Bombay Cambridge Gurukul

Time, Distance and Speed
MATHEMATICS
STANDARD : VII
Contents
 Time, distance and speed – concept
 Units of Measurement
 Conversion
 Important formulae
 Calculate distance using formula
 Calculate time using formula
 Calculate speed using formula
 Word Problems
 Train goes past a pole
 Time, distance and speed in daily life
 Check It Out
Time, Distance & SpeedConcept
Home

Tree

In the picture above the girl is going really
fast. She catches up and passes the boy.
Can you say who is slower?
The boy is slower than the girl. Can you
say why is the boy slower than the girl?
The boy is slower than the girl because the
boy
takes more time to cover the same
(Contd…)
distance.
We can also say that the speed of boy is
less than that of the girl.

When a person covers a given distance in a
given time then the person is said to be in
motion and the rate with which he/she
moves is called speed.

BACK
Units of Measurement
The units of measurement of distance are
km, m, cm etc.
The units of measurement of time are hour (hr),
minute (min), second (sec).
The units of measurement of speed are
km/hr and m/sec, cm/sec etc.
NOTE: The units of time and distance determine
the unit of measurement of speed.
BACK
Conversion
1000 m = 1 km
1 km
1m =
1000
1 hr = 60 min
1 min = 60 sec

∴ 1 hr = 60 × 60

sec
∴ 1 sec =

1

60 × 60 hr

(Contd…)
1) Changing the speed given in km/hr into m/sec.

e.g. 90km/hr = 90 x
5
10
= 90 x

5
1000 m
60 x 60 sec
3
5m
18 sec
2
1

90 km/hr = 25 m/sec
(Contd…)
2) Changing the speed given in m/sec into km/hr.
50 km
e.g. 50m/sec =
1000

∴

÷

1
hr
60 x 60

50 x 60 x 60
=
1000
3
50m/sec = 50 x 60 x 60
1000
5
10
18 km
= 50 x
5 hr
1
50m/sec = 180km/hr
Easy way to Remember
Conversion
To convert the speed given in km/hr into
m/sec, multiply the given speed by 5
18
To convert the speed given in m/sec into
km/hr, multiply the given speed by 18
5
BACK
Important Formulae
DISTANCE = SPEED X TIME
SPEED =
TIME =

DISTANCE
TIME
DISTANCE
SPEED

Easy Way to Remember the Distance Formula:
If you know any of the two of the three variables, (distance,
Ispeed in DSTREET. (DST are what the otheras in the
stay and time) you can find out in the order one is.
Distance Formula.)
BACK
I) CALCULATE DISTANCE FROM SPEED AND TIME

Enter Speed

40

m/sec

Enter Time

10

sec

DISTANCE = SPEED
=
=
BACK

X

40 m/sec
400

m

TIME
X

10 sec
II) CALCULATE TIME FROM DISTANCE AND SPEED
Enter Distance

30

m

Enter Speed

27

km/hr

Distance & speed are not in the same unit of measurement, so
conversion is required.
Conversion:
Speed = 27km/hr
3
15 m/sec
= 27 x 5 =
2
18
2
( Contd…….)
TIME = DISTANCE
SPEED

=

30 m
15/2 m/sec

2
= 30 X

2
= 4 sec.
15
1

TIME = 4 seconds
BACK
III) CALCULATE SPEED FROM TIME AND DISTANCE
Enter Time

2 hrs

Enter Distance

45 min

132 km

Time is given in both hour and minute so this can be
converted into hour.
Conversion : Time = 2 hrs 45 min
OR
Time = 2 hrs + 45 min
3
45 min = 45 hr
60 4
( Contd…….)
(Contd…….)
45 min =

3 hr
4

∴ 2 hrs + 45 min = 2 hr + 3 hr
4
8 + 3 hr
=
4
= 11 hr
4
(Contd…….)
SPEED = DISTANCE
TIME

=

132 km
11/4 hr

12
= 132 X

4
11

1

SPEED = 48 km/hr
BACK
Word Problems
The distance between Pune and Nasik is 352 km. A
bus running at the speed of 40 km/hr left Pune at
20.00 hrs. What time will it reach Nasik?
TIME = DISTANCE ÷ SPEED
44
4 hr
4 hrs
44 hrs
352 km
= 8 hrs +
= 8
=
=
5
5
5
40 km/hr
5
12
4 X 60 min
= 8 hrs and
5
1

= 8 hrs and 48 min

The bus started at 20.00 hrs and travelled for a
period of 8 hrs 48 min.

(Contd…)
Contd…

∴ the bus reached at 20.00 hrs + 8.48 hrs = 28.48 hrs
To find the time of the day according to the 24 hours
system, let us subtract 24 from 28.48 .

hrs
28

min
48

24

00

4

48

= 4 hrs and 48 min

The bus reached Nasik early morning the
next day at 4 hours and 48 minutes.
BACK
TRAIN GOES PAST A POLE

Q. A train running at the speed of 36 km/hr goes
past a pole in 20 seconds. Find the length of
the train.
W does the phrase “train goes past a pole mean”?
hat
This means that the train has to travel a
distance equal to its length to go past
the pole. Hence, the time required to go
past a pole is the same as the time
required to travel a distance equal to the
train’s length.
(Contd…)
SOLUTION:
The length of the train will be equal to the
distance travelled in the given time with the
same speed.
Speed = 36 km/hr
Conversion:

Time = 20 sec

2

6
36 km/hr = 36 x 5
= 10 m/sec
18
3
1
DISTANCE = SPEED X TIME
Distance = 10m/sec x 20 sec
BACK

= 200 m
Time, Distance and Speed in Daily
Life
Speed, time and distance is one of the basic
tools a sailor uses in navigation. Using these
simple formulae he can predict the time of
arrival, the speed of travel or the distance he
has to cover.

In athletic events and elimination rounds speed,
distance and time play a major role in the
making and breaking of records.
The departure and arrival of aeroplanes, trains
and buses depends on calculations involving
speed, time and distance.
BACK
Fill in the blanks and complete the
following:

To convert the speed given in km/hr into m/sec,
multiply the given speed by
1m =

1
km
1000

5

18
60
1 hr = 60 × ______ sec

Speed = Distance
Time

Time =

Distance
Speed

Speed
Distance = ___________ X Time
1 sec =

1
60
60
___ × ___

hr
BACK
The End
Created by

Department of R
esearch

Time distance

  • 1.
    Bombay Cambridge Gurukul Time,Distance and Speed MATHEMATICS STANDARD : VII
  • 2.
    Contents  Time, distanceand speed – concept  Units of Measurement  Conversion  Important formulae  Calculate distance using formula  Calculate time using formula  Calculate speed using formula  Word Problems  Train goes past a pole  Time, distance and speed in daily life  Check It Out
  • 3.
    Time, Distance &SpeedConcept Home Tree In the picture above the girl is going really fast. She catches up and passes the boy. Can you say who is slower? The boy is slower than the girl. Can you say why is the boy slower than the girl? The boy is slower than the girl because the boy takes more time to cover the same (Contd…) distance.
  • 4.
    We can alsosay that the speed of boy is less than that of the girl. When a person covers a given distance in a given time then the person is said to be in motion and the rate with which he/she moves is called speed. BACK
  • 5.
    Units of Measurement Theunits of measurement of distance are km, m, cm etc. The units of measurement of time are hour (hr), minute (min), second (sec). The units of measurement of speed are km/hr and m/sec, cm/sec etc. NOTE: The units of time and distance determine the unit of measurement of speed. BACK
  • 6.
    Conversion 1000 m =1 km 1 km 1m = 1000 1 hr = 60 min 1 min = 60 sec ∴ 1 hr = 60 × 60 sec ∴ 1 sec = 1 60 × 60 hr (Contd…)
  • 7.
    1) Changing thespeed given in km/hr into m/sec. e.g. 90km/hr = 90 x 5 10 = 90 x 5 1000 m 60 x 60 sec 3 5m 18 sec 2 1 90 km/hr = 25 m/sec (Contd…)
  • 8.
    2) Changing thespeed given in m/sec into km/hr. 50 km e.g. 50m/sec = 1000 ∴ ÷ 1 hr 60 x 60 50 x 60 x 60 = 1000 3 50m/sec = 50 x 60 x 60 1000 5 10 18 km = 50 x 5 hr 1 50m/sec = 180km/hr
  • 9.
    Easy way toRemember Conversion To convert the speed given in km/hr into m/sec, multiply the given speed by 5 18 To convert the speed given in m/sec into km/hr, multiply the given speed by 18 5 BACK
  • 10.
    Important Formulae DISTANCE =SPEED X TIME SPEED = TIME = DISTANCE TIME DISTANCE SPEED Easy Way to Remember the Distance Formula: If you know any of the two of the three variables, (distance, Ispeed in DSTREET. (DST are what the otheras in the stay and time) you can find out in the order one is. Distance Formula.) BACK
  • 11.
    I) CALCULATE DISTANCEFROM SPEED AND TIME Enter Speed 40 m/sec Enter Time 10 sec DISTANCE = SPEED = = BACK X 40 m/sec 400 m TIME X 10 sec
  • 12.
    II) CALCULATE TIMEFROM DISTANCE AND SPEED Enter Distance 30 m Enter Speed 27 km/hr Distance & speed are not in the same unit of measurement, so conversion is required. Conversion: Speed = 27km/hr 3 15 m/sec = 27 x 5 = 2 18 2 ( Contd…….)
  • 13.
    TIME = DISTANCE SPEED = 30m 15/2 m/sec 2 = 30 X 2 = 4 sec. 15 1 TIME = 4 seconds BACK
  • 14.
    III) CALCULATE SPEEDFROM TIME AND DISTANCE Enter Time 2 hrs Enter Distance 45 min 132 km Time is given in both hour and minute so this can be converted into hour. Conversion : Time = 2 hrs 45 min OR Time = 2 hrs + 45 min 3 45 min = 45 hr 60 4 ( Contd…….)
  • 15.
    (Contd…….) 45 min = 3hr 4 ∴ 2 hrs + 45 min = 2 hr + 3 hr 4 8 + 3 hr = 4 = 11 hr 4 (Contd…….)
  • 16.
    SPEED = DISTANCE TIME = 132km 11/4 hr 12 = 132 X 4 11 1 SPEED = 48 km/hr BACK
  • 17.
    Word Problems The distancebetween Pune and Nasik is 352 km. A bus running at the speed of 40 km/hr left Pune at 20.00 hrs. What time will it reach Nasik? TIME = DISTANCE ÷ SPEED 44 4 hr 4 hrs 44 hrs 352 km = 8 hrs + = 8 = = 5 5 5 40 km/hr 5 12 4 X 60 min = 8 hrs and 5 1 = 8 hrs and 48 min The bus started at 20.00 hrs and travelled for a period of 8 hrs 48 min. (Contd…)
  • 18.
    Contd… ∴ the busreached at 20.00 hrs + 8.48 hrs = 28.48 hrs To find the time of the day according to the 24 hours system, let us subtract 24 from 28.48 . hrs 28 min 48 24 00 4 48 = 4 hrs and 48 min The bus reached Nasik early morning the next day at 4 hours and 48 minutes. BACK
  • 19.
    TRAIN GOES PASTA POLE Q. A train running at the speed of 36 km/hr goes past a pole in 20 seconds. Find the length of the train. W does the phrase “train goes past a pole mean”? hat This means that the train has to travel a distance equal to its length to go past the pole. Hence, the time required to go past a pole is the same as the time required to travel a distance equal to the train’s length. (Contd…)
  • 20.
    SOLUTION: The length ofthe train will be equal to the distance travelled in the given time with the same speed. Speed = 36 km/hr Conversion: Time = 20 sec 2 6 36 km/hr = 36 x 5 = 10 m/sec 18 3 1 DISTANCE = SPEED X TIME Distance = 10m/sec x 20 sec BACK = 200 m
  • 21.
    Time, Distance andSpeed in Daily Life Speed, time and distance is one of the basic tools a sailor uses in navigation. Using these simple formulae he can predict the time of arrival, the speed of travel or the distance he has to cover. In athletic events and elimination rounds speed, distance and time play a major role in the making and breaking of records. The departure and arrival of aeroplanes, trains and buses depends on calculations involving speed, time and distance. BACK
  • 22.
    Fill in theblanks and complete the following: To convert the speed given in km/hr into m/sec, multiply the given speed by 1m = 1 km 1000 5 18 60 1 hr = 60 × ______ sec Speed = Distance Time Time = Distance Speed Speed Distance = ___________ X Time 1 sec = 1 60 60 ___ × ___ hr BACK
  • 23.