SlideShare a Scribd company logo
V7.0-03|Work Order Management with MC v7.0
MC University
MC University
Agenda
General Enhancements
Work Manger and Calendars
Complete / Close Process
WO Report / Printout
MC University
General Enhancements
SMS to Work Order Feature
New Assignment Action
Task Enhancements
Miscellaneous Features and Changes
MC University
SMS to Work Order Feature
Optional service available to initiate a Work
Order by sending a text (SMS)
• Sent to a predefined number
MC University
SMS to Work Order Feature (cont’d)
Process for creating Work Order via SMS:
• Subject of text is populated for WO Reason
• Number will be checked for Requester Info
• Any Images added will upload to WO
• Text is sent and WO is created based on the
above criteria
MC University
SMS to Work Order Feature (cont’d)
Important things to know:
• Additional cost to use service
• Only available to Cloud hosted customers
MC University
Interactive Example
Let’s practice the skill you just learned! Check
out the following interactive example, located
under the MCU course slides:
• V7.0-03 – Using the SMS to Work Order
Feature Example 1
MC University
New Assignment Action
Work Order Details includes new Assignment
Action control
MC University
New Assignment Action (cont’d)
New features include:
• “Assign to Me” option
• Filter dropdown to assign from list
MC University
Task Enhancements
New Task enhancements include:
• Option to mark task as “N/A”
• Task headers now editable
MC University
Miscellaneous Features and Changes
Many new features and changes to existing
interface:
• Materials re-labeled as Parts for consistency
• Service Requester can be configured to display
specific WO types
• Clone button added to Work Order record
• Projects cannot be closed until all Work Orders
have been closed
MC University
Work Manager and Calendars
Gantt View
Multi-Select
Pop In / Out Control
MC University
Gantt View
New View option for Calendars to view
extended lists of Work Orders or Assignments
Includes exciting features:
• Duration and progress recording
• Smart Shift
MC University
Gantt View (cont’d)
Days displayed horizontally across top row
Work orders listed chronologically in left
column
MC University
Gantt View (cont’d)
Duration and progress can now be recorded
per individual Work Order using Duration Bar
MC University
Gantt View (cont’d)
Duration Bar can be used to take the
following actions:
• Extend bar to anticipate duration of work
• Adjust Target Date
• Percentage of completion shown in Progress
column
• Bar adjusts color based on progress
MC University
Gantt View (cont’d)
Smart Shift feature allows for moving records
matching filter criteria by same number of
days
• Use case: Project running behind
MC University
Gantt View (cont’d)
Smart Shift must be enabled for Access Group
Indicator must be checked to use
MC University
Interactive Example
Let’s practice the skill you just learned! Check
out the following interactive example, located
under the MCU course slides:
• V7.0-03 – Exploring Gantt View Example 2
MC University
Multi-Select
New Calendar ability to update multiple Work
Orders or Assignments in single step!
MC University
Multi Select (cont’d)
Process for using Multi Select:
• Click Multi-Select indicator
• Select Work Orders / Assignments
• Drag to new date
MC University
Multi Select (cont’d)
“Cut and Paste” feature also available to
move selections
Right click on gray area of Calendar to select
all records for day, week, or month
MC University
Pop In / Out Control
New ability to view Calendar in full screen
mode
• Hides List Pane, Menu, Toolbars, and Tabs
MC University
Complete / Close Process
General Information
Labor Report Enhancements
Percentage Completion
New Preferences
MC University
General Information
Numerous enhancements have been made
All customers will automatically upgrade to
using current version of ECC in v7.0
MC University
Labor Report Enhancements
Comments can be prefaced with current date
and Labor ID using ECC preference
MC University
Labor Report Enhancements (cont’d)
Displays previously entered content in
separate area from ECC
• Permission used to determine edit rights for
previous content
MC University
Interactive Example
Let’s practice the skill you just learned! Check
out the following interactive example, located
under the MCU course slides:
• V7.0-03 – Interacting with New Labor
Report Enhancements Example 3
MC University
Percentage Completion
Technicians can now indicate percentage of
completion on Work Orders in progress
• Appears in Work Manager using Gantt View
MC University
New Preferences
New preferences include:
• Sub-Status field set during Complete / Close
• More control over Meter Reading prompts
• Choose to allow Meter Readings lower than
current value
MC University
WO Report / Printout
Adding User Defined Fields (UDFs)
Work Order Images
Last PM Date
Display as a Link
Work Order Charge Statement
MC University
Adding User Defined Fields (UDFs)
Up to five UDFs can be added
Setup through Work Order Report
Preferences
MC University
Work Order Images
Work Order Images can be displayed in new
section
Setup through Work Order Report Preference
MC University
Last PM Date
Last PM Date now displayed to provide Tech
with reference information
MC University
Display as Link
New ability to designate Document to
Displays as a Link on Work Order Report
Documents marked will be hyperlinked
MC University
Work Order Charge Statement
New configuration option to show Work
Order Labor Comments with each record
MC University
Interactive Example
Let’s practice the skill you just learned! Check
out the following interactive example, located
under the MCU course slides:
• V7.0-03 – Adding UDFs and WO Images to
WO Report Example 4
MC University
Don’t Forget Your Homework!
Watch the previously recorded course Video
or review the course Slides
Practice your new skills with the Interactive
Examples
Test your knowledge of the course material
with the Quiz
Review the other MC v7.0 courses
Thank You for
Attending!

More Related Content

What's hot

SA05 | Customizing the User Interface (MCUI)
SA05 | Customizing the User Interface  (MCUI)SA05 | Customizing the User Interface  (MCUI)
SA05 | Customizing the User Interface (MCUI)
Maintenance Connection
 
W08 | Rules Manager Notifications and Alerts (MCUI)
W08 | Rules Manager Notifications and Alerts (MCUI)W08 | Rules Manager Notifications and Alerts (MCUI)
W08 | Rules Manager Notifications and Alerts (MCUI)
Maintenance Connection
 
Ex05 | System Administration for MC Express (MCUI)
Ex05 | System Administration for MC Express (MCUI)Ex05 | System Administration for MC Express (MCUI)
Ex05 | System Administration for MC Express (MCUI)
Maintenance Connection
 
SA02 | User and Password Management Techniques (MCUI)
SA02 | User and Password Management Techniques  (MCUI)SA02 | User and Password Management Techniques  (MCUI)
SA02 | User and Password Management Techniques (MCUI)
Maintenance Connection
 
SA07 | Rules Manager and Events Notifications (MCUI)
SA07 | Rules Manager and Events Notifications  (MCUI)SA07 | Rules Manager and Events Notifications  (MCUI)
SA07 | Rules Manager and Events Notifications (MCUI)
Maintenance Connection
 
SA04 | Managing KPI's and Dashboards (MCUI)
SA04 | Managing KPI's and Dashboards  (MCUI)SA04 | Managing KPI's and Dashboards  (MCUI)
SA04 | Managing KPI's and Dashboards (MCUI)
Maintenance Connection
 
Ex02 | Asset Management Through MC Express (MCUI)
Ex02 | Asset Management Through MC Express (MCUI)Ex02 | Asset Management Through MC Express (MCUI)
Ex02 | Asset Management Through MC Express (MCUI)
Maintenance Connection
 
P07 | Inventory and Purchasing Preferences (MCUI)
P07 | Inventory and Purchasing Preferences (MCUI)P07 | Inventory and Purchasing Preferences (MCUI)
P07 | Inventory and Purchasing Preferences (MCUI)
Maintenance Connection
 
Ex03 | Work Order Management Through MC Express (MCUI)
Ex03 | Work Order Management Through MC Express (MCUI)Ex03 | Work Order Management Through MC Express (MCUI)
Ex03 | Work Order Management Through MC Express (MCUI)
Maintenance Connection
 
W09 | Work Order Management Tools (MCUI)
W09 | Work Order Management Tools  (MCUI)W09 | Work Order Management Tools  (MCUI)
W09 | Work Order Management Tools (MCUI)
Maintenance Connection
 
Sa03 | Overview of Access Groups (MCUI)
Sa03 | Overview of Access Groups  (MCUI)Sa03 | Overview of Access Groups  (MCUI)
Sa03 | Overview of Access Groups (MCUI)
Maintenance Connection
 
R02 | Basics of Reporting Overview Part 2 (MCUI)
R02 | Basics of Reporting Overview Part 2 (MCUI)R02 | Basics of Reporting Overview Part 2 (MCUI)
R02 | Basics of Reporting Overview Part 2 (MCUI)
Maintenance Connection
 
SA06 | Human Resource Management (MCUI)
SA06 | Human Resource Management  (MCUI)SA06 | Human Resource Management  (MCUI)
SA06 | Human Resource Management (MCUI)
Maintenance Connection
 
W10 | Work Order Preferences (MCUI)
W10 | Work Order Preferences  (MCUI)W10 | Work Order Preferences  (MCUI)
W10 | Work Order Preferences (MCUI)
Maintenance Connection
 
W07 | Tracking Time and Cost on Work Orders (MCUI)
W07 | Tracking Time and Cost on Work Orders  (MCUI)W07 | Tracking Time and Cost on Work Orders  (MCUI)
W07 | Tracking Time and Cost on Work Orders (MCUI)
Maintenance Connection
 
A03 | Managing Assets Using Classifications (MCUI)
A03 | Managing Assets Using Classifications (MCUI)A03 | Managing Assets Using Classifications (MCUI)
A03 | Managing Assets Using Classifications (MCUI)
Maintenance Connection
 
A05 | Managing Asset Life Cycles (MCUI)
A05 | Managing Asset Life Cycles (MCUI)A05 | Managing Asset Life Cycles (MCUI)
A05 | Managing Asset Life Cycles (MCUI)
Maintenance Connection
 
R03 | Basics of Reporting - Report Setup Part 1 (MCUI)
R03 | Basics of Reporting - Report Setup Part 1 (MCUI)R03 | Basics of Reporting - Report Setup Part 1 (MCUI)
R03 | Basics of Reporting - Report Setup Part 1 (MCUI)
Maintenance Connection
 
PPP05 | Creating Preventative Maintenance Schedules (MCUI)
PPP05 | Creating Preventative Maintenance Schedules (MCUI)PPP05 | Creating Preventative Maintenance Schedules (MCUI)
PPP05 | Creating Preventative Maintenance Schedules (MCUI)
Maintenance Connection
 
R01 | Basics of Reporting Overview Part 1 (MCUI)
R01 | Basics of Reporting Overview Part 1 (MCUI)R01 | Basics of Reporting Overview Part 1 (MCUI)
R01 | Basics of Reporting Overview Part 1 (MCUI)
Maintenance Connection
 

What's hot (20)

SA05 | Customizing the User Interface (MCUI)
SA05 | Customizing the User Interface  (MCUI)SA05 | Customizing the User Interface  (MCUI)
SA05 | Customizing the User Interface (MCUI)
 
W08 | Rules Manager Notifications and Alerts (MCUI)
W08 | Rules Manager Notifications and Alerts (MCUI)W08 | Rules Manager Notifications and Alerts (MCUI)
W08 | Rules Manager Notifications and Alerts (MCUI)
 
Ex05 | System Administration for MC Express (MCUI)
Ex05 | System Administration for MC Express (MCUI)Ex05 | System Administration for MC Express (MCUI)
Ex05 | System Administration for MC Express (MCUI)
 
SA02 | User and Password Management Techniques (MCUI)
SA02 | User and Password Management Techniques  (MCUI)SA02 | User and Password Management Techniques  (MCUI)
SA02 | User and Password Management Techniques (MCUI)
 
SA07 | Rules Manager and Events Notifications (MCUI)
SA07 | Rules Manager and Events Notifications  (MCUI)SA07 | Rules Manager and Events Notifications  (MCUI)
SA07 | Rules Manager and Events Notifications (MCUI)
 
SA04 | Managing KPI's and Dashboards (MCUI)
SA04 | Managing KPI's and Dashboards  (MCUI)SA04 | Managing KPI's and Dashboards  (MCUI)
SA04 | Managing KPI's and Dashboards (MCUI)
 
Ex02 | Asset Management Through MC Express (MCUI)
Ex02 | Asset Management Through MC Express (MCUI)Ex02 | Asset Management Through MC Express (MCUI)
Ex02 | Asset Management Through MC Express (MCUI)
 
P07 | Inventory and Purchasing Preferences (MCUI)
P07 | Inventory and Purchasing Preferences (MCUI)P07 | Inventory and Purchasing Preferences (MCUI)
P07 | Inventory and Purchasing Preferences (MCUI)
 
Ex03 | Work Order Management Through MC Express (MCUI)
Ex03 | Work Order Management Through MC Express (MCUI)Ex03 | Work Order Management Through MC Express (MCUI)
Ex03 | Work Order Management Through MC Express (MCUI)
 
W09 | Work Order Management Tools (MCUI)
W09 | Work Order Management Tools  (MCUI)W09 | Work Order Management Tools  (MCUI)
W09 | Work Order Management Tools (MCUI)
 
Sa03 | Overview of Access Groups (MCUI)
Sa03 | Overview of Access Groups  (MCUI)Sa03 | Overview of Access Groups  (MCUI)
Sa03 | Overview of Access Groups (MCUI)
 
R02 | Basics of Reporting Overview Part 2 (MCUI)
R02 | Basics of Reporting Overview Part 2 (MCUI)R02 | Basics of Reporting Overview Part 2 (MCUI)
R02 | Basics of Reporting Overview Part 2 (MCUI)
 
SA06 | Human Resource Management (MCUI)
SA06 | Human Resource Management  (MCUI)SA06 | Human Resource Management  (MCUI)
SA06 | Human Resource Management (MCUI)
 
W10 | Work Order Preferences (MCUI)
W10 | Work Order Preferences  (MCUI)W10 | Work Order Preferences  (MCUI)
W10 | Work Order Preferences (MCUI)
 
W07 | Tracking Time and Cost on Work Orders (MCUI)
W07 | Tracking Time and Cost on Work Orders  (MCUI)W07 | Tracking Time and Cost on Work Orders  (MCUI)
W07 | Tracking Time and Cost on Work Orders (MCUI)
 
A03 | Managing Assets Using Classifications (MCUI)
A03 | Managing Assets Using Classifications (MCUI)A03 | Managing Assets Using Classifications (MCUI)
A03 | Managing Assets Using Classifications (MCUI)
 
A05 | Managing Asset Life Cycles (MCUI)
A05 | Managing Asset Life Cycles (MCUI)A05 | Managing Asset Life Cycles (MCUI)
A05 | Managing Asset Life Cycles (MCUI)
 
R03 | Basics of Reporting - Report Setup Part 1 (MCUI)
R03 | Basics of Reporting - Report Setup Part 1 (MCUI)R03 | Basics of Reporting - Report Setup Part 1 (MCUI)
R03 | Basics of Reporting - Report Setup Part 1 (MCUI)
 
PPP05 | Creating Preventative Maintenance Schedules (MCUI)
PPP05 | Creating Preventative Maintenance Schedules (MCUI)PPP05 | Creating Preventative Maintenance Schedules (MCUI)
PPP05 | Creating Preventative Maintenance Schedules (MCUI)
 
R01 | Basics of Reporting Overview Part 1 (MCUI)
R01 | Basics of Reporting Overview Part 1 (MCUI)R01 | Basics of Reporting Overview Part 1 (MCUI)
R01 | Basics of Reporting Overview Part 1 (MCUI)
 

Similar to V7.0-03 - Work Order Management with MC v7.0

V7.0-08 - MC Express with MC v7.0
V7.0-08 - MC Express with MC v7.0V7.0-08 - MC Express with MC v7.0
V7.0-08 - MC Express with MC v7.0
Maintenance Connection
 
R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)
R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)
R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)
Maintenance Connection
 
EX01 - Overview of MC Express
EX01 - Overview of MC Express EX01 - Overview of MC Express
EX01 - Overview of MC Express
Maintenance Connection
 
R10 - Advanced Reporting Report Setup and Summary Reports (MCU)
R10 - Advanced Reporting Report Setup and Summary Reports (MCU)R10 - Advanced Reporting Report Setup and Summary Reports (MCU)
R10 - Advanced Reporting Report Setup and Summary Reports (MCU)
Maintenance Connection
 
Ex04 | Parts Management Through MC Express
Ex04 | Parts Management Through MC ExpressEx04 | Parts Management Through MC Express
Ex04 | Parts Management Through MC Express
Maintenance Connection
 
PPP03 | Complex Preventative Maintenance Procedures (MCUI)
PPP03 | Complex Preventative Maintenance Procedures (MCUI)PPP03 | Complex Preventative Maintenance Procedures (MCUI)
PPP03 | Complex Preventative Maintenance Procedures (MCUI)
Maintenance Connection
 
PPP06 | PM Generation Methods and Work Order Projections (MCUI)
PPP06 | PM Generation Methods and Work Order Projections (MCUI)PPP06 | PM Generation Methods and Work Order Projections (MCUI)
PPP06 | PM Generation Methods and Work Order Projections (MCUI)
Maintenance Connection
 
A06 | Overview of Asset Reporting (MCUI)
A06 | Overview of Asset Reporting (MCUI)A06 | Overview of Asset Reporting (MCUI)
A06 | Overview of Asset Reporting (MCUI)
Maintenance Connection
 
R07 - Intermediate Reporting Smart Reports (MCU)
R07 - Intermediate Reporting Smart Reports (MCU)R07 - Intermediate Reporting Smart Reports (MCU)
R07 - Intermediate Reporting Smart Reports (MCU)
Maintenance Connection
 
R10 - Advanced Reporting: Report Setup and Summary Reports (MCU)
R10 - Advanced Reporting: Report Setup and Summary Reports (MCU)R10 - Advanced Reporting: Report Setup and Summary Reports (MCU)
R10 - Advanced Reporting: Report Setup and Summary Reports (MCU)
Maintenance Connection
 
A08 | Using Asset Meters and User Defined Fields (MCUI)
A08 | Using Asset Meters and User Defined Fields (MCUI) A08 | Using Asset Meters and User Defined Fields (MCUI)
A08 | Using Asset Meters and User Defined Fields (MCUI)
Maintenance Connection
 
R05 - Intermediate Reporting Report Configuration (MCU)
R05 - Intermediate Reporting Report Configuration (MCU)R05 - Intermediate Reporting Report Configuration (MCU)
R05 - Intermediate Reporting Report Configuration (MCU)
Maintenance Connection
 
A08 - Using Asset Meters and User Defined Fields (MCU)
A08 - Using Asset Meters and User Defined Fields (MCU)A08 - Using Asset Meters and User Defined Fields (MCU)
A08 - Using Asset Meters and User Defined Fields (MCU)
Maintenance Connection
 
EX03 - Work Management Through MC Express
EX03 - Work Management Through MC Express EX03 - Work Management Through MC Express
EX03 - Work Management Through MC Express
Maintenance Connection
 
SA04 - Managing KPIs and Dashboards (MCU)
SA04 - Managing KPIs and Dashboards (MCU) SA04 - Managing KPIs and Dashboards (MCU)
SA04 - Managing KPIs and Dashboards (MCU)
Maintenance Connection
 
SA04 - Managing KPIs and Dashboards (MCU)
SA04 - Managing KPIs and Dashboards (MCU)SA04 - Managing KPIs and Dashboards (MCU)
SA04 - Managing KPIs and Dashboards (MCU)
Maintenance Connection
 
W06 - Standard / Enhanced Complete Close Setup (MCU)
W06 - Standard / Enhanced Complete Close Setup (MCU)W06 - Standard / Enhanced Complete Close Setup (MCU)
W06 - Standard / Enhanced Complete Close Setup (MCU)
Maintenance Connection
 
W09 - Work Order Management Tools (MCU)
W09 - Work Order Management Tools (MCU)W09 - Work Order Management Tools (MCU)
W09 - Work Order Management Tools (MCU)
Maintenance Connection
 
R05 | Intermediate Reporting - Report Configuration (MCI)
R05 | Intermediate Reporting - Report Configuration (MCI)R05 | Intermediate Reporting - Report Configuration (MCI)
R05 | Intermediate Reporting - Report Configuration (MCI)
Maintenance Connection
 
PPP07 | Project and Project Plans (MCUI)
PPP07 | Project and Project Plans (MCUI)PPP07 | Project and Project Plans (MCUI)
PPP07 | Project and Project Plans (MCUI)
Maintenance Connection
 

Similar to V7.0-03 - Work Order Management with MC v7.0 (20)

V7.0-08 - MC Express with MC v7.0
V7.0-08 - MC Express with MC v7.0V7.0-08 - MC Express with MC v7.0
V7.0-08 - MC Express with MC v7.0
 
R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)
R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)
R10 | Advanced Reporting - Report Setup and Summary Reports (MCUI)
 
EX01 - Overview of MC Express
EX01 - Overview of MC Express EX01 - Overview of MC Express
EX01 - Overview of MC Express
 
R10 - Advanced Reporting Report Setup and Summary Reports (MCU)
R10 - Advanced Reporting Report Setup and Summary Reports (MCU)R10 - Advanced Reporting Report Setup and Summary Reports (MCU)
R10 - Advanced Reporting Report Setup and Summary Reports (MCU)
 
Ex04 | Parts Management Through MC Express
Ex04 | Parts Management Through MC ExpressEx04 | Parts Management Through MC Express
Ex04 | Parts Management Through MC Express
 
PPP03 | Complex Preventative Maintenance Procedures (MCUI)
PPP03 | Complex Preventative Maintenance Procedures (MCUI)PPP03 | Complex Preventative Maintenance Procedures (MCUI)
PPP03 | Complex Preventative Maintenance Procedures (MCUI)
 
PPP06 | PM Generation Methods and Work Order Projections (MCUI)
PPP06 | PM Generation Methods and Work Order Projections (MCUI)PPP06 | PM Generation Methods and Work Order Projections (MCUI)
PPP06 | PM Generation Methods and Work Order Projections (MCUI)
 
A06 | Overview of Asset Reporting (MCUI)
A06 | Overview of Asset Reporting (MCUI)A06 | Overview of Asset Reporting (MCUI)
A06 | Overview of Asset Reporting (MCUI)
 
R07 - Intermediate Reporting Smart Reports (MCU)
R07 - Intermediate Reporting Smart Reports (MCU)R07 - Intermediate Reporting Smart Reports (MCU)
R07 - Intermediate Reporting Smart Reports (MCU)
 
R10 - Advanced Reporting: Report Setup and Summary Reports (MCU)
R10 - Advanced Reporting: Report Setup and Summary Reports (MCU)R10 - Advanced Reporting: Report Setup and Summary Reports (MCU)
R10 - Advanced Reporting: Report Setup and Summary Reports (MCU)
 
A08 | Using Asset Meters and User Defined Fields (MCUI)
A08 | Using Asset Meters and User Defined Fields (MCUI) A08 | Using Asset Meters and User Defined Fields (MCUI)
A08 | Using Asset Meters and User Defined Fields (MCUI)
 
R05 - Intermediate Reporting Report Configuration (MCU)
R05 - Intermediate Reporting Report Configuration (MCU)R05 - Intermediate Reporting Report Configuration (MCU)
R05 - Intermediate Reporting Report Configuration (MCU)
 
A08 - Using Asset Meters and User Defined Fields (MCU)
A08 - Using Asset Meters and User Defined Fields (MCU)A08 - Using Asset Meters and User Defined Fields (MCU)
A08 - Using Asset Meters and User Defined Fields (MCU)
 
EX03 - Work Management Through MC Express
EX03 - Work Management Through MC Express EX03 - Work Management Through MC Express
EX03 - Work Management Through MC Express
 
SA04 - Managing KPIs and Dashboards (MCU)
SA04 - Managing KPIs and Dashboards (MCU) SA04 - Managing KPIs and Dashboards (MCU)
SA04 - Managing KPIs and Dashboards (MCU)
 
SA04 - Managing KPIs and Dashboards (MCU)
SA04 - Managing KPIs and Dashboards (MCU)SA04 - Managing KPIs and Dashboards (MCU)
SA04 - Managing KPIs and Dashboards (MCU)
 
W06 - Standard / Enhanced Complete Close Setup (MCU)
W06 - Standard / Enhanced Complete Close Setup (MCU)W06 - Standard / Enhanced Complete Close Setup (MCU)
W06 - Standard / Enhanced Complete Close Setup (MCU)
 
W09 - Work Order Management Tools (MCU)
W09 - Work Order Management Tools (MCU)W09 - Work Order Management Tools (MCU)
W09 - Work Order Management Tools (MCU)
 
R05 | Intermediate Reporting - Report Configuration (MCI)
R05 | Intermediate Reporting - Report Configuration (MCI)R05 | Intermediate Reporting - Report Configuration (MCI)
R05 | Intermediate Reporting - Report Configuration (MCI)
 
PPP07 | Project and Project Plans (MCUI)
PPP07 | Project and Project Plans (MCUI)PPP07 | Project and Project Plans (MCUI)
PPP07 | Project and Project Plans (MCUI)
 

More from Maintenance Connection

Three Easy Ways to Radically Improve Your Manufacturing Asset Management Process
Three Easy Ways to Radically Improve Your Manufacturing Asset Management ProcessThree Easy Ways to Radically Improve Your Manufacturing Asset Management Process
Three Easy Ways to Radically Improve Your Manufacturing Asset Management Process
Maintenance Connection
 
3 inventory strategies to maximize your CMMS profitability
3 inventory strategies to maximize your CMMS profitability3 inventory strategies to maximize your CMMS profitability
3 inventory strategies to maximize your CMMS profitability
Maintenance Connection
 
3 Ways a Mobile CMMS Strategy Can Revolutionize Your Organization
3 Ways a Mobile CMMS Strategy Can Revolutionize Your Organization3 Ways a Mobile CMMS Strategy Can Revolutionize Your Organization
3 Ways a Mobile CMMS Strategy Can Revolutionize Your Organization
Maintenance Connection
 
How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...
How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...
How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...
Maintenance Connection
 
Manufacturers: What's next in the ever-evolving industry?
Manufacturers: What's next in the ever-evolving industry?Manufacturers: What's next in the ever-evolving industry?
Manufacturers: What's next in the ever-evolving industry?
Maintenance Connection
 
R11 | Pivot Reports (MCUI)
R11 | Pivot Reports (MCUI)R11 | Pivot Reports (MCUI)
R11 | Pivot Reports (MCUI)
Maintenance Connection
 
R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)
R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)
R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)
Maintenance Connection
 
R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)
R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)
R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)
Maintenance Connection
 
R07 | Intermediate Reporting - Smart Reports (MCUI)
R07 | Intermediate Reporting - Smart Reports (MCUI)R07 | Intermediate Reporting - Smart Reports (MCUI)
R07 | Intermediate Reporting - Smart Reports (MCUI)
Maintenance Connection
 
R06 | Intermediate Reporting - Conditional Formatting (MCUI)
R06 | Intermediate Reporting - Conditional Formatting (MCUI)R06 | Intermediate Reporting - Conditional Formatting (MCUI)
R06 | Intermediate Reporting - Conditional Formatting (MCUI)
Maintenance Connection
 
R04 | Basics of Reporting - Report Setup Part 2 (MCUI)
R04 | Basics of Reporting - Report Setup Part 2  (MCUI)R04 | Basics of Reporting - Report Setup Part 2  (MCUI)
R04 | Basics of Reporting - Report Setup Part 2 (MCUI)
Maintenance Connection
 

More from Maintenance Connection (11)

Three Easy Ways to Radically Improve Your Manufacturing Asset Management Process
Three Easy Ways to Radically Improve Your Manufacturing Asset Management ProcessThree Easy Ways to Radically Improve Your Manufacturing Asset Management Process
Three Easy Ways to Radically Improve Your Manufacturing Asset Management Process
 
3 inventory strategies to maximize your CMMS profitability
3 inventory strategies to maximize your CMMS profitability3 inventory strategies to maximize your CMMS profitability
3 inventory strategies to maximize your CMMS profitability
 
3 Ways a Mobile CMMS Strategy Can Revolutionize Your Organization
3 Ways a Mobile CMMS Strategy Can Revolutionize Your Organization3 Ways a Mobile CMMS Strategy Can Revolutionize Your Organization
3 Ways a Mobile CMMS Strategy Can Revolutionize Your Organization
 
How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...
How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...
How Healthcare Maintenance Pros Can Improve Operations with Preventive Mainte...
 
Manufacturers: What's next in the ever-evolving industry?
Manufacturers: What's next in the ever-evolving industry?Manufacturers: What's next in the ever-evolving industry?
Manufacturers: What's next in the ever-evolving industry?
 
R11 | Pivot Reports (MCUI)
R11 | Pivot Reports (MCUI)R11 | Pivot Reports (MCUI)
R11 | Pivot Reports (MCUI)
 
R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)
R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)
R09 | Advanced Reporting - Custom Expressions and Criteria (MCUI)
 
R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)
R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)
R08 | Intermediate Reporting - Email Schedule and Reporting (MCUI)
 
R07 | Intermediate Reporting - Smart Reports (MCUI)
R07 | Intermediate Reporting - Smart Reports (MCUI)R07 | Intermediate Reporting - Smart Reports (MCUI)
R07 | Intermediate Reporting - Smart Reports (MCUI)
 
R06 | Intermediate Reporting - Conditional Formatting (MCUI)
R06 | Intermediate Reporting - Conditional Formatting (MCUI)R06 | Intermediate Reporting - Conditional Formatting (MCUI)
R06 | Intermediate Reporting - Conditional Formatting (MCUI)
 
R04 | Basics of Reporting - Report Setup Part 2 (MCUI)
R04 | Basics of Reporting - Report Setup Part 2  (MCUI)R04 | Basics of Reporting - Report Setup Part 2  (MCUI)
R04 | Basics of Reporting - Report Setup Part 2 (MCUI)
 

Recently uploaded

Energy consumption of Database Management - Florina Jonuzi
Energy consumption of Database Management - Florina JonuziEnergy consumption of Database Management - Florina Jonuzi
Energy consumption of Database Management - Florina Jonuzi
Green Software Development
 
E-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian Companies
E-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian CompaniesE-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian Companies
E-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian Companies
Quickdice ERP
 
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit ParisNeo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j
 
SMS API Integration in Saudi Arabia| Best SMS API Service
SMS API Integration in Saudi Arabia| Best SMS API ServiceSMS API Integration in Saudi Arabia| Best SMS API Service
SMS API Integration in Saudi Arabia| Best SMS API Service
Yara Milbes
 
Empowering Growth with Best Software Development Company in Noida - Deuglo
Empowering Growth with Best Software  Development Company in Noida - DeugloEmpowering Growth with Best Software  Development Company in Noida - Deuglo
Empowering Growth with Best Software Development Company in Noida - Deuglo
Deuglo Infosystem Pvt Ltd
 
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit ParisNeo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j
 
Oracle 23c New Features For DBAs and Developers.pptx
Oracle 23c New Features For DBAs and Developers.pptxOracle 23c New Features For DBAs and Developers.pptx
Oracle 23c New Features For DBAs and Developers.pptx
Remote DBA Services
 
8 Best Automated Android App Testing Tool and Framework in 2024.pdf
8 Best Automated Android App Testing Tool and Framework in 2024.pdf8 Best Automated Android App Testing Tool and Framework in 2024.pdf
8 Best Automated Android App Testing Tool and Framework in 2024.pdf
kalichargn70th171
 
Vitthal Shirke Java Microservices Resume.pdf
Vitthal Shirke Java Microservices Resume.pdfVitthal Shirke Java Microservices Resume.pdf
Vitthal Shirke Java Microservices Resume.pdf
Vitthal Shirke
 
E-commerce Application Development Company.pdf
E-commerce Application Development Company.pdfE-commerce Application Development Company.pdf
E-commerce Application Development Company.pdf
Hornet Dynamics
 
openEuler Case Study - The Journey to Supply Chain Security
openEuler Case Study - The Journey to Supply Chain SecurityopenEuler Case Study - The Journey to Supply Chain Security
openEuler Case Study - The Journey to Supply Chain Security
Shane Coughlan
 
DDS-Security 1.2 - What's New? Stronger security for long-running systems
DDS-Security 1.2 - What's New? Stronger security for long-running systemsDDS-Security 1.2 - What's New? Stronger security for long-running systems
DDS-Security 1.2 - What's New? Stronger security for long-running systems
Gerardo Pardo-Castellote
 
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Łukasz Chruściel
 
Webinar On-Demand: Using Flutter for Embedded
Webinar On-Demand: Using Flutter for EmbeddedWebinar On-Demand: Using Flutter for Embedded
Webinar On-Demand: Using Flutter for Embedded
ICS
 
Atelier - Innover avec l’IA Générative et les graphes de connaissances
Atelier - Innover avec l’IA Générative et les graphes de connaissancesAtelier - Innover avec l’IA Générative et les graphes de connaissances
Atelier - Innover avec l’IA Générative et les graphes de connaissances
Neo4j
 
ALGIT - Assembly Line for Green IT - Numbers, Data, Facts
ALGIT - Assembly Line for Green IT - Numbers, Data, FactsALGIT - Assembly Line for Green IT - Numbers, Data, Facts
ALGIT - Assembly Line for Green IT - Numbers, Data, Facts
Green Software Development
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
Safe Software
 
Artificia Intellicence and XPath Extension Functions
Artificia Intellicence and XPath Extension FunctionsArtificia Intellicence and XPath Extension Functions
Artificia Intellicence and XPath Extension Functions
Octavian Nadolu
 
How to write a program in any programming language
How to write a program in any programming languageHow to write a program in any programming language
How to write a program in any programming language
Rakesh Kumar R
 
socradar-q1-2024-aviation-industry-report.pdf
socradar-q1-2024-aviation-industry-report.pdfsocradar-q1-2024-aviation-industry-report.pdf
socradar-q1-2024-aviation-industry-report.pdf
SOCRadar
 

Recently uploaded (20)

Energy consumption of Database Management - Florina Jonuzi
Energy consumption of Database Management - Florina JonuziEnergy consumption of Database Management - Florina Jonuzi
Energy consumption of Database Management - Florina Jonuzi
 
E-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian Companies
E-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian CompaniesE-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian Companies
E-Invoicing Implementation: A Step-by-Step Guide for Saudi Arabian Companies
 
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit ParisNeo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
 
SMS API Integration in Saudi Arabia| Best SMS API Service
SMS API Integration in Saudi Arabia| Best SMS API ServiceSMS API Integration in Saudi Arabia| Best SMS API Service
SMS API Integration in Saudi Arabia| Best SMS API Service
 
Empowering Growth with Best Software Development Company in Noida - Deuglo
Empowering Growth with Best Software  Development Company in Noida - DeugloEmpowering Growth with Best Software  Development Company in Noida - Deuglo
Empowering Growth with Best Software Development Company in Noida - Deuglo
 
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit ParisNeo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
Neo4j - Product Vision and Knowledge Graphs - GraphSummit Paris
 
Oracle 23c New Features For DBAs and Developers.pptx
Oracle 23c New Features For DBAs and Developers.pptxOracle 23c New Features For DBAs and Developers.pptx
Oracle 23c New Features For DBAs and Developers.pptx
 
8 Best Automated Android App Testing Tool and Framework in 2024.pdf
8 Best Automated Android App Testing Tool and Framework in 2024.pdf8 Best Automated Android App Testing Tool and Framework in 2024.pdf
8 Best Automated Android App Testing Tool and Framework in 2024.pdf
 
Vitthal Shirke Java Microservices Resume.pdf
Vitthal Shirke Java Microservices Resume.pdfVitthal Shirke Java Microservices Resume.pdf
Vitthal Shirke Java Microservices Resume.pdf
 
E-commerce Application Development Company.pdf
E-commerce Application Development Company.pdfE-commerce Application Development Company.pdf
E-commerce Application Development Company.pdf
 
openEuler Case Study - The Journey to Supply Chain Security
openEuler Case Study - The Journey to Supply Chain SecurityopenEuler Case Study - The Journey to Supply Chain Security
openEuler Case Study - The Journey to Supply Chain Security
 
DDS-Security 1.2 - What's New? Stronger security for long-running systems
DDS-Security 1.2 - What's New? Stronger security for long-running systemsDDS-Security 1.2 - What's New? Stronger security for long-running systems
DDS-Security 1.2 - What's New? Stronger security for long-running systems
 
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️Need for Speed: Removing speed bumps from your Symfony projects ⚡️
Need for Speed: Removing speed bumps from your Symfony projects ⚡️
 
Webinar On-Demand: Using Flutter for Embedded
Webinar On-Demand: Using Flutter for EmbeddedWebinar On-Demand: Using Flutter for Embedded
Webinar On-Demand: Using Flutter for Embedded
 
Atelier - Innover avec l’IA Générative et les graphes de connaissances
Atelier - Innover avec l’IA Générative et les graphes de connaissancesAtelier - Innover avec l’IA Générative et les graphes de connaissances
Atelier - Innover avec l’IA Générative et les graphes de connaissances
 
ALGIT - Assembly Line for Green IT - Numbers, Data, Facts
ALGIT - Assembly Line for Green IT - Numbers, Data, FactsALGIT - Assembly Line for Green IT - Numbers, Data, Facts
ALGIT - Assembly Line for Green IT - Numbers, Data, Facts
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
 
Artificia Intellicence and XPath Extension Functions
Artificia Intellicence and XPath Extension FunctionsArtificia Intellicence and XPath Extension Functions
Artificia Intellicence and XPath Extension Functions
 
How to write a program in any programming language
How to write a program in any programming languageHow to write a program in any programming language
How to write a program in any programming language
 
socradar-q1-2024-aviation-industry-report.pdf
socradar-q1-2024-aviation-industry-report.pdfsocradar-q1-2024-aviation-industry-report.pdf
socradar-q1-2024-aviation-industry-report.pdf
 

V7.0-03 - Work Order Management with MC v7.0

  • 1. V7.0-03|Work Order Management with MC v7.0 MC University
  • 2. MC University Agenda General Enhancements Work Manger and Calendars Complete / Close Process WO Report / Printout
  • 3. MC University General Enhancements SMS to Work Order Feature New Assignment Action Task Enhancements Miscellaneous Features and Changes
  • 4. MC University SMS to Work Order Feature Optional service available to initiate a Work Order by sending a text (SMS) • Sent to a predefined number
  • 5. MC University SMS to Work Order Feature (cont’d) Process for creating Work Order via SMS: • Subject of text is populated for WO Reason • Number will be checked for Requester Info • Any Images added will upload to WO • Text is sent and WO is created based on the above criteria
  • 6. MC University SMS to Work Order Feature (cont’d) Important things to know: • Additional cost to use service • Only available to Cloud hosted customers
  • 7. MC University Interactive Example Let’s practice the skill you just learned! Check out the following interactive example, located under the MCU course slides: • V7.0-03 – Using the SMS to Work Order Feature Example 1
  • 8. MC University New Assignment Action Work Order Details includes new Assignment Action control
  • 9. MC University New Assignment Action (cont’d) New features include: • “Assign to Me” option • Filter dropdown to assign from list
  • 10. MC University Task Enhancements New Task enhancements include: • Option to mark task as “N/A” • Task headers now editable
  • 11. MC University Miscellaneous Features and Changes Many new features and changes to existing interface: • Materials re-labeled as Parts for consistency • Service Requester can be configured to display specific WO types • Clone button added to Work Order record • Projects cannot be closed until all Work Orders have been closed
  • 12. MC University Work Manager and Calendars Gantt View Multi-Select Pop In / Out Control
  • 13. MC University Gantt View New View option for Calendars to view extended lists of Work Orders or Assignments Includes exciting features: • Duration and progress recording • Smart Shift
  • 14. MC University Gantt View (cont’d) Days displayed horizontally across top row Work orders listed chronologically in left column
  • 15. MC University Gantt View (cont’d) Duration and progress can now be recorded per individual Work Order using Duration Bar
  • 16. MC University Gantt View (cont’d) Duration Bar can be used to take the following actions: • Extend bar to anticipate duration of work • Adjust Target Date • Percentage of completion shown in Progress column • Bar adjusts color based on progress
  • 17. MC University Gantt View (cont’d) Smart Shift feature allows for moving records matching filter criteria by same number of days • Use case: Project running behind
  • 18. MC University Gantt View (cont’d) Smart Shift must be enabled for Access Group Indicator must be checked to use
  • 19. MC University Interactive Example Let’s practice the skill you just learned! Check out the following interactive example, located under the MCU course slides: • V7.0-03 – Exploring Gantt View Example 2
  • 20. MC University Multi-Select New Calendar ability to update multiple Work Orders or Assignments in single step!
  • 21. MC University Multi Select (cont’d) Process for using Multi Select: • Click Multi-Select indicator • Select Work Orders / Assignments • Drag to new date
  • 22. MC University Multi Select (cont’d) “Cut and Paste” feature also available to move selections Right click on gray area of Calendar to select all records for day, week, or month
  • 23. MC University Pop In / Out Control New ability to view Calendar in full screen mode • Hides List Pane, Menu, Toolbars, and Tabs
  • 24. MC University Complete / Close Process General Information Labor Report Enhancements Percentage Completion New Preferences
  • 25. MC University General Information Numerous enhancements have been made All customers will automatically upgrade to using current version of ECC in v7.0
  • 26. MC University Labor Report Enhancements Comments can be prefaced with current date and Labor ID using ECC preference
  • 27. MC University Labor Report Enhancements (cont’d) Displays previously entered content in separate area from ECC • Permission used to determine edit rights for previous content
  • 28. MC University Interactive Example Let’s practice the skill you just learned! Check out the following interactive example, located under the MCU course slides: • V7.0-03 – Interacting with New Labor Report Enhancements Example 3
  • 29. MC University Percentage Completion Technicians can now indicate percentage of completion on Work Orders in progress • Appears in Work Manager using Gantt View
  • 30. MC University New Preferences New preferences include: • Sub-Status field set during Complete / Close • More control over Meter Reading prompts • Choose to allow Meter Readings lower than current value
  • 31. MC University WO Report / Printout Adding User Defined Fields (UDFs) Work Order Images Last PM Date Display as a Link Work Order Charge Statement
  • 32. MC University Adding User Defined Fields (UDFs) Up to five UDFs can be added Setup through Work Order Report Preferences
  • 33. MC University Work Order Images Work Order Images can be displayed in new section Setup through Work Order Report Preference
  • 34. MC University Last PM Date Last PM Date now displayed to provide Tech with reference information
  • 35. MC University Display as Link New ability to designate Document to Displays as a Link on Work Order Report Documents marked will be hyperlinked
  • 36. MC University Work Order Charge Statement New configuration option to show Work Order Labor Comments with each record
  • 37. MC University Interactive Example Let’s practice the skill you just learned! Check out the following interactive example, located under the MCU course slides: • V7.0-03 – Adding UDFs and WO Images to WO Report Example 4
  • 38. MC University Don’t Forget Your Homework! Watch the previously recorded course Video or review the course Slides Practice your new skills with the Interactive Examples Test your knowledge of the course material with the Quiz Review the other MC v7.0 courses

Editor's Notes

  1. USE CASE: A good use case for this feature is in the Projects area. If a project was running behind, a work order could be shifted forward a week which would result in all future work orders for the displayed project moving in tandem. The target dates for each work order would shift by seven days.
  2. NOTE: This feature is valuable for when it is needed to gain a more visible area when there are a large number of assignments.