The Why, Where and How of
Service Virtualization Adoption
Stefana Muller & Alan Baptista
DevOps: API Management and Application Development
CA Technologies
DO3X118S
@StefanaMuller
@AlanJBaptista
#CAWorld
2 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
For Informational Purposes Only
© 2015 CA. All rights reserved. All trademarks referenced herein belong to their respective companies. The presentation provided at CA
World 2015 is intended for information purposes only and does not form any type of warranty. Some of the specific slides with customer
references relate to customer's specific use and experience of CA products and solutions so actual results may vary.
Certain information in this presentation may outline CA’s general product direction. This presentation shall not serve to (i) affect the rights
and/or obligations of CA or its licensees under any existing or future license agreement or services agreement relating to any CA software
product; or (ii) amend any product documentation or specifications for any CA software product. This presentation is based on current
information and resource allocations as of November 18, 2015 and is subject to change or withdrawal by CA at any time without notice. The
development, release and timing of any features or functionality described in this presentation remain at CA’s sole discretion.
Notwithstanding anything in this presentation to the contrary, upon the general availability of any future CA product release referenced in
this presentation, CA may make such release available to new licensees in the form of a regularly scheduled major product release. Such
release may be made available to licensees of the product who are active subscribers to CA maintenance and support, on a when and if-
available basis. The information in this presentation is not deemed to be incorporated into any contract.
Terms of this Presentation
3 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Abstract
This session will cover major questions many of CA Technologies
customers have once they have decided to adopt service
virtualization: Now what? Where do I start? How do I
implement and maintain the service virtualization practice
within my organization? What are the “dos" and "do nots” that
other customers have learned? And even, how to grow the
service virtualization adoption within my organization?
Stefana Muller
CA Technologies
Advisor, Product
Management
Alan Baptista
CA Technologies
Sr. Principal, Product
Marketing
4 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Agenda
TRANSFORMATIONAL PROGRAM
ENTERPRISE ADOPTION
QUESTION AND ANSWER
ESTABLISH
OPERATIONALIZE
SCALE
1
2
3
4
5
6
5 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Service Virtualization: Transformational
Realization of
business value is key
driving factor:
 The proven value-centric
enablement model from
CA Services has
successfully enabled over
200 Customers to adopt
CA Service Virtualization.
Primary challenge is
“organizational
inertia”:
 It’s drowned in tactical
objectives.
Service virtualization
is a transformation
program:
 Adoption of technology
is just one aspect.
 Process, people and
technological changes
have to come together.
6 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
1. ESTABLISH
2. OPERATIONALIZE
3. SCALE
 Apply federated adoption.
 Roll out process repeatably.
 Establish support.
 Accelerate roll out.
 Get a quick win—business
value.
 Use technology/best practices.
 Establish center of expertise.
 Create a roadmap for success.
 Integrate with SDLC.
 Expand use cases.
 Apply self learning.
 Operationalize COE.
Enterprise
Adoption
Establish
8 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Process Technology
 Define infrastructure
processes.
 Apply stand up
architecture.
 Identify owners for
product licensing, support
and maintenance.
 Create demand gen
process to discover,
prioritize and select
projects.
 Establish quick and
impactful win to ignite
adoption.
 Identify key value metrics
to track.
People
 Establish adoption team.
 Establish SMEs.
 Educate.
 Gain commitment from
key stakeholders.
1. Establish
9 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Center of Expertise/
Enablement
CoE
Governance
Demand
Management
Skills
Management
App. &
Infrastructure
Management
Asset
Management
Knowledge
Management
Implementation
Management
Support &
Maintenance
Who will we oversee enterprise adoption?
 Define an engagement model.
 Define a resource structure.
 Define SDLC integration.
 Define value metrics.
How do you build a pipeline?
 Develop a heat map.
 Develop questionnaires.
How can we enable self-sufficiency?
 Create an enablement process.
 Build a skills assessment process.
 Develop Skills Assessment Template
How can we efficiently deliver the platform?
 Develop an application requisitioning
process.
 Develop an infrastructure requisitioning
process.
How can we facilitate reuse?
Create a service catalog framework.
How do you accelerate enablement?
 Document best practices.
 Upload product guides.
 Develop media content.
How do we execute efficiently?
 Develop readiness checklist.
 Develop a design template.
 Develop a work breakdown
structure.
How can we sustain operations?
 Build solution support processes.
 Build product support processes.
People
10 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Program Increments
Backlog
Heat Map
Questionnaire
Create a roadmap for success:
App1
App2
App3
App4
App5
App6
App7
App8
App9
App10
Value
Complexity
Identify
Analyze
Prioritize
Roadmap
Process
11 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Usage
 Number of running VSEs
 Number of VSE added by month
 Number of total deployed
services
 Number of users
 Number of services added by
month
 Number of transactions by VSE
 Number of monthly
transactions
 Number of new users by month
Value
 Time to market
 Productivity
 Customer loyalty
 Cost avoidance
Adoption
 Number of new teams in
pipeline
 Number of teams engaged
 Number of teams enabled
 Number of resources
trained by group
 Number of project Using SV
Metrics | What should we measure?
Process
12 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Value Metrics
Process
EFFICIENCY QUALITY INFRASTRUCTURE
EVOLVING
 Cycle time
 Test data setup
 Co-ordination overhead
 System unavailability
 Mock/stub effort
 Defects detected
 Code/test coverage
 Third party costs
 Mainframe costs
 Internal licensing costs
 Internal hardware costs
MATURE
 Sprint velocity
 Time to market
 MTTR
 Defect removal efficiency
 Automation value
acceleration
 Defect leakage
 Defect escape ratio
 Cyclomatic complexity
13 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Adoption & Usage Metrics
Process
ADOPTION USAGE
EVOLVING
 Number of teams engaged
 Number of teams enabled
 Number of resources trained by
the group
 Number of resources trained by
the application
 Number of running VSEs
 Number of total deployed services
 Number of users
MATURE
 Number of new teams in the
pipeline
 Number of projects using SV
 Number of VSE added by month
 Number of services added by month
 Number of transactions by VSE
 Number of monthly transactions
 Number of new users by month
14 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Technology Implementation and Best Practices
 Hardware and architecture
 Educate and build SMEs
 Licensing
 Support
 Maintenance
Technology
Operationalize
16 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Process Technology
 Self service catalog
 Docker use cases and
cloud enablement models
 Team based environments
 Expand past just “test” or
just “virtual services”
 Standardize request and
support processes
 Establish SDLC integration
long-term strategy
 Communicate key value
metrics
People
 Centralized enablement
 Embedded engineers
 Formal education and
certification
 Self learning
2. Operationalize
17 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Centralized Enablement Team
and Embedded Engineers
DEVOPS
ENABLEMENT
TEAM:
AGILE TEAMS:
DevOps
Engineers
Embedded
Enablement
Adoption
Team
People
18 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Education
https://communities.ca.com/community/ca-devtest-
community/blog/2015/07/21/service-virtualizatiion-educational-courses
https://communities.ca.com/comm
unity/ca-devtest-
community/content?filterID=conte
ntstatus[published]~objecttype~obj
ecttype[blogpost]&start=0
135 Blogs
People
19 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Self Help
http://bit.ly/SV90Playlist
http://bit.ly/SVonDemandPlaylist
http://bit.ly/SV_Videos
People
20 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
CA Service Virtualization—Hero Kit
Process
21 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Manage the performance and availability of the entire
technology ecosystem—from the development to test to
production.
Ensure product quality and provide
the tools for team’s work easier.
Develop new innovative applications fast in order to secure
the organization’s market leadership position.
Bring quality apps to market faster,
drive innovation and best practice.
22 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Where to start?
 Service Vvrtualization adoption
 “Seven Common Use Cases”
eBook
 Specific user cases—Training
 “Parallel Development” eBook
 DevTest CA Community
 DevOps simulation experience
What’s the value?
Calculated Value
 Benefits calculator
 Interactive infographic
Customer Value
 Real customers, real results
 TechValidate
 IT central station
Reported Value
 Voke SV ROI
 Forrester TEI Study & Wave
 Gartner Market Guide
 EMA WP & Case Study
CA Service Virtualization Hero Kit
3 Areas of Focus
What is it?
 C+ service virtualization video
 Service virtualization book
 Key capabilities white paper
 Service virtualization today
23 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Hero Kit—What is service virtualization?
www.Servicevirtualization.com
24 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Hero Kit—What is the value of service virtualization?
25 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Hero Kit—Where to start with service virtualization?
26 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Move to self service with
federated enablement.
 Create self service catalog.
 Apply Docker Use Cases and Cloud Enablement Models.
 Use team based environments/federated.
 Expand past just “test” or just “virtual services.”
 Consider test data management/test case optimization.
 Consider continuous application insight.
Technology
Scale
28 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Process Technology
 Upgrade strategy
 Integrated ALM
 Custom protocols
 Advanced use cases
 TDM + TCO + CAI
 Organic adoption
 Automated enablement
 Service catalog
 Automatic value
assessments
 Chargeback models
People
 Create resident experts in
every application group.
 Develop internal
community.
 Support federation
through in-house support
forums.
3. Scale
29 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Supporting
• Knowledge management
• Internal community
• CA DevTest community
• Embedded enablement
• Member of CA Customer
Validation
Evangelizing
• Marketing the value
• Share benefits
• Business Value Assessment
• Scorecards
• Product showcase or
demos
• Use the “Hero Kit”
Educating
• Instructor lead training
• Self paced training
• Proof of concept demo
• Proof of concept workshop
• Lunch and learn
• You Tube videos
• Best practices on
community
Successful Tactics to Increase Adoption
People
30 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Automated Enablement
 Self-service atalog
 Automatic value
assessments
 Chargeback models
 Community
support model
Process
31 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Technology Assessment and Future Strategy
 Upgrade strategy
 Integrated ALM/tools
 Custom protocols
 Advanced use cases—integrated test and SV workflows
 Test data management implementation
 Deep validation with continuous application insight
Technology
32 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Q & A
33 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Recommended Sessions
SESSION # TITLE DATE/TIME
DO3X116S
Lloyds Banking Group Leverages Service Virtualization to
Deliver Quality Technology Services
11/19/2015 at 03:00 pm
DO3X114S
Freeing the World from Slow: How Service Virtualization
and the Concept of S.P.E.E.D. Will Steer You Away from
Committing Continuous Delivery Suicide
11/19/2015 at 03:45 pm
DO3T22S DevOps for a 10-Year-Old (Codebase) 11/19/2015 at 04:30 pm
34 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Must See Demos
Service
Virtualization
DevOps
Theater 3
DevOps
Simulation
DevOps
Theater 3
Service
Virtualization
Innovations
DevOps
Theater 3
Service
Virtualization
Use Cases
DevOps
Theater 3
35 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Follow On Conversations At…
Smart Bar
DevOps
Theater 3 & 4
Tech Talks
DevOps
Theater 3 & 4
Reference Material
37 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Document the Value : Value Scorecard
Measure Before After Basis/Comments Improvement / Savings Total / Year
Efficiency
Ability to start development before
environment is ready
5 weeks
delay
No
dependency
25% gain in elimination of idle time for 40 developers
@ $50 / hour
5 weeks initial savings 0.1MM
Resources to maintain data for
development & testing
40k 10k
16 hours per week in live and 4 hours per week using
LISA @ $50 / hour
75% reduction in data setup
time
$30k
Downtime of live system impacts
development
50k 10k
4 hours per week downtime impacting 20 developers
causing 25% idle time and 0.5 hours weekly downtime
with LISA @ $50 / hour
80% savings due to reduced
downtime
$40k
Quality
Improved quality due to better unit
testing by developers using LISA
20 fewer bugs
1 fewer bug using LISA per developer per year at $10k
per bug
20 fewer bugs per year 0.2MM
Improved quality due to better system
testing by QA team
10 fewer bugs
10 fewer bugs escape from QA due to using LISA at
$40k per bug
10 fewer bugs per year 0.4MM
Infrastructure & Resources
Cost of pre-prod environment
LISA replaces multiple pre-prod servers, associated
software costs, maintenance costs & administration
costs
Est. 500k per year $0.5MM
Cost avoidance of hiring NAC resources
for development phase (assume 40
resources for 6 months)
$75/hour
3MM / year
$45/hour
1.8MM
Offshore resource do not have access to secure Tricare
environment, but have access to virtual environment
1.2MM one-time savings
(40%)
$1.2MM
Cost avoidance of hiring NAC resources
for maintenance phase (assume 10
resources ongoing basis)
$75/hour
1.5MM / year
$45/hour
0.9MM
Offshore resource do not have access to secure Tricare
environment, but have access to virtual environment
0.6MM savings (40%) $.6MM
Total $ Savings / Year $3.07MM
Health Care Example : Virtualization of External Interfaces for Performance Testing
38 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Large Financial Services Institution:
Enterprise Adoption
Use case:
Shift-Left Performance Testing
& Third Party Cost Avoidance
# of projects: 2
Saves*: up to USD$650k/year
Lines of business: 1
1/2013
4/2013
11/2013
4/2014
Use case:
Enabled Parallel Development,
Automated Regression Testing
Continued Performance Testing
# of projects/teams: 4
Saves*: up to USD$2.5 MM/year
Lines of business: 2
Use case:
Functional Testing - Early
Defect Identification,
Performance, regression,
functional testing,
development
# of projects/teams: 12
Saves*: up to USD $6
MM/year
Lines of business: 2
Use case:
End-to-end SDLC
Federated teams: 7
# of projects/teams: 18
Targeted saves: USD$10
MM/year
Lines of business: 2
Operationalize
Establish
Scale
Federate
39 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
Financial Services Institution: Consolidated Benefits
Labor Cost
Avoidance
$1.4 MM
Infrastructure
Cost
Avoidance,
$2.3 MM
Infrastructure
Cost
Reduction,
$2MM
Quality Cost
Avoidance,
$380 k
Labor cost avoidance: Improved testing efficiency, reduction in developer and QA resource time
Infrastructure cost avoidance: Reduced infrastructure costs, related environment support costs
Infrastructure cost reduction: Reduction or elimination of existing infrastructure, third party and resource costs
Quality-related cost avoidance: Early defect identification
% increase in system availability: Increased dependent system availability
Time-to-market: Parallelize testing phases and help shrink release cycles
Total Annual Estimated Savings using CA Service Virtualization*: up to USD$6 MM
Consolidated Data from Adoption across
 2 Business Verticals
 12 different application teams
 Up to 300% increase in System Availability
 Up to 20% increase time to market
 Different use cases :
- Performance Testing
- Increase System Availability
- Third party Cost Avoidance
- Parallel Development (Time To Market)
- Functional Testing (Early Defect Detection)
- Regression Testing
40 © 2015 CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD
For More Information
To learn more, please visit:
http://cainc.to/Nv2VOe
CA World ’15

The Why, Where and How of Service Virtualization Adoption

  • 1.
    The Why, Whereand How of Service Virtualization Adoption Stefana Muller & Alan Baptista DevOps: API Management and Application Development CA Technologies DO3X118S @StefanaMuller @AlanJBaptista #CAWorld
  • 2.
    2 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD For Informational Purposes Only © 2015 CA. All rights reserved. All trademarks referenced herein belong to their respective companies. The presentation provided at CA World 2015 is intended for information purposes only and does not form any type of warranty. Some of the specific slides with customer references relate to customer's specific use and experience of CA products and solutions so actual results may vary. Certain information in this presentation may outline CA’s general product direction. This presentation shall not serve to (i) affect the rights and/or obligations of CA or its licensees under any existing or future license agreement or services agreement relating to any CA software product; or (ii) amend any product documentation or specifications for any CA software product. This presentation is based on current information and resource allocations as of November 18, 2015 and is subject to change or withdrawal by CA at any time without notice. The development, release and timing of any features or functionality described in this presentation remain at CA’s sole discretion. Notwithstanding anything in this presentation to the contrary, upon the general availability of any future CA product release referenced in this presentation, CA may make such release available to new licensees in the form of a regularly scheduled major product release. Such release may be made available to licensees of the product who are active subscribers to CA maintenance and support, on a when and if- available basis. The information in this presentation is not deemed to be incorporated into any contract. Terms of this Presentation
  • 3.
    3 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Abstract This session will cover major questions many of CA Technologies customers have once they have decided to adopt service virtualization: Now what? Where do I start? How do I implement and maintain the service virtualization practice within my organization? What are the “dos" and "do nots” that other customers have learned? And even, how to grow the service virtualization adoption within my organization? Stefana Muller CA Technologies Advisor, Product Management Alan Baptista CA Technologies Sr. Principal, Product Marketing
  • 4.
    4 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Agenda TRANSFORMATIONAL PROGRAM ENTERPRISE ADOPTION QUESTION AND ANSWER ESTABLISH OPERATIONALIZE SCALE 1 2 3 4 5 6
  • 5.
    5 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Service Virtualization: Transformational Realization of business value is key driving factor:  The proven value-centric enablement model from CA Services has successfully enabled over 200 Customers to adopt CA Service Virtualization. Primary challenge is “organizational inertia”:  It’s drowned in tactical objectives. Service virtualization is a transformation program:  Adoption of technology is just one aspect.  Process, people and technological changes have to come together.
  • 6.
    6 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD 1. ESTABLISH 2. OPERATIONALIZE 3. SCALE  Apply federated adoption.  Roll out process repeatably.  Establish support.  Accelerate roll out.  Get a quick win—business value.  Use technology/best practices.  Establish center of expertise.  Create a roadmap for success.  Integrate with SDLC.  Expand use cases.  Apply self learning.  Operationalize COE. Enterprise Adoption
  • 7.
  • 8.
    8 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Process Technology  Define infrastructure processes.  Apply stand up architecture.  Identify owners for product licensing, support and maintenance.  Create demand gen process to discover, prioritize and select projects.  Establish quick and impactful win to ignite adoption.  Identify key value metrics to track. People  Establish adoption team.  Establish SMEs.  Educate.  Gain commitment from key stakeholders. 1. Establish
  • 9.
    9 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Center of Expertise/ Enablement CoE Governance Demand Management Skills Management App. & Infrastructure Management Asset Management Knowledge Management Implementation Management Support & Maintenance Who will we oversee enterprise adoption?  Define an engagement model.  Define a resource structure.  Define SDLC integration.  Define value metrics. How do you build a pipeline?  Develop a heat map.  Develop questionnaires. How can we enable self-sufficiency?  Create an enablement process.  Build a skills assessment process.  Develop Skills Assessment Template How can we efficiently deliver the platform?  Develop an application requisitioning process.  Develop an infrastructure requisitioning process. How can we facilitate reuse? Create a service catalog framework. How do you accelerate enablement?  Document best practices.  Upload product guides.  Develop media content. How do we execute efficiently?  Develop readiness checklist.  Develop a design template.  Develop a work breakdown structure. How can we sustain operations?  Build solution support processes.  Build product support processes. People
  • 10.
    10 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Program Increments Backlog Heat Map Questionnaire Create a roadmap for success: App1 App2 App3 App4 App5 App6 App7 App8 App9 App10 Value Complexity Identify Analyze Prioritize Roadmap Process
  • 11.
    11 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Usage  Number of running VSEs  Number of VSE added by month  Number of total deployed services  Number of users  Number of services added by month  Number of transactions by VSE  Number of monthly transactions  Number of new users by month Value  Time to market  Productivity  Customer loyalty  Cost avoidance Adoption  Number of new teams in pipeline  Number of teams engaged  Number of teams enabled  Number of resources trained by group  Number of project Using SV Metrics | What should we measure? Process
  • 12.
    12 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Value Metrics Process EFFICIENCY QUALITY INFRASTRUCTURE EVOLVING  Cycle time  Test data setup  Co-ordination overhead  System unavailability  Mock/stub effort  Defects detected  Code/test coverage  Third party costs  Mainframe costs  Internal licensing costs  Internal hardware costs MATURE  Sprint velocity  Time to market  MTTR  Defect removal efficiency  Automation value acceleration  Defect leakage  Defect escape ratio  Cyclomatic complexity
  • 13.
    13 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Adoption & Usage Metrics Process ADOPTION USAGE EVOLVING  Number of teams engaged  Number of teams enabled  Number of resources trained by the group  Number of resources trained by the application  Number of running VSEs  Number of total deployed services  Number of users MATURE  Number of new teams in the pipeline  Number of projects using SV  Number of VSE added by month  Number of services added by month  Number of transactions by VSE  Number of monthly transactions  Number of new users by month
  • 14.
    14 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Technology Implementation and Best Practices  Hardware and architecture  Educate and build SMEs  Licensing  Support  Maintenance Technology
  • 15.
  • 16.
    16 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Process Technology  Self service catalog  Docker use cases and cloud enablement models  Team based environments  Expand past just “test” or just “virtual services”  Standardize request and support processes  Establish SDLC integration long-term strategy  Communicate key value metrics People  Centralized enablement  Embedded engineers  Formal education and certification  Self learning 2. Operationalize
  • 17.
    17 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Centralized Enablement Team and Embedded Engineers DEVOPS ENABLEMENT TEAM: AGILE TEAMS: DevOps Engineers Embedded Enablement Adoption Team People
  • 18.
    18 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Education https://communities.ca.com/community/ca-devtest- community/blog/2015/07/21/service-virtualizatiion-educational-courses https://communities.ca.com/comm unity/ca-devtest- community/content?filterID=conte ntstatus[published]~objecttype~obj ecttype[blogpost]&start=0 135 Blogs People
  • 19.
    19 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Self Help http://bit.ly/SV90Playlist http://bit.ly/SVonDemandPlaylist http://bit.ly/SV_Videos People
  • 20.
    20 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD CA Service Virtualization—Hero Kit Process
  • 21.
    21 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Manage the performance and availability of the entire technology ecosystem—from the development to test to production. Ensure product quality and provide the tools for team’s work easier. Develop new innovative applications fast in order to secure the organization’s market leadership position. Bring quality apps to market faster, drive innovation and best practice.
  • 22.
    22 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Where to start?  Service Vvrtualization adoption  “Seven Common Use Cases” eBook  Specific user cases—Training  “Parallel Development” eBook  DevTest CA Community  DevOps simulation experience What’s the value? Calculated Value  Benefits calculator  Interactive infographic Customer Value  Real customers, real results  TechValidate  IT central station Reported Value  Voke SV ROI  Forrester TEI Study & Wave  Gartner Market Guide  EMA WP & Case Study CA Service Virtualization Hero Kit 3 Areas of Focus What is it?  C+ service virtualization video  Service virtualization book  Key capabilities white paper  Service virtualization today
  • 23.
    23 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Hero Kit—What is service virtualization? www.Servicevirtualization.com
  • 24.
    24 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Hero Kit—What is the value of service virtualization?
  • 25.
    25 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Hero Kit—Where to start with service virtualization?
  • 26.
    26 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Move to self service with federated enablement.  Create self service catalog.  Apply Docker Use Cases and Cloud Enablement Models.  Use team based environments/federated.  Expand past just “test” or just “virtual services.”  Consider test data management/test case optimization.  Consider continuous application insight. Technology
  • 27.
  • 28.
    28 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Process Technology  Upgrade strategy  Integrated ALM  Custom protocols  Advanced use cases  TDM + TCO + CAI  Organic adoption  Automated enablement  Service catalog  Automatic value assessments  Chargeback models People  Create resident experts in every application group.  Develop internal community.  Support federation through in-house support forums. 3. Scale
  • 29.
    29 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Supporting • Knowledge management • Internal community • CA DevTest community • Embedded enablement • Member of CA Customer Validation Evangelizing • Marketing the value • Share benefits • Business Value Assessment • Scorecards • Product showcase or demos • Use the “Hero Kit” Educating • Instructor lead training • Self paced training • Proof of concept demo • Proof of concept workshop • Lunch and learn • You Tube videos • Best practices on community Successful Tactics to Increase Adoption People
  • 30.
    30 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Automated Enablement  Self-service atalog  Automatic value assessments  Chargeback models  Community support model Process
  • 31.
    31 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Technology Assessment and Future Strategy  Upgrade strategy  Integrated ALM/tools  Custom protocols  Advanced use cases—integrated test and SV workflows  Test data management implementation  Deep validation with continuous application insight Technology
  • 32.
    32 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Q & A
  • 33.
    33 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Recommended Sessions SESSION # TITLE DATE/TIME DO3X116S Lloyds Banking Group Leverages Service Virtualization to Deliver Quality Technology Services 11/19/2015 at 03:00 pm DO3X114S Freeing the World from Slow: How Service Virtualization and the Concept of S.P.E.E.D. Will Steer You Away from Committing Continuous Delivery Suicide 11/19/2015 at 03:45 pm DO3T22S DevOps for a 10-Year-Old (Codebase) 11/19/2015 at 04:30 pm
  • 34.
    34 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Must See Demos Service Virtualization DevOps Theater 3 DevOps Simulation DevOps Theater 3 Service Virtualization Innovations DevOps Theater 3 Service Virtualization Use Cases DevOps Theater 3
  • 35.
    35 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Follow On Conversations At… Smart Bar DevOps Theater 3 & 4 Tech Talks DevOps Theater 3 & 4
  • 36.
  • 37.
    37 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Document the Value : Value Scorecard Measure Before After Basis/Comments Improvement / Savings Total / Year Efficiency Ability to start development before environment is ready 5 weeks delay No dependency 25% gain in elimination of idle time for 40 developers @ $50 / hour 5 weeks initial savings 0.1MM Resources to maintain data for development & testing 40k 10k 16 hours per week in live and 4 hours per week using LISA @ $50 / hour 75% reduction in data setup time $30k Downtime of live system impacts development 50k 10k 4 hours per week downtime impacting 20 developers causing 25% idle time and 0.5 hours weekly downtime with LISA @ $50 / hour 80% savings due to reduced downtime $40k Quality Improved quality due to better unit testing by developers using LISA 20 fewer bugs 1 fewer bug using LISA per developer per year at $10k per bug 20 fewer bugs per year 0.2MM Improved quality due to better system testing by QA team 10 fewer bugs 10 fewer bugs escape from QA due to using LISA at $40k per bug 10 fewer bugs per year 0.4MM Infrastructure & Resources Cost of pre-prod environment LISA replaces multiple pre-prod servers, associated software costs, maintenance costs & administration costs Est. 500k per year $0.5MM Cost avoidance of hiring NAC resources for development phase (assume 40 resources for 6 months) $75/hour 3MM / year $45/hour 1.8MM Offshore resource do not have access to secure Tricare environment, but have access to virtual environment 1.2MM one-time savings (40%) $1.2MM Cost avoidance of hiring NAC resources for maintenance phase (assume 10 resources ongoing basis) $75/hour 1.5MM / year $45/hour 0.9MM Offshore resource do not have access to secure Tricare environment, but have access to virtual environment 0.6MM savings (40%) $.6MM Total $ Savings / Year $3.07MM Health Care Example : Virtualization of External Interfaces for Performance Testing
  • 38.
    38 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Large Financial Services Institution: Enterprise Adoption Use case: Shift-Left Performance Testing & Third Party Cost Avoidance # of projects: 2 Saves*: up to USD$650k/year Lines of business: 1 1/2013 4/2013 11/2013 4/2014 Use case: Enabled Parallel Development, Automated Regression Testing Continued Performance Testing # of projects/teams: 4 Saves*: up to USD$2.5 MM/year Lines of business: 2 Use case: Functional Testing - Early Defect Identification, Performance, regression, functional testing, development # of projects/teams: 12 Saves*: up to USD $6 MM/year Lines of business: 2 Use case: End-to-end SDLC Federated teams: 7 # of projects/teams: 18 Targeted saves: USD$10 MM/year Lines of business: 2 Operationalize Establish Scale Federate
  • 39.
    39 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD Financial Services Institution: Consolidated Benefits Labor Cost Avoidance $1.4 MM Infrastructure Cost Avoidance, $2.3 MM Infrastructure Cost Reduction, $2MM Quality Cost Avoidance, $380 k Labor cost avoidance: Improved testing efficiency, reduction in developer and QA resource time Infrastructure cost avoidance: Reduced infrastructure costs, related environment support costs Infrastructure cost reduction: Reduction or elimination of existing infrastructure, third party and resource costs Quality-related cost avoidance: Early defect identification % increase in system availability: Increased dependent system availability Time-to-market: Parallelize testing phases and help shrink release cycles Total Annual Estimated Savings using CA Service Virtualization*: up to USD$6 MM Consolidated Data from Adoption across  2 Business Verticals  12 different application teams  Up to 300% increase in System Availability  Up to 20% increase time to market  Different use cases : - Performance Testing - Increase System Availability - Third party Cost Avoidance - Parallel Development (Time To Market) - Functional Testing (Early Defect Detection) - Regression Testing
  • 40.
    40 © 2015CA. ALL RIGHTS RESERVED.@CAWORLD #CAWORLD For More Information To learn more, please visit: http://cainc.to/Nv2VOe CA World ’15