Implementation of Theory Of Constraints - TOC theory in manufacturing. The challenges faced by the plant. The figures before the implementation and the result.
Ramen Ball Sector Basis Weight Valve is an Electrically operated control valve with a high-precision control actuator for GSM / basis weight control application in Pulp & Paper Industry.
BENZ makes high-quality live tools for lathes and machining centers. Durable X-line Crown Gear runs smoother and more quietly, with higher torque and RPMs but less heat in a compact design.
Implementation of Theory Of Constraints - TOC theory in manufacturing. The challenges faced by the plant. The figures before the implementation and the result.
Ramen Ball Sector Basis Weight Valve is an Electrically operated control valve with a high-precision control actuator for GSM / basis weight control application in Pulp & Paper Industry.
BENZ makes high-quality live tools for lathes and machining centers. Durable X-line Crown Gear runs smoother and more quietly, with higher torque and RPMs but less heat in a compact design.
BENZ High Speed Spindles provide 5x the spindle RPM up to 40,000 RPM boosting productivity and efficiency for high speed drilling and milling applications.
G.G. Automotive Gears Ltd. is a leading manufacturer of traction gears and pinions, based out of Dewas, Madhya Pradesh in India. GGAG has been a market leader in Locomotive gears for the last 40 years. Established in 1974, the company undertakes to manufacture of traction gears as a strategic shift from its traditional business of automotive gears.
We established in the year 1998. We are into the manufacturing of heavy sheet metal and tubular welded sub - assemblies required for automobile industries. Our Philosophy is implemented by having detailed quality instructions in regards to raw material, in process and finished components.
Lanner client Hayward Tyler Group share their experience with predictive simu...Lanner
Presenting at the Lanner predictive simulation conference, 2016, Ross Meikle and Oliver Buhlinger from Hayward Tyler Group explain how they used Lanner simulation software to achieve their vision and growth and increase their efficiencies.
We established in the year 1998. We are into the manufacturing of heavy sheet metal and tubular welded sub - assemblies required for automobile industries.
Since 1919, GEKA Group has been manufacturing ironworkers for angle work, strips and profiles - for ironmongery, metal workshops, metal constructions, telecommunication and electricity towers and, generally all that is related with civil and industrial construction.
Cam gear process improvement shifter assembly manufacturingQuan Nguyen
Design and manufacture shifter assemblies
Implement Six Sigma and Lean to address quality issues
Use expenses only where necessary
Save company over $50,000/year in key areas of production
We established in the year 1998. We are into the manufacturing of heavy sheet metal and tubular welded sub - assemblies required for automobile industries.
BENZ High Speed Spindles provide 5x the spindle RPM up to 40,000 RPM boosting productivity and efficiency for high speed drilling and milling applications.
G.G. Automotive Gears Ltd. is a leading manufacturer of traction gears and pinions, based out of Dewas, Madhya Pradesh in India. GGAG has been a market leader in Locomotive gears for the last 40 years. Established in 1974, the company undertakes to manufacture of traction gears as a strategic shift from its traditional business of automotive gears.
We established in the year 1998. We are into the manufacturing of heavy sheet metal and tubular welded sub - assemblies required for automobile industries. Our Philosophy is implemented by having detailed quality instructions in regards to raw material, in process and finished components.
Lanner client Hayward Tyler Group share their experience with predictive simu...Lanner
Presenting at the Lanner predictive simulation conference, 2016, Ross Meikle and Oliver Buhlinger from Hayward Tyler Group explain how they used Lanner simulation software to achieve their vision and growth and increase their efficiencies.
We established in the year 1998. We are into the manufacturing of heavy sheet metal and tubular welded sub - assemblies required for automobile industries.
Since 1919, GEKA Group has been manufacturing ironworkers for angle work, strips and profiles - for ironmongery, metal workshops, metal constructions, telecommunication and electricity towers and, generally all that is related with civil and industrial construction.
Cam gear process improvement shifter assembly manufacturingQuan Nguyen
Design and manufacture shifter assemblies
Implement Six Sigma and Lean to address quality issues
Use expenses only where necessary
Save company over $50,000/year in key areas of production
We established in the year 1998. We are into the manufacturing of heavy sheet metal and tubular welded sub - assemblies required for automobile industries.
¡ESPECIALÍZATE Y CERTIFÍCATE! En nuestro Curso Integral “Las Contrataciones Públicas” Inicio: 11 de Febrero. Convenio con OSCE y Certificación por R&C Consulting.
Para mayor información ingresa a: http://bit.ly/23OjYyH
Entérate de nuestros Cursos y diplomados actualizados e inscríbete AQUÍ→ http://goo.gl/fcRnEi
Síguenos en Facebook → http://goo.gl/6vNsuf
También puedes llamarnos a los siguientes números:
Movistar: 9-9911-4921
RPM: # 956991632
RPC: 987-972-131
Fijo: (01) 2661067 Anexo 101
Every Media Works [www.everymediaworks.com] is a Creative Design Agency, that Creates State of the Art Business Presentation and other Multimedia Creative Content for its Clients. Here is one of the Business Presentation that we have Created for SandFits Foundries Pvt. Ltd. Disclaimer : This is for Demonstrative Purposes and not to be used for Commercial Purposes. The Content is Copyrighted to SandFits Foundries Pvt. Ltd. and the usage of Contents can solely be done with discretion of the Content Owner and SandFits Foundries Pvt. Ltd..
Automation for Horizontal Plastic Injection Moulding industries at to pick and place sprue (plastic waste) from plastic IMM to granulator within 8 sec reducing cycle time and thus enhancing productivity.Robot works on electro-pneumatic circuit operated by C programmed micro-controller.Design was validated in CATIA V5. The model works on 2 to 4 bar pressure air compressor with flow controlled.The model was designed for 40 to 65 ton machines. Different existing models were studied, industrial survey of 14 companies was done and by design synthesis, swing arm horizontal prototype was made with 1/2 kg payload for sprue.The robust mild steel body had miter bevel gear for power transmission and Teflon slider on aluminium arm.
The best design innovation was that through gravity use, gripper wrist rotation and vertical descend stroke for sprue release was eliminated in motion sequence by adopting swing arm horizontal robot configuration instead of conventional swing arm vertical movement. Also, effective trajectory planning for swing arm cylinder was done.
The Norton Clipper range of hand-held petrol saws features an electronic carburettor which eliminates the hassle of a choke and makes a stress-free start of the powerful 4kW/5,4HP engine. 4 models are available, in 300 or 350 mm blade diameter, and using standard fuel + oil mix or fitted with the first ever iLube® automatic lubrication system, which controls the mix of oil and fuel electronically.
2. PRESENTED BY:
KHUSHBOO CHOUDHARY (2015HB74028)
SHASHANK SHEKHAR SINGH (2015HB79013)
NANDITA PRADEEP (2015HB74006)
VINOY VINCENT (2015HB74020)
IMPLEMENTATION OF THEORY OF
CONSTRAINTS (TOC) IN PRODUCTION
3. THE CASE STUDY FIRM: KEY FACTS
THE FIRM: A start-up
Deals in
• SHEET METAL
• ALUMINIUM EXTRUSIONS
Sheet metal includes
• Automobile chassis, UPS and invertor chassis and cabinets
• Refrigerating , silencers , leg guards
Aluminum extrusions includes
• Heat sinks, panels
Vendors/ Partners
• Valco India ltd, Indo alusys, Bhushan steels,BALCO, Jindal Steels, Tata
Steels
Sales & distributes
• Schneider electric, Luminous Power technologies, Zenus powers,Tata
motors, Voltas, Ashoka Leyland , Scooter India.
4.
5. FOCUS AREA: Taking HEAT SINK
Manufacturing Unit into Consideration
HEAT INDULGENCE?!
Heat indulgence techniques are the prime concern to remove the
waste heat produced by Electronic Devices, to keep them within
permitted operating temperature limits. Heat indulgence techniques
include heat sinks, fans for air cooling, and other forms of cooling
such as liquid cooling. Heat produced by electronic devices and
circuitry must be self-indulgent to improve reliability and prevent
premature failure. Integrated circuits such as CPUs, chipset, graphic
cards, and hard disk drives are susceptible to temporary malfunction
or permanent failure if overheated.
6. ECOVOLT HEATSINKS
851-153403450010, 851-0001, 851-0002 are the three different types of
heat sinks they are mounted on 666 PCB plate of ecovolt inverter of
luminous power technologies in the ratio of 2:1:1. All the three heat sinks
are having common front and bottom operations; they can be distinguished
by their top operations. As 851-153403450010 has no operations on top
while 851-0001 has three holes on top two are M4 holes and one is M3.
Similarly 851-0002 has two M4 holes on top.
14. Figures before the implementation of TOC
32750
26880 28480
October November December
No.of 851-0001 heatsinks
produced
No.of 851-0001 heatsinks produced
Ecovolt 851-0001 monthly production.
Month
No.of 851-0001
heatsinks
produced
Rate value
October 32750 20.35 666436.00
November 26880 20.01 537868.80
December 28480 19.66 559916.80
35040
26240 27840
October November December
No. of 851-0002
heatsinks produced.
No. of 851-0002 heatsinks
produced.
Ecovolt 851-0002 heat sinks
Months
No. of 851-0002 heat
sinks produced.
Rate Value
October 35040 19.76 692222.40
November 26240 19.47 511022.40
December 27840 19.11 532022.40
15. 73880
46060
58880
October November December
No of 851-153403450010 heatsink produced
No of 851-153403450010 heatsink produced
Ecovolt heatsink 851-153403450010
Month No of 851-153403450010 heatsink produced Rate Value
October
73880 18.61 1374906.80
November
46060 18.25 840600.60
December
58880 17.91 1054540.80
16. The CHALLENGES we face.
Slow throughput
Less productive
High non-operating expenses
Incomplete purchase order
Inventories deposition near 6-
spindle tapping machine of
851-153403450010 line.
Slow productive rate due to
poor synchronization between
manual machines and
automatic SPM machines.
17. What is Theory of constraint(TOC) ?
Identify - the system constraint(s)
Exploit - the system constraint(s)
Subordinate - the system constraint(s)
Elevate – the system constraint(s)
Go back to step 1 if bottleneck fails
18. Main causes of slow throughput:
The center distance between 3 holes in front portion is 13mm. but our existing spindles
are not able to adjust lesser than 14mm, that’s why we do 1st and 3rd hole of front portion
and two holes of bottom portion at a time. For the 2nd hole we need extra machine and
labor.
(Note-1:- All three parts are having same front and bottom operations.)
(Note-2:- We use compounded fixtures in which we can perform two operations at a time one
is at front and another one is at bottom).
First we place unprocessed part in first block, then after the completion of operation we
take it out and place in second block like this we can perform two operations at time.
20. Elimination
The problem can be eliminated only when we can adjust our spindles at
the center distance of 13mm.
Grind our spindles 0.3mm from both the sides
Remove the capping ring placed over the bearing.
Before Grinding After Grinding
21. Modification done
By doing these modifications we are able to adjust our spindles at
the center distance of 13mm and we can save 4 persons from each
production line.
PRODUCTION LINE:-
In both 851-0001 and 851-0002 heat sinks
Before:-
After:-
6-spindle
drilling
2-spindle
drilling
6-spindle
tapping
manual M4
drilling
manual M3
drilling
chamfering
manual M4
tapping
manual M3
tapping
6-spindle
drilling
2-spindle
drilling-M4
holes
6-spindle
tapping
2-spindle
tapping-M4
holes
manual M3
drilling
chamfering
22. In 851-0002
Before:-
After:-
2 spindle machine is vacant now. This we can save two operators
and reduce the non operating expenses. By using automatic
machines instead of manual we can reduce the WIP inventory.
6-spindle
drilling
2-spindle
drilling
6-spindle
tapping
manual M4
drilling
chamfering
manual M4
tapping
6-spindle
drilling
2-spindle
drilling-
M4holes
6-spindle
tapping
2-spindle
tapping-M4
holes
23. In 851-153403450010
Before:-
Line 1
Line 2
Two 6 spindle drilling machines and two 2 spindle drilling machines
for drilling holes. But only one 6-spindle drilling machine for tapping
6-spindle
drilling
2-spindle
drilling
6-spindle
tapping
chamfering
6-spindle
drilling
2-spindle
drilling
24. After:-
Line 1
Line 2
we used our vacant operator for running one extra 6-spindle tapping
machine for converting all WIP inventories into FG’s.
6-spindle
drilling
6-spindle
tapping
chamfering
6-spindle drilling 6-spindle tapping
25. Figures after the implementation of TOC
Ecovolt 851-0001 monthly production.
Month
No.of 851-0001 heat sinks
produced
Rate value
October 32750 20.35 666436.00
November 26880 20.01 537868.80
December 28480 19.66 559916.80
Expected 50000 19.66
983000.00
32750 26880 28480
50000
October November December january(till 29th)
No.of 851-0001 heatsinks produced
No.of 851-0001 heatsinks produced
26. Ecovolt 851-0002 heatsinks
Months No. of 851-0002 heatsinks produced. Rate Value
October 35040 19.76 692222.40
November 26240 19.47 511022.40
December 27840 19.11 532022.40
Expected 50000 19.11 955500.00
35040
26240 27840
50000
October November December january(till 29th)
No. of 851-0002 heatsinks produced.
No. of 851-0002 heatsinks produced.
27. Ecovolt heatsink 851-153403450010
Month No of 851-153403450010 heatsink produced Rate Value
October
73880 18.61 1374906.80
November
46060 18.25 840600.60
December
58880 17.91 1054540.80
Expected
100000 17.91 1791000.00
73880
46060
58880
100000
October November December january(till 29th)
No of 851-153403450010 heatsink produced
No of 851-153403450010 heatsink produced
28. Rate of production : A comparison
Rate of production per shift. (Before)
Part code
No.of parts/
shift
WIP
No. of operators
required
No.of machines required
No.of
working days
Mothlty
production
capacity
Price
rate/Part
Total
value
Operator's/
month
wages
Total wage
value given
Net value
Manual SPM
851-0001 2000 500 8 5 3 20 40000
19.66 786400 7045 56360 730040
851-0002 2000 500 6 3 3 20 40000
19.11 764400 7045 42270 722130
851-
153403450010
4000 1000 6 1 5 20 80000
17.91 1432800 7045 42270 1390530
Total 2842700
29. Rate of production per shift. (After)
Part code
No.of parts/
shift
WIP
No. of operators
required
No.of machines required
No.of
working days
Mothlty
production
capacity
Price
rate/Part
Total
value
Operator's/
month
wages
Total wage
value given
Net value
Manual SPM
851-0001 2500 0 6 2 4 20 50000
19.66 983000 7045 42270 940730
851-0002 2500 0 4 1 4 20 50000
19.11 955500 7045 28180 927320
851-
153403450010
5000 0 5 1 4 20 100000
17.91 1791000 7045 35225 1755775
Total 3623825
Profit Value 781125
30. Goal Achieved!
Proper utilization
Synchronized form
Increased throughput
Completion of purchase order
Operator saved:
o In 851-153403450010:- 1
o In 851-0001:- 2
o In 851-0002:- 2