SlideShare a Scribd company logo
1 of 7
Download to read offline
1 Like us on facebook : https://www.facebook.com/Exam.Affairs.EA
TIME AND WORK:
Concept:
Work is the quantity of energy transferred from one system to another. Work is defined as the amount
of job assigned or the amount of job actually done. Problem on work are based on the application of
concept of ratio of time and speed. Work is always considered as a whole or one.
Above mentioned definition of work throws light on three important points.
Work = 1 ( as it is always measured as a whole)
Rate at which work is done = Efficiency of Work
Number of days required to do the work = No of Day and Hour
FORMULAE
1. Work from Days:
If A can do a piece of work in n days, then A's 1 day's work = (1/n).
2. Days from Work:
If A’s 1 day's work = (1/n), then A can finish the work in n days.
3. Ratio:
A is thrice as good a workman as B, then:
Ratio of work done by A and B = 3 : 1.
Ratio of times taken by A and B to finish a work = 1 : 3.
4. If A is 'x' times as good a workman as B, then he will take (1/x)th of the time by B to do the same
work.
2 Like us on facebook : https://www.facebook.com/Exam.Affairs.EA
5. A and B can do a piece of work in 'a' days and 'b' days respectively, then working together, they will
take [xy/x+y]th days to finish the work and in one day, they will finish [x+y/xy]th part of work.
6. Definition of Variation: The change in two different variables follow some definite rule. It said that the
two variables vary directly or inversely. Its notation is X/Y = k, where k is called constant. This variation is
called direct variation. XY = k. This variation is called inverse variation.
7. Some Pairs of Variables:
i. Number of workers and their wages. If the number of workers increases, their total wages increase. If
the number of days reduced, there will be less work. If the number of days is increased, there will be
more work. Therefore, here we have direct proportion or direct variation.
ii. Number workers and days required to do a certain work is an example of inverse variation. If more
men are employed, they will require fewer days and if there are less number of workers, more days are
required.
iii. There is an inverse proportion between the daily hours of a work and the days required. If the
number of hours is increased, less number of days are required and if the number of hours is reduced,
more days are required.
8. Some Important Tips:
More Men - Less Days and Conversely More Day - Less Men.
More Men - More Work and Conversely More Work - More Men.
More Days - More Work and Conversely More Work - More Days.
Number of days required to complete the given work = Total work/One day"s work.
Since the total work is assumed to be one (unit), the number of days required to complete the given
work would be the reciprocal of one day"s work. Sometimes, the problems on time and work can be
solved using the proportional rule ((man*days*hours)/work) in another situation.
9. If men are fixed, work is proportional to day (time). If work is fixed, then day, hour, efficiency is
inversely proportional to men therefore,
(M1*D1*H1*E1/W1) = (M2*D2*H2*E2/W2)
3 Like us on facebook : https://www.facebook.com/Exam.Affairs.EA
Facebook Link : https://www.facebook.com/Exam.Affairs.EA
SOLVED EXAMPLES:-
1. Worker A takes 8 hours to do a job. Worker B takes 10 hours to do the same Job. How long should it
take both A and B, working together but independently, to do the same job?
sol:-
A’s 1 hour's work = 1/8
B's 1 hour's work = 1/10
(A + B)'s 1 hour's work = (1/8) +(1/10)=9/40
Both A and B will finish the work in 40/9 days.
2. A and B together can complete a piece of work in 4 days. If A alone can complete the same work in 12
days, in how many days can B alone complete that work?
sol:-
(A + B)'s 1 day's work = (1/4).
A's 1 day's work = (1/12)
B's 1 day's work =((1/4)-(1/12))=(1/6)
Hence, B alone can complete the work in 6 days.
3. A can do a piece of work in 7 days of 9 hours each and B can do it in 6 days of 7 hours each. How long
will they take to do it, working together 8 (2/5) hours a day?
A can complete the work in (7 x 9) = 63 hours
B can complete the work in (6 x 7) = 42 hours.
A’s 1 hour's work = (1/63) and B's 1 hour's work =(1/42)
4 Like us on facebook : https://www.facebook.com/Exam.Affairs.EA
(A + B)'s 1 hour's work =(1/63)+(1/42)=(5/126)
Both will finish the work in (126/5) hrs.
Number of days. of (42/5) hrs each =(126 x 5)/(5 x 42)=3 days
4. A and B can do a piece of work in 18 days; B and C can do it in 24 days A and C can do it in 36 days. In
how many days will A, B and C finish it together and separately?
(A + B)'s 1 day's work = (1/18) (B + C)'s 1 day's work = (1/24)
and (A + C)'s 1 day's work = (1/36)
Adding, we get:
2 (A + B + C)'s 1 day's work =¬(1/18 + 1/24 + 1/36) =9/72 =1/8
(A +B + C)'s 1 day's work =1/16
Thus, A, Band C together can finish the work in 16 days.
Now, A’s 1 day's work = *(A + B + C)'s 1 day's work+ - [(B + C)'s 1 day work:
=(1/16 – 1/24)= 1/48
A alone can finish the work in 48 days.
Similarly, B's 1 day's work =(1/16 – 1/36)=5/144
B alone can finish the work in 144/5=28 4/5 days
And C’s 1 day work =(1/16-1/18)=1/144
Hence C alone can finish the work in 144 days.
5. A, B and C are employed to do a piece of work for Rs. 529. A and C are supposed to finish 19/23 of the
work together. How much shall be paid to B ?
Work done by B = 1 - (19/23) = 4/23
B's share = RS.529*(4/23) = 92
6. A is twice as good a workman as B and together they finish a piece in 18 days. In how many days will A
alone finish the work?
5 Like us on facebook : https://www.facebook.com/Exam.Affairs.EA
(A’s 1 day’s work):(B’s 1 days work) = 2 : 1.
(A + B)'s 1 day's work = 1/18
Divide 1/18 in the ratio 2 : 1.
:. A’s 1 day's work =(1/18*2/3)=1/27
Hence, A alone can finish the work in 27 days.
7. A can do a certain job in 12 days. B is 60% more efficient than A. How many
days does B alone take to do the same job?
Ratio of times taken by A and B = 160 : 100 = 8 : 5.
Suppose B alone takes x days to do the job.
Then, 8 : 5 :: 12 : x = 8x = 5 x 12 =x = 7 1/2 days.
8. A can do a piece of work in 80 days. He works at it for 10 days B alone finishes the remaining work in
42 days. In how much time will A and B working together, finish the work?
Work done by A in 10 days =(1/80*10)=1/8
Remaining work = (1- 1/8) =7/ 8
Now,7/ 8 work is done by B in 42 days.
Whole work will be done by B in (42 x 8/7) = 48 days.
A’s 1 day's work = 1/80 and B's 1 day's work = 1/48
(A+B)'s 1 day's work = (1/80+1/48)=8/240=1/30
Hence, both will finish the work in 30 days.
9. A and B undertake to do a piece of work for Rs. 600. A alone can do it in 6 days while B alone can do it
in 8 days. With the help of C, they finish it in 3 days. find the share of each.
C's 1 day's work = 1/3-(1/6+1/8)=1/24
A : B : C = Ratio of their 1 day's work = 1/6:1/8:1/24= 4 : 3 : 1.
6 Like us on facebook : https://www.facebook.com/Exam.Affairs.EA
A’s share = Rs. (600 *4/8) = Rs.300, B's share = Rs. (600 *3/8) = Rs. 225.
C's share = Rs. [600 - (300 + 225) = Rs. 75.
10. A and B working separately can do a piece of work in 9 and 12 days respectively, If they work for a
day alternately, A beginning, in how many days, the work will be completed?
(A + B)'s 2 days' work =(1/9+1/12)=7/36
Work done in 5 pairs of days =(5*7/36)=35/36
Remaining work =(1-35/36)=1/36
On 11th day, it is A’s turn. 1/9 work is done by him in 1 day.
1/36 work is done by him in(9*1/36)=1/4 day
Total time taken = (10 + 1/4) days = 10 (1/4)days.
11. 45 men can complete a work in 16 days. Six days after they started working, 30 more men joined
them. How many days will they now take to complete the remaining work?
(45 x 16) men can complete the work in 1 day.
1 man's 1 day's work = 1/720
45 men's 6 days' work =(1/16*6)=3/8
Remaining work =(1-3/8)=5/8
75 men's 1 day's work = 75/720=5/48
5/8 work is done by them in (5/48)/(5/8)=6 days.
12. 2 men and 3 boys can do a piece of work in 10 days while 3 men and 2 boys can do the same work in
8 days. In how many days can 2 men and 1 boy do the work?
Let 1 man’s 1 day’s work = x and 1 boy’s 1 day’s work = y.
Then, 2x+3y = 1/10 and 3x+2y = 1/8
Solving, we get: x = 7/200 and y = 1/100
(2 men + 1 boy)’s 1 day’s work = (2x7/200 + 1 x 1/100 )
7 Like us on facebook : https://www.facebook.com/Exam.Affairs.EA
So, 2 men and 1 boy together can finish the work in 25/2 =12 1/2 days
13. 12 men can complete a work in 18 days. Six days after they started working, 4 men joined them.
How many days will all of them take to finish the remaining work?
(12 * 18) men can complete the work in 1 day.
1 mans 1 days work = 1/216
12 men’s 6 days work = (1/18)*6 = 1/3
remaining work = 1 - (1/3) = 2/3
16 mens 1 days work = 16/216 = 2/27
2/27 work is done by them in 1 day.
2/3 work is done by them in (27/2)*(2/3) = 9 days.
14. If 12 carpenters, working.6 hours a day can make 460 chairs in 24 days, how many chairs will 18
carpenters make in 36 days, each working 8 hours a day ?
(Carpenters 12: 18) : (His/Day 6:8 ) : (Days 24 : 36) : : 460 : x
12 * 6 * 24*x =18 * 8 * 36 * 460 or x = 1380
15. Some persons can do a piece of work in 12 days. Two times the number of such persons will do half
of that work in
(Mens 2x : x) : (work 1:1/2) :: 12 :y
2x * 1 * y = x * 1/2 * 12 or y = 3 days
Facebook Link : https://www.facebook.com/Exam.Affairs.EA

More Related Content

Similar to Time and work ea #2

3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_priya mega
 
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...SOURAV DAS
 
UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.pptDeependra46
 
time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptxgoud10
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdLearningHomeBD.com
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxMRUNALSHETHIYA1
 
Aptitude time and work
Aptitude time and workAptitude time and work
Aptitude time and workMaria Yesudass
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptxvikiawsac
 
Time & Work & Time & Distance In Quantitative Aptitude
Time & Work & Time & Distance In Quantitative AptitudeTime & Work & Time & Distance In Quantitative Aptitude
Time & Work & Time & Distance In Quantitative AptitudeDr. Trilok Kumar Jain
 
Pipes and Cisterns - Work and Time
Pipes and Cisterns - Work and Time Pipes and Cisterns - Work and Time
Pipes and Cisterns - Work and Time 2IIM
 
Pipes and Cisterns - Work Time - 2
Pipes and Cisterns - Work Time - 2Pipes and Cisterns - Work Time - 2
Pipes and Cisterns - Work Time - 22IIM
 

Similar to Time and work ea #2 (20)

Doc
DocDoc
Doc
 
3rd time & work new_
3rd time & work new_3rd time & work new_
3rd time & work new_
 
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
TIME AND WORK , TIME SPEED AND DISTANCE FOR CAT , MAT , MBA , BANKING EXAM , ...
 
3. Workbook.pdf
3. Workbook.pdf3. Workbook.pdf
3. Workbook.pdf
 
UNIT 1 PEA306.ppt
UNIT 1 PEA306.pptUNIT 1 PEA306.ppt
UNIT 1 PEA306.ppt
 
time and work by shiva kumar goud .pptx
time and work by shiva kumar goud  .pptxtime and work by shiva kumar goud  .pptx
time and work by shiva kumar goud .pptx
 
Time & work
Time & workTime & work
Time & work
 
Time and work
Time and workTime and work
Time and work
 
Indiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebdIndiabix all math solution - learninghomebd
Indiabix all math solution - learninghomebd
 
Aptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptxAptitude Lecture 13 (Time and work)-1.pptx
Aptitude Lecture 13 (Time and work)-1.pptx
 
Numerical reasoning II
Numerical reasoning IINumerical reasoning II
Numerical reasoning II
 
Aptitude time and work
Aptitude time and workAptitude time and work
Aptitude time and work
 
TIME & WORK.pptx
TIME & WORK.pptxTIME & WORK.pptx
TIME & WORK.pptx
 
Aptitude_Day06.pptx
Aptitude_Day06.pptxAptitude_Day06.pptx
Aptitude_Day06.pptx
 
Timeandwork
TimeandworkTimeandwork
Timeandwork
 
Time and work
Time and workTime and work
Time and work
 
Time & Work & Time & Distance In Quantitative Aptitude
Time & Work & Time & Distance In Quantitative AptitudeTime & Work & Time & Distance In Quantitative Aptitude
Time & Work & Time & Distance In Quantitative Aptitude
 
Time and work rbi
Time and work rbiTime and work rbi
Time and work rbi
 
Pipes and Cisterns - Work and Time
Pipes and Cisterns - Work and Time Pipes and Cisterns - Work and Time
Pipes and Cisterns - Work and Time
 
Pipes and Cisterns - Work Time - 2
Pipes and Cisterns - Work Time - 2Pipes and Cisterns - Work Time - 2
Pipes and Cisterns - Work Time - 2
 

Recently uploaded

Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 

Recently uploaded (20)

Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 

Time and work ea #2

  • 1. 1 Like us on facebook : https://www.facebook.com/Exam.Affairs.EA TIME AND WORK: Concept: Work is the quantity of energy transferred from one system to another. Work is defined as the amount of job assigned or the amount of job actually done. Problem on work are based on the application of concept of ratio of time and speed. Work is always considered as a whole or one. Above mentioned definition of work throws light on three important points. Work = 1 ( as it is always measured as a whole) Rate at which work is done = Efficiency of Work Number of days required to do the work = No of Day and Hour FORMULAE 1. Work from Days: If A can do a piece of work in n days, then A's 1 day's work = (1/n). 2. Days from Work: If A’s 1 day's work = (1/n), then A can finish the work in n days. 3. Ratio: A is thrice as good a workman as B, then: Ratio of work done by A and B = 3 : 1. Ratio of times taken by A and B to finish a work = 1 : 3. 4. If A is 'x' times as good a workman as B, then he will take (1/x)th of the time by B to do the same work.
  • 2. 2 Like us on facebook : https://www.facebook.com/Exam.Affairs.EA 5. A and B can do a piece of work in 'a' days and 'b' days respectively, then working together, they will take [xy/x+y]th days to finish the work and in one day, they will finish [x+y/xy]th part of work. 6. Definition of Variation: The change in two different variables follow some definite rule. It said that the two variables vary directly or inversely. Its notation is X/Y = k, where k is called constant. This variation is called direct variation. XY = k. This variation is called inverse variation. 7. Some Pairs of Variables: i. Number of workers and their wages. If the number of workers increases, their total wages increase. If the number of days reduced, there will be less work. If the number of days is increased, there will be more work. Therefore, here we have direct proportion or direct variation. ii. Number workers and days required to do a certain work is an example of inverse variation. If more men are employed, they will require fewer days and if there are less number of workers, more days are required. iii. There is an inverse proportion between the daily hours of a work and the days required. If the number of hours is increased, less number of days are required and if the number of hours is reduced, more days are required. 8. Some Important Tips: More Men - Less Days and Conversely More Day - Less Men. More Men - More Work and Conversely More Work - More Men. More Days - More Work and Conversely More Work - More Days. Number of days required to complete the given work = Total work/One day"s work. Since the total work is assumed to be one (unit), the number of days required to complete the given work would be the reciprocal of one day"s work. Sometimes, the problems on time and work can be solved using the proportional rule ((man*days*hours)/work) in another situation. 9. If men are fixed, work is proportional to day (time). If work is fixed, then day, hour, efficiency is inversely proportional to men therefore, (M1*D1*H1*E1/W1) = (M2*D2*H2*E2/W2)
  • 3. 3 Like us on facebook : https://www.facebook.com/Exam.Affairs.EA Facebook Link : https://www.facebook.com/Exam.Affairs.EA SOLVED EXAMPLES:- 1. Worker A takes 8 hours to do a job. Worker B takes 10 hours to do the same Job. How long should it take both A and B, working together but independently, to do the same job? sol:- A’s 1 hour's work = 1/8 B's 1 hour's work = 1/10 (A + B)'s 1 hour's work = (1/8) +(1/10)=9/40 Both A and B will finish the work in 40/9 days. 2. A and B together can complete a piece of work in 4 days. If A alone can complete the same work in 12 days, in how many days can B alone complete that work? sol:- (A + B)'s 1 day's work = (1/4). A's 1 day's work = (1/12) B's 1 day's work =((1/4)-(1/12))=(1/6) Hence, B alone can complete the work in 6 days. 3. A can do a piece of work in 7 days of 9 hours each and B can do it in 6 days of 7 hours each. How long will they take to do it, working together 8 (2/5) hours a day? A can complete the work in (7 x 9) = 63 hours B can complete the work in (6 x 7) = 42 hours. A’s 1 hour's work = (1/63) and B's 1 hour's work =(1/42)
  • 4. 4 Like us on facebook : https://www.facebook.com/Exam.Affairs.EA (A + B)'s 1 hour's work =(1/63)+(1/42)=(5/126) Both will finish the work in (126/5) hrs. Number of days. of (42/5) hrs each =(126 x 5)/(5 x 42)=3 days 4. A and B can do a piece of work in 18 days; B and C can do it in 24 days A and C can do it in 36 days. In how many days will A, B and C finish it together and separately? (A + B)'s 1 day's work = (1/18) (B + C)'s 1 day's work = (1/24) and (A + C)'s 1 day's work = (1/36) Adding, we get: 2 (A + B + C)'s 1 day's work =¬(1/18 + 1/24 + 1/36) =9/72 =1/8 (A +B + C)'s 1 day's work =1/16 Thus, A, Band C together can finish the work in 16 days. Now, A’s 1 day's work = *(A + B + C)'s 1 day's work+ - [(B + C)'s 1 day work: =(1/16 – 1/24)= 1/48 A alone can finish the work in 48 days. Similarly, B's 1 day's work =(1/16 – 1/36)=5/144 B alone can finish the work in 144/5=28 4/5 days And C’s 1 day work =(1/16-1/18)=1/144 Hence C alone can finish the work in 144 days. 5. A, B and C are employed to do a piece of work for Rs. 529. A and C are supposed to finish 19/23 of the work together. How much shall be paid to B ? Work done by B = 1 - (19/23) = 4/23 B's share = RS.529*(4/23) = 92 6. A is twice as good a workman as B and together they finish a piece in 18 days. In how many days will A alone finish the work?
  • 5. 5 Like us on facebook : https://www.facebook.com/Exam.Affairs.EA (A’s 1 day’s work):(B’s 1 days work) = 2 : 1. (A + B)'s 1 day's work = 1/18 Divide 1/18 in the ratio 2 : 1. :. A’s 1 day's work =(1/18*2/3)=1/27 Hence, A alone can finish the work in 27 days. 7. A can do a certain job in 12 days. B is 60% more efficient than A. How many days does B alone take to do the same job? Ratio of times taken by A and B = 160 : 100 = 8 : 5. Suppose B alone takes x days to do the job. Then, 8 : 5 :: 12 : x = 8x = 5 x 12 =x = 7 1/2 days. 8. A can do a piece of work in 80 days. He works at it for 10 days B alone finishes the remaining work in 42 days. In how much time will A and B working together, finish the work? Work done by A in 10 days =(1/80*10)=1/8 Remaining work = (1- 1/8) =7/ 8 Now,7/ 8 work is done by B in 42 days. Whole work will be done by B in (42 x 8/7) = 48 days. A’s 1 day's work = 1/80 and B's 1 day's work = 1/48 (A+B)'s 1 day's work = (1/80+1/48)=8/240=1/30 Hence, both will finish the work in 30 days. 9. A and B undertake to do a piece of work for Rs. 600. A alone can do it in 6 days while B alone can do it in 8 days. With the help of C, they finish it in 3 days. find the share of each. C's 1 day's work = 1/3-(1/6+1/8)=1/24 A : B : C = Ratio of their 1 day's work = 1/6:1/8:1/24= 4 : 3 : 1.
  • 6. 6 Like us on facebook : https://www.facebook.com/Exam.Affairs.EA A’s share = Rs. (600 *4/8) = Rs.300, B's share = Rs. (600 *3/8) = Rs. 225. C's share = Rs. [600 - (300 + 225) = Rs. 75. 10. A and B working separately can do a piece of work in 9 and 12 days respectively, If they work for a day alternately, A beginning, in how many days, the work will be completed? (A + B)'s 2 days' work =(1/9+1/12)=7/36 Work done in 5 pairs of days =(5*7/36)=35/36 Remaining work =(1-35/36)=1/36 On 11th day, it is A’s turn. 1/9 work is done by him in 1 day. 1/36 work is done by him in(9*1/36)=1/4 day Total time taken = (10 + 1/4) days = 10 (1/4)days. 11. 45 men can complete a work in 16 days. Six days after they started working, 30 more men joined them. How many days will they now take to complete the remaining work? (45 x 16) men can complete the work in 1 day. 1 man's 1 day's work = 1/720 45 men's 6 days' work =(1/16*6)=3/8 Remaining work =(1-3/8)=5/8 75 men's 1 day's work = 75/720=5/48 5/8 work is done by them in (5/48)/(5/8)=6 days. 12. 2 men and 3 boys can do a piece of work in 10 days while 3 men and 2 boys can do the same work in 8 days. In how many days can 2 men and 1 boy do the work? Let 1 man’s 1 day’s work = x and 1 boy’s 1 day’s work = y. Then, 2x+3y = 1/10 and 3x+2y = 1/8 Solving, we get: x = 7/200 and y = 1/100 (2 men + 1 boy)’s 1 day’s work = (2x7/200 + 1 x 1/100 )
  • 7. 7 Like us on facebook : https://www.facebook.com/Exam.Affairs.EA So, 2 men and 1 boy together can finish the work in 25/2 =12 1/2 days 13. 12 men can complete a work in 18 days. Six days after they started working, 4 men joined them. How many days will all of them take to finish the remaining work? (12 * 18) men can complete the work in 1 day. 1 mans 1 days work = 1/216 12 men’s 6 days work = (1/18)*6 = 1/3 remaining work = 1 - (1/3) = 2/3 16 mens 1 days work = 16/216 = 2/27 2/27 work is done by them in 1 day. 2/3 work is done by them in (27/2)*(2/3) = 9 days. 14. If 12 carpenters, working.6 hours a day can make 460 chairs in 24 days, how many chairs will 18 carpenters make in 36 days, each working 8 hours a day ? (Carpenters 12: 18) : (His/Day 6:8 ) : (Days 24 : 36) : : 460 : x 12 * 6 * 24*x =18 * 8 * 36 * 460 or x = 1380 15. Some persons can do a piece of work in 12 days. Two times the number of such persons will do half of that work in (Mens 2x : x) : (work 1:1/2) :: 12 :y 2x * 1 * y = x * 1/2 * 12 or y = 3 days Facebook Link : https://www.facebook.com/Exam.Affairs.EA