This document provides biographies of several artists who contributed work to the book The Art of Basic Drawing, including Michael Butkus, Walter T. Foster, and Michele Maltseff. It also includes an overview of the tools and materials useful for basic drawing, such as pencils, erasers, and different types of paper. Finally, the document introduces basic concepts of perspective that are important for creating realistic drawings.