SlideShare a Scribd company logo
1 of 71
TIME & WORK
S.S.HARICHANDAN
INTRODUCTION:
The questions on Time & Work are
based on the following factors:
β€’ Number of days taken by
different persons with respect to
the working schedule.
β€’ Number of days with number of
hours per day by different
persons with respect to the
working schedule.
β€’ Efficiency of the persons with
respect to the working schedule.
SOME IMPORTANT POINTS:
1.Number of men Ξ±
2.Efficiency Ξ±
ys
Numberofda
1
ys
Numberofda
1
CONVENTIONAL
METHOD:
If A can do a total work of
1 unit in X days.
Then 1 day A can do 1/x of
the work.
As the calculation is
based on fraction which
will take time.
METHOD TO SOLVE BY USING L.C.M. CONCEPT
β€’ As the total work is same for
each persons, take the L.C.M. of
the number of days as the total
parts of the work.
β€’ Find out the one day work of the
persons by dividing the L.C.M.
with respect to the number of
days taken by them .
β€’ Then find out the required
number of days taken by them
according to the working
schedule.
Example:
A can do a piece of work
in 30 days and B can do
the same work in 45 days.
If they work together, the
work will be completed in
how many number of
days?
Example:
A can do a piece of work
in 12 days, B in 15 days &
C in 20 days respectively.If
they work together the
work will be completed in
how many days?
Example:
A & B can do a piece of
work in 12 days, B & C in
15 days and C & A in 20
days respectively.If they
work together the work
will be completed in how
many days?
SOME IMPORTANT QUESTIONS
Question:1
A and B complete a work
in 6 days. A alone can do it
in 18 days. If B works
alone, he can do the work
in how many days?
A. 6days B. 8 days
C. 9 days D. 12 days
Question:2
A can do a piece of work in 12
days. B can do it in 18 days.
With the assistance of C they
completed the work in 6 days.
Find in how many days can C
alone do it?
A. 24days B. 30 days
C. 32 days D. 36 days
Question:3
A and B can do a piece of
work in 8 days and 12 days
respectively. They work
together for 2 days and then A
leaves the work. In how many
days after that B will complete
the work alone?
A. 4 days B. 5 days
C. 6 days D. 7 days
Question:4
A can do a piece of work in 20
days. He works at it for 5 days
and then B finishes it in 12
days. In what time can A and B
together do it?
A. 8 days
B. 8 1/3 days
C. 8 2/3 days
D. 8 8/9days
Question:5
A and B can do a piece of
work in 12 days, B and C
in 15 days, C and A in 20
days. How long will C take
to do it?
A. 20 days B. 30 days
C. 40 days D. 60 days
Question:6
A can do a piece of work in 18
days; B can do the same in 24
days. A started alone but left
the work after 8 days, then B
worked at it for 6 days. C
finished the remaining work in
11 days. C alone can do the
whole work in how many
days?
A. 24 days B. 30 days
C. 36days D. 40 days
Question:7
A can do a piece of work in 12
days and B in 15 days. They
began the work together but 6
days before the completion of
the work, A leaves the work.
The work was completed in
how many days?
A. 8 days B. 10 days
C. 15 days D. 11 3/7 days
Question:8
A and B can do a job together
in 7 days. A is 7/4 times as
efficient as B. The same job
can be done by A alone in:
(a) 28/3 days
(b) 11 days
(c) 49/4 days
(d) 49/3 days
Question:9
A and B can complete a work in 15
days and 10 days respectively.
They started doing the work
together but after 2 days B had to
leave and A alone completed the
remaining work. The whole work
was completed in:
(a) 8 days
(b) 10 days
(c) 12 days
(d) 15 days
Question:10
A, B and C together can complete a
piece of work in 10 days. All the
three started working at it together
and after 4 days A left. Then B and
C together completed the work in
10 more days. A alone could
complete the work in:
(a) 15 days
(b) 16 days
(c) 25 days
(d) 50 days
Question:11
Ram and Shyam together do a work
in 8 days. Both of them began to
work. After 3 days Ram fell ill.
Shyam completed the remaining
work in 15 days. In how many days
can Ram complete the whole work?
(a) 12
(b) 17
(c) 16
(d) 15
Question:12
Two workers A and B were
employed for a work. A takes 8
hour more than the time taken by A
and B together. If B takes 4.5 hours
more than the time taken by A and
B together, how long would A and B
take together to complete the
work?
(a) 7 hours
(b) 6 hours
(c) 5 hours
(d) 4 hours
Question:13
A takes thrice as long to do a
piece of work, as B takes. A
and B together can do a piece
of work in 7.5 days. A alone
can do in:
(a) 30 days
(b) 40 days
(c) 50 days
(d) 60 days
Question:14
A is thrice as efficient as B
and is, therefore, able to finish
a piece of work in 12 days
earlier than B. In how many
days A and B will finish it
together?
A. 3 1/2 days B. 3 4/5 days
C. 4days D. 4.5 days
Question:15
After working for 8 days, Amar
finds that only 1/4th of the
work has been done. He
employs Samar who is 80% as
efficient as Amar. How many
days more would Samar take
to complete the work?
A. 30 days B. 36 days
C. 40 days D. 45days
Question:16
A is twice as good a work
man as B and together
they finish the work in 8
days. In how many days A
alone can finish the work?
A. 8 B. 10
C. 12 D. 15
Question:17
If 3men or 4 women can
do a piece of work in
31days, then 4men & 5
women can do the same
work in how many days?
A.9days B.10days
C.12days D. 15days
Question:18
If 2 men or 3 women or 4
boys can do a piece of
work in 49days, then
3men, 4 women & 5 boys
can do the same work in
how many days?
A.10 B.12
C.12.5 D.15
Question:19
A can do a piece of work in 12
days and B in 15 days. If they
work on alternate days and A
starts the work, it will be
completed in how many days?
A.13days B.13 ΒΌ days
C.13 2/5 days D.14days
Question:20
A can do a piece of work in 18
days, B in 24 days & C in 36
days. If A is assisted by B & C
on alternate days, the work
will be completed in how
many days?
A.11days B.12days
C.13days D.14days
Question:21
Two workers A and B assigned for
a certain work. A worked for 3 days
and B for 5 days and they did half
the work. Then they worked
together for another 3 days and
they had to do (1/30) th of the work.
How many days does B take to
complete the work, if he worked
alone?
A. 20 days B. 40 days
C. 50 days D. 60 days
Question:22
A and B can do a job in X
days. If A works alone he
can do the job in X + 8
days. If B works alone he
completes the same job in
X+ 18 days. What is X?
A. 10 B. 12
C. 15 D. 18
Question:23
A alone can do a piece of work
in 12 days and B alone can do
it in 15 days. A and B
undertook to do it for Rs.1080.
With the help of C they
finished it in 5 days. How
much is paid to C?
A. Rs.240 B. Rs.250
C. Rs.270 D. Rs.300
Question:24
A does 1/3rd as much
work as B in 2/3rd of the
time. If work together they
can do a work in 12 days,
then A can do the same
work in how many days?
A.20days B.27days
C.32days D.36days
Question:25
A & B can do a piece of work
in 12 days and B & C in 16
days respectively. After A has
been working for 5 days and B
for 7 days, C finishes it in 13
days. In how many days A can
do the work alone?
A.16 days B.24 days
C.32 days D.48days
Question:26
A is 60% more efficient
than B and together can
do a piece of work in
24days. If A works alone
the work will be completed
in how many days?
A.26days B.33days
C.39days D.42days
Question:27
A can complete a piece of work in 4
days. B takes double the time taken
by A, C takes double that of B, and
D takes double that of C to
complete the same task. They are
paired in groups of two each. One
pair takes two-thirds the time
needed by the second pair to
complete the work. Which is the
first pair?
A.A & B B.A & C
C.B & C D.A & D
Question:28
A takes as much time as B & C
together take to finish the job.
A & B working together finish
the job in 10 days. C alone can
do the same job in 15 days. In
how many days can B alone
do the same work?
A.30 days B.45 days
C.60 days D. 75 days
Question:29
A started a work and left after
working for 2 days. Then B was
called and he finished the work in 9
days. Had A left the work after
working for 3 days, B would have
finished in 6 days. In how many
days can B working alone, finish
the whole work?
A.6 days B.9days
C.12 days D.15 days
Question:30
One man, 3 women and 4 boys
can do a work in 96 hours; 2
men and 8 boys can do it in 80
hours; and 2 men and 3
women can do it in 120 hours.
In how many hours can 5 men
and 12 boys do it?
A.46 B. 43 7/11
C.48 D.48 2/3
Question:31
There are two candles of equal
lengths and of different thickness.
The thicker one lasts of six hours.
The thinner lasts 2 hours less than
the thicker one. Rajesh lights the
two candles at the same time.
When he went to bed he saw the
thicker one is twice the length of
the thinner one. How long ago did
Rajesh light the two candles?
A. 1 hr B. 2 hrs
C. 3 hrs D.4 hrs
Question:32
To do a piece of work, B takes
3 times as long as A & C
together and C twice as long
as A & B together. If the three
together can complete the
work in 10 days, how long
would A take by himself?
A.18days B.20days
C.24days D.27days
Question:33
Aman, Suman & Raman can do a
piece of work in 18 days, 27 days
and 36 days respectively. They start
working together. After working for
4 days, Aman goes away and
Suman leaves 7 days before the
work is finished. Only Raman
remains at work from beginning to
end. In how many days was the
whole work done?
A. 16 days B. 17 days
C. 18 days D. 19 days
Question:34
12 men take 28 days of 8
hours each to do a piece of
work. How many days of 6
hours each would 27 women
take to do the twice the work.
If 3 women do as much work
as 2 men?
A. 48 days B. 56 days
C. 60 days D.64 days
Question:35
A, B and C together can complete a
piece of work in 12 days. All the
three started working at it together
and after 4 days A left. Then B and
C together completed the work in
12 more days. A alone could
complete the work in how many
days?
A. 25 days B. 30 days
C. 36 days D.60 days
Question:36
Two workers A and B were
employed for a work. A takes
8days more than the time
taken by A and B together. If B
takes 18days more than the
time taken by A and B
together, how long would A
and B take together to
complete the work?
A. 8days B. 10days
C. 12days D. 15days
Question:37
45 men can complete a work
in 24 days. Six days after
started the work, 15 men left
the group. In how many days
can the remaining work be
completed?
A. 21 days B. 24 days
C. 27 days D. 30days
Question:38
A certain number of men can
do a work in 65 days working
6 hours a day. If the number of
men decreased by one-fourth,
then for how many hours per
day should they work in order
to complete the work in 40
days?
A. 14 B. 13
C. 15 D. 16
Question:39
Some persons can do a piece
of work in 12 days. Two times
the number of such persons
will do half of that work in:
(a) 6 days
(b) 4 days
(c) 3 days
(d) 12 days
Question:40
Twelve men and six women
together can complete a piece of
work in four days. The work done
by a woman in one day is half of
the work done by a man in one day.
If 12 men and six women started
working and after two days, six
men left and six women joined,
then in how many more days will
the work be completed?
A. 1.5days B. 1 day
C. 2 days D. 2.5days
Question:41
12 men can complete a piece of
work in 4 days, while 15 women can
complete the same work in 4 days.
6 men start working on the job and
after working for 2 days, all of them
stopped working. How many
women should be put on the job to
complete the remaining work, if it
so to be completed in 3 days?
A. 15 B. 18
C. 22 D. 24
Question:42
Amar and Barun are working on an
assignment. Amar takes 6 hrs to
type 36 pages on a computer, while
Barun takes 8 hrs to type 40 pages.
How much time will they take,
working together on two different
computers to type an assignment
of 80 pages?
A. 7 hrs 30 min B. 8 hrs
C. 8 hrs 15 min D. 8 hrs 25 min
Question:43
6 men can complete a piece of work in 12
days. 8 women can complete the same
piece of work in 18 days where as 18
children can complete the work in 10 days.
4 men, 12 women and 20 children work
together for 2 days. If only men were to
complete the remaining work in 1 day, how
many men would be required totally?
A. 36
B. 24
C. 18
D. Cannot be determined.
Question:44
3 men and 4 boys do a piece
of work in 8 days, while 4 men
and 4 boys do the same work
in 6 days. In how many days
will 2 men and 4 boys finish
the work?
A.6 days B.9 days
C. 12 days D. 15 days
Question:45
A garrison of 3300 men has
provisions for 32 days, when given
at a rate of 850 grams per head. At
the end of 7 days reinforcement
arrives and it was found that now
the provisions will last 8 days less,
when given at the rate of 825 grams
per head. How, many more men
arrived?
A. 1500 B.1600
C. 1700 D.None of these
Question:46
Grass in a lawn grows equally
thick and in a uniform rate. If it
lasts for 24 days for 70 cows
and 60 days for 30 cows, then
how many cows will eat the
whole grass in 96 days?
A.18 B.20
C.21 D.24
Question:47
If 12 oxen or 16cows can
eat the grass of a field in
30days, then in how many
days will 3 oxen and 2
cows eat the same grass?
A. 40 B.60
C.80 D.100
Question:48
39 men can complete a
work in 12 days, working 5
hours a day. In how many
days will 30 men, working
6 hours a day, complete
twice the work?
A. 10 B.13
C.20 D.26
Question:49
If 20 untrained workers can do a
work in 12 days of 8 hr. each, how
many trained workers can do 50%
more work in 15 days of 10 hr each
? (It may be assumed that it takes 3
trained workers to do the work of 4
untrained workers)
A. 10 B. 12
C. 15 D. 18
Question:50
A builder decided to build a
farmhouse in 35 days. He employed
30 men in the beginning and 30
more after 30 days and completed
the construction in stipulated time.
If he had not employed the
additional men, how many days
behind the schedule would it have
been finished?
A.3days B.4days
C.5days D.6days
Question:51
12 men can complete a piece of
work in 4 days, while 15 women can
complete the same work in 4 days.
6 men start working on the job and
after working for 2 days, all of them
stopped working. How many
women should be put on the job to
complete the remaining work, if it
so to be completed in 3 days?
A. 15 B. 18
C. 22 D. 24
Question:52
12 men take 28 days of 8
hours each to do a piece of
work. How many days of 6
hours each would 27 women
take to do the twice the work.
If 3 women do as much work
as 2 men?
A. 48 days B. 56 days
C. 60 days D.64 days
Question:53
A certain number of men can
do a piece of work in 12 days.
But due to 8 men more the
work gets completed in 3 days
less. How many original men
are there?
A.15 B.18
C.21 D.24
Question:54
A contractor has to complete a
farm house in 12 days. He
employed 30 men in the beginning
and after 9 days another 15 more
men so that the work is completed
in the stipulated time. If he had not
employed the additional men, the
work would have been completed
in how many days behind the
schedule?
A.1day B.1.5days
C.2days D.2.5days
Question:55
A contractor under take to build a
road of 15kms in 12 days. He
employed 20men in the beginning
and after 6 days he observed that
only 6 kms of road has been
completed. Then in order to
complete the work in the stipulated
time how many extra men are
needed?
A.8men B.10men
C.12men D.15men
Question:56
If 33 untrained labourers can do a
work in 15 days of 12 hr. each, how
many trained labourers can do 50%
more work in 11 days of 9 hr each ?
(It may be assumed that it takes 2
trained labourers to do the work of
5 untrained labourers)
(a)42
(b)36
(c) 90
(d) 100
Question:57
Ronald and Elan are working on an
assignment. Ronald takes 6 hours
to type 32 pages on a computer,
while Elan takes 5 hours to type 40
pages. How much time will they
take, working together on two
different computers to type an
assignment of 110 pages ?
(a) 7 hours 30 minutes
(b) 8 hours
(c) 8 hours 15 minutes
(d) 8 hours 25 minutes
Question:58
39 persons can repair a road
in 12 days, working 5 hours a
day. In how many days will 30
persons, working 6 hours a
day, complete the work ?
(a) 10
(b) 13
(c) 14
(d) 15
​P​ ​can​ ​do​ ​a​ ​piece​ ​of​ ​work​ ​in​ ​5​ ​d
ays​ ​of​ ​8​ ​hours​ ​each​ ​and​ ​Q​ ​can​
​do​ ​in​ ​4​ ​days​ ​of​ ​6​ ​hours​ ​each.
How​ ​long​ ​will​ ​they​ ​take​ ​do​ ​it​ ​w
orking​ ​​ ​5​ ​hours​ ​a​ ​day?
a.​ ​2​ ​days​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​
b.​ ​3​ ​days​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​
c.​ ​4​ ​days​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​
d.​ ​5​ ​days
TIME & WORK.pptx
TIME & WORK.pptx
TIME & WORK.pptx
TIME & WORK.pptx

More Related Content

Similar to TIME & WORK.pptx

3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_priya mega
Β 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdLearningHomeBD.com
Β 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptxvikiawsac
Β 
Time and work session 1
Time and work session 1Time and work session 1
Time and work session 1George Prep
Β 
Time and work questins FOR COMPETATIVE EXAMS
Time and work questins FOR COMPETATIVE EXAMS Time and work questins FOR COMPETATIVE EXAMS
Time and work questins FOR COMPETATIVE EXAMS Aradhana Kumari
Β 
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...SOURAV DAS
Β 
3. Workbook.pdf
3. Workbook.pdf3. Workbook.pdf
3. Workbook.pdfRahul215838
Β 
44 Time and Work Problems - Competition Gurukul
  44 Time and Work Problems - Competition Gurukul  44 Time and Work Problems - Competition Gurukul
44 Time and Work Problems - Competition GurukulCompetition Gurukul
Β 
C11
C11C11
C11BGEsp1
Β 
Banks and SSC Time and Work
Banks and SSC Time and WorkBanks and SSC Time and Work
Banks and SSC Time and WorkGeorge Prep
Β 
Aptitude time and work
Aptitude time and workAptitude time and work
Aptitude time and workMaria Yesudass
Β 
Time and work ea #2
Time and work  ea #2Time and work  ea #2
Time and work ea #2Exam Affairs!
Β 
Pipes and Cisterns - Work Time
 Pipes and Cisterns - Work Time Pipes and Cisterns - Work Time
Pipes and Cisterns - Work Time2IIM
Β 

Similar to TIME & WORK.pptx (20)

Time and work
Time and workTime and work
Time and work
Β 
Time & work
Time & workTime & work
Time & work
Β 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_
Β 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebd
Β 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptx
Β 
Time and work session 1
Time and work session 1Time and work session 1
Time and work session 1
Β 
Time and work questins FOR COMPETATIVE EXAMS
Time and work questins FOR COMPETATIVE EXAMS Time and work questins FOR COMPETATIVE EXAMS
Time and work questins FOR COMPETATIVE EXAMS
Β 
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
Β 
3. Workbook.pdf
3. Workbook.pdf3. Workbook.pdf
3. Workbook.pdf
Β 
44 Time and Work Problems - Competition Gurukul
  44 Time and Work Problems - Competition Gurukul  44 Time and Work Problems - Competition Gurukul
44 Time and Work Problems - Competition Gurukul
Β 
C11
C11C11
C11
Β 
maths set-01.pptx
maths set-01.pptxmaths set-01.pptx
maths set-01.pptx
Β 
Doc
DocDoc
Doc
Β 
AMCAT time work pipes cisterns
 AMCAT time  work pipes cisterns AMCAT time  work pipes cisterns
AMCAT time work pipes cisterns
Β 
Banks and SSC Time and Work
Banks and SSC Time and WorkBanks and SSC Time and Work
Banks and SSC Time and Work
Β 
Aptitude time and work
Aptitude time and workAptitude time and work
Aptitude time and work
Β 
Time and work ea #2
Time and work  ea #2Time and work  ea #2
Time and work ea #2
Β 
Qa01 time and work
Qa01 time and workQa01 time and work
Qa01 time and work
Β 
Pipes and Cisterns - Work Time
 Pipes and Cisterns - Work Time Pipes and Cisterns - Work Time
Pipes and Cisterns - Work Time
Β 
TRW
TRWTRW
TRW
Β 

More from 104SIMANJEETKALIA

More from 104SIMANJEETKALIA (6)

lalalol.pptx
lalalol.pptxlalalol.pptx
lalalol.pptx
Β 
lalalol.pptx
lalalol.pptxlalalol.pptx
lalalol.pptx
Β 
lalalol.pptx
lalalol.pptxlalalol.pptx
lalalol.pptx
Β 
lalalol.pptx
lalalol.pptxlalalol.pptx
lalalol.pptx
Β 
lalolol.pptx
lalolol.pptxlalolol.pptx
lalolol.pptx
Β 
lol.pptx
lol.pptxlol.pptx
lol.pptx
Β 

Recently uploaded

Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryCall me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryPooja Nehwal
Β 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxDineshKumar4165
Β 
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERUNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERDineshKumar4165
Β 
GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024AHOhOops1
Β 
Transformative journey for Automotive Components Manufacturers- D&V Business ...
Transformative journey for Automotive Components Manufacturers- D&V Business ...Transformative journey for Automotive Components Manufacturers- D&V Business ...
Transformative journey for Automotive Components Manufacturers- D&V Business ...D&V Business Consulting
Β 
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service ManualJohn Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service ManualExcavator
Β 
How To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative ErrorHow To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative ErrorAndres Auto Service
Β 
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111Sapana Sha
Β 
Crash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.pptCrash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.pptVlademirGebDubouzet1
Β 
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhiHauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhiHot Call Girls In Sector 58 (Noida)
Β 
The 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journeyThe 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journeyHyundai Motor Group
Β 
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi *οΌŠβœΏβ€7042364481β€βœΏοΌŠ*Escorts ServiCes C...
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi *οΌŠβœΏβ€7042364481β€βœΏοΌŠ*Escorts ServiCes C...꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi *οΌŠβœΏβ€7042364481β€βœΏοΌŠ*Escorts ServiCes C...
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi *οΌŠβœΏβ€7042364481β€βœΏοΌŠ*Escorts ServiCes C...Hot Call Girls In Sector 58 (Noida)
Β 
83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagar
83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagar83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagar
83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagardollysharma2066
Β 
Hyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRCHyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRCHyundai Motor Group
Β 
Rockwell Automation 2711R PanelView 800 HMI
Rockwell Automation 2711R PanelView 800 HMIRockwell Automation 2711R PanelView 800 HMI
Rockwell Automation 2711R PanelView 800 HMIAsteam Techno
Β 
Vip Hot Call Girls 🫀 Mahipalpur ➑️ 9711199171 ➑️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫀 Mahipalpur ➑️ 9711199171 ➑️ Delhi 🫦 Whatsapp NumberVip Hot Call Girls 🫀 Mahipalpur ➑️ 9711199171 ➑️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫀 Mahipalpur ➑️ 9711199171 ➑️ Delhi 🫦 Whatsapp Numberkumarajju5765
Β 
(NEHA) Call Girls Pushkar Booking Open 8617697112 Pushkar Escorts
(NEHA) Call Girls Pushkar Booking Open 8617697112 Pushkar Escorts(NEHA) Call Girls Pushkar Booking Open 8617697112 Pushkar Escorts
(NEHA) Call Girls Pushkar Booking Open 8617697112 Pushkar EscortsCall girls in Ahmedabad High profile
Β 
FULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | NoidaFULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | NoidaMalviyaNagarCallGirl
Β 

Recently uploaded (20)

Hotel Escorts Sushant Golf City - 9548273370 Call Girls Service in Lucknow, c...
Hotel Escorts Sushant Golf City - 9548273370 Call Girls Service in Lucknow, c...Hotel Escorts Sushant Golf City - 9548273370 Call Girls Service in Lucknow, c...
Hotel Escorts Sushant Golf City - 9548273370 Call Girls Service in Lucknow, c...
Β 
Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home DeliveryCall me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Call me @ 9892124323 Call Girl in Andheri East With Free Home Delivery
Β 
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptxUNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
UNIT-IV-STEERING, BRAKES AND SUSPENSION SYSTEMS.pptx
Β 
Call Girls in Shri Niwas Puri Delhi πŸ’―Call Us πŸ”9953056974πŸ”
Call Girls in  Shri Niwas Puri  Delhi πŸ’―Call Us πŸ”9953056974πŸ”Call Girls in  Shri Niwas Puri  Delhi πŸ’―Call Us πŸ”9953056974πŸ”
Call Girls in Shri Niwas Puri Delhi πŸ’―Call Us πŸ”9953056974πŸ”
Β 
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGERUNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
UNIT-II-ENGINE AUXILIARY SYSTEMS &TURBOCHARGER
Β 
GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024GREEN VEHICLES the kids picture show 2024
GREEN VEHICLES the kids picture show 2024
Β 
Transformative journey for Automotive Components Manufacturers- D&V Business ...
Transformative journey for Automotive Components Manufacturers- D&V Business ...Transformative journey for Automotive Components Manufacturers- D&V Business ...
Transformative journey for Automotive Components Manufacturers- D&V Business ...
Β 
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service ManualJohn Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
John Deere 300 3029 4039 4045 6059 6068 Engine Operation and Service Manual
Β 
How To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative ErrorHow To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
How To Troubleshoot Mercedes Blind Spot Assist Inoperative Error
Β 
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
ENJOY Call Girls In Okhla Vihar Delhi Call 9654467111
Β 
Crash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.pptCrash Vehicle Emergency Rescue Slideshow.ppt
Crash Vehicle Emergency Rescue Slideshow.ppt
Β 
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhiHauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Hauz Khas Call Girls ☎ 7042364481 independent Escorts Service in delhi
Β 
The 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journeyThe 10th anniversary, Hyundai World Rally Team's amazing journey
The 10th anniversary, Hyundai World Rally Team's amazing journey
Β 
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi *οΌŠβœΏβ€7042364481β€βœΏοΌŠ*Escorts ServiCes C...
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi *οΌŠβœΏβ€7042364481β€βœΏοΌŠ*Escorts ServiCes C...꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi *οΌŠβœΏβ€7042364481β€βœΏοΌŠ*Escorts ServiCes C...
꧁ ୨⎯Call Girls In Ashok Vihar, New Delhi *οΌŠβœΏβ€7042364481β€βœΏοΌŠ*Escorts ServiCes C...
Β 
83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagar
83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagar83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagar
83778-77756 ( HER.SELF ) Brings Call Girls In Laxmi Nagar
Β 
Hyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRCHyundai World Rally Team in action at 2024 WRC
Hyundai World Rally Team in action at 2024 WRC
Β 
Rockwell Automation 2711R PanelView 800 HMI
Rockwell Automation 2711R PanelView 800 HMIRockwell Automation 2711R PanelView 800 HMI
Rockwell Automation 2711R PanelView 800 HMI
Β 
Vip Hot Call Girls 🫀 Mahipalpur ➑️ 9711199171 ➑️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫀 Mahipalpur ➑️ 9711199171 ➑️ Delhi 🫦 Whatsapp NumberVip Hot Call Girls 🫀 Mahipalpur ➑️ 9711199171 ➑️ Delhi 🫦 Whatsapp Number
Vip Hot Call Girls 🫀 Mahipalpur ➑️ 9711199171 ➑️ Delhi 🫦 Whatsapp Number
Β 
(NEHA) Call Girls Pushkar Booking Open 8617697112 Pushkar Escorts
(NEHA) Call Girls Pushkar Booking Open 8617697112 Pushkar Escorts(NEHA) Call Girls Pushkar Booking Open 8617697112 Pushkar Escorts
(NEHA) Call Girls Pushkar Booking Open 8617697112 Pushkar Escorts
Β 
FULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | NoidaFULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
FULL ENJOY - 9953040155 Call Girls in Sector 61 | Noida
Β 

TIME & WORK.pptx

  • 2. INTRODUCTION: The questions on Time & Work are based on the following factors: β€’ Number of days taken by different persons with respect to the working schedule. β€’ Number of days with number of hours per day by different persons with respect to the working schedule. β€’ Efficiency of the persons with respect to the working schedule.
  • 3. SOME IMPORTANT POINTS: 1.Number of men Ξ± 2.Efficiency Ξ± ys Numberofda 1 ys Numberofda 1
  • 4. CONVENTIONAL METHOD: If A can do a total work of 1 unit in X days. Then 1 day A can do 1/x of the work. As the calculation is based on fraction which will take time.
  • 5. METHOD TO SOLVE BY USING L.C.M. CONCEPT β€’ As the total work is same for each persons, take the L.C.M. of the number of days as the total parts of the work. β€’ Find out the one day work of the persons by dividing the L.C.M. with respect to the number of days taken by them . β€’ Then find out the required number of days taken by them according to the working schedule.
  • 6. Example: A can do a piece of work in 30 days and B can do the same work in 45 days. If they work together, the work will be completed in how many number of days?
  • 7. Example: A can do a piece of work in 12 days, B in 15 days & C in 20 days respectively.If they work together the work will be completed in how many days?
  • 8. Example: A & B can do a piece of work in 12 days, B & C in 15 days and C & A in 20 days respectively.If they work together the work will be completed in how many days?
  • 9. SOME IMPORTANT QUESTIONS Question:1 A and B complete a work in 6 days. A alone can do it in 18 days. If B works alone, he can do the work in how many days? A. 6days B. 8 days C. 9 days D. 12 days
  • 10. Question:2 A can do a piece of work in 12 days. B can do it in 18 days. With the assistance of C they completed the work in 6 days. Find in how many days can C alone do it? A. 24days B. 30 days C. 32 days D. 36 days
  • 11. Question:3 A and B can do a piece of work in 8 days and 12 days respectively. They work together for 2 days and then A leaves the work. In how many days after that B will complete the work alone? A. 4 days B. 5 days C. 6 days D. 7 days
  • 12. Question:4 A can do a piece of work in 20 days. He works at it for 5 days and then B finishes it in 12 days. In what time can A and B together do it? A. 8 days B. 8 1/3 days C. 8 2/3 days D. 8 8/9days
  • 13. Question:5 A and B can do a piece of work in 12 days, B and C in 15 days, C and A in 20 days. How long will C take to do it? A. 20 days B. 30 days C. 40 days D. 60 days
  • 14. Question:6 A can do a piece of work in 18 days; B can do the same in 24 days. A started alone but left the work after 8 days, then B worked at it for 6 days. C finished the remaining work in 11 days. C alone can do the whole work in how many days? A. 24 days B. 30 days C. 36days D. 40 days
  • 15. Question:7 A can do a piece of work in 12 days and B in 15 days. They began the work together but 6 days before the completion of the work, A leaves the work. The work was completed in how many days? A. 8 days B. 10 days C. 15 days D. 11 3/7 days
  • 16. Question:8 A and B can do a job together in 7 days. A is 7/4 times as efficient as B. The same job can be done by A alone in: (a) 28/3 days (b) 11 days (c) 49/4 days (d) 49/3 days
  • 17. Question:9 A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in: (a) 8 days (b) 10 days (c) 12 days (d) 15 days
  • 18. Question:10 A, B and C together can complete a piece of work in 10 days. All the three started working at it together and after 4 days A left. Then B and C together completed the work in 10 more days. A alone could complete the work in: (a) 15 days (b) 16 days (c) 25 days (d) 50 days
  • 19. Question:11 Ram and Shyam together do a work in 8 days. Both of them began to work. After 3 days Ram fell ill. Shyam completed the remaining work in 15 days. In how many days can Ram complete the whole work? (a) 12 (b) 17 (c) 16 (d) 15
  • 20. Question:12 Two workers A and B were employed for a work. A takes 8 hour more than the time taken by A and B together. If B takes 4.5 hours more than the time taken by A and B together, how long would A and B take together to complete the work? (a) 7 hours (b) 6 hours (c) 5 hours (d) 4 hours
  • 21. Question:13 A takes thrice as long to do a piece of work, as B takes. A and B together can do a piece of work in 7.5 days. A alone can do in: (a) 30 days (b) 40 days (c) 50 days (d) 60 days
  • 22. Question:14 A is thrice as efficient as B and is, therefore, able to finish a piece of work in 12 days earlier than B. In how many days A and B will finish it together? A. 3 1/2 days B. 3 4/5 days C. 4days D. 4.5 days
  • 23. Question:15 After working for 8 days, Amar finds that only 1/4th of the work has been done. He employs Samar who is 80% as efficient as Amar. How many days more would Samar take to complete the work? A. 30 days B. 36 days C. 40 days D. 45days
  • 24. Question:16 A is twice as good a work man as B and together they finish the work in 8 days. In how many days A alone can finish the work? A. 8 B. 10 C. 12 D. 15
  • 25. Question:17 If 3men or 4 women can do a piece of work in 31days, then 4men & 5 women can do the same work in how many days? A.9days B.10days C.12days D. 15days
  • 26. Question:18 If 2 men or 3 women or 4 boys can do a piece of work in 49days, then 3men, 4 women & 5 boys can do the same work in how many days? A.10 B.12 C.12.5 D.15
  • 27. Question:19 A can do a piece of work in 12 days and B in 15 days. If they work on alternate days and A starts the work, it will be completed in how many days? A.13days B.13 ΒΌ days C.13 2/5 days D.14days
  • 28. Question:20 A can do a piece of work in 18 days, B in 24 days & C in 36 days. If A is assisted by B & C on alternate days, the work will be completed in how many days? A.11days B.12days C.13days D.14days
  • 29. Question:21 Two workers A and B assigned for a certain work. A worked for 3 days and B for 5 days and they did half the work. Then they worked together for another 3 days and they had to do (1/30) th of the work. How many days does B take to complete the work, if he worked alone? A. 20 days B. 40 days C. 50 days D. 60 days
  • 30. Question:22 A and B can do a job in X days. If A works alone he can do the job in X + 8 days. If B works alone he completes the same job in X+ 18 days. What is X? A. 10 B. 12 C. 15 D. 18
  • 31. Question:23 A alone can do a piece of work in 12 days and B alone can do it in 15 days. A and B undertook to do it for Rs.1080. With the help of C they finished it in 5 days. How much is paid to C? A. Rs.240 B. Rs.250 C. Rs.270 D. Rs.300
  • 32. Question:24 A does 1/3rd as much work as B in 2/3rd of the time. If work together they can do a work in 12 days, then A can do the same work in how many days? A.20days B.27days C.32days D.36days
  • 33. Question:25 A & B can do a piece of work in 12 days and B & C in 16 days respectively. After A has been working for 5 days and B for 7 days, C finishes it in 13 days. In how many days A can do the work alone? A.16 days B.24 days C.32 days D.48days
  • 34. Question:26 A is 60% more efficient than B and together can do a piece of work in 24days. If A works alone the work will be completed in how many days? A.26days B.33days C.39days D.42days
  • 35. Question:27 A can complete a piece of work in 4 days. B takes double the time taken by A, C takes double that of B, and D takes double that of C to complete the same task. They are paired in groups of two each. One pair takes two-thirds the time needed by the second pair to complete the work. Which is the first pair? A.A & B B.A & C C.B & C D.A & D
  • 36. Question:28 A takes as much time as B & C together take to finish the job. A & B working together finish the job in 10 days. C alone can do the same job in 15 days. In how many days can B alone do the same work? A.30 days B.45 days C.60 days D. 75 days
  • 37. Question:29 A started a work and left after working for 2 days. Then B was called and he finished the work in 9 days. Had A left the work after working for 3 days, B would have finished in 6 days. In how many days can B working alone, finish the whole work? A.6 days B.9days C.12 days D.15 days
  • 38. Question:30 One man, 3 women and 4 boys can do a work in 96 hours; 2 men and 8 boys can do it in 80 hours; and 2 men and 3 women can do it in 120 hours. In how many hours can 5 men and 12 boys do it? A.46 B. 43 7/11 C.48 D.48 2/3
  • 39. Question:31 There are two candles of equal lengths and of different thickness. The thicker one lasts of six hours. The thinner lasts 2 hours less than the thicker one. Rajesh lights the two candles at the same time. When he went to bed he saw the thicker one is twice the length of the thinner one. How long ago did Rajesh light the two candles? A. 1 hr B. 2 hrs C. 3 hrs D.4 hrs
  • 40. Question:32 To do a piece of work, B takes 3 times as long as A & C together and C twice as long as A & B together. If the three together can complete the work in 10 days, how long would A take by himself? A.18days B.20days C.24days D.27days
  • 41. Question:33 Aman, Suman & Raman can do a piece of work in 18 days, 27 days and 36 days respectively. They start working together. After working for 4 days, Aman goes away and Suman leaves 7 days before the work is finished. Only Raman remains at work from beginning to end. In how many days was the whole work done? A. 16 days B. 17 days C. 18 days D. 19 days
  • 42. Question:34 12 men take 28 days of 8 hours each to do a piece of work. How many days of 6 hours each would 27 women take to do the twice the work. If 3 women do as much work as 2 men? A. 48 days B. 56 days C. 60 days D.64 days
  • 43. Question:35 A, B and C together can complete a piece of work in 12 days. All the three started working at it together and after 4 days A left. Then B and C together completed the work in 12 more days. A alone could complete the work in how many days? A. 25 days B. 30 days C. 36 days D.60 days
  • 44. Question:36 Two workers A and B were employed for a work. A takes 8days more than the time taken by A and B together. If B takes 18days more than the time taken by A and B together, how long would A and B take together to complete the work? A. 8days B. 10days C. 12days D. 15days
  • 45. Question:37 45 men can complete a work in 24 days. Six days after started the work, 15 men left the group. In how many days can the remaining work be completed? A. 21 days B. 24 days C. 27 days D. 30days
  • 46. Question:38 A certain number of men can do a work in 65 days working 6 hours a day. If the number of men decreased by one-fourth, then for how many hours per day should they work in order to complete the work in 40 days? A. 14 B. 13 C. 15 D. 16
  • 47. Question:39 Some persons can do a piece of work in 12 days. Two times the number of such persons will do half of that work in: (a) 6 days (b) 4 days (c) 3 days (d) 12 days
  • 48. Question:40 Twelve men and six women together can complete a piece of work in four days. The work done by a woman in one day is half of the work done by a man in one day. If 12 men and six women started working and after two days, six men left and six women joined, then in how many more days will the work be completed? A. 1.5days B. 1 day C. 2 days D. 2.5days
  • 49. Question:41 12 men can complete a piece of work in 4 days, while 15 women can complete the same work in 4 days. 6 men start working on the job and after working for 2 days, all of them stopped working. How many women should be put on the job to complete the remaining work, if it so to be completed in 3 days? A. 15 B. 18 C. 22 D. 24
  • 50. Question:42 Amar and Barun are working on an assignment. Amar takes 6 hrs to type 36 pages on a computer, while Barun takes 8 hrs to type 40 pages. How much time will they take, working together on two different computers to type an assignment of 80 pages? A. 7 hrs 30 min B. 8 hrs C. 8 hrs 15 min D. 8 hrs 25 min
  • 51. Question:43 6 men can complete a piece of work in 12 days. 8 women can complete the same piece of work in 18 days where as 18 children can complete the work in 10 days. 4 men, 12 women and 20 children work together for 2 days. If only men were to complete the remaining work in 1 day, how many men would be required totally? A. 36 B. 24 C. 18 D. Cannot be determined.
  • 52. Question:44 3 men and 4 boys do a piece of work in 8 days, while 4 men and 4 boys do the same work in 6 days. In how many days will 2 men and 4 boys finish the work? A.6 days B.9 days C. 12 days D. 15 days
  • 53. Question:45 A garrison of 3300 men has provisions for 32 days, when given at a rate of 850 grams per head. At the end of 7 days reinforcement arrives and it was found that now the provisions will last 8 days less, when given at the rate of 825 grams per head. How, many more men arrived? A. 1500 B.1600 C. 1700 D.None of these
  • 54. Question:46 Grass in a lawn grows equally thick and in a uniform rate. If it lasts for 24 days for 70 cows and 60 days for 30 cows, then how many cows will eat the whole grass in 96 days? A.18 B.20 C.21 D.24
  • 55. Question:47 If 12 oxen or 16cows can eat the grass of a field in 30days, then in how many days will 3 oxen and 2 cows eat the same grass? A. 40 B.60 C.80 D.100
  • 56. Question:48 39 men can complete a work in 12 days, working 5 hours a day. In how many days will 30 men, working 6 hours a day, complete twice the work? A. 10 B.13 C.20 D.26
  • 57. Question:49 If 20 untrained workers can do a work in 12 days of 8 hr. each, how many trained workers can do 50% more work in 15 days of 10 hr each ? (It may be assumed that it takes 3 trained workers to do the work of 4 untrained workers) A. 10 B. 12 C. 15 D. 18
  • 58. Question:50 A builder decided to build a farmhouse in 35 days. He employed 30 men in the beginning and 30 more after 30 days and completed the construction in stipulated time. If he had not employed the additional men, how many days behind the schedule would it have been finished? A.3days B.4days C.5days D.6days
  • 59. Question:51 12 men can complete a piece of work in 4 days, while 15 women can complete the same work in 4 days. 6 men start working on the job and after working for 2 days, all of them stopped working. How many women should be put on the job to complete the remaining work, if it so to be completed in 3 days? A. 15 B. 18 C. 22 D. 24
  • 60. Question:52 12 men take 28 days of 8 hours each to do a piece of work. How many days of 6 hours each would 27 women take to do the twice the work. If 3 women do as much work as 2 men? A. 48 days B. 56 days C. 60 days D.64 days
  • 61. Question:53 A certain number of men can do a piece of work in 12 days. But due to 8 men more the work gets completed in 3 days less. How many original men are there? A.15 B.18 C.21 D.24
  • 62. Question:54 A contractor has to complete a farm house in 12 days. He employed 30 men in the beginning and after 9 days another 15 more men so that the work is completed in the stipulated time. If he had not employed the additional men, the work would have been completed in how many days behind the schedule? A.1day B.1.5days C.2days D.2.5days
  • 63. Question:55 A contractor under take to build a road of 15kms in 12 days. He employed 20men in the beginning and after 6 days he observed that only 6 kms of road has been completed. Then in order to complete the work in the stipulated time how many extra men are needed? A.8men B.10men C.12men D.15men
  • 64. Question:56 If 33 untrained labourers can do a work in 15 days of 12 hr. each, how many trained labourers can do 50% more work in 11 days of 9 hr each ? (It may be assumed that it takes 2 trained labourers to do the work of 5 untrained labourers) (a)42 (b)36 (c) 90 (d) 100
  • 65. Question:57 Ronald and Elan are working on an assignment. Ronald takes 6 hours to type 32 pages on a computer, while Elan takes 5 hours to type 40 pages. How much time will they take, working together on two different computers to type an assignment of 110 pages ? (a) 7 hours 30 minutes (b) 8 hours (c) 8 hours 15 minutes (d) 8 hours 25 minutes
  • 66. Question:58 39 persons can repair a road in 12 days, working 5 hours a day. In how many days will 30 persons, working 6 hours a day, complete the work ? (a) 10 (b) 13 (c) 14 (d) 15
  • 67. ​P​ ​can​ ​do​ ​a​ ​piece​ ​of​ ​work​ ​in​ ​5​ ​d ays​ ​of​ ​8​ ​hours​ ​each​ ​and​ ​Q​ ​can​ ​do​ ​in​ ​4​ ​days​ ​of​ ​6​ ​hours​ ​each. How​ ​long​ ​will​ ​they​ ​take​ ​do​ ​it​ ​w orking​ ​​ ​5​ ​hours​ ​a​ ​day? a.​ ​2​ ​days​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​ b.​ ​3​ ​days​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​ c.​ ​4​ ​days​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​​ ​ d.​ ​5​ ​days