TIME & WORK
Standard level
c.s.veeraragavan
9894834264
veeraa1729@gmail.com
MEN
Normally it takes 5 students 1 hour to arrange chairs for a function.
If one of them is absent, how much time will it take for the remaining 4 students to
arrange the same number of chairs?
a) 80 mins b) 75 mins c) 90 mins d) 100 mins
Total units of work by 5 students = 5 * 60 = 300 units.
No of units for 4 students =
300
4
=75 minutes.
MEN
A group of workers can do a piece of work in 60 days.
However 4 workers were absent due to illness and it took 100 days to complete the
work.
How many workers are there in total?
a)6 b)8 c)10 d)12
Let the number of workers be x.
60x = 100(x – 4)
100x – 400 = 60x
X = 10
MEN
66 men can finish a job in 42 days.
If the work has to be completed 9 days earlier, how many additional men must be
engaged to complete the work?
a) 18 b) 5 c) 15 d) 9
No of men required to complete the work = 66 *
42
33
= 84
No of additional men required = 84 – 66 = 18
Beginning
A group of men decided to do a job in 7 days.
But as 10 men dropped out everyday, the job got completed at the end of tenth day.
How many men were at the beginning?
a) 200 b) 180 c) 175 d) 150
Let no. of men in the beginning be x.
Overall work = 7x man-days.
7x = x + (x – 10) + (x – 20) +…+(x – 90).
7x = 10x – 450
3x = 450
x = 150
EFFICIENCY
A is twice as good as B and together they finish a piece of work in 18 days.
In how many days will B alone finish the work?
a) 27 b) 35 c) 42 d) 54
Ratio of efficiency = A:B = 2:1
=
2
x
:
1
x
Work done by together in 1 day=
2
x
+
1
x
=
3
x
=
1
18
X = 54.
Total work done by B in = 54 days.
EFFICIENCY
A can do a piece of work in 20 days.
B is 25% more efficient than A.
How many days will B take to complete the same work?
a) 15 b) 18 c) 16 d) 14
B is 25% more efficient than A
Hence B’s efficiency is 125% of A =
5
4
of A
Work done by B =
4
5
* 20= 16 days.
Days
A, B and C can together do a piece of work in 7.5 days.
A can do alone in 40 days and B alone in 24 days.
In how many days can C do it alone? a) 9 days
b) 12 days c) 15 days d) None of these
(A + B + C)’s 1 day work =
1
7.5
=
2
15
(A + B)’s 1 day work =
64
40 ∗ 24
=
1
15
C’s 1 day work =
1
15
C can complete the work alone in 15 days
LCM OF 7.5, 40, 24 = 120
WORK DONE BY A IN 1 DAY = 3
WORK DONE BY B IN 1 DAY = 5
WORK DONE BY ALL IN 1 DAY = 16
WORK DONE BY C IN 1 DAY = 8
TOTAL NO OF DAYS FOR C = 120/8 = 15
DAYS
Venkat and Prasad can do a job in 12 days.
Prasad alone can finish it in 28 days.
In how many days can Venkat alone finish the work?
a) 21 days b) 20 days c) 15 days d)18 days
Amount of work per day for Venkat =
1
12
−
1
28
=
7 −3
12∗7
=
1
21
No of days required for Venkat alone = 21 days.
Days
5 men can do a work in 20 days of 8 hrs each.
In how many days of 10 hrs each can 8 men do the same work?
a) 6 days b) 8 days c) 10 days d) 12 days
Days =
5
8
∗
8
10
∗ 20 = 10 days
men hours Days
5 8 20
8 10 ?
DAYS
Amar and Akbar can do a job in 20 days.
Akbar alone can finish it in 30 days.
In how many days can Amar alone finish the work?
a)70 days b)60 days c)50 days d)54 days
1 day work of Amar =
1
20
−
1
30
=
1
60
Amar can finish in 60 days.
Days
10 horses and 9 donkeys can do a piece of work in 20 days.
6 horses and 12 donkeys can do the same work in 30 days.
In how many days can the same work be done by 1 horse and 1 donkey?
a)174 days b) 182 days c) 190 days d) 198 days
(10 H + 9 D) * 20 = ( 6 H + 12 D) * 30
200 H + 180 D = 180 H + 360 D
20 H = 180 D
H = 9 D
Hence total units of work = (90 D + 9 D) * 20 = 1980 D units.
Hence 1 Horse and 1 Donkey can do 10 D units in 1 day.
Hence no of days to complete the work by 1 Horse and 1 donkey =
1980
10 = 198.
Days
Two workers Gopal and Shyam can do a work alone in 10 and 15 days respectively.
Find the amount of work done by them in 5 days.
a)
4
9
parts b)
3
8
parts c)
5
6
parts d)
3
4
parts
LCM of 10 and 15 is 30 units.
Work done by both in 1 day =
30
10
+
30
15
= 3 + 2 = 5 units.
Work done in 5 days = 25 units.
Hence amount of work done =
25
30
=
5
6
Days
Bimal starts working on a job and works on it for 20 days and completes 50% of the work.
To help him complete the work, he employs Ritesh and together they work for another 12
days and the work gets completed.
In how many days Ritesh alone can complete the work?
a) 40 days b) 50 days c) 60 days d) None of these
As Bimal completes 50% work in 20 days, Bimal can complete in 40 days.
Let Ritesh can complete in y days. Let the entire work be x.
0.5x = 12 days *
𝑥
40
+
𝑥
𝑦
Solving y = 60 days.
TIME
Three friends Sam, Stephen and Durai can complete a piece of work in 13,5 and 10 days
respectively.
What is the approximate difference in the number of days between the number of days when
Sam alone does the work and the number of days when Stephen and Durai together do the
work?
a)11.3 days b)8.5 days c)9.6 days d)13 days
LCM of 13,5,10 is130 units.
No of units of work done by Stephen and Durai =
130
5
+
130
10
= 26 + 13 = 39
No of days =
130
39
No of units of work done by Sam alone = 13 -
130
39
= 9.66 days.
TIME
Four machines can mow a large playground in 12 hours.
How long will it take 6 machines to mow a playground of same size?
a) 7 hrs b) 8 hrs c) 9 hrs d) 10 hrs
Total units of work for 4 machines = 4 * 12 = 48 hrs
Total units of work for 6 machines =
48
6
= 8 hrs
TIME
Carpenters A and B can do a work in 10 hrs when working at the same time.
B works twice as fast as A.
How long would it take for B to complete the work if B worked alone?
a) 3.33 hrs b) 30 hrs c) 20 hrs d) 15 hrs
Let A do x units of work and B do 2x units of work.
Total units of work = 10 * 3x = 30x
Time taken by B alone =
30𝑥
2𝑥
= 15 hrs.
TIMEA software company in Noida has been doing well in the last four years.
The company recruited people from ECE, CSE, IT streams.
All programmers receive equal amount as salary and perform equal amount of
work.
Suppose 15 such programmers take 15 minutes to write 15 lines of code in
total.
How long will it take for 84 programmers to write 84 lines of code in total?
a)15 minutes b) 84 minutes c) 30 minutes d) 42 minutes
Let no of lines coded by 1 programmer in 1 minute be x.
15 programmers takes 15 minutes to write 15 lines of code. X =
15
15 ∗15
Assume 84 programmers take y minutes to write 84 lines.
X =
84
84∗y
Thus x =
15
15 ∗15
=
84
84 ∗ y
.
Solving y = 15 minutes
PROGRAMMERS LINES OF CODE TIME
15 15 15
84 84 ?
More programmers less time (Indirect)
15 : 84 :: x : 15
More lines more time (direct)
15 : 84 :: 15 : x
Time taken =
15
84 ∗
84
15 ∗15
= 15
TIME
7 men can produce 7 candles in 7 minutes.
1 man can produce 1 candle in how many minutes?
a)49 b)5 c) 7 d) 9
Less men More minutes (inverse) 7:1 :: x : 7
Less candles less minutes (direct) 1:7 :: x : 7
7*1*7 = 1 * 7 * x (or)
7
1
∗
1
7
∗ 7 = 7
X = 7
men candles Minutes
7 7 7
1 1 ?
TIME
If a pipe can fill the tank within 3 hrs but due to a leak at the bottom it took 15
minutes more.
Now once the tank is full, how much time will it take to get emptied through the
leak?
a)39 hrs b)64 hrs c)75 hrs d)None of these
Difference in time taken in 1 hr =
1
3
−
1
3.25
=
0.25
3∗3.25
=
25
3∗325
=
1
39
Hence total time taken to get emptied = 39 hours.
PIPES & CISTERN
Two pipes A and B can fill a tank in 16 minutes and 20 minutes respectively.
Both the pipes are opened together but after 5 minutes, pipe A is turned off.
What is the total time required to fill the tank?
a) 8.75 minutes b) 9.45 minutes c) 8.65 minutes d) 10.15 min
Work done in 5 minutes = 5
16 + 20
16 ∗ 20
=
36
64
=
9
16
Remaining work =
7
16
Time required for B =
7
16
* 20 =
35
4
= 8.75 minutes.
PIPES & CISTERN
Two pipes can fill a tank in 10 and 20 hrs respectively.
There is a leakage at the bottom of the tank which takes 40 hrs to empty the tank.
If both the pipes are used together, then how long will it take to fill the tank? (with the
leakage still being present)?
a) 5hrs b) 12 hrsc) 8 hrs d) 14 hrs.
Work done in one hour =
1
10
+
1
20
−
1
40
=
4 + 2 − 1
40
=
5
40
=
1
8
Total work done in = 8 hrs.
Alternate Method: LCM OF 10,20,40 IS 40. PIPE 1 (4 units), Pipe2 (2) Pipe 3 (1)
Capacity = 4 + 2 – 1 = 5
Total work done = 40/5 = 8 hrs.
PIPES & CISTERN
A pipe can fill a tank in 3 hrs.
Due to a leakage at the bottom of the tank, it takes 3.5hrs to fill the same tank.
In how many hrs will the leakage empty the tank once it is full?
a) 12 hrs b) 15hrs c) 18hrs d) 21 hrs.
Difference in time taken to fill the tank in 1 hr =
1
3
−
1
3.5
=
1
3
−
2
7
=
1
21
Total time taken to empty = 21 hrs.
PIPES & CISTERN
Three pipes A, B and C can together fill a tank in 5 hours.
After working at it together for 2 hours, C is closed and
A and B can fill the remaining part in 8 hours.
The number of hours taken by C alone to fill the tank is
a)8 hours b)9 hours c)10 hours d)12 hours.
Work done by A, B and C together in 2 hours =
2
5
3
5
of work done by A, B together in = 8 hours.
Work done by A,B together in 2 hours =
3
5
*
2
8
=
3
20
Work done by C alone in 2 hours =
2
5
−
3
20
=
5
20
=
1
4
Total work done by C alone in = 8 hours.
PIPES & CISTERN
Pipe A usually fills a tank in 2 hours.
On account of a leak at the bottom of the tank, it takes pipe A 30 more minutes to fill
the tank.
How long will the leak take to empty a full tank if pipe A is shut?
a)6 hrs b)8 hrs c)10 hrs d)12 hrs
Difference in time taken =
1
2
−
1
2.5
=
0.5
5
= 0.1
Hence time taken to empty the tank = 10 hrs.
Ratio
12 Women can do a work in 16 days.
16 men can complete the same work in 17 days.
What is the ratio between the working capacity of a woman and a man?
a)12:17 b)11:16 c) 16:11 d) 17:12
Work done by 1 woman in 1 day =
1
12 ∗ 16
Work done by 1 man in 1 day =
1
17 ∗ 16
Ratio =
1
12 ∗ 16
:
1
17 ∗ 16
= 17 : 12

More Related Content

What's hot

Forouzan-ch19-Network-Layer-Logical-Addressing.ppt
Forouzan-ch19-Network-Layer-Logical-Addressing.pptForouzan-ch19-Network-Layer-Logical-Addressing.ppt
Forouzan-ch19-Network-Layer-Logical-Addressing.pptJayaprasanna4
 
operator overloading & type conversion in cpp over view || c++
operator overloading & type conversion in cpp over view || c++operator overloading & type conversion in cpp over view || c++
operator overloading & type conversion in cpp over view || c++gourav kottawar
 
GRAPH COLORING AND ITS APPLICATIONS
GRAPH COLORING AND ITS APPLICATIONSGRAPH COLORING AND ITS APPLICATIONS
GRAPH COLORING AND ITS APPLICATIONSManojit Chakraborty
 
Desirable software features simulation & modeling
Desirable software features simulation & modelingDesirable software features simulation & modeling
Desirable software features simulation & modelingShashwat Shriparv
 
Computer Networks for Computer Science Student
Computer Networks for Computer Science StudentComputer Networks for Computer Science Student
Computer Networks for Computer Science Studentrprajat007
 
Classful and classless addressing
Classful and classless addressingClassful and classless addressing
Classful and classless addressingSourav Jyoti Das
 
Leaky Bucket & Tocken Bucket - Traffic shaping
Leaky Bucket & Tocken Bucket - Traffic shapingLeaky Bucket & Tocken Bucket - Traffic shaping
Leaky Bucket & Tocken Bucket - Traffic shapingVimal Dewangan
 
What is complex number
What is complex numberWhat is complex number
What is complex numberHamza Sajjad
 
Operating system; Multitasking
Operating system; MultitaskingOperating system; Multitasking
Operating system; MultitaskingFlameDimension95
 
Chapter 2 : Balagurusamy_ Programming ANsI in C
Chapter 2 :  Balagurusamy_ Programming ANsI in CChapter 2 :  Balagurusamy_ Programming ANsI in C
Chapter 2 : Balagurusamy_ Programming ANsI in CBUBT
 

What's hot (20)

Forouzan-ch19-Network-Layer-Logical-Addressing.ppt
Forouzan-ch19-Network-Layer-Logical-Addressing.pptForouzan-ch19-Network-Layer-Logical-Addressing.ppt
Forouzan-ch19-Network-Layer-Logical-Addressing.ppt
 
Numbers standard level
Numbers standard levelNumbers standard level
Numbers standard level
 
operator overloading & type conversion in cpp over view || c++
operator overloading & type conversion in cpp over view || c++operator overloading & type conversion in cpp over view || c++
operator overloading & type conversion in cpp over view || c++
 
GRAPH COLORING AND ITS APPLICATIONS
GRAPH COLORING AND ITS APPLICATIONSGRAPH COLORING AND ITS APPLICATIONS
GRAPH COLORING AND ITS APPLICATIONS
 
Desirable software features simulation & modeling
Desirable software features simulation & modelingDesirable software features simulation & modeling
Desirable software features simulation & modeling
 
Classless subnetting
Classless subnettingClassless subnetting
Classless subnetting
 
C vs c++
C vs c++C vs c++
C vs c++
 
Computer Networks for Computer Science Student
Computer Networks for Computer Science StudentComputer Networks for Computer Science Student
Computer Networks for Computer Science Student
 
Prim's algorithm
Prim's algorithmPrim's algorithm
Prim's algorithm
 
Graph coloring problem
Graph coloring problemGraph coloring problem
Graph coloring problem
 
Graph coloring
Graph coloringGraph coloring
Graph coloring
 
Dijkstra's Algorithm
Dijkstra's Algorithm Dijkstra's Algorithm
Dijkstra's Algorithm
 
Classful and classless addressing
Classful and classless addressingClassful and classless addressing
Classful and classless addressing
 
Leaky Bucket & Tocken Bucket - Traffic shaping
Leaky Bucket & Tocken Bucket - Traffic shapingLeaky Bucket & Tocken Bucket - Traffic shaping
Leaky Bucket & Tocken Bucket - Traffic shaping
 
What is complex number
What is complex numberWhat is complex number
What is complex number
 
IP addressing
IP addressingIP addressing
IP addressing
 
IPV6 ADDRESS
IPV6 ADDRESSIPV6 ADDRESS
IPV6 ADDRESS
 
Network layer logical addressing
Network layer logical addressingNetwork layer logical addressing
Network layer logical addressing
 
Operating system; Multitasking
Operating system; MultitaskingOperating system; Multitasking
Operating system; Multitasking
 
Chapter 2 : Balagurusamy_ Programming ANsI in C
Chapter 2 :  Balagurusamy_ Programming ANsI in CChapter 2 :  Balagurusamy_ Programming ANsI in C
Chapter 2 : Balagurusamy_ Programming ANsI in C
 

Viewers also liked (20)

Apt maths shortcuts
Apt maths shortcutsApt maths shortcuts
Apt maths shortcuts
 
Problems on ages
Problems on agesProblems on ages
Problems on ages
 
Fifty questions with answers in aptitude
Fifty questions with answers in aptitudeFifty questions with answers in aptitude
Fifty questions with answers in aptitude
 
Amcat 2
Amcat 2Amcat 2
Amcat 2
 
Non –verbal reasoning1
Non –verbal reasoning1Non –verbal reasoning1
Non –verbal reasoning1
 
Averages and alligations level 2
Averages and alligations level 2Averages and alligations level 2
Averages and alligations level 2
 
Percentage and profit loss new version 4
Percentage and profit loss new version 4Percentage and profit loss new version 4
Percentage and profit loss new version 4
 
Long division- DOWNLOAD ENABLED
Long division- DOWNLOAD ENABLEDLong division- DOWNLOAD ENABLED
Long division- DOWNLOAD ENABLED
 
Amcat 3-DOWNLOAD ENABLED
Amcat 3-DOWNLOAD ENABLEDAmcat 3-DOWNLOAD ENABLED
Amcat 3-DOWNLOAD ENABLED
 
Srinivasaramanujan a reminiscence 3
Srinivasaramanujan a reminiscence 3Srinivasaramanujan a reminiscence 3
Srinivasaramanujan a reminiscence 3
 
#rkresume
#rkresume#rkresume
#rkresume
 
Diagrammatic Elements
Diagrammatic ElementsDiagrammatic Elements
Diagrammatic Elements
 
Average standard level
Average standard levelAverage standard level
Average standard level
 
Simple equations level 2
Simple equations level 2Simple equations level 2
Simple equations level 2
 
Permutation level two
Permutation level twoPermutation level two
Permutation level two
 
Amcat & nac
Amcat & nac Amcat & nac
Amcat & nac
 
Theme detection
Theme detectionTheme detection
Theme detection
 
Statistics – level 2
Statistics – level 2Statistics – level 2
Statistics – level 2
 
Number system 1surds & indices
Number system 1surds & indicesNumber system 1surds & indices
Number system 1surds & indices
 
Multiplication shortcuts- DOWNLOAD ENABLED
Multiplication shortcuts- DOWNLOAD ENABLEDMultiplication shortcuts- DOWNLOAD ENABLED
Multiplication shortcuts- DOWNLOAD ENABLED
 

Similar to Time and work standard level

time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptxgoud10
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_priya mega
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdLearningHomeBD.com
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptxvikiawsac
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxMRUNALSHETHIYA1
 
Ethiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfEthiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfAsfawosen Dingama
 
44 Time and Work Problems - Competition Gurukul
  44 Time and Work Problems - Competition Gurukul  44 Time and Work Problems - Competition Gurukul
44 Time and Work Problems - Competition GurukulCompetition Gurukul
 
Time and work.pdf
Time and work.pdfTime and work.pdf
Time and work.pdfalphared4
 
ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES 983...
ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES  983...ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES  983...
ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES 983...SOURAV DAS
 
ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...
ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...
ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...SOURAV DAS
 
Actuarial Science (ACET) Mock Test Paper I By Sourav Sir's Classes
Actuarial Science (ACET) Mock Test Paper I By Sourav Sir's ClassesActuarial Science (ACET) Mock Test Paper I By Sourav Sir's Classes
Actuarial Science (ACET) Mock Test Paper I By Sourav Sir's ClassesSOURAV DAS
 

Similar to Time and work standard level (20)

time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptx
 
Time and work rbi
Time and work rbiTime and work rbi
Time and work rbi
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_
 
Apttitude
ApttitudeApttitude
Apttitude
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebd
 
Doc
DocDoc
Doc
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptx
 
Time & work
Time & workTime & work
Time & work
 
Numerical reasoning II
Numerical reasoning IINumerical reasoning II
Numerical reasoning II
 
TRW
TRWTRW
TRW
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptx
 
C11
C11C11
C11
 
Ethiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdfEthiopian Banking Questions with Answers.pdf
Ethiopian Banking Questions with Answers.pdf
 
Time and work
Time and workTime and work
Time and work
 
44 Time and Work Problems - Competition Gurukul
  44 Time and Work Problems - Competition Gurukul  44 Time and Work Problems - Competition Gurukul
44 Time and Work Problems - Competition Gurukul
 
Time and work.pdf
Time and work.pdfTime and work.pdf
Time and work.pdf
 
ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES 983...
ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES  983...ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES  983...
ACTUARIAL SCIENCE ACET MODEL PAPER WITH SOLUTION BY SOURAV SIR'S CLASSES 983...
 
ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...
ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...
ACTUARIAL SCIENCE | MODEL TEST EXAM | NOTES SOLUTIONS STUDY MATERIAL BY SOURA...
 
TIME & WORK.pptx
TIME & WORK.pptxTIME & WORK.pptx
TIME & WORK.pptx
 
Actuarial Science (ACET) Mock Test Paper I By Sourav Sir's Classes
Actuarial Science (ACET) Mock Test Paper I By Sourav Sir's ClassesActuarial Science (ACET) Mock Test Paper I By Sourav Sir's Classes
Actuarial Science (ACET) Mock Test Paper I By Sourav Sir's Classes
 

More from Veeraragavan Subramaniam (17)

Percentage standard level
Percentage standard levelPercentage standard level
Percentage standard level
 
Partnership standard level
Partnership standard levelPartnership standard level
Partnership standard level
 
Profit and loss standard level
Profit and loss standard levelProfit and loss standard level
Profit and loss standard level
 
Cts 2017
Cts 2017Cts 2017
Cts 2017
 
Logarithms level 2
Logarithms level 2Logarithms level 2
Logarithms level 2
 
Progressions level 2
Progressions level 2Progressions level 2
Progressions level 2
 
Mouse multiple probability
Mouse multiple probabilityMouse multiple probability
Mouse multiple probability
 
Syllogism level 2 new
Syllogism level 2 newSyllogism level 2 new
Syllogism level 2 new
 
Number systems level 2 special equations 4
Number systems level  2 special equations 4Number systems level  2 special equations 4
Number systems level 2 special equations 4
 
Aptitude Problems on Trains
Aptitude Problems on TrainsAptitude Problems on Trains
Aptitude Problems on Trains
 
Time & distance
Time & distanceTime & distance
Time & distance
 
Qa02 mixtures
Qa02 mixturesQa02 mixtures
Qa02 mixtures
 
Problems on trains (2)
Problems on trains (2)Problems on trains (2)
Problems on trains (2)
 
Height & distance
Height & distanceHeight & distance
Height & distance
 
After plus two
After plus twoAfter plus two
After plus two
 
Mathematical shortcuts1
Mathematical shortcuts1Mathematical shortcuts1
Mathematical shortcuts1
 
Aptitude at ease
Aptitude at easeAptitude at ease
Aptitude at ease
 

Recently uploaded

MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxabhijeetpadhi001
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxEyham Joco
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 

Recently uploaded (20)

MICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptxMICROBIOLOGY biochemical test detailed.pptx
MICROBIOLOGY biochemical test detailed.pptx
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Types of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptxTypes of Journalistic Writing Grade 8.pptx
Types of Journalistic Writing Grade 8.pptx
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 

Time and work standard level

  • 1. TIME & WORK Standard level c.s.veeraragavan 9894834264 veeraa1729@gmail.com
  • 2. MEN Normally it takes 5 students 1 hour to arrange chairs for a function. If one of them is absent, how much time will it take for the remaining 4 students to arrange the same number of chairs? a) 80 mins b) 75 mins c) 90 mins d) 100 mins Total units of work by 5 students = 5 * 60 = 300 units. No of units for 4 students = 300 4 =75 minutes.
  • 3. MEN A group of workers can do a piece of work in 60 days. However 4 workers were absent due to illness and it took 100 days to complete the work. How many workers are there in total? a)6 b)8 c)10 d)12 Let the number of workers be x. 60x = 100(x – 4) 100x – 400 = 60x X = 10
  • 4. MEN 66 men can finish a job in 42 days. If the work has to be completed 9 days earlier, how many additional men must be engaged to complete the work? a) 18 b) 5 c) 15 d) 9 No of men required to complete the work = 66 * 42 33 = 84 No of additional men required = 84 – 66 = 18
  • 5. Beginning A group of men decided to do a job in 7 days. But as 10 men dropped out everyday, the job got completed at the end of tenth day. How many men were at the beginning? a) 200 b) 180 c) 175 d) 150 Let no. of men in the beginning be x. Overall work = 7x man-days. 7x = x + (x – 10) + (x – 20) +…+(x – 90). 7x = 10x – 450 3x = 450 x = 150
  • 6. EFFICIENCY A is twice as good as B and together they finish a piece of work in 18 days. In how many days will B alone finish the work? a) 27 b) 35 c) 42 d) 54 Ratio of efficiency = A:B = 2:1 = 2 x : 1 x Work done by together in 1 day= 2 x + 1 x = 3 x = 1 18 X = 54. Total work done by B in = 54 days.
  • 7. EFFICIENCY A can do a piece of work in 20 days. B is 25% more efficient than A. How many days will B take to complete the same work? a) 15 b) 18 c) 16 d) 14 B is 25% more efficient than A Hence B’s efficiency is 125% of A = 5 4 of A Work done by B = 4 5 * 20= 16 days.
  • 8. Days A, B and C can together do a piece of work in 7.5 days. A can do alone in 40 days and B alone in 24 days. In how many days can C do it alone? a) 9 days b) 12 days c) 15 days d) None of these (A + B + C)’s 1 day work = 1 7.5 = 2 15 (A + B)’s 1 day work = 64 40 ∗ 24 = 1 15 C’s 1 day work = 1 15 C can complete the work alone in 15 days LCM OF 7.5, 40, 24 = 120 WORK DONE BY A IN 1 DAY = 3 WORK DONE BY B IN 1 DAY = 5 WORK DONE BY ALL IN 1 DAY = 16 WORK DONE BY C IN 1 DAY = 8 TOTAL NO OF DAYS FOR C = 120/8 = 15
  • 9. DAYS Venkat and Prasad can do a job in 12 days. Prasad alone can finish it in 28 days. In how many days can Venkat alone finish the work? a) 21 days b) 20 days c) 15 days d)18 days Amount of work per day for Venkat = 1 12 − 1 28 = 7 −3 12∗7 = 1 21 No of days required for Venkat alone = 21 days.
  • 10. Days 5 men can do a work in 20 days of 8 hrs each. In how many days of 10 hrs each can 8 men do the same work? a) 6 days b) 8 days c) 10 days d) 12 days Days = 5 8 ∗ 8 10 ∗ 20 = 10 days men hours Days 5 8 20 8 10 ?
  • 11. DAYS Amar and Akbar can do a job in 20 days. Akbar alone can finish it in 30 days. In how many days can Amar alone finish the work? a)70 days b)60 days c)50 days d)54 days 1 day work of Amar = 1 20 − 1 30 = 1 60 Amar can finish in 60 days.
  • 12. Days 10 horses and 9 donkeys can do a piece of work in 20 days. 6 horses and 12 donkeys can do the same work in 30 days. In how many days can the same work be done by 1 horse and 1 donkey? a)174 days b) 182 days c) 190 days d) 198 days (10 H + 9 D) * 20 = ( 6 H + 12 D) * 30 200 H + 180 D = 180 H + 360 D 20 H = 180 D H = 9 D Hence total units of work = (90 D + 9 D) * 20 = 1980 D units. Hence 1 Horse and 1 Donkey can do 10 D units in 1 day. Hence no of days to complete the work by 1 Horse and 1 donkey = 1980 10 = 198.
  • 13. Days Two workers Gopal and Shyam can do a work alone in 10 and 15 days respectively. Find the amount of work done by them in 5 days. a) 4 9 parts b) 3 8 parts c) 5 6 parts d) 3 4 parts LCM of 10 and 15 is 30 units. Work done by both in 1 day = 30 10 + 30 15 = 3 + 2 = 5 units. Work done in 5 days = 25 units. Hence amount of work done = 25 30 = 5 6
  • 14. Days Bimal starts working on a job and works on it for 20 days and completes 50% of the work. To help him complete the work, he employs Ritesh and together they work for another 12 days and the work gets completed. In how many days Ritesh alone can complete the work? a) 40 days b) 50 days c) 60 days d) None of these As Bimal completes 50% work in 20 days, Bimal can complete in 40 days. Let Ritesh can complete in y days. Let the entire work be x. 0.5x = 12 days * 𝑥 40 + 𝑥 𝑦 Solving y = 60 days.
  • 15. TIME Three friends Sam, Stephen and Durai can complete a piece of work in 13,5 and 10 days respectively. What is the approximate difference in the number of days between the number of days when Sam alone does the work and the number of days when Stephen and Durai together do the work? a)11.3 days b)8.5 days c)9.6 days d)13 days LCM of 13,5,10 is130 units. No of units of work done by Stephen and Durai = 130 5 + 130 10 = 26 + 13 = 39 No of days = 130 39 No of units of work done by Sam alone = 13 - 130 39 = 9.66 days.
  • 16. TIME Four machines can mow a large playground in 12 hours. How long will it take 6 machines to mow a playground of same size? a) 7 hrs b) 8 hrs c) 9 hrs d) 10 hrs Total units of work for 4 machines = 4 * 12 = 48 hrs Total units of work for 6 machines = 48 6 = 8 hrs
  • 17. TIME Carpenters A and B can do a work in 10 hrs when working at the same time. B works twice as fast as A. How long would it take for B to complete the work if B worked alone? a) 3.33 hrs b) 30 hrs c) 20 hrs d) 15 hrs Let A do x units of work and B do 2x units of work. Total units of work = 10 * 3x = 30x Time taken by B alone = 30𝑥 2𝑥 = 15 hrs.
  • 18. TIMEA software company in Noida has been doing well in the last four years. The company recruited people from ECE, CSE, IT streams. All programmers receive equal amount as salary and perform equal amount of work. Suppose 15 such programmers take 15 minutes to write 15 lines of code in total. How long will it take for 84 programmers to write 84 lines of code in total? a)15 minutes b) 84 minutes c) 30 minutes d) 42 minutes Let no of lines coded by 1 programmer in 1 minute be x. 15 programmers takes 15 minutes to write 15 lines of code. X = 15 15 ∗15 Assume 84 programmers take y minutes to write 84 lines. X = 84 84∗y Thus x = 15 15 ∗15 = 84 84 ∗ y . Solving y = 15 minutes PROGRAMMERS LINES OF CODE TIME 15 15 15 84 84 ? More programmers less time (Indirect) 15 : 84 :: x : 15 More lines more time (direct) 15 : 84 :: 15 : x Time taken = 15 84 ∗ 84 15 ∗15 = 15
  • 19. TIME 7 men can produce 7 candles in 7 minutes. 1 man can produce 1 candle in how many minutes? a)49 b)5 c) 7 d) 9 Less men More minutes (inverse) 7:1 :: x : 7 Less candles less minutes (direct) 1:7 :: x : 7 7*1*7 = 1 * 7 * x (or) 7 1 ∗ 1 7 ∗ 7 = 7 X = 7 men candles Minutes 7 7 7 1 1 ?
  • 20. TIME If a pipe can fill the tank within 3 hrs but due to a leak at the bottom it took 15 minutes more. Now once the tank is full, how much time will it take to get emptied through the leak? a)39 hrs b)64 hrs c)75 hrs d)None of these Difference in time taken in 1 hr = 1 3 − 1 3.25 = 0.25 3∗3.25 = 25 3∗325 = 1 39 Hence total time taken to get emptied = 39 hours.
  • 21. PIPES & CISTERN Two pipes A and B can fill a tank in 16 minutes and 20 minutes respectively. Both the pipes are opened together but after 5 minutes, pipe A is turned off. What is the total time required to fill the tank? a) 8.75 minutes b) 9.45 minutes c) 8.65 minutes d) 10.15 min Work done in 5 minutes = 5 16 + 20 16 ∗ 20 = 36 64 = 9 16 Remaining work = 7 16 Time required for B = 7 16 * 20 = 35 4 = 8.75 minutes.
  • 22. PIPES & CISTERN Two pipes can fill a tank in 10 and 20 hrs respectively. There is a leakage at the bottom of the tank which takes 40 hrs to empty the tank. If both the pipes are used together, then how long will it take to fill the tank? (with the leakage still being present)? a) 5hrs b) 12 hrsc) 8 hrs d) 14 hrs. Work done in one hour = 1 10 + 1 20 − 1 40 = 4 + 2 − 1 40 = 5 40 = 1 8 Total work done in = 8 hrs. Alternate Method: LCM OF 10,20,40 IS 40. PIPE 1 (4 units), Pipe2 (2) Pipe 3 (1) Capacity = 4 + 2 – 1 = 5 Total work done = 40/5 = 8 hrs.
  • 23. PIPES & CISTERN A pipe can fill a tank in 3 hrs. Due to a leakage at the bottom of the tank, it takes 3.5hrs to fill the same tank. In how many hrs will the leakage empty the tank once it is full? a) 12 hrs b) 15hrs c) 18hrs d) 21 hrs. Difference in time taken to fill the tank in 1 hr = 1 3 − 1 3.5 = 1 3 − 2 7 = 1 21 Total time taken to empty = 21 hrs.
  • 24. PIPES & CISTERN Three pipes A, B and C can together fill a tank in 5 hours. After working at it together for 2 hours, C is closed and A and B can fill the remaining part in 8 hours. The number of hours taken by C alone to fill the tank is a)8 hours b)9 hours c)10 hours d)12 hours. Work done by A, B and C together in 2 hours = 2 5 3 5 of work done by A, B together in = 8 hours. Work done by A,B together in 2 hours = 3 5 * 2 8 = 3 20 Work done by C alone in 2 hours = 2 5 − 3 20 = 5 20 = 1 4 Total work done by C alone in = 8 hours.
  • 25. PIPES & CISTERN Pipe A usually fills a tank in 2 hours. On account of a leak at the bottom of the tank, it takes pipe A 30 more minutes to fill the tank. How long will the leak take to empty a full tank if pipe A is shut? a)6 hrs b)8 hrs c)10 hrs d)12 hrs Difference in time taken = 1 2 − 1 2.5 = 0.5 5 = 0.1 Hence time taken to empty the tank = 10 hrs.
  • 26. Ratio 12 Women can do a work in 16 days. 16 men can complete the same work in 17 days. What is the ratio between the working capacity of a woman and a man? a)12:17 b)11:16 c) 16:11 d) 17:12 Work done by 1 woman in 1 day = 1 12 ∗ 16 Work done by 1 man in 1 day = 1 17 ∗ 16 Ratio = 1 12 ∗ 16 : 1 17 ∗ 16 = 17 : 12