Topics
• Design a ‘Solution’
• Who Should Be on the Project Team
• Select the Right Project Manager
• Manage Risks
• Develop a Good Project Plan
• Preparing your Facility
• Test, Test, Test, then Test Again
• The Executive Sponsor
• Training for a Successful Project
• Managing Your Go-Live
• Phrases To Avoid During Your Implementation
Top Reasons Projects Go ‘Off the Rails”
• Lack of Understanding the Solution They Were Buying
• Lack of Understanding Their Day to Day Business
Processes
• Not Enough Preparation Up Front
• Lack of Committing the Proper Resources to the Project
• Not Taking the Experienced Solution Provider’s Counsel
Warning Signs
• Did the Solution
Provider Ask Questions?
• Talk to your team?
• Walkthrough?
• Demo before
understanding your
business?
• Identify Pain Points?
• Talk with you about
assigning pain points a
priority?
• Ask about your existing
business systems?
• Focus on providing you
with a ‘Solution’ (Good)
rather than ‘Software”
(Bad)?
Build a ‘Solution’ Design
• THE most important phase of the project!
– Why your vendor should NOT do it for free
• Design for Improved Processes
– Don’t make an Inefficient Manual Process Faster
• Understand how the Solution will Fit with Existing Business Systems
• Incorporates the Goals for Everyone
• Operations Should Drive the Project
• The Design Document or ‘Foundations” is the Blueprint for the Rest of the
Project
• Team Members Should Be the Most Experienced
– Not Always the Department Manager
• Look for Exceptions During the Design Phase
Selecting Your Project Team
• Organizational Change
Involves People
• Select a Cross Functional
Team
– IT, Operations, Finance,
Purchasing, Sales/Marketing,
Customer Service, Executive
Sponsor
– Ensures Support from All
Levels Inside of Your
Company
– Eases Fear of Losing Their
Jobs
• Regular Project Meetings
– Encourage Open Discussions
– Manages Communications
– Manages Expectations
Selecting the Right Project Manager
• Selecting a Strong Project Manager is the Second Most
Important Step!
• Planning – Knowledge – Preparedness - Communications
• Experienced in Managing Complex Projects Involving Inside
and Outside Stakeholders
– Understands your Business Systems
– Leadership in Keeping the Project On Track – Timeline and Goals
– Manages Scope Creep
– Educates Self On the Solution In order to Ask Good Questions
Managing Risks
• Lots of Moving Parts!
– A Complex Project with many
Variables and Points of Failure
• Benefits of ‘One Throat to Choke’
– One Phone Call
– No Finger Pointing
– Hardware from One Vendor Who
Knows the Specs
– Leverages the Solution Provider-
Hardware Manufacturer
Relationship to Your Advantage
• Do the Heavy Lifting During the
Design Phase
• Take the Advice of Your
Experienced Solution Provider
• Have an RF Site Survey Done
During the Design Phase
• Plan the Response to Problems in
Advance
– Team Members Leave
– Hardware is Backordered
– Network has to be Improved
Develop a Good Project Plan
• Well-Defined Milestones and Tasks
• Include Contingency Plans
• Use the Solution’s Provider’s Proven Methodology
– Process and Procedures Development by Learning What Works AND
What Didn’t Work
• Clearly Defined Roles and Responsibilities
• Every Phase of the Project Signed off by Team Members on Both
Sides
• Implementation on the Client Side Involves More than Software
– A Good Solutions Provider Includes this in their Plan
Preparing Your Facility
• Facility Preparation:
– Reconfigure Racks
– Product Placement in the
Warehouse
– Staging Areas
– Workstations
– Labeling Locations
– Designing Barcodes Labels
– Buying Hardware
– Acceptance Testing
– End User Training
• A RF Site Survey is a MUST
even if you have a wireless
network in place
• It’s Easy to get Focused on
the Software
• Ensure Your Solution’s
Provider Includes Facility
Preparation in the Timeline
and Project Plan
• Choosing the Right
Hardware
Factors In Choosing Hardware
• How rugged?
• Form Factor – Lift Mounted, Handheld, Stationary Workstation?
• Type of Barcode – 1D or 2D? Need for Photo?
• Signature Capture?
• Scan Distance? Barcode Size?
• Scan Intensive?
• Warehouse Air Conditioned?
• Freezer Use? Cooler Use? Temperature?
• Screen Viewed in Direct Sunlight
• Gloves On?
• Consumer Grade Versus Ruggedized – Consider TCO!
• How Connect to the Business System?
Test, Test, Test, then…Test Again
• Thoroughly testing each
work flow or use case is
often the first thing to go
if a project falls behind
• Modifications or
interfaces makes this
even more critical
• UAT’s and Scripts must
cover normal processes
and exceptions
• Ensure your test
environment effectively
mirrors your production
environment
• Go Live is NOT a
substitute for testing
Your Executive Sponsor
• When the Going Gets Rough
– Resource Allocation
– Issues Resolution
• You Must have C-Level project support
Training for A Successful Project
• Usually 4 weeks before Go Live
• ‘Train the Trainer’ - Train key users who will train other
employees
– Become your in house knowledge base
• Customize your training program for each employee’s job
function
• More than once, different scenarios, including exceptions
• Ensure custom functions are documented
• Respected trainers can ease uncertainly about the new
solution
Plan for a Managed Go Live
• Expect Minor Issues
• Ensure Enough Support
Team Members in Place
During the Week You Go
Live
• Recruit People Who Know
the Process if Enough
Support Team Members
Not Available
• It’s Okay if Your Support
Team has to Stand
Around Waiting
• Post-Implementation
Support
– Hardware Maintenance
– Mobile Device
Management lightens the
IT Load in managing your
new hardware
Phrases to Avoid for Success
• Our Existing Wireless Network is Just Fine…
• We Won’t Need Hardware Maintenance
• We Want to use iPad’s in our warehouse
• We Won’t Need Software Maintenance…
• Bob/Sue Does Not Need to Be Involved Because…
• Our Busy Season Starts in 8 Weeks so We Need to
Be Live by Then…

More Related Content

What's hot

Lean Six Sigma Foundations
Lean Six Sigma FoundationsLean Six Sigma Foundations
Lean Six Sigma Foundations
RyanKing202
 
The case for coaching-Norwich
The case for coaching-NorwichThe case for coaching-Norwich
The case for coaching-Norwich
Ryan Lockard
 
Kaizen software development model
Kaizen software development modelKaizen software development model
Kaizen software development model
Zachar Prychoda
 
OEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementOEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component Improvement
Lean Teams USA
 
Maintaining a-healthy-architecture-in-sf
Maintaining a-healthy-architecture-in-sfMaintaining a-healthy-architecture-in-sf
Maintaining a-healthy-architecture-in-sf
panayaofficial
 
Contract Manufacturing - CMD Prototyping
Contract Manufacturing - CMD PrototypingContract Manufacturing - CMD Prototyping
Contract Manufacturing - CMD Prototyping
NORCAT
 
Resume_9JUN16
Resume_9JUN16Resume_9JUN16
Resume_9JUN16
Sabastian Haigh
 
Standard work for leaders
Standard work for leadersStandard work for leaders
Standard work for leaders
Lean Teams USA
 
Managing and Optimizing Your Cisco UC and Contact Center
Managing and Optimizing Your Cisco UC and Contact CenterManaging and Optimizing Your Cisco UC and Contact Center
Managing and Optimizing Your Cisco UC and Contact Center
Christine Elizabeth
 
Why becoming agile is hard, but worth it
Why becoming agile is hard, but worth itWhy becoming agile is hard, but worth it
Why becoming agile is hard, but worth it
Camilla Lichti M. Gonzalez
 
Least Waste Way Project Planning
Least Waste Way Project PlanningLeast Waste Way Project Planning
Least Waste Way Project Planning
Romains Bos, PMP, MBA
 
What does it mean to be Lean
What does it mean to be LeanWhat does it mean to be Lean
What does it mean to be Lean
Excella
 
Erp presentation updated
Erp presentation updatedErp presentation updated
Erp presentation updated
Kartik Donga
 
Envisioning & Delivering Future Technology Sucesses
Envisioning & Delivering Future Technology SucessesEnvisioning & Delivering Future Technology Sucesses
Envisioning & Delivering Future Technology Sucesses
Nathan Davenport
 
Kaizen
KaizenKaizen
Lean Project Management
Lean Project ManagementLean Project Management
Lean Project Management
Chartered Management Institute
 
Panaya Tech Talk, Part Two on Salesforce Org Health
Panaya Tech Talk, Part Two on Salesforce Org HealthPanaya Tech Talk, Part Two on Salesforce Org Health
Panaya Tech Talk, Part Two on Salesforce Org Health
panayaofficial
 
Plunet Summit 2018: Plunet automation and change management
Plunet Summit 2018: Plunet automation and change managementPlunet Summit 2018: Plunet automation and change management
Plunet Summit 2018: Plunet automation and change management
Plunet BusinessManager
 
Blackbaud CRM After Go-Live
Blackbaud CRM After Go-LiveBlackbaud CRM After Go-Live
Blackbaud CRM After Go-Live
Blackbaud
 

What's hot (19)

Lean Six Sigma Foundations
Lean Six Sigma FoundationsLean Six Sigma Foundations
Lean Six Sigma Foundations
 
The case for coaching-Norwich
The case for coaching-NorwichThe case for coaching-Norwich
The case for coaching-Norwich
 
Kaizen software development model
Kaizen software development modelKaizen software development model
Kaizen software development model
 
OEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementOEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component Improvement
 
Maintaining a-healthy-architecture-in-sf
Maintaining a-healthy-architecture-in-sfMaintaining a-healthy-architecture-in-sf
Maintaining a-healthy-architecture-in-sf
 
Contract Manufacturing - CMD Prototyping
Contract Manufacturing - CMD PrototypingContract Manufacturing - CMD Prototyping
Contract Manufacturing - CMD Prototyping
 
Resume_9JUN16
Resume_9JUN16Resume_9JUN16
Resume_9JUN16
 
Standard work for leaders
Standard work for leadersStandard work for leaders
Standard work for leaders
 
Managing and Optimizing Your Cisco UC and Contact Center
Managing and Optimizing Your Cisco UC and Contact CenterManaging and Optimizing Your Cisco UC and Contact Center
Managing and Optimizing Your Cisco UC and Contact Center
 
Why becoming agile is hard, but worth it
Why becoming agile is hard, but worth itWhy becoming agile is hard, but worth it
Why becoming agile is hard, but worth it
 
Least Waste Way Project Planning
Least Waste Way Project PlanningLeast Waste Way Project Planning
Least Waste Way Project Planning
 
What does it mean to be Lean
What does it mean to be LeanWhat does it mean to be Lean
What does it mean to be Lean
 
Erp presentation updated
Erp presentation updatedErp presentation updated
Erp presentation updated
 
Envisioning & Delivering Future Technology Sucesses
Envisioning & Delivering Future Technology SucessesEnvisioning & Delivering Future Technology Sucesses
Envisioning & Delivering Future Technology Sucesses
 
Kaizen
KaizenKaizen
Kaizen
 
Lean Project Management
Lean Project ManagementLean Project Management
Lean Project Management
 
Panaya Tech Talk, Part Two on Salesforce Org Health
Panaya Tech Talk, Part Two on Salesforce Org HealthPanaya Tech Talk, Part Two on Salesforce Org Health
Panaya Tech Talk, Part Two on Salesforce Org Health
 
Plunet Summit 2018: Plunet automation and change management
Plunet Summit 2018: Plunet automation and change managementPlunet Summit 2018: Plunet automation and change management
Plunet Summit 2018: Plunet automation and change management
 
Blackbaud CRM After Go-Live
Blackbaud CRM After Go-LiveBlackbaud CRM After Go-Live
Blackbaud CRM After Go-Live
 

Similar to Top Tips for a Successful Traceability System Implemention Paula Peterson 2015

Synergis60: 6 Critical Steps to Implementing Data Managment
Synergis60: 6 Critical Steps to Implementing Data ManagmentSynergis60: 6 Critical Steps to Implementing Data Managment
Synergis60: 6 Critical Steps to Implementing Data Managment
Synergis Engineering Design Solutions
 
Erp implementation guide
Erp implementation guideErp implementation guide
Erp implementation guide
PPTS India Pvt Ltd
 
Fundamentals of agile tntu (2015-04-27)
Fundamentals of agile   tntu (2015-04-27)Fundamentals of agile   tntu (2015-04-27)
Fundamentals of agile tntu (2015-04-27)
Oleg Nazarevych
 
How to get the most from your E-Business Suite Developers
How to get the most from your E-Business Suite DevelopersHow to get the most from your E-Business Suite Developers
How to get the most from your E-Business Suite Developers
AXIA Consulting Inc.
 
requirements analysis and design
requirements analysis and designrequirements analysis and design
requirements analysis and design
Preeti Mishra
 
UNIT V - 1 SPM.pptx
UNIT V - 1 SPM.pptxUNIT V - 1 SPM.pptx
UNIT V - 1 SPM.pptx
Devnath13
 
BoS2015 Jeff Szczepanski – COO, Stack Exchange - Stack Overflow. Scaling a Te...
BoS2015 Jeff Szczepanski – COO, Stack Exchange - Stack Overflow. Scaling a Te...BoS2015 Jeff Szczepanski – COO, Stack Exchange - Stack Overflow. Scaling a Te...
BoS2015 Jeff Szczepanski – COO, Stack Exchange - Stack Overflow. Scaling a Te...
Business of Software Conference
 
AVATA Webinar: Solutions to Common Demantra & ASCP Challenges
AVATA Webinar: Solutions to Common Demantra & ASCP ChallengesAVATA Webinar: Solutions to Common Demantra & ASCP Challenges
AVATA Webinar: Solutions to Common Demantra & ASCP Challenges
AVATA
 
Primavera Unifier: How to Tame Complexity and Achieve Success
Primavera Unifier: How to Tame Complexity and Achieve SuccessPrimavera Unifier: How to Tame Complexity and Achieve Success
Primavera Unifier: How to Tame Complexity and Achieve Success
p6academy
 
WSO2Con USA 2017: Building a Successful Delivery Team for Customer Success
WSO2Con USA 2017: Building a Successful Delivery Team for Customer SuccessWSO2Con USA 2017: Building a Successful Delivery Team for Customer Success
WSO2Con USA 2017: Building a Successful Delivery Team for Customer Success
WSO2
 
Software engineering for small product companies
Software engineering for small product companiesSoftware engineering for small product companies
Software engineering for small product companies
Raman Kannan
 
Intro agile development methodology abhilash chandran
Intro agile development methodology   abhilash chandranIntro agile development methodology   abhilash chandran
Intro agile development methodology abhilash chandran
Abhilash Chandran
 
Sdec10 lean AMS
Sdec10 lean AMSSdec10 lean AMS
Sdec10 lean AMS
Terry Bunio
 
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
admford
 
lecture_Analysis Phase.ppt
lecture_Analysis Phase.pptlecture_Analysis Phase.ppt
lecture_Analysis Phase.ppt
AteeqaKokab1
 
lecture_5 (2).ppt hjhrrgjbgrmgrhbgrgghjd
lecture_5 (2).ppt hjhrrgjbgrmgrhbgrgghjdlecture_5 (2).ppt hjhrrgjbgrmgrhbgrgghjd
lecture_5 (2).ppt hjhrrgjbgrmgrhbgrgghjd
AqeelAbbas94
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
Sutharthan Mariyappan
 
How to Select the Right Business Management Software
How to Select the Right Business Management SoftwareHow to Select the Right Business Management Software
How to Select the Right Business Management Software
Evosus
 
Large scale agile_svante_lidman
Large scale agile_svante_lidmanLarge scale agile_svante_lidman
Large scale agile_svante_lidman
Svante Lidman
 
The art of execution
The art of executionThe art of execution
The art of execution
Crystal Taggart
 

Similar to Top Tips for a Successful Traceability System Implemention Paula Peterson 2015 (20)

Synergis60: 6 Critical Steps to Implementing Data Managment
Synergis60: 6 Critical Steps to Implementing Data ManagmentSynergis60: 6 Critical Steps to Implementing Data Managment
Synergis60: 6 Critical Steps to Implementing Data Managment
 
Erp implementation guide
Erp implementation guideErp implementation guide
Erp implementation guide
 
Fundamentals of agile tntu (2015-04-27)
Fundamentals of agile   tntu (2015-04-27)Fundamentals of agile   tntu (2015-04-27)
Fundamentals of agile tntu (2015-04-27)
 
How to get the most from your E-Business Suite Developers
How to get the most from your E-Business Suite DevelopersHow to get the most from your E-Business Suite Developers
How to get the most from your E-Business Suite Developers
 
requirements analysis and design
requirements analysis and designrequirements analysis and design
requirements analysis and design
 
UNIT V - 1 SPM.pptx
UNIT V - 1 SPM.pptxUNIT V - 1 SPM.pptx
UNIT V - 1 SPM.pptx
 
BoS2015 Jeff Szczepanski – COO, Stack Exchange - Stack Overflow. Scaling a Te...
BoS2015 Jeff Szczepanski – COO, Stack Exchange - Stack Overflow. Scaling a Te...BoS2015 Jeff Szczepanski – COO, Stack Exchange - Stack Overflow. Scaling a Te...
BoS2015 Jeff Szczepanski – COO, Stack Exchange - Stack Overflow. Scaling a Te...
 
AVATA Webinar: Solutions to Common Demantra & ASCP Challenges
AVATA Webinar: Solutions to Common Demantra & ASCP ChallengesAVATA Webinar: Solutions to Common Demantra & ASCP Challenges
AVATA Webinar: Solutions to Common Demantra & ASCP Challenges
 
Primavera Unifier: How to Tame Complexity and Achieve Success
Primavera Unifier: How to Tame Complexity and Achieve SuccessPrimavera Unifier: How to Tame Complexity and Achieve Success
Primavera Unifier: How to Tame Complexity and Achieve Success
 
WSO2Con USA 2017: Building a Successful Delivery Team for Customer Success
WSO2Con USA 2017: Building a Successful Delivery Team for Customer SuccessWSO2Con USA 2017: Building a Successful Delivery Team for Customer Success
WSO2Con USA 2017: Building a Successful Delivery Team for Customer Success
 
Software engineering for small product companies
Software engineering for small product companiesSoftware engineering for small product companies
Software engineering for small product companies
 
Intro agile development methodology abhilash chandran
Intro agile development methodology   abhilash chandranIntro agile development methodology   abhilash chandran
Intro agile development methodology abhilash chandran
 
Sdec10 lean AMS
Sdec10 lean AMSSdec10 lean AMS
Sdec10 lean AMS
 
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
When Management Asks You: “Do You Accept Agile as Your Lord and Savior?"
 
lecture_Analysis Phase.ppt
lecture_Analysis Phase.pptlecture_Analysis Phase.ppt
lecture_Analysis Phase.ppt
 
lecture_5 (2).ppt hjhrrgjbgrmgrhbgrgghjd
lecture_5 (2).ppt hjhrrgjbgrmgrhbgrgghjdlecture_5 (2).ppt hjhrrgjbgrmgrhbgrgghjd
lecture_5 (2).ppt hjhrrgjbgrmgrhbgrgghjd
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
How to Select the Right Business Management Software
How to Select the Right Business Management SoftwareHow to Select the Right Business Management Software
How to Select the Right Business Management Software
 
Large scale agile_svante_lidman
Large scale agile_svante_lidmanLarge scale agile_svante_lidman
Large scale agile_svante_lidman
 
The art of execution
The art of executionThe art of execution
The art of execution
 

Top Tips for a Successful Traceability System Implemention Paula Peterson 2015

  • 1. Top Tips for a Successful Traceability Solution Implementation Or How to Minimize Risk
  • 2. Topics • Design a ‘Solution’ • Who Should Be on the Project Team • Select the Right Project Manager • Manage Risks • Develop a Good Project Plan • Preparing your Facility • Test, Test, Test, then Test Again • The Executive Sponsor • Training for a Successful Project • Managing Your Go-Live • Phrases To Avoid During Your Implementation
  • 3. Top Reasons Projects Go ‘Off the Rails” • Lack of Understanding the Solution They Were Buying • Lack of Understanding Their Day to Day Business Processes • Not Enough Preparation Up Front • Lack of Committing the Proper Resources to the Project • Not Taking the Experienced Solution Provider’s Counsel
  • 4. Warning Signs • Did the Solution Provider Ask Questions? • Talk to your team? • Walkthrough? • Demo before understanding your business? • Identify Pain Points? • Talk with you about assigning pain points a priority? • Ask about your existing business systems? • Focus on providing you with a ‘Solution’ (Good) rather than ‘Software” (Bad)?
  • 5. Build a ‘Solution’ Design • THE most important phase of the project! – Why your vendor should NOT do it for free • Design for Improved Processes – Don’t make an Inefficient Manual Process Faster • Understand how the Solution will Fit with Existing Business Systems • Incorporates the Goals for Everyone • Operations Should Drive the Project • The Design Document or ‘Foundations” is the Blueprint for the Rest of the Project • Team Members Should Be the Most Experienced – Not Always the Department Manager • Look for Exceptions During the Design Phase
  • 6. Selecting Your Project Team • Organizational Change Involves People • Select a Cross Functional Team – IT, Operations, Finance, Purchasing, Sales/Marketing, Customer Service, Executive Sponsor – Ensures Support from All Levels Inside of Your Company – Eases Fear of Losing Their Jobs • Regular Project Meetings – Encourage Open Discussions – Manages Communications – Manages Expectations
  • 7. Selecting the Right Project Manager • Selecting a Strong Project Manager is the Second Most Important Step! • Planning – Knowledge – Preparedness - Communications • Experienced in Managing Complex Projects Involving Inside and Outside Stakeholders – Understands your Business Systems – Leadership in Keeping the Project On Track – Timeline and Goals – Manages Scope Creep – Educates Self On the Solution In order to Ask Good Questions
  • 8. Managing Risks • Lots of Moving Parts! – A Complex Project with many Variables and Points of Failure • Benefits of ‘One Throat to Choke’ – One Phone Call – No Finger Pointing – Hardware from One Vendor Who Knows the Specs – Leverages the Solution Provider- Hardware Manufacturer Relationship to Your Advantage • Do the Heavy Lifting During the Design Phase • Take the Advice of Your Experienced Solution Provider • Have an RF Site Survey Done During the Design Phase • Plan the Response to Problems in Advance – Team Members Leave – Hardware is Backordered – Network has to be Improved
  • 9. Develop a Good Project Plan • Well-Defined Milestones and Tasks • Include Contingency Plans • Use the Solution’s Provider’s Proven Methodology – Process and Procedures Development by Learning What Works AND What Didn’t Work • Clearly Defined Roles and Responsibilities • Every Phase of the Project Signed off by Team Members on Both Sides • Implementation on the Client Side Involves More than Software – A Good Solutions Provider Includes this in their Plan
  • 10. Preparing Your Facility • Facility Preparation: – Reconfigure Racks – Product Placement in the Warehouse – Staging Areas – Workstations – Labeling Locations – Designing Barcodes Labels – Buying Hardware – Acceptance Testing – End User Training • A RF Site Survey is a MUST even if you have a wireless network in place • It’s Easy to get Focused on the Software • Ensure Your Solution’s Provider Includes Facility Preparation in the Timeline and Project Plan • Choosing the Right Hardware
  • 11. Factors In Choosing Hardware • How rugged? • Form Factor – Lift Mounted, Handheld, Stationary Workstation? • Type of Barcode – 1D or 2D? Need for Photo? • Signature Capture? • Scan Distance? Barcode Size? • Scan Intensive? • Warehouse Air Conditioned? • Freezer Use? Cooler Use? Temperature? • Screen Viewed in Direct Sunlight • Gloves On? • Consumer Grade Versus Ruggedized – Consider TCO! • How Connect to the Business System?
  • 12. Test, Test, Test, then…Test Again • Thoroughly testing each work flow or use case is often the first thing to go if a project falls behind • Modifications or interfaces makes this even more critical • UAT’s and Scripts must cover normal processes and exceptions • Ensure your test environment effectively mirrors your production environment • Go Live is NOT a substitute for testing
  • 13. Your Executive Sponsor • When the Going Gets Rough – Resource Allocation – Issues Resolution • You Must have C-Level project support
  • 14. Training for A Successful Project • Usually 4 weeks before Go Live • ‘Train the Trainer’ - Train key users who will train other employees – Become your in house knowledge base • Customize your training program for each employee’s job function • More than once, different scenarios, including exceptions • Ensure custom functions are documented • Respected trainers can ease uncertainly about the new solution
  • 15. Plan for a Managed Go Live • Expect Minor Issues • Ensure Enough Support Team Members in Place During the Week You Go Live • Recruit People Who Know the Process if Enough Support Team Members Not Available • It’s Okay if Your Support Team has to Stand Around Waiting • Post-Implementation Support – Hardware Maintenance – Mobile Device Management lightens the IT Load in managing your new hardware
  • 16. Phrases to Avoid for Success • Our Existing Wireless Network is Just Fine… • We Won’t Need Hardware Maintenance • We Want to use iPad’s in our warehouse • We Won’t Need Software Maintenance… • Bob/Sue Does Not Need to Be Involved Because… • Our Busy Season Starts in 8 Weeks so We Need to Be Live by Then…