THEORY OF CONSTRAINTS :
A CASE STUDY
PRESENTED BY:
KHUSHBOO CHOUDHARY (2015HB74028)
SHASHANK SHEKHAR SINGH (2015HB79013)
NANDITA PRADEEP (2015HB74006)
VINOY VINCENT (2015HB74020)
IMPLEMENTATION OF THEORY OF
CONSTRAINTS (TOC) IN PRODUCTION
THE CASE STUDY FIRM: KEY FACTS
THE FIRM: A start-up
Deals in
• SHEET METAL
• ALUMINIUM EXTRUSIONS
Sheet metal includes
• Automobile chassis, UPS and invertor chassis and cabinets
• Refrigerating , silencers , leg guards
Aluminum extrusions includes
• Heat sinks, panels
Vendors/ Partners
• Valco India ltd, Indo alusys, Bhushan steels,BALCO, Jindal Steels, Tata
Steels
Sales & distributes
• Schneider electric, Luminous Power technologies, Zenus powers,Tata
motors, Voltas, Ashoka Leyland , Scooter India.
FOCUS AREA: Taking HEAT SINK
Manufacturing Unit into Consideration
HEAT INDULGENCE?!
Heat indulgence techniques are the prime concern to remove the
waste heat produced by Electronic Devices, to keep them within
permitted operating temperature limits. Heat indulgence techniques
include heat sinks, fans for air cooling, and other forms of cooling
such as liquid cooling. Heat produced by electronic devices and
circuitry must be self-indulgent to improve reliability and prevent
premature failure. Integrated circuits such as CPUs, chipset, graphic
cards, and hard disk drives are susceptible to temporary malfunction
or permanent failure if overheated.
ECOVOLT HEATSINKS
851-153403450010, 851-0001, 851-0002 are the three different types of
heat sinks they are mounted on 666 PCB plate of ecovolt inverter of
luminous power technologies in the ratio of 2:1:1. All the three heat sinks
are having common front and bottom operations; they can be distinguished
by their top operations. As 851-153403450010 has no operations on top
while 851-0001 has three holes on top two are M4 holes and one is M3.
Similarly 851-0002 has two M4 holes on top.
Number of Machines
6 SPINDLE
DRILLING
6 SPINDLE
TAPPING
4 SPINDLE
DRILLING
4 SPINDLE
TAPPING
2 SPINDLE
DRILLING
2 SPINDLE
TAPPING
Machines used :-
 SPM
 6 SPINDLE
 4 SPINDLE
 2 SPINDLE
 Manual
For manufacturing 851-153403450010
 2- 6 spindles drilling
 2- 2 spindles drilling
 1- 6 spindle tapping
 Single manual machine –
Chamfering
 Manpower- 6 operators
851-153403450010
For manufacturing 851-0001
 1- 6 spindle drilling
 1- 2 spindle drilling
 1- 6 spindle tapping
 5-manual machines are
required
◦ For m4 holes
◦ For m3 hole
◦ For chamfering
◦ For tapping m4 holes
◦ For tapping m3 holes
 Manpower- 8 operators
851-0001
For manufacturing 851-0002
 1-6 spindles drilling
 1- 2 spindles drilling
 1- 6 spindles tapping
 3 manual machines
◦ For m4 holes
◦ For Chamfering
◦ For m4 tapping
 Manpower- 6 operators
851-0002
Figures before the implementation of TOC
32750
26880 28480
October November December
No.of 851-0001 heatsinks
produced
No.of 851-0001 heatsinks produced
Ecovolt 851-0001 monthly production.
Month
No.of 851-0001
heatsinks
produced
Rate value
October 32750 20.35 666436.00
November 26880 20.01 537868.80
December 28480 19.66 559916.80
35040
26240 27840
October November December
No. of 851-0002
heatsinks produced.
No. of 851-0002 heatsinks
produced.
Ecovolt 851-0002 heat sinks
Months
No. of 851-0002 heat
sinks produced.
Rate Value
October 35040 19.76 692222.40
November 26240 19.47 511022.40
December 27840 19.11 532022.40
73880
46060
58880
October November December
No of 851-153403450010 heatsink produced
No of 851-153403450010 heatsink produced
Ecovolt heatsink 851-153403450010
Month No of 851-153403450010 heatsink produced Rate Value
October
73880 18.61 1374906.80
November
46060 18.25 840600.60
December
58880 17.91 1054540.80
The CHALLENGES we face.
 Slow throughput
 Less productive
 High non-operating expenses
 Incomplete purchase order
 Inventories deposition near 6-
spindle tapping machine of
851-153403450010 line.
 Slow productive rate due to
poor synchronization between
manual machines and
automatic SPM machines.
What is Theory of constraint(TOC) ?
 Identify - the system constraint(s)
 Exploit - the system constraint(s)
 Subordinate - the system constraint(s)
 Elevate – the system constraint(s)
 Go back to step 1 if bottleneck fails
Main causes of slow throughput:
 The center distance between 3 holes in front portion is 13mm. but our existing spindles
are not able to adjust lesser than 14mm, that’s why we do 1st and 3rd hole of front portion
and two holes of bottom portion at a time. For the 2nd hole we need extra machine and
labor.
(Note-1:- All three parts are having same front and bottom operations.)
(Note-2:- We use compounded fixtures in which we can perform two operations at a time one
is at front and another one is at bottom).
 First we place unprocessed part in first block, then after the completion of operation we
take it out and place in second block like this we can perform two operations at time.
working of compounded fixtures given below:-
Elimination
 The problem can be eliminated only when we can adjust our spindles at
the center distance of 13mm.
 Grind our spindles 0.3mm from both the sides
 Remove the capping ring placed over the bearing.
Before Grinding After Grinding
Modification done
By doing these modifications we are able to adjust our spindles at
the center distance of 13mm and we can save 4 persons from each
production line.
PRODUCTION LINE:-
 In both 851-0001 and 851-0002 heat sinks
Before:-
After:-
6-spindle
drilling
2-spindle
drilling
6-spindle
tapping
manual M4
drilling
manual M3
drilling
chamfering
manual M4
tapping
manual M3
tapping
6-spindle
drilling
2-spindle
drilling-M4
holes
6-spindle
tapping
2-spindle
tapping-M4
holes
manual M3
drilling
chamfering
 In 851-0002
Before:-
After:-
2 spindle machine is vacant now. This we can save two operators
and reduce the non operating expenses. By using automatic
machines instead of manual we can reduce the WIP inventory.
6-spindle
drilling
2-spindle
drilling
6-spindle
tapping
manual M4
drilling
chamfering
manual M4
tapping
6-spindle
drilling
2-spindle
drilling-
M4holes
6-spindle
tapping
2-spindle
tapping-M4
holes
 In 851-153403450010
Before:-
Line 1
Line 2
Two 6 spindle drilling machines and two 2 spindle drilling machines
for drilling holes. But only one 6-spindle drilling machine for tapping
6-spindle
drilling
2-spindle
drilling
6-spindle
tapping
chamfering
6-spindle
drilling
2-spindle
drilling
After:-
Line 1
Line 2
we used our vacant operator for running one extra 6-spindle tapping
machine for converting all WIP inventories into FG’s.
6-spindle
drilling
6-spindle
tapping
chamfering
6-spindle drilling 6-spindle tapping
Figures after the implementation of TOC
Ecovolt 851-0001 monthly production.
Month
No.of 851-0001 heat sinks
produced
Rate value
October 32750 20.35 666436.00
November 26880 20.01 537868.80
December 28480 19.66 559916.80
Expected 50000 19.66
983000.00
32750 26880 28480
50000
October November December january(till 29th)
No.of 851-0001 heatsinks produced
No.of 851-0001 heatsinks produced
Ecovolt 851-0002 heatsinks
Months No. of 851-0002 heatsinks produced. Rate Value
October 35040 19.76 692222.40
November 26240 19.47 511022.40
December 27840 19.11 532022.40
Expected 50000 19.11 955500.00
35040
26240 27840
50000
October November December january(till 29th)
No. of 851-0002 heatsinks produced.
No. of 851-0002 heatsinks produced.
Ecovolt heatsink 851-153403450010
Month No of 851-153403450010 heatsink produced Rate Value
October
73880 18.61 1374906.80
November
46060 18.25 840600.60
December
58880 17.91 1054540.80
Expected
100000 17.91 1791000.00
73880
46060
58880
100000
October November December january(till 29th)
No of 851-153403450010 heatsink produced
No of 851-153403450010 heatsink produced
Rate of production : A comparison
Rate of production per shift. (Before)
Part code
No.of parts/
shift
WIP
No. of operators
required
No.of machines required
No.of
working days
Mothlty
production
capacity
Price
rate/Part
Total
value
Operator's/
month
wages
Total wage
value given
Net value
Manual SPM
851-0001 2000 500 8 5 3 20 40000
19.66 786400 7045 56360 730040
851-0002 2000 500 6 3 3 20 40000
19.11 764400 7045 42270 722130
851-
153403450010
4000 1000 6 1 5 20 80000
17.91 1432800 7045 42270 1390530
Total 2842700
Rate of production per shift. (After)
Part code
No.of parts/
shift
WIP
No. of operators
required
No.of machines required
No.of
working days
Mothlty
production
capacity
Price
rate/Part
Total
value
Operator's/
month
wages
Total wage
value given
Net value
Manual SPM
851-0001 2500 0 6 2 4 20 50000
19.66 983000 7045 42270 940730
851-0002 2500 0 4 1 4 20 50000
19.11 955500 7045 28180 927320
851-
153403450010
5000 0 5 1 4 20 100000
17.91 1791000 7045 35225 1755775
Total 3623825
Profit Value 781125
Goal Achieved!
 Proper utilization
 Synchronized form
 Increased throughput
 Completion of purchase order
 Operator saved:
o In 851-153403450010:- 1
o In 851-0001:- 2
o In 851-0002:- 2
Theory Of Constraints.

More Related Content

What's hot

Ejemplos industria de automocion
Ejemplos industria de automocionEjemplos industria de automocion
Ejemplos industria de automocion
Comegui
 
Machining fundamentals
Machining fundamentalsMachining fundamentals
Machining fundamentals
endika55
 
Angle Heads
Angle HeadsAngle Heads
Angle Heads
benztooling
 
Multi-Spindle Heads
Multi-Spindle HeadsMulti-Spindle Heads
Multi-Spindle Headsbenztooling
 
powertorcbolting
powertorcboltingpowertorcbolting
powertorcboltingRitu Sharma
 
High-Speed Spindles
High-Speed SpindlesHigh-Speed Spindles
High-Speed Spindles
benztooling
 
Energy saving ball mill
Energy saving ball millEnergy saving ball mill
Energy saving ball mill
millball
 
Return conveyor-loopteq-o-300-en
Return conveyor-loopteq-o-300-enReturn conveyor-loopteq-o-300-en
Return conveyor-loopteq-o-300-en
AmirStern2
 
Edge banding-machines-edgeteq-s-380-s-500-2019-englisch
Edge banding-machines-edgeteq-s-380-s-500-2019-englischEdge banding-machines-edgeteq-s-380-s-500-2019-englisch
Edge banding-machines-edgeteq-s-380-s-500-2019-englisch
AmirStern2
 
MISSION STATMENT 2015
MISSION STATMENT 2015MISSION STATMENT 2015
MISSION STATMENT 2015Alauddin Alam
 
GGAG Corporate Presentation
GGAG Corporate Presentation GGAG Corporate Presentation
GGAG Corporate Presentation
Akshay Sharma
 
Avishkar'16 vvv
Avishkar'16 vvvAvishkar'16 vvv
Avishkar'16 vvv
Hemant Rawat
 
Manish Engg. Introduction (16.07.18)
Manish Engg. Introduction (16.07.18)Manish Engg. Introduction (16.07.18)
Manish Engg. Introduction (16.07.18)
Maxpromotion
 
Lanner client Hayward Tyler Group share their experience with predictive simu...
Lanner client Hayward Tyler Group share their experience with predictive simu...Lanner client Hayward Tyler Group share their experience with predictive simu...
Lanner client Hayward Tyler Group share their experience with predictive simu...
Lanner
 
Mew introduction-ppt (17.05.16)
Mew introduction-ppt (17.05.16)Mew introduction-ppt (17.05.16)
Mew introduction-ppt (17.05.16)
Maxpromotion
 
Geka Group's Presentation
Geka Group's PresentationGeka Group's Presentation
Geka Group's Presentation
Geka Group
 
Cam gear process improvement shifter assembly manufacturing
Cam gear process improvement  shifter assembly manufacturingCam gear process improvement  shifter assembly manufacturing
Cam gear process improvement shifter assembly manufacturing
Quan Nguyen
 
Manish engg ppt 26.04.16
Manish engg ppt 26.04.16Manish engg ppt 26.04.16
Manish engg ppt 26.04.16
Maxpromotion
 

What's hot (20)

Ejemplos industria de automocion
Ejemplos industria de automocionEjemplos industria de automocion
Ejemplos industria de automocion
 
Machining fundamentals
Machining fundamentalsMachining fundamentals
Machining fundamentals
 
Angle Heads
Angle HeadsAngle Heads
Angle Heads
 
Multi-Spindle Heads
Multi-Spindle HeadsMulti-Spindle Heads
Multi-Spindle Heads
 
powertorcbolting
powertorcboltingpowertorcbolting
powertorcbolting
 
High-Speed Spindles
High-Speed SpindlesHigh-Speed Spindles
High-Speed Spindles
 
Energy saving ball mill
Energy saving ball millEnergy saving ball mill
Energy saving ball mill
 
Return conveyor-loopteq-o-300-en
Return conveyor-loopteq-o-300-enReturn conveyor-loopteq-o-300-en
Return conveyor-loopteq-o-300-en
 
Gauging
GaugingGauging
Gauging
 
Edge banding-machines-edgeteq-s-380-s-500-2019-englisch
Edge banding-machines-edgeteq-s-380-s-500-2019-englischEdge banding-machines-edgeteq-s-380-s-500-2019-englisch
Edge banding-machines-edgeteq-s-380-s-500-2019-englisch
 
MISSION STATMENT 2015
MISSION STATMENT 2015MISSION STATMENT 2015
MISSION STATMENT 2015
 
GGAG Corporate Presentation
GGAG Corporate Presentation GGAG Corporate Presentation
GGAG Corporate Presentation
 
Avishkar'16 vvv
Avishkar'16 vvvAvishkar'16 vvv
Avishkar'16 vvv
 
Manish Engg. Introduction (16.07.18)
Manish Engg. Introduction (16.07.18)Manish Engg. Introduction (16.07.18)
Manish Engg. Introduction (16.07.18)
 
Lanner client Hayward Tyler Group share their experience with predictive simu...
Lanner client Hayward Tyler Group share their experience with predictive simu...Lanner client Hayward Tyler Group share their experience with predictive simu...
Lanner client Hayward Tyler Group share their experience with predictive simu...
 
Mew introduction-ppt (17.05.16)
Mew introduction-ppt (17.05.16)Mew introduction-ppt (17.05.16)
Mew introduction-ppt (17.05.16)
 
Geka Group's Presentation
Geka Group's PresentationGeka Group's Presentation
Geka Group's Presentation
 
Local Service
Local ServiceLocal Service
Local Service
 
Cam gear process improvement shifter assembly manufacturing
Cam gear process improvement  shifter assembly manufacturingCam gear process improvement  shifter assembly manufacturing
Cam gear process improvement shifter assembly manufacturing
 
Manish engg ppt 26.04.16
Manish engg ppt 26.04.16Manish engg ppt 26.04.16
Manish engg ppt 26.04.16
 

Viewers also liked

Práctica web de la sesión 3
Práctica web de la sesión 3Práctica web de la sesión 3
Práctica web de la sesión 3
Emmanuel Palacios
 
24348746
2434874624348746
24348746
andres castillo
 
Curso Integral “Las Contrataciones Públicas”
 Curso Integral “Las Contrataciones Públicas”  Curso Integral “Las Contrataciones Públicas”
Curso Integral “Las Contrataciones Públicas”
RC Consulting SRL
 
Recovered file 1
Recovered file 1Recovered file 1
Recovered file 1
medico
 
MUHAMMAD SOFIE BIN SAPAWI resume
MUHAMMAD SOFIE BIN SAPAWI resumeMUHAMMAD SOFIE BIN SAPAWI resume
MUHAMMAD SOFIE BIN SAPAWI resumemuhammad sofie
 
conceptos de metrologia
conceptos de metrologiaconceptos de metrologia
conceptos de metrologia
Banamex
 
2.. presentación técnicos laborales 2015
2.. presentación técnicos laborales 20152.. presentación técnicos laborales 2015
2.. presentación técnicos laborales 2015
HERNANDO RAMOS BARRIOS
 
Ambiental ecocinema
Ambiental ecocinemaAmbiental ecocinema
Ambiental ecocinema
Jotica Rincon
 

Viewers also liked (13)

Excel
ExcelExcel
Excel
 
Práctica web de la sesión 3
Práctica web de la sesión 3Práctica web de la sesión 3
Práctica web de la sesión 3
 
24348746
2434874624348746
24348746
 
koroshus_2014
koroshus_2014koroshus_2014
koroshus_2014
 
BPClairRidge
BPClairRidgeBPClairRidge
BPClairRidge
 
Curso Integral “Las Contrataciones Públicas”
 Curso Integral “Las Contrataciones Públicas”  Curso Integral “Las Contrataciones Públicas”
Curso Integral “Las Contrataciones Públicas”
 
Recovered file 1
Recovered file 1Recovered file 1
Recovered file 1
 
Schmitt_Resume_43015
Schmitt_Resume_43015Schmitt_Resume_43015
Schmitt_Resume_43015
 
Madelene leininger
Madelene leiningerMadelene leininger
Madelene leininger
 
MUHAMMAD SOFIE BIN SAPAWI resume
MUHAMMAD SOFIE BIN SAPAWI resumeMUHAMMAD SOFIE BIN SAPAWI resume
MUHAMMAD SOFIE BIN SAPAWI resume
 
conceptos de metrologia
conceptos de metrologiaconceptos de metrologia
conceptos de metrologia
 
2.. presentación técnicos laborales 2015
2.. presentación técnicos laborales 20152.. presentación técnicos laborales 2015
2.. presentación técnicos laborales 2015
 
Ambiental ecocinema
Ambiental ecocinemaAmbiental ecocinema
Ambiental ecocinema
 

Similar to Theory Of Constraints.

Sandfits Business Presentation #1 - Creative Works | Every Media Works
Sandfits Business Presentation #1 - Creative Works | Every Media WorksSandfits Business Presentation #1 - Creative Works | Every Media Works
Sandfits Business Presentation #1 - Creative Works | Every Media Works
Every Media Works | Everentures
 
AKC's ppt on scooters india
AKC's ppt on scooters indiaAKC's ppt on scooters india
AKC's ppt on scooters india
Akshay Chhabria
 
yaxi introduction V1.4
yaxi introduction V1.4yaxi introduction V1.4
yaxi introduction V1.4Tina Lee
 
Diesel locomotive workshop
Diesel locomotive workshopDiesel locomotive workshop
Diesel locomotive workshop
Home
 
Tk catalog english_18_1
Tk catalog english_18_1Tk catalog english_18_1
Tk catalog english_18_1
Timo Ala-Jaaski
 
Pneumobot-Pneumatic Pick and Place Robot
Pneumobot-Pneumatic Pick and Place RobotPneumobot-Pneumatic Pick and Place Robot
Pneumobot-Pneumatic Pick and Place Robot
Abhijeet Pawar
 
IRJET- Design Methodology and Assembly for a Radial Feed in a CNC Gear Hobbin...
IRJET- Design Methodology and Assembly for a Radial Feed in a CNC Gear Hobbin...IRJET- Design Methodology and Assembly for a Radial Feed in a CNC Gear Hobbin...
IRJET- Design Methodology and Assembly for a Radial Feed in a CNC Gear Hobbin...
IRJET Journal
 
BWEL Project Report
BWEL Project ReportBWEL Project Report
BWEL Project ReportASHISH KUMAR
 
cement mill(ball)seminar.pdf
cement mill(ball)seminar.pdfcement mill(ball)seminar.pdf
cement mill(ball)seminar.pdf
Muhammad565043
 
Sheet metal and Fabrication Shop
Sheet metal and Fabrication ShopSheet metal and Fabrication Shop
Sheet metal and Fabrication Shop
Sd A
 
Reliable-Sponge-Pvt-Ltd-Unit-lll
Reliable-Sponge-Pvt-Ltd-Unit-lllReliable-Sponge-Pvt-Ltd-Unit-lll
Reliable-Sponge-Pvt-Ltd-Unit-lll
Reliable India
 
Caterpillar cat 966 c wheel loader (prefix 18b) service repair manual (18b002...
Caterpillar cat 966 c wheel loader (prefix 18b) service repair manual (18b002...Caterpillar cat 966 c wheel loader (prefix 18b) service repair manual (18b002...
Caterpillar cat 966 c wheel loader (prefix 18b) service repair manual (18b002...
didkskdkmdm
 
Brochure Norton Clipper hand-held petrol saws
Brochure Norton Clipper hand-held petrol sawsBrochure Norton Clipper hand-held petrol saws
Brochure Norton Clipper hand-held petrol saws
Saint-Gobain Abrasives EMEA
 
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
fusjejfskekem
 
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
fujsjefskekm
 
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
fhsejkdkme
 
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
jfjkskrtekfmsmem
 
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
ufujjsejfkkemme
 

Similar to Theory Of Constraints. (20)

Sandfits Business Presentation #1 - Creative Works | Every Media Works
Sandfits Business Presentation #1 - Creative Works | Every Media WorksSandfits Business Presentation #1 - Creative Works | Every Media Works
Sandfits Business Presentation #1 - Creative Works | Every Media Works
 
AKC's ppt on scooters india
AKC's ppt on scooters indiaAKC's ppt on scooters india
AKC's ppt on scooters india
 
yaxi introduction V1.4
yaxi introduction V1.4yaxi introduction V1.4
yaxi introduction V1.4
 
Diesel locomotive workshop
Diesel locomotive workshopDiesel locomotive workshop
Diesel locomotive workshop
 
Tk catalog english_18_1
Tk catalog english_18_1Tk catalog english_18_1
Tk catalog english_18_1
 
Pneumobot-Pneumatic Pick and Place Robot
Pneumobot-Pneumatic Pick and Place RobotPneumobot-Pneumatic Pick and Place Robot
Pneumobot-Pneumatic Pick and Place Robot
 
STP REPORT (final)
STP REPORT (final)STP REPORT (final)
STP REPORT (final)
 
IRJET- Design Methodology and Assembly for a Radial Feed in a CNC Gear Hobbin...
IRJET- Design Methodology and Assembly for a Radial Feed in a CNC Gear Hobbin...IRJET- Design Methodology and Assembly for a Radial Feed in a CNC Gear Hobbin...
IRJET- Design Methodology and Assembly for a Radial Feed in a CNC Gear Hobbin...
 
Arai parts brochure
Arai parts brochureArai parts brochure
Arai parts brochure
 
BWEL Project Report
BWEL Project ReportBWEL Project Report
BWEL Project Report
 
cement mill(ball)seminar.pdf
cement mill(ball)seminar.pdfcement mill(ball)seminar.pdf
cement mill(ball)seminar.pdf
 
Sheet metal and Fabrication Shop
Sheet metal and Fabrication ShopSheet metal and Fabrication Shop
Sheet metal and Fabrication Shop
 
Reliable-Sponge-Pvt-Ltd-Unit-lll
Reliable-Sponge-Pvt-Ltd-Unit-lllReliable-Sponge-Pvt-Ltd-Unit-lll
Reliable-Sponge-Pvt-Ltd-Unit-lll
 
Caterpillar cat 966 c wheel loader (prefix 18b) service repair manual (18b002...
Caterpillar cat 966 c wheel loader (prefix 18b) service repair manual (18b002...Caterpillar cat 966 c wheel loader (prefix 18b) service repair manual (18b002...
Caterpillar cat 966 c wheel loader (prefix 18b) service repair manual (18b002...
 
Brochure Norton Clipper hand-held petrol saws
Brochure Norton Clipper hand-held petrol sawsBrochure Norton Clipper hand-held petrol saws
Brochure Norton Clipper hand-held petrol saws
 
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
 
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
 
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
 
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
 
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
Caterpillar cat 140 h motor grader (prefix 8km) service repair manual (8km000...
 

Theory Of Constraints.

  • 1. THEORY OF CONSTRAINTS : A CASE STUDY
  • 2. PRESENTED BY: KHUSHBOO CHOUDHARY (2015HB74028) SHASHANK SHEKHAR SINGH (2015HB79013) NANDITA PRADEEP (2015HB74006) VINOY VINCENT (2015HB74020) IMPLEMENTATION OF THEORY OF CONSTRAINTS (TOC) IN PRODUCTION
  • 3. THE CASE STUDY FIRM: KEY FACTS THE FIRM: A start-up Deals in • SHEET METAL • ALUMINIUM EXTRUSIONS Sheet metal includes • Automobile chassis, UPS and invertor chassis and cabinets • Refrigerating , silencers , leg guards Aluminum extrusions includes • Heat sinks, panels Vendors/ Partners • Valco India ltd, Indo alusys, Bhushan steels,BALCO, Jindal Steels, Tata Steels Sales & distributes • Schneider electric, Luminous Power technologies, Zenus powers,Tata motors, Voltas, Ashoka Leyland , Scooter India.
  • 4.
  • 5. FOCUS AREA: Taking HEAT SINK Manufacturing Unit into Consideration HEAT INDULGENCE?! Heat indulgence techniques are the prime concern to remove the waste heat produced by Electronic Devices, to keep them within permitted operating temperature limits. Heat indulgence techniques include heat sinks, fans for air cooling, and other forms of cooling such as liquid cooling. Heat produced by electronic devices and circuitry must be self-indulgent to improve reliability and prevent premature failure. Integrated circuits such as CPUs, chipset, graphic cards, and hard disk drives are susceptible to temporary malfunction or permanent failure if overheated.
  • 6. ECOVOLT HEATSINKS 851-153403450010, 851-0001, 851-0002 are the three different types of heat sinks they are mounted on 666 PCB plate of ecovolt inverter of luminous power technologies in the ratio of 2:1:1. All the three heat sinks are having common front and bottom operations; they can be distinguished by their top operations. As 851-153403450010 has no operations on top while 851-0001 has three holes on top two are M4 holes and one is M3. Similarly 851-0002 has two M4 holes on top.
  • 7. Number of Machines 6 SPINDLE DRILLING 6 SPINDLE TAPPING 4 SPINDLE DRILLING 4 SPINDLE TAPPING 2 SPINDLE DRILLING 2 SPINDLE TAPPING Machines used :-  SPM  6 SPINDLE  4 SPINDLE  2 SPINDLE  Manual
  • 8. For manufacturing 851-153403450010  2- 6 spindles drilling  2- 2 spindles drilling  1- 6 spindle tapping  Single manual machine – Chamfering  Manpower- 6 operators
  • 10. For manufacturing 851-0001  1- 6 spindle drilling  1- 2 spindle drilling  1- 6 spindle tapping  5-manual machines are required ◦ For m4 holes ◦ For m3 hole ◦ For chamfering ◦ For tapping m4 holes ◦ For tapping m3 holes  Manpower- 8 operators
  • 12. For manufacturing 851-0002  1-6 spindles drilling  1- 2 spindles drilling  1- 6 spindles tapping  3 manual machines ◦ For m4 holes ◦ For Chamfering ◦ For m4 tapping  Manpower- 6 operators
  • 14. Figures before the implementation of TOC 32750 26880 28480 October November December No.of 851-0001 heatsinks produced No.of 851-0001 heatsinks produced Ecovolt 851-0001 monthly production. Month No.of 851-0001 heatsinks produced Rate value October 32750 20.35 666436.00 November 26880 20.01 537868.80 December 28480 19.66 559916.80 35040 26240 27840 October November December No. of 851-0002 heatsinks produced. No. of 851-0002 heatsinks produced. Ecovolt 851-0002 heat sinks Months No. of 851-0002 heat sinks produced. Rate Value October 35040 19.76 692222.40 November 26240 19.47 511022.40 December 27840 19.11 532022.40
  • 15. 73880 46060 58880 October November December No of 851-153403450010 heatsink produced No of 851-153403450010 heatsink produced Ecovolt heatsink 851-153403450010 Month No of 851-153403450010 heatsink produced Rate Value October 73880 18.61 1374906.80 November 46060 18.25 840600.60 December 58880 17.91 1054540.80
  • 16. The CHALLENGES we face.  Slow throughput  Less productive  High non-operating expenses  Incomplete purchase order  Inventories deposition near 6- spindle tapping machine of 851-153403450010 line.  Slow productive rate due to poor synchronization between manual machines and automatic SPM machines.
  • 17. What is Theory of constraint(TOC) ?  Identify - the system constraint(s)  Exploit - the system constraint(s)  Subordinate - the system constraint(s)  Elevate – the system constraint(s)  Go back to step 1 if bottleneck fails
  • 18. Main causes of slow throughput:  The center distance between 3 holes in front portion is 13mm. but our existing spindles are not able to adjust lesser than 14mm, that’s why we do 1st and 3rd hole of front portion and two holes of bottom portion at a time. For the 2nd hole we need extra machine and labor. (Note-1:- All three parts are having same front and bottom operations.) (Note-2:- We use compounded fixtures in which we can perform two operations at a time one is at front and another one is at bottom).  First we place unprocessed part in first block, then after the completion of operation we take it out and place in second block like this we can perform two operations at time.
  • 19. working of compounded fixtures given below:-
  • 20. Elimination  The problem can be eliminated only when we can adjust our spindles at the center distance of 13mm.  Grind our spindles 0.3mm from both the sides  Remove the capping ring placed over the bearing. Before Grinding After Grinding
  • 21. Modification done By doing these modifications we are able to adjust our spindles at the center distance of 13mm and we can save 4 persons from each production line. PRODUCTION LINE:-  In both 851-0001 and 851-0002 heat sinks Before:- After:- 6-spindle drilling 2-spindle drilling 6-spindle tapping manual M4 drilling manual M3 drilling chamfering manual M4 tapping manual M3 tapping 6-spindle drilling 2-spindle drilling-M4 holes 6-spindle tapping 2-spindle tapping-M4 holes manual M3 drilling chamfering
  • 22.  In 851-0002 Before:- After:- 2 spindle machine is vacant now. This we can save two operators and reduce the non operating expenses. By using automatic machines instead of manual we can reduce the WIP inventory. 6-spindle drilling 2-spindle drilling 6-spindle tapping manual M4 drilling chamfering manual M4 tapping 6-spindle drilling 2-spindle drilling- M4holes 6-spindle tapping 2-spindle tapping-M4 holes
  • 23.  In 851-153403450010 Before:- Line 1 Line 2 Two 6 spindle drilling machines and two 2 spindle drilling machines for drilling holes. But only one 6-spindle drilling machine for tapping 6-spindle drilling 2-spindle drilling 6-spindle tapping chamfering 6-spindle drilling 2-spindle drilling
  • 24. After:- Line 1 Line 2 we used our vacant operator for running one extra 6-spindle tapping machine for converting all WIP inventories into FG’s. 6-spindle drilling 6-spindle tapping chamfering 6-spindle drilling 6-spindle tapping
  • 25. Figures after the implementation of TOC Ecovolt 851-0001 monthly production. Month No.of 851-0001 heat sinks produced Rate value October 32750 20.35 666436.00 November 26880 20.01 537868.80 December 28480 19.66 559916.80 Expected 50000 19.66 983000.00 32750 26880 28480 50000 October November December january(till 29th) No.of 851-0001 heatsinks produced No.of 851-0001 heatsinks produced
  • 26. Ecovolt 851-0002 heatsinks Months No. of 851-0002 heatsinks produced. Rate Value October 35040 19.76 692222.40 November 26240 19.47 511022.40 December 27840 19.11 532022.40 Expected 50000 19.11 955500.00 35040 26240 27840 50000 October November December january(till 29th) No. of 851-0002 heatsinks produced. No. of 851-0002 heatsinks produced.
  • 27. Ecovolt heatsink 851-153403450010 Month No of 851-153403450010 heatsink produced Rate Value October 73880 18.61 1374906.80 November 46060 18.25 840600.60 December 58880 17.91 1054540.80 Expected 100000 17.91 1791000.00 73880 46060 58880 100000 October November December january(till 29th) No of 851-153403450010 heatsink produced No of 851-153403450010 heatsink produced
  • 28. Rate of production : A comparison Rate of production per shift. (Before) Part code No.of parts/ shift WIP No. of operators required No.of machines required No.of working days Mothlty production capacity Price rate/Part Total value Operator's/ month wages Total wage value given Net value Manual SPM 851-0001 2000 500 8 5 3 20 40000 19.66 786400 7045 56360 730040 851-0002 2000 500 6 3 3 20 40000 19.11 764400 7045 42270 722130 851- 153403450010 4000 1000 6 1 5 20 80000 17.91 1432800 7045 42270 1390530 Total 2842700
  • 29. Rate of production per shift. (After) Part code No.of parts/ shift WIP No. of operators required No.of machines required No.of working days Mothlty production capacity Price rate/Part Total value Operator's/ month wages Total wage value given Net value Manual SPM 851-0001 2500 0 6 2 4 20 50000 19.66 983000 7045 42270 940730 851-0002 2500 0 4 1 4 20 50000 19.11 955500 7045 28180 927320 851- 153403450010 5000 0 5 1 4 20 100000 17.91 1791000 7045 35225 1755775 Total 3623825 Profit Value 781125
  • 30. Goal Achieved!  Proper utilization  Synchronized form  Increased throughput  Completion of purchase order  Operator saved: o In 851-153403450010:- 1 o In 851-0001:- 2 o In 851-0002:- 2