Investment Grade Solar
       System Feasibility
       Underwriting, Production, and Presentation of
                Investment Grade Studies
                        UCBX 430


Produced and Presented By Theodore Horton, LEED AP, Managing Member NorCal PV LLC.
Key Concepts
Instant Feasibility
Quantifying Demand
The Value Stack vs the Cost Stack
Harvesting & System Design
Let’s Make A Deal
The Five Questions
You Need to Answer on any Project
1. Why is this the Right Customer?
2. Why is this the Right Site?
3. Why is this the Right Way to Buy Solar?
4.Is the Pain Worth the Gain?
5. Why Do It Now?
Course Objectives
•Get to feasible projects faster
•Use tax, technology, customer to get to a deal
•Do it right, build it now.
Instant      Capitalize
             Feasibility     Right
             ID Host       ID SITE(S)


The Route                               Design
                                         Right
PRESENT
PROJECT                                 ID TEAM



                Pull It      Selling
            All Together     Solar
            FIX SIZE &
                            ID RISKS
             CAPSTACK
PV
POWER
PARTNERING




   WHERE PV
     WORKS.
YES         Wants       YES
Tax Appetite?
                      Performance Risk?
                                              Got Cash?         Balance Sheet


                          NO                         NO         Capital Lease
          NO
                                                                   AB811?

                                               NO
                       Bankable?                            NO PROJECT
                         YES
                            Wants              YES
                                                            Operating Lease
                      Performance Risk?
                               NO             NO
Which                                                              CREBs

                                                          YES
Financing Structure?                      > 400kW?                   PPA
26%




      VALUE
      STACK
Tour of Commercial Solar Project
Tilt & Azimuth Matter
Student Presentations on Solar Project as Course Capstone
50 The Right Customer—14SEP10

       40 The Right Site—21SEP10


               25 The Right Design—28SEP10

                          Meeting the Need—5OCT10
                       10         The Deal—12OCT10
                              4          1 Do It Now
The 12 Step Solar System Feasibility Process
              Step                            Task                         Goal
1.   Host Customer Description       Solar intent, Onsite Loads         Define Need

2.    Tax Equity Monetization    Treasury cash grants, ITC, MACRS      Capitalization

3.      Production Forecast        Energy production, guarantees       Onsite Savings

4.         Site Control              Lease, license, easement             Control

5.         System Costs          Contracts, leases, finance package       Contract

6.         Risk Factors           Design, Construction, Operation       Buy Out Risk

7.         Capitalization         PBI, Lease, debt, equity, SRECs     Low Cost of Funds
The 12 Step Solar System Development Process
              Step                            Task                              Goal
8.          Permitting          Fire, electrical, site code compliance     Building Permit

9.         Procurement           Component & equipment delivery          Vendor Agreements

10.        Construction              Quality, pace and intensity         On-time, On-budget

11.       Commissioning              Reduce errors and defects            Utility Connection

12.   Monitoring & Operations      System yield, warranty service         Beat Projections



      Reversion & Expansion      Add’l sites, sale/xfer of PV assets        Profitability
The scientists
represented by the
IPCC have spoken —
what we need now
are passionate, even
partisan political
soldiers to lead the
way and push the
final tipping point
from awareness to
action.
       --Bill Walsh, CNN
See you
Saturday 11SEP 9A


Registration: http://www.unex.berkeley.edu/cat/course1885.html

Ucbx430 fall 2010

  • 1.
    Investment Grade Solar System Feasibility Underwriting, Production, and Presentation of Investment Grade Studies UCBX 430 Produced and Presented By Theodore Horton, LEED AP, Managing Member NorCal PV LLC.
  • 2.
    Key Concepts Instant Feasibility QuantifyingDemand The Value Stack vs the Cost Stack Harvesting & System Design Let’s Make A Deal
  • 3.
    The Five Questions YouNeed to Answer on any Project 1. Why is this the Right Customer? 2. Why is this the Right Site? 3. Why is this the Right Way to Buy Solar? 4.Is the Pain Worth the Gain? 5. Why Do It Now?
  • 4.
    Course Objectives •Get tofeasible projects faster •Use tax, technology, customer to get to a deal •Do it right, build it now.
  • 5.
    Instant Capitalize Feasibility Right ID Host ID SITE(S) The Route Design Right PRESENT PROJECT ID TEAM Pull It Selling All Together Solar FIX SIZE & ID RISKS CAPSTACK
  • 6.
    PV POWER PARTNERING WHERE PV WORKS.
  • 7.
    YES Wants YES Tax Appetite? Performance Risk? Got Cash? Balance Sheet NO NO Capital Lease NO AB811? NO Bankable? NO PROJECT YES Wants YES Operating Lease Performance Risk? NO NO Which CREBs YES Financing Structure? > 400kW? PPA
  • 8.
    26% VALUE STACK
  • 10.
    Tour of CommercialSolar Project
  • 11.
  • 12.
    Student Presentations onSolar Project as Course Capstone
  • 13.
    50 The RightCustomer—14SEP10 40 The Right Site—21SEP10 25 The Right Design—28SEP10 Meeting the Need—5OCT10 10 The Deal—12OCT10 4 1 Do It Now
  • 14.
    The 12 StepSolar System Feasibility Process Step Task Goal 1. Host Customer Description Solar intent, Onsite Loads Define Need 2. Tax Equity Monetization Treasury cash grants, ITC, MACRS Capitalization 3. Production Forecast Energy production, guarantees Onsite Savings 4. Site Control Lease, license, easement Control 5. System Costs Contracts, leases, finance package Contract 6. Risk Factors Design, Construction, Operation Buy Out Risk 7. Capitalization PBI, Lease, debt, equity, SRECs Low Cost of Funds
  • 15.
    The 12 StepSolar System Development Process Step Task Goal 8. Permitting Fire, electrical, site code compliance Building Permit 9. Procurement Component & equipment delivery Vendor Agreements 10. Construction Quality, pace and intensity On-time, On-budget 11. Commissioning Reduce errors and defects Utility Connection 12. Monitoring & Operations System yield, warranty service Beat Projections Reversion & Expansion Add’l sites, sale/xfer of PV assets Profitability
  • 16.
    The scientists represented bythe IPCC have spoken — what we need now are passionate, even partisan political soldiers to lead the way and push the final tipping point from awareness to action. --Bill Walsh, CNN