compliances of Audit
GMP compliances of AuditGMP compliances of Audit
GMP compliances of AuditMegha bhise
 
Chapter 7 Controlling
Chapter 7   ControllingChapter 7   Controlling
Chapter 7 ControllingLaura Law
 
Quality and Inspection indicators which are in details.
Quality and Inspection indicators which are in details.Quality and Inspection indicators which are in details.
Quality and Inspection indicators which are in details.RajviParmar5
 
Quality control and inspection
Quality control and inspectionQuality control and inspection
Quality control and inspectionSamiksha Sawant
 
Deviation and root cause analysis in Pharma
Deviation and root cause analysis in PharmaDeviation and root cause analysis in Pharma
Deviation and root cause analysis in PharmaSubhash Sanghani
 
Root Cause Analysis .pdf
Root Cause Analysis .pdfRoot Cause Analysis .pdf
Root Cause Analysis .pdfssuser089410
 

Similar to Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abnormality (20)

Planned preventive maintenance report
Planned preventive maintenance reportPlanned preventive maintenance report
Planned preventive maintenance report
 
operator -self inspection.pdf
operator -self inspection.pdfoperator -self inspection.pdf
operator -self inspection.pdf
 
Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...
Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...
Six Sigma Control Methods-Introduction to Control Methods Used in Lean Six Si...
 
Autonomous_Maintenance_Part_1.pptx
Autonomous_Maintenance_Part_1.pptxAutonomous_Maintenance_Part_1.pptx
Autonomous_Maintenance_Part_1.pptx
 
Managerial and Technical skills of supervisors
Managerial and Technical skills of supervisorsManagerial and Technical skills of supervisors
Managerial and Technical skills of supervisors
 
Managing non conformance colonel sri(titto sunny)
Managing non conformance colonel sri(titto sunny)Managing non conformance colonel sri(titto sunny)
Managing non conformance colonel sri(titto sunny)
 
cGMP / Sai sasidhar.ch
cGMP / Sai sasidhar.chcGMP / Sai sasidhar.ch
cGMP / Sai sasidhar.ch
 
Face.ppt
Face.pptFace.ppt
Face.ppt
 
5S & Safety
5S & Safety5S & Safety
5S & Safety
 
Quality and control Management
Quality and control Management Quality and control Management
Quality and control Management
 
Preventive and Predictive maintenance.ppt
Preventive and Predictive maintenance.pptPreventive and Predictive maintenance.ppt
Preventive and Predictive maintenance.ppt
 
Quality Course 1
Quality Course 1Quality Course 1
Quality Course 1
 
good manufacturing practices presentation
good manufacturing practices presentationgood manufacturing practices presentation
good manufacturing practices presentation
 
GMP compliances of Audit
GMP compliances of AuditGMP compliances of Audit
GMP compliances of Audit
 
Chapter 7 Controlling
Chapter 7   ControllingChapter 7   Controlling
Chapter 7 Controlling
 
Quality and Inspection indicators which are in details.
Quality and Inspection indicators which are in details.Quality and Inspection indicators which are in details.
Quality and Inspection indicators which are in details.
 
Quality control and inspection
Quality control and inspectionQuality control and inspection
Quality control and inspection
 
Deviation and root cause analysis in Pharma
Deviation and root cause analysis in PharmaDeviation and root cause analysis in Pharma
Deviation and root cause analysis in Pharma
 
Standard
StandardStandard
Standard
 
Root Cause Analysis .pdf
Root Cause Analysis .pdfRoot Cause Analysis .pdf
Root Cause Analysis .pdf
 

More from Antonius Pompi Bramono

More from Antonius Pompi Bramono (14)

Lean Construction: From Theory to Implementation
Lean Construction: From Theory to ImplementationLean Construction: From Theory to Implementation
Lean Construction: From Theory to Implementation
 
Lean Construction
Lean ConstructionLean Construction
Lean Construction
 
Penetrant testing
Penetrant testingPenetrant testing
Penetrant testing
 
8 tips for 5S Success
8 tips for 5S Success8 tips for 5S Success
8 tips for 5S Success
 
Employee Suggestion System
Employee Suggestion SystemEmployee Suggestion System
Employee Suggestion System
 
Weld Repair
Weld RepairWeld Repair
Weld Repair
 
Destructive test
Destructive testDestructive test
Destructive test
 
Weld Inspection - Non Destructive Test
Weld Inspection - Non Destructive TestWeld Inspection - Non Destructive Test
Weld Inspection - Non Destructive Test
 
How to Qualify a Welding Procedure
How to Qualify a Welding ProcedureHow to Qualify a Welding Procedure
How to Qualify a Welding Procedure
 
GTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IXGTAW & GMAW Welder Qualification - ASME Section IX
GTAW & GMAW Welder Qualification - ASME Section IX
 
The 6 Most Common Myths about Quality Management System
The 6 Most Common Myths about Quality Management SystemThe 6 Most Common Myths about Quality Management System
The 6 Most Common Myths about Quality Management System
 
Is Your Management Review Process Adding Value?
Is Your Management Review Process Adding Value?Is Your Management Review Process Adding Value?
Is Your Management Review Process Adding Value?
 
Fundamentals of Quality Control
Fundamentals of Quality ControlFundamentals of Quality Control
Fundamentals of Quality Control
 
Are You Auditing QMS Requirements In The 21st Century?
Are You Auditing QMS Requirements In The 21st Century?Are You Auditing QMS Requirements In The 21st Century?
Are You Auditing QMS Requirements In The 21st Century?
 

Recently uploaded

BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 

Recently uploaded (20)

BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 

Daily Production Management - 5 Tips to Maintain Stability & Exclusion of Abnormality

  • 1. Daily Production Management “5 Tips to Maintain Stability & Exclusion of Abnormality”
  • 3. 5S is one of the most widely adopted techniques from the lean manufacturing. 5S is a "foundational" lean management (waste removing) concept, as it establishes the operational stability required for making and sustaining continuous improvements.
  • 4. 1. Sort: Separate what is needed and what is not needed, and keep only those things that are needed in the workplace. Discard unnecessary items. 2. Set-In-Order: Neatly place and identify needed work items. Designate a place for everything so that anyone can find it. Always put things back in their designated spots. 3. Shine: Clean up thoroughly and take measures against the sources of dust, leakage of oil, etc. 4. Standardize: Maintain 5 S’s by indicating the rules in visible forms. 5. Sustain: Guide the people never to allow a violation of the rule. Maintain and practice the first four S’s. Points of 5S’s
  • 6. Purpose of Visual Control • Visual control methods aim to increase the efficiency and effectiveness of a process by making the steps in that process more visible.
  • 7. Requirements for Visual Control 1. Make control items and criteria clear 2. Make everyone instantly recognize the situation. Normally called “visual expression.”
  • 8. Points of Visual Control 1. Abnormalities and problems to be instantly identified with the item on the spot • Control criteria are incorporated in the things on the spot • Conventional visual control 2. The status of control to be identified at a glance with the things on the spot • Control on 5M conditions and characteristics visually identified 3. Observance of rules and standards visually identified, including the checking by manager
  • 9. 3. Observing & Enforcement of Standard
  • 10. Points of Observance and Enforcement of Standard Clarificationofrolesand responsibilities Devicestoimprovedifficult works Devicestomakenormalconditions andabnormalitiesvisuallyidentifiable Standard Observance and enforcement of Observance and enforcement of Observance and enforcement of Securingbasicquality 100%assurance working standard working standard working standard Improvement to enable observance and enforcement Enhancement of quality consciousness for observance and enforcement of standards
  • 11. Three Standards at The Production Site Standard Operation Confirmation of Quality Remedies of Abnormalities  Production Standard  Operation Standard  One Operation, One Production  First In, First Out  Daily Check of Facilities, Jigs and Tools  Control of Manufacturing Conditions  Safety Standard  Recording of Production and Material Use Histories  Identification and Classifications by Lots  Working Qualification System  Rules on Special Process  Inspection Standard  Rules on Self Check of The Process  Rules on third-party confirmation  Rules on Daily Checking of Measuring Instruments  Rules on Quality Confirmation at The Time Set-Up or Equipment Abnormalities  Rules on Quality Confirmation at The Time Renewal or Improvement of Equipment and Tools  Rules on Control of Measuring Instruments  Definition of Abnormalities  Rules on Remedies for Abnormalities  “Go to The Jobsite, See The Object, and Confirm The Phenomenon Immediately”  Rules on Control of Changed Points  Judgment of The Lots and Taking Measures Against The Defect Product
  • 12. Promotion of Observance and Enforcement of Standards Review and Improvement Set Up the Right Standards Sort Out the Work Hard To Do or Standards Difficult To Observe, & Propose Improvements Observe the Standards Securely (Confirm Secure Observance of Standards) - Create the Climate of the Jobsite Strict on Fundamentals Firmly Observe What was Determined Always Follow the Right Procedures When Changing Rules Build Up Dependable Qualities
  • 13. Points to be Noticed in Establishing Standards 1. Focus on the necessary rules.  Is it really necessary? (Not influenced by nominal principles or preoccupations)  Can it be done by the hardware? (By automatization or failsafe devices) 2. Make clear the objectives, scope of work, sharing the roles, responsibilities and authorizations. 3. Make clear the risks if the rules are not observed. 4. Reflect the opinion of the operators. 5. Avoid vague expressions 6. Make the points clear.
  • 14. 14 Managers and supervisors Make standards that can be observed Revision of the standards Study the improvement of standards Sort out the points by observation of jobsite Operators Observe the right methods Implementation Propose improvement of the standards that are hard to be observed 1. Is the work done according to the right procedure? 2. Are points of work observed? 3. Are there any work hard to do or standards difficult to observe? The Roles of the Operators and Supervisors in Rotating the PDCA Cycle
  • 15. Devices to make off-standards apparent Third-party confirmation (Confirmation of the state of confirmation) Building up the quality (Causes)  Failsafe devices  Alarm devices work when condition not fulfilled  Automatic shutdown of equipment  Standardization of the place and manner of storage  Effective use of computers  Checking of production records  Checking by patrol  Indication of standard passage  Simplification and standardization of work  Shortening the cycle by “one-piece-at-a- time system Confirmation of quality (Results)  Equipment for 100% inspection  Failsafe devices  Computer checking  Comparison with actual checking  Graphic management  Automatic shutdown of equipment  Retaining of actual product  Inspection records  Checking by patrol  Audit (Not double-checks) Framework to Identify Off-Standards
  • 17. Fact: People Make Mistakes. A good failsafe device makes it impossible to make a mistake.
  • 18. Points to be Noticed on Failsafe Devices • Checking of the functions of failsafe devices is necessary (at regular intervals) • Design the process upon full understanding of actual situation of the jobsite (work) • Reflect the opinions from the jobsite to avoid unnecessary difficulties of work • Let the operators well understand the significance of failsafe devices
  • 19. Abnormality is the condition different from normal, but not necessarily troubles or defects. Select and put out acceptable products only Right treatment for finished products. Preventive measures against possible claims. The group is in trouble! Combine all the technologies and skills 5. Abnormality Control
  • 20. Heavy injury Claim <Latent> Slight injury Near miss or near accident Defects Quality abnormalities  Insufficient enforcement of standards  Insufficient establishment of rules  Insufficient horizontal deployment of know-how  Insufficient succession of technologies Identification of potential defects is the points (just as with safety) <Apparent> (Safety) (Quality) <Latent> Causes of Quality & Safety Defect
  • 21. Detection of abnormalities and remedies Early detection of abnormalities Quick judgment and countermeasures Rules of remedies for abnormalities Atmosphere of jobsite to make reporting customary Enhancement of abilities to detect abnormalities Abnormalities are: conditions different from normal  Work cannot be done in accordance with standards.  Inexperienced defects occurred  Conditions of materials or equipment differ from normal  Continuous defects occurred  The results went off the control limit. (Control chart, etc.) Points of Abnormality Control
  • 22. - Off-specification products - Out of controlled conditions - Off-company-rule products* but within - Quality different from normal official specifications - Quality abnormalities - Off-specification products but accepted - Abnormalities in 5 M’s with by the customer equipment, materials, etc Defects are Waiver concessions are Manners of occurrence, Characteristics and appearance, Beyond control limits Manners of occurrence Beyond control limits *Company rules: Established on the basis of process Abnormalities are Defects and Abnormalities
  • 23. Abnormality control by control chart A control chart is a time series linear graph representing data with specific control lines, in order to see if the processes are in stable condition (whether there are abnormalities) or to maintain the processes in stable condition. Upper control limit (UCL) Center line (CL) Lower control limit (LCL) Early Detection of Abnormalities
  • 24. Qualitative characteristics cannot be controlled by control charts. Enhancement of the abilities to detect abnormalities of the forefront operators Detecting Abnormalities  Abnormalities are the differences in sound, colour, touch, smell, temperature, etc. from normal.  Repeated education on abnormalities.  Example of identifying a problem by detection of abnormalities A part-timer identified the change in material quality of piston sealing by a slight difference of touch Education on Abnormalities
  • 25. 1. Definition of abnormalities and education on them o Clarification of rules of measures and easy-to-see indication o Enhancement of abilities to detect abnormalities o Simulated training on measure for abnormalities 2. Enforcement of rules on irregularity measures for abnormalities o Report: Quick report to the superiors o Notification: Information to the previous and next processes, relevant divisions, customers, etc. o Consultation: Emergency measures for the abnormalities and prevention of recurrence 3. Making the framework for recurrence prevention of abnormalities Rules on Abnormalities
  • 26. Upon detecting or perceiving abnormalities either in own process or in other processes, report to the superiors and notify the inspection division for prompt remedies. Upon detecting or perceiving abnormalities of equipment which may lead to quality defects, report to the superiors for the prevention of defects. Aim 1. Out line of the system 2. Route of application 1) Targets I. Defects of parts purchased II. Defects of preceding processes III.Troubles with equipment Operators (Report to the superiors) Managers Notification and processing Drafting of the application Manager of the QA Department (Examination) An abnormality was detected or perceived by the efforts of the employees, appropriate measures were taken by the organization and quality defects were prevented Commendation System for Detection of Abnormalities
  • 27. Report (1) Quickly to the superiors (2) Notify relevant parties in precedent and following processes 2. Identification of abnormal situation (1) Comparison with previous level - Rough analysis of the phenomenon (2) Comparison with non-defective products (3) Observation of the defectives, Micro analysis 3. Identification of the lots (1) Tracing the background of production and material 4. Measures taken to the specified goods (1) Production shutdown (2) Separation of the specified goods (3) Judgements as lots (4) Arrangement of substitutes, observing the delivery time (5) Treatment: Disposal, selection, reworks 5. Measures taken to the processes and design (1) Detailed analysis of the phenomenon - Identification of the cause (2) Investigation of the cause (3) Emergency measures: Target subject and similar product. Both for occurrence and outflow (4) Permanent measures: Target subject and similar product. Both for occurrence and outflow 5M: Equipment (Machine) + 1D: Design Materials and parts (Material) Production standards (Method) Skill, human factors (Man) Measurement, inspection (Measurement) Quick Judgment and Measures
  • 29.
  • 30. Feel free to contact:  Antonius P. Bramono e: pbramono@gmail.com