Outline
• An “X” is used to indicate an
association between a data
element and methodology
• A “Blank Cell” is not used as
input for the corresponding
methodology
Data
RequiRement
explanatiOn Of sOme teRm
 Total walkway width
• Distance from outside edge of road ( or face of curb) to far edge of the sidewalk
• Buffer width is included
• Paved shoulder is not included
• For varying width along segment use average value
 Effective width of fixed object
• Along the inside of the sidewalk
• Along the outside of the sidewalk
 Buffer width
• Distance between outside edge of road ( or face of curb) and the near edge of the sidewalk
• Not for pedestrian or vehicle use
• For vertical objects of 3ft or more high, spacing need to be recorded
 Pedestrian delay
• Delay to pedestrians who travel through the boundary intersection along the path parallel to segment
centerline
• Delay incurred by pedestrians who cross the subject segment at the nearest signal-controlled crossing
• Delay incurred when pedestrians wait at an uncontrolled crossing section (if illegal need not to count)
 Proportion of On-Street parking occupied
• Sum of the curb line length occupied by parked vehicle divided by the link length
• If parking is not allowed value is 0.0
Exhibit 17-39
pROblem DefinitiOn
StepS of methodology
Step 1
free flow Speed
 Average free flow speed (Spf) is the speed that reflect the condition in which there are negligible
pedestrian to pedestrian conflicts and negligible adjustments in a pedestrian’s desired walking path
to avoid other pedestrians
 Spf = 4.4 ft/s if elderly pedestrian proportion is with in 20%
 Spf = 3.3 ft/s if elderly pedestrian proportion is more than 20%
 An upgrade of 10% or more reduce speed by 0.3 ft/s
• Spf =Average free flow speed (ft/s)
 Spf = 4.4 ft/s
Step 2
AverAge pedeStriAn SpAce
• WE= Effective sidewalk width (ft)
• WT= Total sidewalk width (ft)
• Wbuf= Buffer width between roadway and sidewalk (ft)
• WO,i= Adjusted fixed-object effective width on inside of
sidewalk (ft)
• WO,o= Adjusted fixed-object effective width on outside of
sidewalk (ft)
• Ws,i= Shy distance on inside (curbside) of sidewalk (ft)
• Ws,o= Shy distance on outside of sidewalk (ft)
• wO,i= Effective width of fixed objects on inside of sidewalk
(ft)
• wO,o= Effective width of fixed objects on outside of
sidewalk (ft)
• pwindow= Proportion of sidewalk length adjacent to a
window display (decimal)
• pbuilding= Proportion of sidewalk length adjacent to a
building face (decimal)
• pfence= Proportion of sidewalk length adjacent to a fence
or low wall (decimal)
• vp= Pedestrian flow per unit width (p/ft/min)
• vped= Pedestrian flow rate in the subject sidewalk
(walking in both direction (p/h)
• Sp= Pedestrian walking speed (ft/s)
• S = Free-flow pedestrian walking speed (ft/s)
Step 3
ped. delAy At interSection
• dpp = delay incurred by pedestrian who travelled through the boundary intersection along a path
parallel to segment center line
• dpc = delay incurred by pedestrian who cross the segment at the nearest signal controlled crossing
• dpw = delay incurred by pedestrians waiting for a gap to cross the segment at an uncontrolled
location
 dpp = 40 s/p [From Chapter 18]
 dpc = 80 s/p [From Chapter 18]
 dpw = 740 s/p [From Chapter 19]
Step 4
ped. trAvel Speed
 Combination of time to walk the segment and delay at downstream boundary
intersection
 Travel speed is less than walking speed, Sp > STp,seg
 STp,seg ≥ 4.0 ft/s is desirable
 STp,seg ≤ 2.0 ft/s is undesirable
Where,
•STp,seg = Travel speed of through pedestrians for the segment (ft/s)
•L = Segment length (ft)
•Sp = Pedestrian walking speed (ft/s)
•dpp = Pedestrian delay when walking parallel to the segment (s/p)
• STp,seg < 4.0 ft/s, but considered acceptable but a higher value is desirable
(Sp from step 2; dpp from step 3; L is given)
Step 5
pedeStrian LOS ScOre fOr interSectiOn
• Ip,int = Pedestrian LOS score for the boundary intersection
 Ip,int = 0.0; for signalized boundary intersection with two-way STOP controlled
 For signalized boundary intersection Ip,int obtained from chapter 18
 Ip,int =3.60 [From Chapter 18]
Step 6
pedeStrian LOS ScOre fOr Link
Where,
•Ip,link= Pedestrian LOS score for link
•Fw= Cross section adjustment factor
•Fv= Motorized vehicle volume adjustment factor
•FS= Motorized vehicle speed adjustment factor
•ln(x) = natural log of x
•Wv= Effective total width of outside through lane, bicycle
lane, and shoulder as a function of traffic volume [Exhibit 17-
18]
•W1= Effective width of combined bicycle lane and shoulder
[Exhibit 17-18] (ft)
•ppk= proportion of on-street parking occupied (decimal)
•Wbuf= Buffer width between roadway and available sidewalk
(=0.0 if sidewalk does not exist (ft)
•fb= Buffer area coefficient= 5.37 for any continuous barrier at
least 3 ft high that is located between the sidewalk and the
outside edge of roadway; otherwise use 1.0
•WA= Available sidewalk width = 0.0 if sidewalk does not exist
or WT-Wbuf if sidewalk exists (ft)
•WaA= Adjusted available sidewalk width = min(WA, 10) (ft)
•fsw= Sidewalk width coefficient = 6.0-0.3 WaA
•vm= Midsegment demand flowrate (direction nearest to the
subject sidewalk) (veh/h)
•Nth= Number of through lanes on the segment in the subject
direction of travel (ln)
•SR= Motorized vehicle running speed = (3600L)/(5280tR)
(mi/h)
Exhibit 17-18
Condition
Variable when
condition is Satisfied
Variable when
condition is NOT
Satisfied
ppk= 0.0 Wt=Wol+Wbl+Wos
*
Wt=Wol+Wbl
vm>160veh/h or
street is divided
Wv=Wt Wv=Wt(2- 0.005 vm)
ppk < 0.25 or parking
is striped
W1=Wbl+WOS
*
W1= 10
• Wt= Total Width of the outside through lane, bicycle lane and paved shoulder
(ft)
• Wol= Width of outside through lane (ft)
• Wos
*
= Adjusted width of paved outside shoulder; if curb is present Wos
*
=Wos
-1.5 ≥ 0.0; otherwise Wos
*
=Wos (ft)
• Wos= Width of paved outside shoulder (ft)
• Wbl= Width of the bicycle lane = 0.0 if no bicycle lane is provided (ft)
Step 6
pedeStrian LOS ScOre fOr Link
 Wt= Wol+ Wbl = 12+5 =17 ft
• As ppk=0.2 (≠0.0)
 Wv= Wt= 17 ft
• As vm= 940 veh/h >160 veh/h
 WOS
*
= 9.5 ft
 WOS
*
= WOS-1.5 = 9.5-1.5 = 8.0 ft
• As street cross section is curved
 W1=Wbl+WOS
*
= 5+8 = 13 ft
• As ppk=0.2 (<0.25)
 WaA= min (WT – Wbuf , 10)
= min (10-5, 5) = 5.0 ft
 Repetitive vertical objects like trees are considered to be a continuous barrier in buffer if they are al
least 3 ft high with average spacing 20 ft or less
 Physical barrier and parked cars between moving vehicles and pedestrians increase the separation
space and the perception of service quality
 For discontinuous sidewalk in the study segment, each segment need to be evaluated individually
and then a weighted average would give LOS score or entire segment
Step 7
Link LOS
 Determined using pedestrian LOS, Ip,link (Step 6) and average pedestrian space, Ap (Step 2) with the
help of Table 17-3
 Absence of sidewalk results in pedestrians walking in the street and LOS is determined using Table 17-
4
 From Step 2, Ap = 32.0 ft2
/p
 From Step 6, Ip,link = 2.51
 Link LOS = C [From Table 17-3]
Table 17-3
Pedestrian
LOS Score
LOS by Average Pedestrian Space (ft2
/p)
>60
>40-
60
>24-40 >15-24
>8.0-
15a ≤8.0a
≤2.00 A B C D E F
>2.00-2.75 B B C D E F
>2.75-3.50 C C C D E F
>3.50-4.25 D D D D E F
>4.25-5.00 E E E E E F
>5.00 F F F F E F
a
In cross-flow situations, the LOS E/F threshold is 13 ft2
/p
Table 17-4
LOS LOS Score
A ≤2.00
B >2.00-2.75
C >2.75-3.50
D >3.50-4.25
E >4.25-5.00
F >5.00
Step 8
rOad crOSSing difficuLty factOr
 Crossing Option
i. Altered travel path by diverting to the nearest signalized crossing
ii. Continuation of original travel path with mid segment uncontrolled
crossing during acceptable gap in motorized vehicle
 Signalized crossing location
i. Signalized intersection
ii. Mid segment signalized crosswalk
 If crossing is somewhat uniform along the segment Dc is assumed
to be one-third of the distance between the nearest signal
controlled crossing
 If mid segment crossing is illegal ignore dpw and dpx= min (dpd,60)
 0.80 ≤ Fcd ≤ 1.20
Where,
•Dd= Diversion distance (ft)
•Dc= Distance to nearest signal-controlled crossing (ft)
•dpd= Pedestrian diversion delay (s/p)
•dpc= Pedestrian delay when crossing the segment at
the nearest signal-controlled crossing (s/p)
•dpx= Crossing delay = min (dpd,dpw,60) (s/p)
•dpw= Pedestrian waiting delay (s/p)
•Sp= Pedestrian walking speed (ft/s)
•Fcd= Roadway crossing difficulty factor
•Ip,link= Pedestrian LOS score for link
•Ip,int= Pedestrian LOS score for intersection
Step 8
Road CRoSSing diffiCulty faCtoR
Step 9
ped. loS SCoRe foR Segment
 Ip,seg = Fcd (0.318 Ip,link+ 0.220 Ip,int+ 1.606)
where.,
• Ip,seg = Pedestrian LOS score for the segment
• Fcd = Roadway crossing difficulty factor
• Ip,link= Pedestrian LOS score for the link
• Ip,int= Pedestrian LOS score for the boundary intersection
 Ip,seg = 1.20 (0.318 [2.51]+ 0.220 [3.60]+ 1.606) = 3.83
Step 10
Segment loS
 Determined using pedestrian LOS Score, Ip,seg (Step 9) and average pedestrian space, Ap (Step 2) with
the help of Table 17-3
 Absence of sidewalk results in pedestrians walking in the street and LOS is determined using Table 17-
4
 From Step 2, Ap = 32.0 ft2
/p
 From Step 9, Ip,seg = 3.83
 Link LOS = D [From Table 17-3]
Table 17-3
Pedestrian
LOS Score
LOS by Average Pedestrian Space (ft2
/p)
>60
>40-
60
>24-40 >15-24
>8.0-
15a ≤8.0a
≤2.00 A B C D E F
>2.00-2.75 B B C D E F
>2.75-3.50 C C C D E F
>3.50-4.25 D D D D E F
>4.25-5.00 E E E E E F
>5.00 F F F F E F
a
In cross-flow situations, the LOS E/F threshold is 13 ft2
/p
Table 17-4
LOS LOS Score
A ≤2.00
B >2.00-2.75
C >2.75-3.50
D >3.50-4.25
E >4.25-5.00
F >5.00
Urban street segments (Pedestrian modes)

More Related Content

Viewers also liked (10)

Morse Road Design Study
Morse Road Design StudyMorse Road Design Study
Morse Road Design Study
 
John Massengale, Street Design
John Massengale, Street Design John Massengale, Street Design
John Massengale, Street Design
 
Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?Urban Design and Street Typology: Do They Matter?
Urban Design and Street Typology: Do They Matter?
 
Road Design and Safety
Road Design and SafetyRoad Design and Safety
Road Design and Safety
 
Ranganthan street,T.Nagar - Urban Design
Ranganthan street,T.Nagar - Urban DesignRanganthan street,T.Nagar - Urban Design
Ranganthan street,T.Nagar - Urban Design
 
Vertical Alignment in road design
Vertical Alignment in road designVertical Alignment in road design
Vertical Alignment in road design
 
UTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINESUTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINES
 
Slums
SlumsSlums
Slums
 
Street design guidelines feb2011-PPT
Street design guidelines feb2011-PPTStreet design guidelines feb2011-PPT
Street design guidelines feb2011-PPT
 
Slideshare ppt
Slideshare pptSlideshare ppt
Slideshare ppt
 

Similar to Urban street segments (Pedestrian modes)

Performance evolution of urban streets for pedestrians
Performance evolution of urban streets for pedestriansPerformance evolution of urban streets for pedestrians
Performance evolution of urban streets for pedestriansRaghupathi Kandiboina
 
L11 Signal Timing Design
L11 Signal Timing Design L11 Signal Timing Design
L11 Signal Timing Design Hossam Shafiq I
 
L15 Actuated Signal Timing Design
L15 Actuated Signal Timing DesignL15 Actuated Signal Timing Design
L15 Actuated Signal Timing DesignHossam Shafiq I
 
L19 Basic Freeway and Multilane Segments
L19 Basic Freeway and Multilane Segments L19 Basic Freeway and Multilane Segments
L19 Basic Freeway and Multilane Segments Hossam Shafiq I
 
Lec 04 Geometric Design (Transportation Engineering)
Lec 04 Geometric Design (Transportation Engineering) Lec 04 Geometric Design (Transportation Engineering)
Lec 04 Geometric Design (Transportation Engineering) Hossam Shafiq I
 
Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Civil Zone
 
Highway LOS - Freeway-- Multilane -- highway class 2 & 3 Housam Siyoufi
Highway LOS - Freeway-- Multilane -- highway class 2 & 3 Housam SiyoufiHighway LOS - Freeway-- Multilane -- highway class 2 & 3 Housam Siyoufi
Highway LOS - Freeway-- Multilane -- highway class 2 & 3 Housam Siyoufisiyoufihoussam
 
Summary_presentation_TL
Summary_presentation_TLSummary_presentation_TL
Summary_presentation_TLTianyuan Liu
 
Operational and Safety Tradeoffs — Narrowing Freeway Lanes and Shoulders to A...
Operational and Safety Tradeoffs — Narrowing Freeway Lanes and Shoulders to A...Operational and Safety Tradeoffs — Narrowing Freeway Lanes and Shoulders to A...
Operational and Safety Tradeoffs — Narrowing Freeway Lanes and Shoulders to A...Texas A&M Transportation Institute
 
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...Malyar Talash
 
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Hossam Shafiq I
 
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)Hossam Shafiq I
 
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...Hossam Shafiq I
 
Sight distance and road allignment
Sight distance and road allignmentSight distance and road allignment
Sight distance and road allignmentPiter Biswas
 
18 Superelevation and Spiral Curves.ppt
18 Superelevation and Spiral Curves.ppt18 Superelevation and Spiral Curves.ppt
18 Superelevation and Spiral Curves.pptKKKL5
 

Similar to Urban street segments (Pedestrian modes) (20)

Performance evolution of urban streets for pedestrians
Performance evolution of urban streets for pedestriansPerformance evolution of urban streets for pedestrians
Performance evolution of urban streets for pedestrians
 
L11 Signal Timing Design
L11 Signal Timing Design L11 Signal Timing Design
L11 Signal Timing Design
 
L15 Actuated Signal Timing Design
L15 Actuated Signal Timing DesignL15 Actuated Signal Timing Design
L15 Actuated Signal Timing Design
 
L19 Basic Freeway and Multilane Segments
L19 Basic Freeway and Multilane Segments L19 Basic Freeway and Multilane Segments
L19 Basic Freeway and Multilane Segments
 
Lec 04 Geometric Design (Transportation Engineering)
Lec 04 Geometric Design (Transportation Engineering) Lec 04 Geometric Design (Transportation Engineering)
Lec 04 Geometric Design (Transportation Engineering)
 
Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)Capacity & level of service (transportation engineering)
Capacity & level of service (transportation engineering)
 
Highway LOS - Freeway-- Multilane -- highway class 2 & 3 Housam Siyoufi
Highway LOS - Freeway-- Multilane -- highway class 2 & 3 Housam SiyoufiHighway LOS - Freeway-- Multilane -- highway class 2 & 3 Housam Siyoufi
Highway LOS - Freeway-- Multilane -- highway class 2 & 3 Housam Siyoufi
 
Summary_presentation_TL
Summary_presentation_TLSummary_presentation_TL
Summary_presentation_TL
 
Operational and Safety Tradeoffs — Narrowing Freeway Lanes and Shoulders to A...
Operational and Safety Tradeoffs — Narrowing Freeway Lanes and Shoulders to A...Operational and Safety Tradeoffs — Narrowing Freeway Lanes and Shoulders to A...
Operational and Safety Tradeoffs — Narrowing Freeway Lanes and Shoulders to A...
 
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
2 Superelevation and Spiral Curve ( by Malyar Talash, Highway Design Manager/...
 
Urban streets
Urban streetsUrban streets
Urban streets
 
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
 
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
Lec 13 Traffic Light Signals (Transportation Engineering Dr.Lina Shbeeb)
 
Capacity at intresection
Capacity at intresectionCapacity at intresection
Capacity at intresection
 
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
 
Sight distance and road allignment
Sight distance and road allignmentSight distance and road allignment
Sight distance and road allignment
 
18 Superelevation and Spiral Curves.ppt
18 Superelevation and Spiral Curves.ppt18 Superelevation and Spiral Curves.ppt
18 Superelevation and Spiral Curves.ppt
 
Capacity at intersection
Capacity at intersectionCapacity at intersection
Capacity at intersection
 
L16 Progression
L16 ProgressionL16 Progression
L16 Progression
 
E017512630
E017512630E017512630
E017512630
 

More from SJ Ohi

Complete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoComplete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoSJ Ohi
 
Bangladesh in Macro data
Bangladesh in Macro dataBangladesh in Macro data
Bangladesh in Macro dataSJ Ohi
 
Land use planning system in bangladesh
Land use planning system in bangladeshLand use planning system in bangladesh
Land use planning system in bangladeshSJ Ohi
 
Review of Existing Guidelines For “Road Signs” in Bangladesh
Review of Existing Guidelines For “Road Signs” in BangladeshReview of Existing Guidelines For “Road Signs” in Bangladesh
Review of Existing Guidelines For “Road Signs” in BangladeshSJ Ohi
 
Dhaka Traffic
Dhaka TrafficDhaka Traffic
Dhaka TrafficSJ Ohi
 
Bike Sharing system "Bay Bike" for foreign tourists
Bike Sharing system "Bay Bike" for foreign tourists Bike Sharing system "Bay Bike" for foreign tourists
Bike Sharing system "Bay Bike" for foreign tourists SJ Ohi
 
Summary of "GENDER EMPOWERMENT AND MICRO-CREDIT IN BANGLADESH" by Shahnaz Huq...
Summary of "GENDER EMPOWERMENT AND MICRO-CREDIT IN BANGLADESH" by Shahnaz Huq...Summary of "GENDER EMPOWERMENT AND MICRO-CREDIT IN BANGLADESH" by Shahnaz Huq...
Summary of "GENDER EMPOWERMENT AND MICRO-CREDIT IN BANGLADESH" by Shahnaz Huq...SJ Ohi
 

More from SJ Ohi (7)

Complete Street Design Guideline: Chicago
Complete Street Design Guideline: ChicagoComplete Street Design Guideline: Chicago
Complete Street Design Guideline: Chicago
 
Bangladesh in Macro data
Bangladesh in Macro dataBangladesh in Macro data
Bangladesh in Macro data
 
Land use planning system in bangladesh
Land use planning system in bangladeshLand use planning system in bangladesh
Land use planning system in bangladesh
 
Review of Existing Guidelines For “Road Signs” in Bangladesh
Review of Existing Guidelines For “Road Signs” in BangladeshReview of Existing Guidelines For “Road Signs” in Bangladesh
Review of Existing Guidelines For “Road Signs” in Bangladesh
 
Dhaka Traffic
Dhaka TrafficDhaka Traffic
Dhaka Traffic
 
Bike Sharing system "Bay Bike" for foreign tourists
Bike Sharing system "Bay Bike" for foreign tourists Bike Sharing system "Bay Bike" for foreign tourists
Bike Sharing system "Bay Bike" for foreign tourists
 
Summary of "GENDER EMPOWERMENT AND MICRO-CREDIT IN BANGLADESH" by Shahnaz Huq...
Summary of "GENDER EMPOWERMENT AND MICRO-CREDIT IN BANGLADESH" by Shahnaz Huq...Summary of "GENDER EMPOWERMENT AND MICRO-CREDIT IN BANGLADESH" by Shahnaz Huq...
Summary of "GENDER EMPOWERMENT AND MICRO-CREDIT IN BANGLADESH" by Shahnaz Huq...
 

Recently uploaded

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Recently uploaded (20)

MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

Urban street segments (Pedestrian modes)

  • 1. Urban Street Segments (Pedestrian Mode) Highway Capacity Manual (HCM) 2010 Vol. 3, Chp. 17 Sabrena Jahan Ohi
  • 3. • An “X” is used to indicate an association between a data element and methodology • A “Blank Cell” is not used as input for the corresponding methodology Data RequiRement
  • 4. explanatiOn Of sOme teRm  Total walkway width • Distance from outside edge of road ( or face of curb) to far edge of the sidewalk • Buffer width is included • Paved shoulder is not included • For varying width along segment use average value  Effective width of fixed object • Along the inside of the sidewalk • Along the outside of the sidewalk  Buffer width • Distance between outside edge of road ( or face of curb) and the near edge of the sidewalk • Not for pedestrian or vehicle use • For vertical objects of 3ft or more high, spacing need to be recorded  Pedestrian delay • Delay to pedestrians who travel through the boundary intersection along the path parallel to segment centerline • Delay incurred by pedestrians who cross the subject segment at the nearest signal-controlled crossing • Delay incurred when pedestrians wait at an uncontrolled crossing section (if illegal need not to count)  Proportion of On-Street parking occupied • Sum of the curb line length occupied by parked vehicle divided by the link length • If parking is not allowed value is 0.0
  • 7. Step 1 free flow Speed  Average free flow speed (Spf) is the speed that reflect the condition in which there are negligible pedestrian to pedestrian conflicts and negligible adjustments in a pedestrian’s desired walking path to avoid other pedestrians  Spf = 4.4 ft/s if elderly pedestrian proportion is with in 20%  Spf = 3.3 ft/s if elderly pedestrian proportion is more than 20%  An upgrade of 10% or more reduce speed by 0.3 ft/s • Spf =Average free flow speed (ft/s)  Spf = 4.4 ft/s
  • 8. Step 2 AverAge pedeStriAn SpAce • WE= Effective sidewalk width (ft) • WT= Total sidewalk width (ft) • Wbuf= Buffer width between roadway and sidewalk (ft) • WO,i= Adjusted fixed-object effective width on inside of sidewalk (ft) • WO,o= Adjusted fixed-object effective width on outside of sidewalk (ft) • Ws,i= Shy distance on inside (curbside) of sidewalk (ft) • Ws,o= Shy distance on outside of sidewalk (ft) • wO,i= Effective width of fixed objects on inside of sidewalk (ft) • wO,o= Effective width of fixed objects on outside of sidewalk (ft) • pwindow= Proportion of sidewalk length adjacent to a window display (decimal) • pbuilding= Proportion of sidewalk length adjacent to a building face (decimal) • pfence= Proportion of sidewalk length adjacent to a fence or low wall (decimal) • vp= Pedestrian flow per unit width (p/ft/min) • vped= Pedestrian flow rate in the subject sidewalk (walking in both direction (p/h) • Sp= Pedestrian walking speed (ft/s) • S = Free-flow pedestrian walking speed (ft/s)
  • 9. Step 3 ped. delAy At interSection • dpp = delay incurred by pedestrian who travelled through the boundary intersection along a path parallel to segment center line • dpc = delay incurred by pedestrian who cross the segment at the nearest signal controlled crossing • dpw = delay incurred by pedestrians waiting for a gap to cross the segment at an uncontrolled location  dpp = 40 s/p [From Chapter 18]  dpc = 80 s/p [From Chapter 18]  dpw = 740 s/p [From Chapter 19]
  • 10. Step 4 ped. trAvel Speed  Combination of time to walk the segment and delay at downstream boundary intersection  Travel speed is less than walking speed, Sp > STp,seg  STp,seg ≥ 4.0 ft/s is desirable  STp,seg ≤ 2.0 ft/s is undesirable Where, •STp,seg = Travel speed of through pedestrians for the segment (ft/s) •L = Segment length (ft) •Sp = Pedestrian walking speed (ft/s) •dpp = Pedestrian delay when walking parallel to the segment (s/p) • STp,seg < 4.0 ft/s, but considered acceptable but a higher value is desirable (Sp from step 2; dpp from step 3; L is given)
  • 11. Step 5 pedeStrian LOS ScOre fOr interSectiOn • Ip,int = Pedestrian LOS score for the boundary intersection  Ip,int = 0.0; for signalized boundary intersection with two-way STOP controlled  For signalized boundary intersection Ip,int obtained from chapter 18  Ip,int =3.60 [From Chapter 18]
  • 12. Step 6 pedeStrian LOS ScOre fOr Link Where, •Ip,link= Pedestrian LOS score for link •Fw= Cross section adjustment factor •Fv= Motorized vehicle volume adjustment factor •FS= Motorized vehicle speed adjustment factor •ln(x) = natural log of x •Wv= Effective total width of outside through lane, bicycle lane, and shoulder as a function of traffic volume [Exhibit 17- 18] •W1= Effective width of combined bicycle lane and shoulder [Exhibit 17-18] (ft) •ppk= proportion of on-street parking occupied (decimal) •Wbuf= Buffer width between roadway and available sidewalk (=0.0 if sidewalk does not exist (ft) •fb= Buffer area coefficient= 5.37 for any continuous barrier at least 3 ft high that is located between the sidewalk and the outside edge of roadway; otherwise use 1.0 •WA= Available sidewalk width = 0.0 if sidewalk does not exist or WT-Wbuf if sidewalk exists (ft) •WaA= Adjusted available sidewalk width = min(WA, 10) (ft) •fsw= Sidewalk width coefficient = 6.0-0.3 WaA •vm= Midsegment demand flowrate (direction nearest to the subject sidewalk) (veh/h) •Nth= Number of through lanes on the segment in the subject direction of travel (ln) •SR= Motorized vehicle running speed = (3600L)/(5280tR) (mi/h) Exhibit 17-18 Condition Variable when condition is Satisfied Variable when condition is NOT Satisfied ppk= 0.0 Wt=Wol+Wbl+Wos * Wt=Wol+Wbl vm>160veh/h or street is divided Wv=Wt Wv=Wt(2- 0.005 vm) ppk < 0.25 or parking is striped W1=Wbl+WOS * W1= 10 • Wt= Total Width of the outside through lane, bicycle lane and paved shoulder (ft) • Wol= Width of outside through lane (ft) • Wos * = Adjusted width of paved outside shoulder; if curb is present Wos * =Wos -1.5 ≥ 0.0; otherwise Wos * =Wos (ft) • Wos= Width of paved outside shoulder (ft) • Wbl= Width of the bicycle lane = 0.0 if no bicycle lane is provided (ft)
  • 13. Step 6 pedeStrian LOS ScOre fOr Link  Wt= Wol+ Wbl = 12+5 =17 ft • As ppk=0.2 (≠0.0)  Wv= Wt= 17 ft • As vm= 940 veh/h >160 veh/h  WOS * = 9.5 ft  WOS * = WOS-1.5 = 9.5-1.5 = 8.0 ft • As street cross section is curved  W1=Wbl+WOS * = 5+8 = 13 ft • As ppk=0.2 (<0.25)  WaA= min (WT – Wbuf , 10) = min (10-5, 5) = 5.0 ft  Repetitive vertical objects like trees are considered to be a continuous barrier in buffer if they are al least 3 ft high with average spacing 20 ft or less  Physical barrier and parked cars between moving vehicles and pedestrians increase the separation space and the perception of service quality  For discontinuous sidewalk in the study segment, each segment need to be evaluated individually and then a weighted average would give LOS score or entire segment
  • 14. Step 7 Link LOS  Determined using pedestrian LOS, Ip,link (Step 6) and average pedestrian space, Ap (Step 2) with the help of Table 17-3  Absence of sidewalk results in pedestrians walking in the street and LOS is determined using Table 17- 4  From Step 2, Ap = 32.0 ft2 /p  From Step 6, Ip,link = 2.51  Link LOS = C [From Table 17-3] Table 17-3 Pedestrian LOS Score LOS by Average Pedestrian Space (ft2 /p) >60 >40- 60 >24-40 >15-24 >8.0- 15a ≤8.0a ≤2.00 A B C D E F >2.00-2.75 B B C D E F >2.75-3.50 C C C D E F >3.50-4.25 D D D D E F >4.25-5.00 E E E E E F >5.00 F F F F E F a In cross-flow situations, the LOS E/F threshold is 13 ft2 /p Table 17-4 LOS LOS Score A ≤2.00 B >2.00-2.75 C >2.75-3.50 D >3.50-4.25 E >4.25-5.00 F >5.00
  • 15. Step 8 rOad crOSSing difficuLty factOr  Crossing Option i. Altered travel path by diverting to the nearest signalized crossing ii. Continuation of original travel path with mid segment uncontrolled crossing during acceptable gap in motorized vehicle  Signalized crossing location i. Signalized intersection ii. Mid segment signalized crosswalk  If crossing is somewhat uniform along the segment Dc is assumed to be one-third of the distance between the nearest signal controlled crossing  If mid segment crossing is illegal ignore dpw and dpx= min (dpd,60)  0.80 ≤ Fcd ≤ 1.20 Where, •Dd= Diversion distance (ft) •Dc= Distance to nearest signal-controlled crossing (ft) •dpd= Pedestrian diversion delay (s/p) •dpc= Pedestrian delay when crossing the segment at the nearest signal-controlled crossing (s/p) •dpx= Crossing delay = min (dpd,dpw,60) (s/p) •dpw= Pedestrian waiting delay (s/p) •Sp= Pedestrian walking speed (ft/s) •Fcd= Roadway crossing difficulty factor •Ip,link= Pedestrian LOS score for link •Ip,int= Pedestrian LOS score for intersection
  • 16. Step 8 Road CRoSSing diffiCulty faCtoR
  • 17. Step 9 ped. loS SCoRe foR Segment  Ip,seg = Fcd (0.318 Ip,link+ 0.220 Ip,int+ 1.606) where., • Ip,seg = Pedestrian LOS score for the segment • Fcd = Roadway crossing difficulty factor • Ip,link= Pedestrian LOS score for the link • Ip,int= Pedestrian LOS score for the boundary intersection  Ip,seg = 1.20 (0.318 [2.51]+ 0.220 [3.60]+ 1.606) = 3.83
  • 18. Step 10 Segment loS  Determined using pedestrian LOS Score, Ip,seg (Step 9) and average pedestrian space, Ap (Step 2) with the help of Table 17-3  Absence of sidewalk results in pedestrians walking in the street and LOS is determined using Table 17- 4  From Step 2, Ap = 32.0 ft2 /p  From Step 9, Ip,seg = 3.83  Link LOS = D [From Table 17-3] Table 17-3 Pedestrian LOS Score LOS by Average Pedestrian Space (ft2 /p) >60 >40- 60 >24-40 >15-24 >8.0- 15a ≤8.0a ≤2.00 A B C D E F >2.00-2.75 B B C D E F >2.75-3.50 C C C D E F >3.50-4.25 D D D D E F >4.25-5.00 E E E E E F >5.00 F F F F E F a In cross-flow situations, the LOS E/F threshold is 13 ft2 /p Table 17-4 LOS LOS Score A ≤2.00 B >2.00-2.75 C >2.75-3.50 D >3.50-4.25 E >4.25-5.00 F >5.00