This document summarizes an internship report on testing energy meters and substation equipment. It describes various tests performed on energy meters like no load test, starting test, and dial test. It provides details about single phase and three phase energy meters. It also explains the working of a transformer and different types of insulators and arresters used in substations. Various ratings of distribution transformers from 5KVA to 200KVA are listed. The document concludes with an overview of safety equipment used in substations.