 Transit shed:
As the name suggests, it is a shed for goods in
transit from the vessel to the consignees or from
consignors to the vessel.
For export cargo, to facilitate the quick
loading cargo is first brought to a transit shed
and collected there.
In case of import cargo, it is not possible to
clear all the destinations by railway and trucks. In
fact for general cargo, verification of marks,
quantity and safe delivery makes it necessary to
take this cargo to a temporary covered storage,
thus for a temporary storage, a covered
arrangement is called a transit shed.
These sheds are single or double storied in
height. The floor area is being used for
handling and distributing the incoming and
out going cargo requiring protection.
A transit shed is a necessary facility
attached to a berth. Thus a port does not
change any rent for its use for a period,
generally 3 to 5 days. Beyond this period
“demurrage” is charged. The idea of charging
demurrage is to discourage the use of a
transit shed beyond the free period allowed
in order that the space can be used for other
cargo and thus more cargo could be handled
at the berth.
 Factors influencing the size of the transit shed:
 Nature of cargo, height of its staking and
allowance for movement and other non storage
areas.
 Size of the vessels
 Length of the transit shed:
The length of the shed provides covered space
opposite to the entire length of the biggest
vessel for which a berth is designed. The idea is
to provide quick access from all hatches. For a
unit length of 180m, the shed length is
suggested as 165m, This leaves space for end
access roadway to apron and shed floor.
 Width of the transit shed:
The width of the transit shed is determined
by the area.The minimum width of the shed
should not be less than 50m.
 Apron:
To expedite the unloading and loading of
cargo in vessels, some open space is left
immediately in front of the berth. This open
space is known as Apron.
The apron is utilized for the installation
of mechanical devices as cranes and transport
agencies as railway track and road for trucks
for the efficient handling of the cargo.
 Dimensions of Apron:
The width of a apron should be kept
depending upon the following factors:
 Width should be kept to a minimum
necessary for contemplated operations.
 The cost of construction of the facility should
be minimum.
 To save the time of travel the carriage of
cargo to and from the ship and transit house
or shed.
For general cargo public terminals, the width of
apron is suggested as follows:
 The plate width of 9m is sufficient. This width
includes single apron rail track.
 For two apron rail track 12m is necessary.
 For half portal gantry crane add 1.5m to the
width in (b) and 3m for full portal crane.
Thus the apron width with two rail tracks and
a full portal crane should not be less than 15m.
In general the apron width usually varies
from 10m for ports with light traffic to 25m for
direct birthing ports with heavy traffic.
Transit shades and aprons.
Transit shades and aprons.

More Related Content

What's hot

Dock and harbour
Dock and harbourDock and harbour
Dock and harbour
Dipankar Sarkar
 
HARBOURS ENGINEERING
HARBOURS ENGINEERING HARBOURS ENGINEERING
HARBOURS ENGINEERING
RAMPRASAD KUMAWAT
 
Site selection for a harbour
Site selection for a harbourSite selection for a harbour
Site selection for a harbourLatif Hyder Wadho
 
Factors in Airport site selection PART-2
Factors in Airport site selection PART-2Factors in Airport site selection PART-2
Factors in Airport site selection PART-2
RAMPRASAD KUMAWAT
 
Design principles and requirements of harbours
Design principles and requirements of harboursDesign principles and requirements of harbours
Design principles and requirements of harboursLatif Hyder Wadho
 
Airpot design
Airpot designAirpot design
Airpot design
pradip dangar
 
Mooring accessories & Navigational aids
Mooring accessories & Navigational aidsMooring accessories & Navigational aids
Mooring accessories & Navigational aids
Chockalingam T
 
Factors influence site selection of an airport
Factors influence site selection of an airportFactors influence site selection of an airport
Factors influence site selection of an airport
MaddelaSiddhardha
 
Classification of airport
Classification of airportClassification of airport
Classification of airport
IsmailQubaisMotiya
 
harbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introductionharbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introduction
Hasna Hassan
 
Vertical wall type breakwaters
Vertical wall type breakwatersVertical wall type breakwaters
Vertical wall type breakwaters
Vikas Patre
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
Arbaz Kazi
 
Airport elements.
Airport elements.Airport elements.
Airport elements.
Tulsi Makwana
 
Harbour engineering by Shankaregowda MIT Mysore
Harbour engineering by Shankaregowda MIT MysoreHarbour engineering by Shankaregowda MIT Mysore
Harbour engineering by Shankaregowda MIT Mysore
Shankaregowda Mandya
 
HARBOUR ENGINEERING
HARBOUR ENGINEERING HARBOUR ENGINEERING
HARBOUR ENGINEERING
VISHNU VIJAYAN
 
Runways
RunwaysRunways
Runways
Akash Waghani
 
Railway station and YARD
Railway station and YARD Railway station and YARD
Railway station and YARD
Dhruv Makadia
 
Design elements of airport taxiway
Design elements of airport taxiwayDesign elements of airport taxiway
Design elements of airport taxiway
Asok999
 
Navigational aids
Navigational aidsNavigational aids
Navigational aids
Shyambharadva
 
Rotary intersection by ravindra c
 Rotary intersection by ravindra c Rotary intersection by ravindra c
Rotary intersection by ravindra c
Ŕąvî Bøňđ
 

What's hot (20)

Dock and harbour
Dock and harbourDock and harbour
Dock and harbour
 
HARBOURS ENGINEERING
HARBOURS ENGINEERING HARBOURS ENGINEERING
HARBOURS ENGINEERING
 
Site selection for a harbour
Site selection for a harbourSite selection for a harbour
Site selection for a harbour
 
Factors in Airport site selection PART-2
Factors in Airport site selection PART-2Factors in Airport site selection PART-2
Factors in Airport site selection PART-2
 
Design principles and requirements of harbours
Design principles and requirements of harboursDesign principles and requirements of harbours
Design principles and requirements of harbours
 
Airpot design
Airpot designAirpot design
Airpot design
 
Mooring accessories & Navigational aids
Mooring accessories & Navigational aidsMooring accessories & Navigational aids
Mooring accessories & Navigational aids
 
Factors influence site selection of an airport
Factors influence site selection of an airportFactors influence site selection of an airport
Factors influence site selection of an airport
 
Classification of airport
Classification of airportClassification of airport
Classification of airport
 
harbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introductionharbour and dock engineering ppt 01 introduction
harbour and dock engineering ppt 01 introduction
 
Vertical wall type breakwaters
Vertical wall type breakwatersVertical wall type breakwaters
Vertical wall type breakwaters
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
 
Airport elements.
Airport elements.Airport elements.
Airport elements.
 
Harbour engineering by Shankaregowda MIT Mysore
Harbour engineering by Shankaregowda MIT MysoreHarbour engineering by Shankaregowda MIT Mysore
Harbour engineering by Shankaregowda MIT Mysore
 
HARBOUR ENGINEERING
HARBOUR ENGINEERING HARBOUR ENGINEERING
HARBOUR ENGINEERING
 
Runways
RunwaysRunways
Runways
 
Railway station and YARD
Railway station and YARD Railway station and YARD
Railway station and YARD
 
Design elements of airport taxiway
Design elements of airport taxiwayDesign elements of airport taxiway
Design elements of airport taxiway
 
Navigational aids
Navigational aidsNavigational aids
Navigational aids
 
Rotary intersection by ravindra c
 Rotary intersection by ravindra c Rotary intersection by ravindra c
Rotary intersection by ravindra c
 

Similar to Transit shades and aprons.

facilities at Dock
facilities at Dockfacilities at Dock
facilities at Dock
amrutaware2
 
Port amenities
Port amenitiesPort amenities
6565165455566666665161-PORT-OPERATIONS.ppt
6565165455566666665161-PORT-OPERATIONS.ppt6565165455566666665161-PORT-OPERATIONS.ppt
6565165455566666665161-PORT-OPERATIONS.ppt
Marcos Boaventura
 
MOG
MOGMOG
Airport apron and holding bays
Airport apron and holding baysAirport apron and holding bays
Airport apron and holding bays
srinivas2036
 
Bangkok river port case study
Bangkok river port case studyBangkok river port case study
Bangkok river port case study
Sem9AD
 
Airport aprons & holding bays
Airport  aprons & holding baysAirport  aprons & holding bays
Airport aprons & holding bays
khans666
 
04 Logistics - transportation by land.pptx
04 Logistics - transportation by land.pptx04 Logistics - transportation by land.pptx
04 Logistics - transportation by land.pptx
Ravindran Raghavan
 
Transhipment_and_Cross_docking( PGDSCLM 203 II ).pdf
Transhipment_and_Cross_docking( PGDSCLM 203 II ).pdfTranshipment_and_Cross_docking( PGDSCLM 203 II ).pdf
Transhipment_and_Cross_docking( PGDSCLM 203 II ).pdf
NandanSingh93
 
Container Handling Equipments
Container Handling EquipmentsContainer Handling Equipments
Container Handling EquipmentsAnuj Gandhi
 
5. PORT AMENITIES & OPERATIONS (PHE) GTU 3170623
5. PORT AMENITIES & OPERATIONS (PHE) GTU 31706235. PORT AMENITIES & OPERATIONS (PHE) GTU 3170623
5. PORT AMENITIES & OPERATIONS (PHE) GTU 3170623
VATSAL PATEL
 
Rail yard container terminal
Rail yard container terminalRail yard container terminal
Rail yard container terminal
KapilLamba6
 
CHAPTER - 6. PORT AMENITIES.ppt
CHAPTER - 6. PORT AMENITIES.pptCHAPTER - 6. PORT AMENITIES.ppt
CHAPTER - 6. PORT AMENITIES.ppt
jaswanthyadav12
 
Glossary of Port and Shipping Terms
Glossary of Port and Shipping TermsGlossary of Port and Shipping Terms
Glossary of Port and Shipping TermsSam Thai Aladeen
 
Container terminals (1)
Container terminals (1)Container terminals (1)
Container terminals (1)
osama Aboul Magd
 
PPT - Cargo PowerPoint Presentation, free download - ID_4571988.pdf
PPT - Cargo PowerPoint Presentation, free download - ID_4571988.pdfPPT - Cargo PowerPoint Presentation, free download - ID_4571988.pdf
PPT - Cargo PowerPoint Presentation, free download - ID_4571988.pdf
Marcos Boaventura
 
Transportation
TransportationTransportation
Transportation
Aishwarya Alagh
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
kanadkapoor
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Formatkanadkapoor
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
kanadkapoor
 

Similar to Transit shades and aprons. (20)

facilities at Dock
facilities at Dockfacilities at Dock
facilities at Dock
 
Port amenities
Port amenitiesPort amenities
Port amenities
 
6565165455566666665161-PORT-OPERATIONS.ppt
6565165455566666665161-PORT-OPERATIONS.ppt6565165455566666665161-PORT-OPERATIONS.ppt
6565165455566666665161-PORT-OPERATIONS.ppt
 
MOG
MOGMOG
MOG
 
Airport apron and holding bays
Airport apron and holding baysAirport apron and holding bays
Airport apron and holding bays
 
Bangkok river port case study
Bangkok river port case studyBangkok river port case study
Bangkok river port case study
 
Airport aprons & holding bays
Airport  aprons & holding baysAirport  aprons & holding bays
Airport aprons & holding bays
 
04 Logistics - transportation by land.pptx
04 Logistics - transportation by land.pptx04 Logistics - transportation by land.pptx
04 Logistics - transportation by land.pptx
 
Transhipment_and_Cross_docking( PGDSCLM 203 II ).pdf
Transhipment_and_Cross_docking( PGDSCLM 203 II ).pdfTranshipment_and_Cross_docking( PGDSCLM 203 II ).pdf
Transhipment_and_Cross_docking( PGDSCLM 203 II ).pdf
 
Container Handling Equipments
Container Handling EquipmentsContainer Handling Equipments
Container Handling Equipments
 
5. PORT AMENITIES & OPERATIONS (PHE) GTU 3170623
5. PORT AMENITIES & OPERATIONS (PHE) GTU 31706235. PORT AMENITIES & OPERATIONS (PHE) GTU 3170623
5. PORT AMENITIES & OPERATIONS (PHE) GTU 3170623
 
Rail yard container terminal
Rail yard container terminalRail yard container terminal
Rail yard container terminal
 
CHAPTER - 6. PORT AMENITIES.ppt
CHAPTER - 6. PORT AMENITIES.pptCHAPTER - 6. PORT AMENITIES.ppt
CHAPTER - 6. PORT AMENITIES.ppt
 
Glossary of Port and Shipping Terms
Glossary of Port and Shipping TermsGlossary of Port and Shipping Terms
Glossary of Port and Shipping Terms
 
Container terminals (1)
Container terminals (1)Container terminals (1)
Container terminals (1)
 
PPT - Cargo PowerPoint Presentation, free download - ID_4571988.pdf
PPT - Cargo PowerPoint Presentation, free download - ID_4571988.pdfPPT - Cargo PowerPoint Presentation, free download - ID_4571988.pdf
PPT - Cargo PowerPoint Presentation, free download - ID_4571988.pdf
 
Transportation
TransportationTransportation
Transportation
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
 
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report FormatC:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
C:\Documents And Settings\Omsai\Desktop\Copy Of Ind Visit Report Format
 

More from Latif Hyder Wadho

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Latif Hyder Wadho
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRW
Latif Hyder Wadho
 
Surveying and Leveling
Surveying and LevelingSurveying and Leveling
Surveying and Leveling
Latif Hyder Wadho
 
Energy crisis in Pakistan
Energy crisis in PakistanEnergy crisis in Pakistan
Energy crisis in Pakistan
Latif Hyder Wadho
 
SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018
Latif Hyder Wadho
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papers
Latif Hyder Wadho
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening test
Latif Hyder Wadho
 
Engineering drawing
Engineering drawingEngineering drawing
Engineering drawing
Latif Hyder Wadho
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global language
Latif Hyder Wadho
 
Bricks
BricksBricks
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2
Latif Hyder Wadho
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical Engineering
Latif Hyder Wadho
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2
Latif Hyder Wadho
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
Latif Hyder Wadho
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of piles
Latif Hyder Wadho
 
Settlement of piles
Settlement of pilesSettlement of piles
Settlement of piles
Latif Hyder Wadho
 
Plate load test
Plate load testPlate load test
Plate load test
Latif Hyder Wadho
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)
Latif Hyder Wadho
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)
Latif Hyder Wadho
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation Engineering
Latif Hyder Wadho
 

More from Latif Hyder Wadho (20)

Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control  Internal Checking Internal Auditing - Auditing By LATiFHRWInternal Control  Internal Checking Internal Auditing - Auditing By LATiFHRW
Internal Control Internal Checking Internal Auditing - Auditing By LATiFHRW
 
Supply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRWSupply and Demand - Modern Economics LATiFHRW
Supply and Demand - Modern Economics LATiFHRW
 
Surveying and Leveling
Surveying and LevelingSurveying and Leveling
Surveying and Leveling
 
Energy crisis in Pakistan
Energy crisis in PakistanEnergy crisis in Pakistan
Energy crisis in Pakistan
 
SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018SPSC PCS Syllabus cce 2018
SPSC PCS Syllabus cce 2018
 
SPSC CCE 2013 Pcs past papers
SPSC  CCE 2013 Pcs past papersSPSC  CCE 2013 Pcs past papers
SPSC CCE 2013 Pcs past papers
 
SPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening testSPSC CCE 2013 Pcs screening test
SPSC CCE 2013 Pcs screening test
 
Engineering drawing
Engineering drawingEngineering drawing
Engineering drawing
 
Why is english as a global language
Why is english as a global languageWhy is english as a global language
Why is english as a global language
 
Bricks
BricksBricks
Bricks
 
Introduction to Geo technical Engineering 2
 Introduction to Geo technical Engineering 2 Introduction to Geo technical Engineering 2
Introduction to Geo technical Engineering 2
 
Introdction to Geo technical Engineering
Introdction to Geo technical EngineeringIntrodction to Geo technical Engineering
Introdction to Geo technical Engineering
 
Sub surface exploration part 2
Sub surface exploration part 2Sub surface exploration part 2
Sub surface exploration part 2
 
Problems on piles and deep footing
Problems on piles and deep footingProblems on piles and deep footing
Problems on piles and deep footing
 
Load carrying capacity of piles
Load carrying capacity of pilesLoad carrying capacity of piles
Load carrying capacity of piles
 
Settlement of piles
Settlement of pilesSettlement of piles
Settlement of piles
 
Plate load test
Plate load testPlate load test
Plate load test
 
Subsurface exploration (part-3)
Subsurface exploration (part-3)Subsurface exploration (part-3)
Subsurface exploration (part-3)
 
Sub surface exploration (part-1)
Sub surface exploration (part-1)Sub surface exploration (part-1)
Sub surface exploration (part-1)
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation Engineering
 

Recently uploaded

CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
DerekIwanaka1
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
AUDIJEAngelo
 

Recently uploaded (20)

CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
BeMetals Presentation_May_22_2024 .pdf
BeMetals Presentation_May_22_2024   .pdfBeMetals Presentation_May_22_2024   .pdf
BeMetals Presentation_May_22_2024 .pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
chapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxationchapter 10 - excise tax of transfer and business taxation
chapter 10 - excise tax of transfer and business taxation
 

Transit shades and aprons.

  • 2.  Transit shed: As the name suggests, it is a shed for goods in transit from the vessel to the consignees or from consignors to the vessel. For export cargo, to facilitate the quick loading cargo is first brought to a transit shed and collected there. In case of import cargo, it is not possible to clear all the destinations by railway and trucks. In fact for general cargo, verification of marks, quantity and safe delivery makes it necessary to take this cargo to a temporary covered storage, thus for a temporary storage, a covered arrangement is called a transit shed.
  • 3. These sheds are single or double storied in height. The floor area is being used for handling and distributing the incoming and out going cargo requiring protection. A transit shed is a necessary facility attached to a berth. Thus a port does not change any rent for its use for a period, generally 3 to 5 days. Beyond this period “demurrage” is charged. The idea of charging demurrage is to discourage the use of a transit shed beyond the free period allowed in order that the space can be used for other cargo and thus more cargo could be handled at the berth.
  • 4.  Factors influencing the size of the transit shed:  Nature of cargo, height of its staking and allowance for movement and other non storage areas.  Size of the vessels  Length of the transit shed: The length of the shed provides covered space opposite to the entire length of the biggest vessel for which a berth is designed. The idea is to provide quick access from all hatches. For a unit length of 180m, the shed length is suggested as 165m, This leaves space for end access roadway to apron and shed floor.
  • 5.  Width of the transit shed: The width of the transit shed is determined by the area.The minimum width of the shed should not be less than 50m.
  • 6.  Apron: To expedite the unloading and loading of cargo in vessels, some open space is left immediately in front of the berth. This open space is known as Apron. The apron is utilized for the installation of mechanical devices as cranes and transport agencies as railway track and road for trucks for the efficient handling of the cargo.
  • 7.  Dimensions of Apron: The width of a apron should be kept depending upon the following factors:  Width should be kept to a minimum necessary for contemplated operations.  The cost of construction of the facility should be minimum.  To save the time of travel the carriage of cargo to and from the ship and transit house or shed.
  • 8. For general cargo public terminals, the width of apron is suggested as follows:  The plate width of 9m is sufficient. This width includes single apron rail track.  For two apron rail track 12m is necessary.  For half portal gantry crane add 1.5m to the width in (b) and 3m for full portal crane. Thus the apron width with two rail tracks and a full portal crane should not be less than 15m. In general the apron width usually varies from 10m for ports with light traffic to 25m for direct birthing ports with heavy traffic.