SlideShare a Scribd company logo
Black holes of Aptitude-Time and Work
©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com
Time and Work
Type I
Exp 1 Rizwan can do a piece of work in 6 days and Payam can do the same work in 8 days,working together ,in
how many days they will complete the same work:
Solution:
Step I Take the L.C.M(6,8) of number of days taken by R and P alone to complete the work
Imagine there are 24 bricks(Total work) in total ,R can transfer all bricks in 6 days from one place to
other, So he will have to pick 4 bricks a day and P will have to pick 3 bricks a day.
R -6 4(24/6)
L.C.M(6,8)=24
P-8 3(24/8)
Step II if P and R work together they will pick 7 bricks/day.
Step III They can pick all 24 bricks in
=
24
7
days =
𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠
𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦
Type II
Exp 2 Gulfshan and Maryam working together can do a piece of work in 8 days. If Gulfshan alone can do it in
24 days, in How many days Maryam alone can complete the same work?
Solution:
G+M-8 3(24/8)
L.C.M (8, 24) =24
G-24 1(24/24)
M alone can pick =2(3-1) bricks/day.
So Maryam alone can do the same work in
= 12 =
24
2
days =
𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠
𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦
Black holes of Aptitude-Time and Work
©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com
Type III
Exp 3 If Afshan and Sahir can do a work in 18 days and 24 days respectively. They worked together
for 8 days and then Afshan left. The remaining work was finished by Sahir in How many days?
Solution:
A-18 4(72/18)
L.C.M (18, 24)=72
S-24 3(72/24)
Step I A+S can pick 7(4+3) bricks/day.
Step II They worked for 8 days so, they will pick 56(8*7(4+3)) bricks in 8 days.
Step III Left over bricks 16(72-56)
Step IV B will pick remaining 16 bricks in 16/3 days.
Type IV
Exp 4:Sajid can do a piece of work in 18 days and Haider in 12 days. They began the work together, But Haider
left the work 3 days before its completion. In How many days in all was the work completed?
Solution:
S-18 2(36/18)
L.C.M (18, 12)=36
H-12 3(36/12)
Let say work was finished in N days ,So S worked for N days and H worked for X-3 days ,together they have to
pick 36 bricks.
Black holes of Aptitude-Time and Work
©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com
Total Bricks=no of days S worked×S can pick bricks/day+no of days H worked×H can pick bricks/day
36=N×2+ (N-3)×3
N= 9days
Shortcut:
H didn’t work for 3 days, so those extra bricks 9(3×3) will be added to total bricks
So your answer will be
36+9/5(3+2)
9 days
Type V
Exp 5:Shabnam and Ayesha together can complete a work in 15 days. Shabnam is 50 % more efficient worker
than Ayesha. How long Shabnam will take to complete the work alone?
Solution:
If S is 50% more efficient worker, She will Pick 150 Bricks and A will pick 100 Bricks in a day.
S=150 bricks
A=100 bricks
S+A=250 bricks
If they can finish the work in 15 days and can pick 250 bricks in a day, there would have been 250×15 bricks in
total. Which can be picked by S in
=
𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠
𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦
=
250×15
150
= 25 𝑑𝑎𝑦𝑠
Type VI
Exp6:Ashba does 4/5 of a piece of work in 20 days, She then calls in Asra and they finish the remaining work in
3 days. How long Asra alone will take to do the whole work?
Solution:
Ah =
4
5
work 20 days
Full work (1) 20×
5
4
=25 days
Ah+Ar1= 1-
4
5
=
1
5
3 days
Full work (1) 3×
5
1
=15 days
Black holes of Aptitude-Time and Work
©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com
Ah+Ar -15 5(75/15)
L.C.M (15, 25)=75
Ah-25 3(75/25)
M alone can pick =2(5-3) bricks/day.
So Maryam alone can do the same work in
=
75
2
days =
𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠
𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦
VII
Exp7:If Manal can do a piece of work in 12 days and Najam can do it in 15 days. How many days it will take to
complete the same work, If they work alternatively starting from Manal:
Solution: 5(60/12)
M 12 60(L.C.M (12, 15))
N 14 4(60/15)
Since they are working on alternate days, so they will pick 9(5+4) bricks in 2 days.
Days bricks
2 9
Now we will multiply bricks with a NUMBER which will make bricks near to total bricks (60), but not greater
than 60, and we will multiply days with the same number.
Days bricks
2 ×6 9×6(54)
Now we are left with 6 bricks, since M has started work, now again its M’s turn after 12 days work.
Days bricks
12 54
+1 +5
13 59
Black holes of Aptitude-Time and Work
©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com
Now its N’s turn and we are left with 1 brick, which can be picked by N in ¼ days.
=
𝑛𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑛𝑒𝑒𝑑 𝑡𝑜 𝑏𝑒 𝑝𝑖𝑐𝑘𝑒𝑑
𝑛𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑐𝑎𝑛 𝑏𝑒 𝑝𝑖𝑐𝑘𝑒𝑑 𝑖𝑛 𝑎 𝑑𝑎𝑦
13+1/4 59+1=60 bricks
So work will be complete in 13
1
4
days.
TypeVIII
Exp 8: Manal and Najam can do a piece of work in 12 days, Najam and Ayesha can do it in 15 days, Manal and
Ayesha can do it in 20 days. how long it will take to complete the work, If they work together and alone?
Solution:
M+N 12 5(60/12)
N+A 15 60 [L.C.M (12, 15, 20)] 4(60/15)
M+A 20 3(60/20)
Since there is double counting of every one so we will multiply total bricks by 2.
M+N+A=
2×60
5+4+3
=10days
If we want to calculate it for M alone, we need to add bricks of those equations where M is present and
subtracted those where M is absent
2 × 60
5 − 4 + 3
= 30 𝑑𝑎𝑦𝑠
Same for N and A
N alone
2 × 60
5 + 4 − 3
= 20𝑑𝑎𝑦𝑠
A alone
2 × 60
4 + 3 − 5
= 60𝑑𝑎𝑦𝑠
Black holes of Aptitude-Time and Work
©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com
Type IX
A=X+t1
B=X+t2
A+B=X=√𝑡1 × 𝑡2
Exp9: If Manal takes 16 hrs more to complete the work than Manal and Asra take together to do the same work
and Asra takes 9 hrs more to do the same work than they together take. How many days it will take to finish the
work if they work together?
Solution:
According to formula
X=√𝑡1 × 𝑡2
X=√16 × 9
=12 days
Type X
Exp 10:If A Men or B women or C children can do a piece of work in N days, How Many days it will take to
complete the same work by D men and E women and F children:
1
𝐴𝑛𝑠
=
1
𝑁
× (
𝐷
𝐴
+
𝐸
𝐵
+
𝐹
𝐶
)
3M or 4 W can do a piece of work in 43 days then 7 M and 5 W will do it in how many days?
Solution:
1
𝐴𝑛𝑠
=
1
𝑁
× (
𝐷
𝐴
+
𝐸
𝐵
+
𝐹
𝐶
)
1
𝐴𝑛𝑠
=
1
43
×
7
3
+
5
4
=
1
12
=12 days
Black holes of Aptitude-Time and Work
©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com
Type XI
𝑀×𝐷×𝐻
𝑊
=
𝑀1×𝐷1×𝐻1
𝑊1
+
𝑀2×𝐷2×𝐻2
𝑊2
+
𝑀3×𝐷3×𝐻3
𝑊3
+……
Exp 11:If 40 men can finish a work in 60 days working 6 hrs a day, how long it will take to finish the double
work by 60 men working 8 hrs a day?
Solution:
𝑀 × 𝐷 × 𝐻
𝑊
=
𝑀1 × 𝐷1 × 𝐻1
𝑊1
40 × 60 × 6
1
=
60 × 𝐷1 × 8
2
=60 days
Exp12:A certain number of person can complete a piece of work in 55 days. If there were 6 person more, the
work could have been finished in 11 days less. How many person were originally there?
𝑀 × 𝐷 × 𝐻
𝑊
=
𝑀1 × 𝐷1 × 𝐻1
𝑊1
𝑀 × 55
1
=
(𝑀 + 6) × 44(55 − 11)
1
M=24 days
Type XII
Exp13:4 men and 6 women can complete the work in 8 days, While 3 men and 7 women can complete the work
in 10 days, In how many days will 10 women and 5 men will complete the same work?
[4M+6W=
1
8
]×8……………………………………(i)
[3M+7W=
1
10
]×10………………………………..(ii)
(i)=(ii)
32 M+48 W=30M+70W
1M=11W=M/W=11/1
Take M=1,W=1
Black holes of Aptitude-Time and Work
©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com
We know that
𝑀 × 𝐷 × 𝐻
𝑊
=
𝑀1 × 𝐷1 × 𝐻1
𝑊1
(4M+6W) ×8=(10W+5M)×D
(4×11+6×1) ×8=(10×1+5×11) ×D
D=80/13 days

More Related Content

Similar to Time and work

3. Workbook.pdf
3. Workbook.pdf3. Workbook.pdf
3. Workbook.pdf
Rahul215838
 
UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.ppt
Deependra46
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_
priya mega
 
C11
C11C11
C11
BGEsp1
 
time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptx
goud10
 
Time and work
Time and workTime and work
Time and work
Ronnie George
 
TRW
TRWTRW
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptx
MRUNALSHETHIYA1
 
TIME & WORK.pptx
TIME & WORK.pptxTIME & WORK.pptx
TIME & WORK.pptx
104SIMANJEETKALIA
 
Time and work ea #2
Time and work  ea #2Time and work  ea #2
Time and work ea #2
Exam Affairs!
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebd
LearningHomeBD.com
 
Time and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfTime and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdf
RishabRoy10
 
Time and work standard level
Time and work standard levelTime and work standard level
Time and work standard level
Veeraragavan Subramaniam
 
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
SOURAV DAS
 
Banks and SSC Time and Work
Banks and SSC Time and WorkBanks and SSC Time and Work
Banks and SSC Time and Work
George Prep
 
Time and work.pdf
Time and work.pdfTime and work.pdf
Time and work.pdf
alphared4
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptx
vikiawsac
 
Time and work session 1
Time and work session 1Time and work session 1
Time and work session 1
George Prep
 

Similar to Time and work (20)

3. Workbook.pdf
3. Workbook.pdf3. Workbook.pdf
3. Workbook.pdf
 
UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.ppt
 
Numerical reasoning II
Numerical reasoning IINumerical reasoning II
Numerical reasoning II
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_
 
C11
C11C11
C11
 
time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptx
 
Doc
DocDoc
Doc
 
Time and work
Time and workTime and work
Time and work
 
TRW
TRWTRW
TRW
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptx
 
TIME & WORK.pptx
TIME & WORK.pptxTIME & WORK.pptx
TIME & WORK.pptx
 
Time and work ea #2
Time and work  ea #2Time and work  ea #2
Time and work ea #2
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebd
 
Time and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdfTime and work Questions Bank Aptitude.pdf
Time and work Questions Bank Aptitude.pdf
 
Time and work standard level
Time and work standard levelTime and work standard level
Time and work standard level
 
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
 
Banks and SSC Time and Work
Banks and SSC Time and WorkBanks and SSC Time and Work
Banks and SSC Time and Work
 
Time and work.pdf
Time and work.pdfTime and work.pdf
Time and work.pdf
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptx
 
Time and work session 1
Time and work session 1Time and work session 1
Time and work session 1
 

More from Mayank Gupt

Vedic part 1
Vedic part 1Vedic part 1
Vedic part 1
Mayank Gupt
 
Workshop topics
Workshop topicsWorkshop topics
Workshop topics
Mayank Gupt
 
Mayank gupt cv
Mayank gupt cvMayank gupt cv
Mayank gupt cv
Mayank Gupt
 
Ppt
PptPpt
Motivational
MotivationalMotivational
Motivational
Mayank Gupt
 
Indian polity
Indian polityIndian polity
Indian polity
Mayank Gupt
 
Compound interest
Compound interestCompound interest
Compound interest
Mayank Gupt
 
Simple interest
Simple interestSimple interest
Simple interest
Mayank Gupt
 
Profit and Loss
Profit and LossProfit and Loss
Profit and Loss
Mayank Gupt
 
Cipla is a leading pharmaceutical company in india with a strong and profitab...
Cipla is a leading pharmaceutical company in india with a strong and profitab...Cipla is a leading pharmaceutical company in india with a strong and profitab...
Cipla is a leading pharmaceutical company in india with a strong and profitab...Mayank Gupt
 
Faculty
FacultyFaculty
Faculty
Mayank Gupt
 
Orientation presentation
Orientation presentationOrientation presentation
Orientation presentation
Mayank Gupt
 
Job satisfaction just temporary
Job satisfaction just temporaryJob satisfaction just temporary
Job satisfaction just temporary
Mayank Gupt
 
Summer training
Summer trainingSummer training
Summer training
Mayank Gupt
 

More from Mayank Gupt (15)

Vedic part 1
Vedic part 1Vedic part 1
Vedic part 1
 
Workshop topics
Workshop topicsWorkshop topics
Workshop topics
 
Mayank gupt cv
Mayank gupt cvMayank gupt cv
Mayank gupt cv
 
Ppt
PptPpt
Ppt
 
Motivational
MotivationalMotivational
Motivational
 
Indian polity
Indian polityIndian polity
Indian polity
 
Compound interest
Compound interestCompound interest
Compound interest
 
Simple interest
Simple interestSimple interest
Simple interest
 
Profit and Loss
Profit and LossProfit and Loss
Profit and Loss
 
Cipla is a leading pharmaceutical company in india with a strong and profitab...
Cipla is a leading pharmaceutical company in india with a strong and profitab...Cipla is a leading pharmaceutical company in india with a strong and profitab...
Cipla is a leading pharmaceutical company in india with a strong and profitab...
 
Faculty
FacultyFaculty
Faculty
 
Orientation presentation
Orientation presentationOrientation presentation
Orientation presentation
 
jamia cms intro
jamia cms introjamia cms intro
jamia cms intro
 
Job satisfaction just temporary
Job satisfaction just temporaryJob satisfaction just temporary
Job satisfaction just temporary
 
Summer training
Summer trainingSummer training
Summer training
 

Recently uploaded

DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
taiba qazi
 
Landownership in the Philippines under the Americans-2-pptx.pptx
Landownership in the Philippines under the Americans-2-pptx.pptxLandownership in the Philippines under the Americans-2-pptx.pptx
Landownership in the Philippines under the Americans-2-pptx.pptx
JezreelCabil2
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
Peter Windle
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
ak6969907
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
Sandy Millin
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
Jean Carlos Nunes Paixão
 
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdfMASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
goswamiyash170123
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
IreneSebastianRueco1
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
Digital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion DesignsDigital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion Designs
chanes7
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
Thiyagu K
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
MysoreMuleSoftMeetup
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
amberjdewit93
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
EverAndrsGuerraGuerr
 
Aficamten in HCM (SEQUOIA HCM TRIAL 2024)
Aficamten in HCM (SEQUOIA HCM TRIAL 2024)Aficamten in HCM (SEQUOIA HCM TRIAL 2024)
Aficamten in HCM (SEQUOIA HCM TRIAL 2024)
Ashish Kohli
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
thanhdowork
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
AyyanKhan40
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 

Recently uploaded (20)

DRUGS AND ITS classification slide share
DRUGS AND ITS classification slide shareDRUGS AND ITS classification slide share
DRUGS AND ITS classification slide share
 
Landownership in the Philippines under the Americans-2-pptx.pptx
Landownership in the Philippines under the Americans-2-pptx.pptxLandownership in the Philippines under the Americans-2-pptx.pptx
Landownership in the Philippines under the Americans-2-pptx.pptx
 
A Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in EducationA Strategic Approach: GenAI in Education
A Strategic Approach: GenAI in Education
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...2024.06.01 Introducing a competency framework for languag learning materials ...
2024.06.01 Introducing a competency framework for languag learning materials ...
 
Lapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdfLapbook sobre os Regimes Totalitários.pdf
Lapbook sobre os Regimes Totalitários.pdf
 
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdfMASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
MASS MEDIA STUDIES-835-CLASS XI Resource Material.pdf
 
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
RPMS TEMPLATE FOR SCHOOL YEAR 2023-2024 FOR TEACHER 1 TO TEACHER 3
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
Digital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion DesignsDigital Artifact 2 - Investigating Pavilion Designs
Digital Artifact 2 - Investigating Pavilion Designs
 
Unit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdfUnit 8 - Information and Communication Technology (Paper I).pdf
Unit 8 - Information and Communication Technology (Paper I).pdf
 
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
Mule 4.6 & Java 17 Upgrade | MuleSoft Mysore Meetup #46
 
Digital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental DesignDigital Artefact 1 - Tiny Home Environmental Design
Digital Artefact 1 - Tiny Home Environmental Design
 
Thesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.pptThesis Statement for students diagnonsed withADHD.ppt
Thesis Statement for students diagnonsed withADHD.ppt
 
Aficamten in HCM (SEQUOIA HCM TRIAL 2024)
Aficamten in HCM (SEQUOIA HCM TRIAL 2024)Aficamten in HCM (SEQUOIA HCM TRIAL 2024)
Aficamten in HCM (SEQUOIA HCM TRIAL 2024)
 
A Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptxA Survey of Techniques for Maximizing LLM Performance.pptx
A Survey of Techniques for Maximizing LLM Performance.pptx
 
PIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf IslamabadPIMS Job Advertisement 2024.pdf Islamabad
PIMS Job Advertisement 2024.pdf Islamabad
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 

Time and work

  • 1. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com Time and Work Type I Exp 1 Rizwan can do a piece of work in 6 days and Payam can do the same work in 8 days,working together ,in how many days they will complete the same work: Solution: Step I Take the L.C.M(6,8) of number of days taken by R and P alone to complete the work Imagine there are 24 bricks(Total work) in total ,R can transfer all bricks in 6 days from one place to other, So he will have to pick 4 bricks a day and P will have to pick 3 bricks a day. R -6 4(24/6) L.C.M(6,8)=24 P-8 3(24/8) Step II if P and R work together they will pick 7 bricks/day. Step III They can pick all 24 bricks in = 24 7 days = 𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠 𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦 Type II Exp 2 Gulfshan and Maryam working together can do a piece of work in 8 days. If Gulfshan alone can do it in 24 days, in How many days Maryam alone can complete the same work? Solution: G+M-8 3(24/8) L.C.M (8, 24) =24 G-24 1(24/24) M alone can pick =2(3-1) bricks/day. So Maryam alone can do the same work in = 12 = 24 2 days = 𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠 𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦
  • 2. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com Type III Exp 3 If Afshan and Sahir can do a work in 18 days and 24 days respectively. They worked together for 8 days and then Afshan left. The remaining work was finished by Sahir in How many days? Solution: A-18 4(72/18) L.C.M (18, 24)=72 S-24 3(72/24) Step I A+S can pick 7(4+3) bricks/day. Step II They worked for 8 days so, they will pick 56(8*7(4+3)) bricks in 8 days. Step III Left over bricks 16(72-56) Step IV B will pick remaining 16 bricks in 16/3 days. Type IV Exp 4:Sajid can do a piece of work in 18 days and Haider in 12 days. They began the work together, But Haider left the work 3 days before its completion. In How many days in all was the work completed? Solution: S-18 2(36/18) L.C.M (18, 12)=36 H-12 3(36/12) Let say work was finished in N days ,So S worked for N days and H worked for X-3 days ,together they have to pick 36 bricks.
  • 3. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com Total Bricks=no of days S worked×S can pick bricks/day+no of days H worked×H can pick bricks/day 36=N×2+ (N-3)×3 N= 9days Shortcut: H didn’t work for 3 days, so those extra bricks 9(3×3) will be added to total bricks So your answer will be 36+9/5(3+2) 9 days Type V Exp 5:Shabnam and Ayesha together can complete a work in 15 days. Shabnam is 50 % more efficient worker than Ayesha. How long Shabnam will take to complete the work alone? Solution: If S is 50% more efficient worker, She will Pick 150 Bricks and A will pick 100 Bricks in a day. S=150 bricks A=100 bricks S+A=250 bricks If they can finish the work in 15 days and can pick 250 bricks in a day, there would have been 250×15 bricks in total. Which can be picked by S in = 𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠 𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦 = 250×15 150 = 25 𝑑𝑎𝑦𝑠 Type VI Exp6:Ashba does 4/5 of a piece of work in 20 days, She then calls in Asra and they finish the remaining work in 3 days. How long Asra alone will take to do the whole work? Solution: Ah = 4 5 work 20 days Full work (1) 20× 5 4 =25 days Ah+Ar1= 1- 4 5 = 1 5 3 days Full work (1) 3× 5 1 =15 days
  • 4. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com Ah+Ar -15 5(75/15) L.C.M (15, 25)=75 Ah-25 3(75/25) M alone can pick =2(5-3) bricks/day. So Maryam alone can do the same work in = 75 2 days = 𝑇𝑜𝑡𝑎𝑙 𝐵𝑟𝑖𝑘𝑠 𝑁𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑝𝑖𝑐𝑘𝑒𝑑 /𝑑𝑎𝑦 VII Exp7:If Manal can do a piece of work in 12 days and Najam can do it in 15 days. How many days it will take to complete the same work, If they work alternatively starting from Manal: Solution: 5(60/12) M 12 60(L.C.M (12, 15)) N 14 4(60/15) Since they are working on alternate days, so they will pick 9(5+4) bricks in 2 days. Days bricks 2 9 Now we will multiply bricks with a NUMBER which will make bricks near to total bricks (60), but not greater than 60, and we will multiply days with the same number. Days bricks 2 ×6 9×6(54) Now we are left with 6 bricks, since M has started work, now again its M’s turn after 12 days work. Days bricks 12 54 +1 +5 13 59
  • 5. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com Now its N’s turn and we are left with 1 brick, which can be picked by N in ¼ days. = 𝑛𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑛𝑒𝑒𝑑 𝑡𝑜 𝑏𝑒 𝑝𝑖𝑐𝑘𝑒𝑑 𝑛𝑜 𝑜𝑓 𝑏𝑟𝑖𝑐𝑘𝑠 𝑐𝑎𝑛 𝑏𝑒 𝑝𝑖𝑐𝑘𝑒𝑑 𝑖𝑛 𝑎 𝑑𝑎𝑦 13+1/4 59+1=60 bricks So work will be complete in 13 1 4 days. TypeVIII Exp 8: Manal and Najam can do a piece of work in 12 days, Najam and Ayesha can do it in 15 days, Manal and Ayesha can do it in 20 days. how long it will take to complete the work, If they work together and alone? Solution: M+N 12 5(60/12) N+A 15 60 [L.C.M (12, 15, 20)] 4(60/15) M+A 20 3(60/20) Since there is double counting of every one so we will multiply total bricks by 2. M+N+A= 2×60 5+4+3 =10days If we want to calculate it for M alone, we need to add bricks of those equations where M is present and subtracted those where M is absent 2 × 60 5 − 4 + 3 = 30 𝑑𝑎𝑦𝑠 Same for N and A N alone 2 × 60 5 + 4 − 3 = 20𝑑𝑎𝑦𝑠 A alone 2 × 60 4 + 3 − 5 = 60𝑑𝑎𝑦𝑠
  • 6. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com Type IX A=X+t1 B=X+t2 A+B=X=√𝑡1 × 𝑡2 Exp9: If Manal takes 16 hrs more to complete the work than Manal and Asra take together to do the same work and Asra takes 9 hrs more to do the same work than they together take. How many days it will take to finish the work if they work together? Solution: According to formula X=√𝑡1 × 𝑡2 X=√16 × 9 =12 days Type X Exp 10:If A Men or B women or C children can do a piece of work in N days, How Many days it will take to complete the same work by D men and E women and F children: 1 𝐴𝑛𝑠 = 1 𝑁 × ( 𝐷 𝐴 + 𝐸 𝐵 + 𝐹 𝐶 ) 3M or 4 W can do a piece of work in 43 days then 7 M and 5 W will do it in how many days? Solution: 1 𝐴𝑛𝑠 = 1 𝑁 × ( 𝐷 𝐴 + 𝐸 𝐵 + 𝐹 𝐶 ) 1 𝐴𝑛𝑠 = 1 43 × 7 3 + 5 4 = 1 12 =12 days
  • 7. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com Type XI 𝑀×𝐷×𝐻 𝑊 = 𝑀1×𝐷1×𝐻1 𝑊1 + 𝑀2×𝐷2×𝐻2 𝑊2 + 𝑀3×𝐷3×𝐻3 𝑊3 +…… Exp 11:If 40 men can finish a work in 60 days working 6 hrs a day, how long it will take to finish the double work by 60 men working 8 hrs a day? Solution: 𝑀 × 𝐷 × 𝐻 𝑊 = 𝑀1 × 𝐷1 × 𝐻1 𝑊1 40 × 60 × 6 1 = 60 × 𝐷1 × 8 2 =60 days Exp12:A certain number of person can complete a piece of work in 55 days. If there were 6 person more, the work could have been finished in 11 days less. How many person were originally there? 𝑀 × 𝐷 × 𝐻 𝑊 = 𝑀1 × 𝐷1 × 𝐻1 𝑊1 𝑀 × 55 1 = (𝑀 + 6) × 44(55 − 11) 1 M=24 days Type XII Exp13:4 men and 6 women can complete the work in 8 days, While 3 men and 7 women can complete the work in 10 days, In how many days will 10 women and 5 men will complete the same work? [4M+6W= 1 8 ]×8……………………………………(i) [3M+7W= 1 10 ]×10………………………………..(ii) (i)=(ii) 32 M+48 W=30M+70W 1M=11W=M/W=11/1 Take M=1,W=1
  • 8. Black holes of Aptitude-Time and Work ©Mayan Gupt &Shahnawaz Alam- bhaptitude@gmail.com We know that 𝑀 × 𝐷 × 𝐻 𝑊 = 𝑀1 × 𝐷1 × 𝐻1 𝑊1 (4M+6W) ×8=(10W+5M)×D (4×11+6×1) ×8=(10×1+5×11) ×D D=80/13 days