This is Lean
1 2 3 4
PRESENTATION
agenda
What is Lean
The Myth of Resource Efficiency.
Key Concepts
Overview of features that meet your
solution requirements.
Key Metrics
Discussion and clarification of needs.
7Geese
How can we apply this to us
Building the
Right Things
Building the
Things Right
Systems
“We create relationships because we
believe that we will create some value that
is not present in the individual parts”
- Reinertsen
“Systems produce the behaviors, not the
people in them”
- Deming
Know Your System
The Myth of Resource Efficiency
SECTION 1
Need: I am sick and I need a diagnosis
Value-adding time: Time with doctors, nurses
or staff (5 hours)
Time Period: Time from bug being reported to
change going live in production (1000 hours)
Flow efficiency: 1 / 7 = 0.05%
FLOW EFFICIENCY
Need: There is a bug in the 7Geese UI
Value-adding time: Developer refactoring
code to fix the bug (1 day)
Time Period: Time from bug being reported to
change going live in production (7 days)
Flow efficiency: 1 / 7 = 15%
FLOW EFFICIENCY
Lean is an operations strategy that prioritizes
Flow Efficiency over Resource Efficiency
This is Lean, p. 89
FACTS
Lean: Definition
Typical flow problems:
● Customer needs not met
● Missed deadlines
● Rework, unnecessary work
● Time wasted waiting for work
● Not enough work, or too much work
● Working on the wrong things
● Inability to estimate
Resource Efficiency Flow Efficiency
Typical resource problems:
● Lack of information
● Toil (work that scales linearly)
● Errors and mistakes (defects)
● Unplanned or hidden work
● Skill and experience
● Equipment / Environment
A Where most organizations think they are
B Where most organizations actually are
C Increasing Flow Efficiency
Use of visualization, standardization and visualization to drive a dramatic
increase in flow
D Increasing Resource Efficiency
Once flow efficiency has been achieved, it becomes easy to see how
resources can be made more efficient and effective
The Efficiency Paradox
E The Ideal State
Resource efficiency is at less than full capacity, allowing the org to deal
with uncertainty,
The reality is that a lot of work performed is superfluous
Status quo appears to work
Unwillingness to risk change
Key Concepts
SECTION 2
Value Stream
1) What activities are value-adding?
2) What is value?
Standardization
Visibility
Flow Measurement
Key Metrics
SECTION 1
Outcomes Provide Evidence of Value
and Ways to Improve
FACTS
Evidenced-Based Management
Work in Progress
Queues (wait states)
Lead Time
How long value take to be delivered
to a customer
Flow Time
(throughput)
How long does it take to create value?
Number of units processed per time unit
Cycle Time
(Little’s Law)
How much work can an activity
process?
Cycle Time =
Work in Process
Average Completion Rate
Value-Creating Time
Time spent within a process that
actually create value
Three Sources of Inefficiency
1) Long throughput times
2) Many flow units
3) Many restarts per flow unit
This is Lean

More Related Content

What's hot

Modern Agile and Organisational Design
Modern Agile and Organisational Design Modern Agile and Organisational Design
Modern Agile and Organisational Design
Lempea
 
Getting things done® overview
Getting things done® overviewGetting things done® overview
Getting things done® overview
Travis Eck
 
Synergita Brochure
Synergita BrochureSynergita Brochure
Synergita Brochure
Venkatesh Narasimhan
 
what is DELEGATION?
what is DELEGATION?what is DELEGATION?
what is DELEGATION?
Chelloline Tebangin
 
Brochure for Synergita__Ver0.2_mail
Brochure for Synergita__Ver0.2_mailBrochure for Synergita__Ver0.2_mail
Brochure for Synergita__Ver0.2_mail
Caroline Anand
 
The journey begins
The journey beginsThe journey begins
The journey begins
Aaron Howard
 
Clc
ClcClc
Key success factors of an ERP Implementation
Key success factors of an ERP ImplementationKey success factors of an ERP Implementation
Key success factors of an ERP Implementation
Visibility by Design
 
Benchmark roundup – why bother
Benchmark roundup – why botherBenchmark roundup – why bother
Benchmark roundup – why bother
PAS_Team
 
What is an Agile Mindset
What is an Agile MindsetWhat is an Agile Mindset
What is an Agile Mindset
PeterSandberg22
 
Agile Governance and Continuous Improvement
Agile Governance and Continuous Improvement Agile Governance and Continuous Improvement
Agile Governance and Continuous Improvement
Kevin Murray
 
APO IT Buzz Overview and Screenshots
APO IT Buzz Overview and ScreenshotsAPO IT Buzz Overview and Screenshots
APO IT Buzz Overview and Screenshots
Computer Aid, Inc
 
Candex
CandexCandex
Candex
antonyharper
 
Martin Clarke - “How the ‘Change Battle’ was won”
Martin Clarke - “How the ‘Change Battle’ was won”Martin Clarke - “How the ‘Change Battle’ was won”
Martin Clarke - “How the ‘Change Battle’ was won”
Alexis May
 
XP2014 talk: Driving Company Evolution Using a Complex Dynamic System Approach
XP2014 talk:  Driving Company Evolution Using a Complex Dynamic System ApproachXP2014 talk:  Driving Company Evolution Using a Complex Dynamic System Approach
XP2014 talk: Driving Company Evolution Using a Complex Dynamic System Approach
Hendrik Esser
 
Dionnca Wilder Resume
Dionnca Wilder ResumeDionnca Wilder Resume
Dionnca Wilder Resume
Dionnca Wilder
 
Enterprise Project Management at Global CyberSoft
Enterprise Project Management at Global CyberSoftEnterprise Project Management at Global CyberSoft
Enterprise Project Management at Global CyberSoft
Hieu Le Trung
 
A New Concept In R&D Dept Of A
A New Concept In R&D Dept Of AA New Concept In R&D Dept Of A
A New Concept In R&D Dept Of A
Madiha Sheikh
 
Real World DevOps - Jason Riggins
Real World DevOps - Jason RigginsReal World DevOps - Jason Riggins
Real World DevOps - Jason Riggins
Jason Riggins
 
Salesforce Implementation Campus-wide: Keeping our eyes on the prize!
Salesforce Implementation Campus-wide: Keeping our eyes on the prize!Salesforce Implementation Campus-wide: Keeping our eyes on the prize!
Salesforce Implementation Campus-wide: Keeping our eyes on the prize!
Xiao Lai
 

What's hot (20)

Modern Agile and Organisational Design
Modern Agile and Organisational Design Modern Agile and Organisational Design
Modern Agile and Organisational Design
 
Getting things done® overview
Getting things done® overviewGetting things done® overview
Getting things done® overview
 
Synergita Brochure
Synergita BrochureSynergita Brochure
Synergita Brochure
 
what is DELEGATION?
what is DELEGATION?what is DELEGATION?
what is DELEGATION?
 
Brochure for Synergita__Ver0.2_mail
Brochure for Synergita__Ver0.2_mailBrochure for Synergita__Ver0.2_mail
Brochure for Synergita__Ver0.2_mail
 
The journey begins
The journey beginsThe journey begins
The journey begins
 
Clc
ClcClc
Clc
 
Key success factors of an ERP Implementation
Key success factors of an ERP ImplementationKey success factors of an ERP Implementation
Key success factors of an ERP Implementation
 
Benchmark roundup – why bother
Benchmark roundup – why botherBenchmark roundup – why bother
Benchmark roundup – why bother
 
What is an Agile Mindset
What is an Agile MindsetWhat is an Agile Mindset
What is an Agile Mindset
 
Agile Governance and Continuous Improvement
Agile Governance and Continuous Improvement Agile Governance and Continuous Improvement
Agile Governance and Continuous Improvement
 
APO IT Buzz Overview and Screenshots
APO IT Buzz Overview and ScreenshotsAPO IT Buzz Overview and Screenshots
APO IT Buzz Overview and Screenshots
 
Candex
CandexCandex
Candex
 
Martin Clarke - “How the ‘Change Battle’ was won”
Martin Clarke - “How the ‘Change Battle’ was won”Martin Clarke - “How the ‘Change Battle’ was won”
Martin Clarke - “How the ‘Change Battle’ was won”
 
XP2014 talk: Driving Company Evolution Using a Complex Dynamic System Approach
XP2014 talk:  Driving Company Evolution Using a Complex Dynamic System ApproachXP2014 talk:  Driving Company Evolution Using a Complex Dynamic System Approach
XP2014 talk: Driving Company Evolution Using a Complex Dynamic System Approach
 
Dionnca Wilder Resume
Dionnca Wilder ResumeDionnca Wilder Resume
Dionnca Wilder Resume
 
Enterprise Project Management at Global CyberSoft
Enterprise Project Management at Global CyberSoftEnterprise Project Management at Global CyberSoft
Enterprise Project Management at Global CyberSoft
 
A New Concept In R&D Dept Of A
A New Concept In R&D Dept Of AA New Concept In R&D Dept Of A
A New Concept In R&D Dept Of A
 
Real World DevOps - Jason Riggins
Real World DevOps - Jason RigginsReal World DevOps - Jason Riggins
Real World DevOps - Jason Riggins
 
Salesforce Implementation Campus-wide: Keeping our eyes on the prize!
Salesforce Implementation Campus-wide: Keeping our eyes on the prize!Salesforce Implementation Campus-wide: Keeping our eyes on the prize!
Salesforce Implementation Campus-wide: Keeping our eyes on the prize!
 

Similar to This is Lean

Robert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls AgileRobert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls Agile
Robert McGeachy
 
Project Server - Who can benefit from it and how?
Project Server - Who can benefit from it and how?Project Server - Who can benefit from it and how?
Project Server - Who can benefit from it and how?
SPC Adriatics
 
Project Server: Who can benefit from it and how?
Project Server: Who can benefit from it and how?Project Server: Who can benefit from it and how?
Project Server: Who can benefit from it and how?
SPC Adriatics
 
Core Lean Tools
Core Lean ToolsCore Lean Tools
Core Lean Tools
Nina Segura
 
The Role of Innovative Analytics in a Recruiting Turnaround
The Role of Innovative Analytics in a Recruiting TurnaroundThe Role of Innovative Analytics in a Recruiting Turnaround
The Role of Innovative Analytics in a Recruiting Turnaround
Taleo
 
Da vita randy larson presentation 070110
Da vita randy larson presentation 070110Da vita randy larson presentation 070110
Da vita randy larson presentation 070110
Sharad Thankappan
 
Tomas Butkus: Agile Practices in Enterprise Environment
Tomas Butkus: Agile Practices in Enterprise EnvironmentTomas Butkus: Agile Practices in Enterprise Environment
Tomas Butkus: Agile Practices in Enterprise Environment
Agile Lietuva
 
Finding Lean in Agile by Adam Parker
Finding Lean in Agile by Adam ParkerFinding Lean in Agile by Adam Parker
Finding Lean in Agile by Adam Parker
Washington DC Scrum User Group
 
DCSUG - Finding Lean in Agile
DCSUG - Finding Lean in AgileDCSUG - Finding Lean in Agile
DCSUG - Finding Lean in Agile
Excella
 
Descaling Organizational Complexity to Expedite Product Delivery_new
Descaling Organizational Complexity to Expedite Product Delivery_newDescaling Organizational Complexity to Expedite Product Delivery_new
Descaling Organizational Complexity to Expedite Product Delivery_new
Chandan Patary
 
Intechgenic im sept 2020 v2 converted
Intechgenic im sept 2020 v2 convertedIntechgenic im sept 2020 v2 converted
Intechgenic im sept 2020 v2 converted
Aninda Mukhopadhyay
 
Agile metrics - Agile KC Meeting 9/26/13
Agile metrics - Agile KC Meeting 9/26/13Agile metrics - Agile KC Meeting 9/26/13
Agile metrics - Agile KC Meeting 9/26/13
molsonkc
 
Aces 405 - Team that actually saved the most money..!!
Aces 405 - Team that actually saved the most money..!!Aces 405 - Team that actually saved the most money..!!
Aces 405 - Team that actually saved the most money..!!
Satwinder Singh
 
aces405upload-091211003244-phpapp01 (1)
aces405upload-091211003244-phpapp01 (1)aces405upload-091211003244-phpapp01 (1)
aces405upload-091211003244-phpapp01 (1)
Satwinder Singh
 
7 qualities of an effective resource management system
7 qualities of an effective resource management system7 qualities of an effective resource management system
7 qualities of an effective resource management system
Orangescrum
 
Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12
Jason Uyder
 
The Power of HR Analytics
The Power of HR AnalyticsThe Power of HR Analytics
The Power of HR Analytics
HackerEarth
 
DEV345_Tools Won’t Fix Your Broken DevOps
DEV345_Tools Won’t Fix Your Broken DevOpsDEV345_Tools Won’t Fix Your Broken DevOps
DEV345_Tools Won’t Fix Your Broken DevOps
Amazon Web Services
 
DevOps Deep Dive Webinar: Building a business case for agile and devops
DevOps Deep Dive Webinar: Building a business case for agile and devopsDevOps Deep Dive Webinar: Building a business case for agile and devops
DevOps Deep Dive Webinar: Building a business case for agile and devops
Basis Technologies
 
5 Employee Relations Metrics you Should be Tracking & Why
5 Employee Relations Metrics you Should be Tracking & Why5 Employee Relations Metrics you Should be Tracking & Why
5 Employee Relations Metrics you Should be Tracking & Why
Dovetail Software
 

Similar to This is Lean (20)

Robert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls AgileRobert Mc Geachy Common Pitfalls Agile
Robert Mc Geachy Common Pitfalls Agile
 
Project Server - Who can benefit from it and how?
Project Server - Who can benefit from it and how?Project Server - Who can benefit from it and how?
Project Server - Who can benefit from it and how?
 
Project Server: Who can benefit from it and how?
Project Server: Who can benefit from it and how?Project Server: Who can benefit from it and how?
Project Server: Who can benefit from it and how?
 
Core Lean Tools
Core Lean ToolsCore Lean Tools
Core Lean Tools
 
The Role of Innovative Analytics in a Recruiting Turnaround
The Role of Innovative Analytics in a Recruiting TurnaroundThe Role of Innovative Analytics in a Recruiting Turnaround
The Role of Innovative Analytics in a Recruiting Turnaround
 
Da vita randy larson presentation 070110
Da vita randy larson presentation 070110Da vita randy larson presentation 070110
Da vita randy larson presentation 070110
 
Tomas Butkus: Agile Practices in Enterprise Environment
Tomas Butkus: Agile Practices in Enterprise EnvironmentTomas Butkus: Agile Practices in Enterprise Environment
Tomas Butkus: Agile Practices in Enterprise Environment
 
Finding Lean in Agile by Adam Parker
Finding Lean in Agile by Adam ParkerFinding Lean in Agile by Adam Parker
Finding Lean in Agile by Adam Parker
 
DCSUG - Finding Lean in Agile
DCSUG - Finding Lean in AgileDCSUG - Finding Lean in Agile
DCSUG - Finding Lean in Agile
 
Descaling Organizational Complexity to Expedite Product Delivery_new
Descaling Organizational Complexity to Expedite Product Delivery_newDescaling Organizational Complexity to Expedite Product Delivery_new
Descaling Organizational Complexity to Expedite Product Delivery_new
 
Intechgenic im sept 2020 v2 converted
Intechgenic im sept 2020 v2 convertedIntechgenic im sept 2020 v2 converted
Intechgenic im sept 2020 v2 converted
 
Agile metrics - Agile KC Meeting 9/26/13
Agile metrics - Agile KC Meeting 9/26/13Agile metrics - Agile KC Meeting 9/26/13
Agile metrics - Agile KC Meeting 9/26/13
 
Aces 405 - Team that actually saved the most money..!!
Aces 405 - Team that actually saved the most money..!!Aces 405 - Team that actually saved the most money..!!
Aces 405 - Team that actually saved the most money..!!
 
aces405upload-091211003244-phpapp01 (1)
aces405upload-091211003244-phpapp01 (1)aces405upload-091211003244-phpapp01 (1)
aces405upload-091211003244-phpapp01 (1)
 
7 qualities of an effective resource management system
7 qualities of an effective resource management system7 qualities of an effective resource management system
7 qualities of an effective resource management system
 
Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12
 
The Power of HR Analytics
The Power of HR AnalyticsThe Power of HR Analytics
The Power of HR Analytics
 
DEV345_Tools Won’t Fix Your Broken DevOps
DEV345_Tools Won’t Fix Your Broken DevOpsDEV345_Tools Won’t Fix Your Broken DevOps
DEV345_Tools Won’t Fix Your Broken DevOps
 
DevOps Deep Dive Webinar: Building a business case for agile and devops
DevOps Deep Dive Webinar: Building a business case for agile and devopsDevOps Deep Dive Webinar: Building a business case for agile and devops
DevOps Deep Dive Webinar: Building a business case for agile and devops
 
5 Employee Relations Metrics you Should be Tracking & Why
5 Employee Relations Metrics you Should be Tracking & Why5 Employee Relations Metrics you Should be Tracking & Why
5 Employee Relations Metrics you Should be Tracking & Why
 

Recently uploaded

digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
Madhumitha Jayaram
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
Ratnakar Mikkili
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
ihlasbinance2003
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
MIGUELANGEL966976
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
JamalHussainArman
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
nooriasukmaningtyas
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
wisnuprabawa3
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
Hitesh Mohapatra
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
Mukeshwaran Balu
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 

Recently uploaded (20)

digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Wearable antenna for antenna applications
Wearable antenna for antenna applicationsWearable antenna for antenna applications
Wearable antenna for antenna applications
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Exception Handling notes in java exception
Exception Handling notes in java exceptionException Handling notes in java exception
Exception Handling notes in java exception
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
5214-1693458878915-Unit 6 2023 to 2024 academic year assignment (AutoRecovere...
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdfBPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
BPV-GUI-01-Guide-for-ASME-Review-Teams-(General)-10-10-2023.pdf
 
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptxML Based Model for NIDS MSc Updated Presentation.v2.pptx
ML Based Model for NIDS MSc Updated Presentation.v2.pptx
 
A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...A review on techniques and modelling methodologies used for checking electrom...
A review on techniques and modelling methodologies used for checking electrom...
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
New techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdfNew techniques for characterising damage in rock slopes.pdf
New techniques for characterising damage in rock slopes.pdf
 
Generative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of contentGenerative AI leverages algorithms to create various forms of content
Generative AI leverages algorithms to create various forms of content
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
ACRP 4-09 Risk Assessment Method to Support Modification of Airfield Separat...
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 

This is Lean

  • 1.
  • 2. John Rauser July 27th, 2018 This is Lean
  • 3. 1 2 3 4 PRESENTATION agenda What is Lean The Myth of Resource Efficiency. Key Concepts Overview of features that meet your solution requirements. Key Metrics Discussion and clarification of needs. 7Geese How can we apply this to us
  • 5. Systems “We create relationships because we believe that we will create some value that is not present in the individual parts” - Reinertsen “Systems produce the behaviors, not the people in them” - Deming Know Your System
  • 6.
  • 7. The Myth of Resource Efficiency SECTION 1
  • 8.
  • 9.
  • 10. Need: I am sick and I need a diagnosis Value-adding time: Time with doctors, nurses or staff (5 hours) Time Period: Time from bug being reported to change going live in production (1000 hours) Flow efficiency: 1 / 7 = 0.05% FLOW EFFICIENCY
  • 11. Need: There is a bug in the 7Geese UI Value-adding time: Developer refactoring code to fix the bug (1 day) Time Period: Time from bug being reported to change going live in production (7 days) Flow efficiency: 1 / 7 = 15% FLOW EFFICIENCY
  • 12. Lean is an operations strategy that prioritizes Flow Efficiency over Resource Efficiency This is Lean, p. 89 FACTS Lean: Definition
  • 13. Typical flow problems: ● Customer needs not met ● Missed deadlines ● Rework, unnecessary work ● Time wasted waiting for work ● Not enough work, or too much work ● Working on the wrong things ● Inability to estimate Resource Efficiency Flow Efficiency Typical resource problems: ● Lack of information ● Toil (work that scales linearly) ● Errors and mistakes (defects) ● Unplanned or hidden work ● Skill and experience ● Equipment / Environment
  • 14.
  • 15. A Where most organizations think they are B Where most organizations actually are C Increasing Flow Efficiency Use of visualization, standardization and visualization to drive a dramatic increase in flow D Increasing Resource Efficiency Once flow efficiency has been achieved, it becomes easy to see how resources can be made more efficient and effective The Efficiency Paradox E The Ideal State Resource efficiency is at less than full capacity, allowing the org to deal with uncertainty, The reality is that a lot of work performed is superfluous Status quo appears to work Unwillingness to risk change
  • 17. Value Stream 1) What activities are value-adding? 2) What is value?
  • 22. Outcomes Provide Evidence of Value and Ways to Improve FACTS Evidenced-Based Management
  • 25. Lead Time How long value take to be delivered to a customer
  • 26. Flow Time (throughput) How long does it take to create value? Number of units processed per time unit
  • 27. Cycle Time (Little’s Law) How much work can an activity process? Cycle Time = Work in Process Average Completion Rate
  • 28. Value-Creating Time Time spent within a process that actually create value
  • 29. Three Sources of Inefficiency 1) Long throughput times 2) Many flow units 3) Many restarts per flow unit