Tekla presents the Global BIM Awards 2013 winners and the finalists. Learn more about these impressive projects from this presentation. This year the categories were Total BIM, Cast in place concrete, Engineering, Precast concrete and Steel.
3. Tekla Global BIM Awards Overview
First organized in 2009
Competitors are winners of regional Tekla BIM Awards
Five categories:
– Total BIM
– Cast in place
– Engineering
– Precast
– Steel
Winners chosen by jury and public vote
TeklaGlobalBIMAwards2013
3
4. Tekla Global BIM Awards Jury
Leading international BIM experts
TeklaGlobalBIMAwards2013
John Bacus
Product Management
Director, Trimble
SketchUp
Ashwin
Mahalingam
Assistant Professor,
Indian Institute of
Technology Madras
Richard Ogden
Chairman, Buildoffsite
Director, acumen7
Risto Räty
Executive Vice President,
Tekla Corporation
General Manager,
Trimble Buildings
Structures Division
Viktor Várkonyi
CEO, Graphisoft
4
5. Contents
Project Company Category
Puuvilla Shopping Centre Project group of multiple companies Total BIM
BB&T Ballpark Wayne Brothers Inc. & Harris Steel Cast in place
Kalasatama Fiskari and Fregatti Insinööritoimisto Mäkeläinen Oy Precast
Gap Ice-skating Rink Sarl Patrick Millet Steel
Tesco Sheringham Pinnacle Engineering
Baku Olympic Stadium Tekfen & Sdeng Total BIM
Sengenthal Biomass Heat and Max Bögl Total BIM
Power Plant
Pantin – Terralia Vinci, CBC, BET Le Joncour & Cast in place
Atelier d’Architecture Téqui
Knislinge Power Plant WSP Bridge & Civil Engineering Cast in place
Jepua Waste-to-Energy Plant Wise Group Finland Oy Steel
Kapelanka 42 Consolis Polska Precast
Nye Gand Videregåend School Constravia Precast
SAFI SAP – Sidi Rosia Plant OCP / JESA / JACOBS France Engineering
King Abdulla Sports City Six Construct Engineering
5
TeklaGlobalBIMAwards2013
6. Puuvilla Shopping Center
TeklaGlobalBIMAwards2013
By Puuvilla Shopping Center project
group
In Pori, Finland
– Mixes 100-year-old and contemporary structures for
creating 100,00m2 of retail space
– A true product of collaboration: 13 companies teamed
up for modeling
– BIM used in structural
design, precast
detailing, steel roof
structures and façade
elements to
architectural, MEP and
sprinkler design
6
8. BB&T Ballpark
TeklaGlobalBIMAwards2013
Concrete and coordination by Wayne
Brothers Inc., Rebar by Harris Steel
In Charlotte, USA
– 10,000 seat stadium used for baseball games, concerts,
festivals and community events
– Wayne Brothers modeled cast in place and sitework, and
planned pours, tracked progress and coordinated
sequences with other trades
– Layout managed with points created
in Tekla and placed with Trimble
Robotic Total Station
8
10. Kalasataman Fiskari and Fregatti
TeklaGlobalBIMAwards2013
By Engineering Office Mäkeläinen Oy
In Helsinki, Finland
– Two 6-7 story residential building with yard deck
– Modeling from conceptual design to construction site
– Challenging facade with 30 structure types
– Model includes the piled foundations, detailed and
reinforced concrete elements, load-bearing structures and
thermal insulation and brickwork
10
12. Gap Ice-skating Rink
TeklaGlobalBIMAwards2013
By Sarl Patrick Millet
In Gap, France
– 1970s ice-skating rink updated to match today´s
seismological and other norms
– Original timber trusses had to be preserved
– Timber and steel structures in the model
12
14. Tesco Sheringham
TeklaGlobalBIMAwards2013
By Pinnacle
In Sheringham, UK
– Everyday yet bespoke Tesco supermarket with a complex
timber roof structure
– BIM used for structural design and detailing of
foundations and concrete and steel
frame, facade, prefabrication, and creating drawings and
bills of materials
– Thanks to modeling, the client could
visualize the complete
shopping experience
14
16. Baku Olympic Stadium
TeklaGlobalBIMAwards2013
By Tekfen Engineering and Sdeng
Steel & Structural Detail Engineering
In Baku, Azerbaijan
– 68,000 seats
– Designers working in several countries and limited
time demanded lot from communication tools
– Team modeled precast, reinforced concrete, steel
structures and extracted fabrication drawings for
fabrication facility in Turkey
– 3D animation of the complex roof installation
developed using Tekla
16
19. Sengenthal
Biomass Heat and Power Plant
TeklaGlobalBIMAwards2013
By Max Bögl
In Sengenthal, Germany
– Supplies heat from biomass
combustion and gasification to the
headquarters of Max Bögl
– Includes a main hall, carburetor
building and a wood chip store
– A Max Bögl project from planning
to assembly
19
21. Pantin - Terralia
TeklaGlobalBIMAwards2013
By Vinci, CBC, BET Le Joncour
& Atelier d’Architecture Téqui
In Paris
– Residential cast in place building project with
41 apartments and a canal-side brasserie
– The team modeled the concrete frame and
planned the pour program
– Documents on planning and structures
including daily formwork created from the
model
21
23. Knislinge Power Plant
TeklaGlobalBIMAwards2013
By WSP Bridge & Civil Engineering
In Skåne, Sweden
– Hydropower plant producing 4GWh
– Tricky geometry around the waterway made modeling concrete
and reinforcement challenging
– WSP modeled parts that supplement the frame, including wood
battens, furring, isolation and facade materials, plus extracted
drawings from the Tekla model
23
25. Jepua Waste-To-Energy Plant
TeklaGlobalBIMAwards2013
By Wise Ground Finland Oy
In Jepua, Finland
– Several buildings including gas
processing, reception and 24-meter high
boiler buildings
– Structural designer Wise and general
contractor Fira collaborated extensively
– Models of process equipment and
structures combined to
avoid clashes
25
27. Kapelanka 42
TeklaGlobalBIMAwards2013
By Consolis Polska
In Cracow, Poland
– 25,000m2 of office space in two
buildings
– Tekla utilized for designing and
detailing the precast concrete elements
plus monolithic and steel parts
– Creating the model in the tendering
phase allowed the team to make
quantity takeoffs and present structural
changes to the client understandably
27
29. Nye Gand Videregåend Skole
TeklaGlobalBIMAwards2013
By Costravia
In Stavanger, Norway
– A school building designed to last seismic
activity
– Constravia modeled precast concrete
structures including
columns, beams, hollow-core slabs and
internal walls, and cast in place concrete
foundations & steel parts of frame
– Very tight schedule and simultaneous
work on design and construction on site
29
31. SAFI SAP - Sidi Rosia Plant
TeklaGlobalBIMAwards2013
By OCP / JESA / JACOBS France
In Sidi Rosia, Morocco
– Two production units for sulfuric acid, both producing 3,400 tons of acid per day
– Effective design process: The units are designed 80% alike although differently
integrated
– Interoperability crucial: PDMS reference
models of initial process design and
piping were exported into Tekla, and
further exported from Tekla to Tekla
BIMsight and Navisworks
31
33. TeklaGlobalBIMAwards2013
King Abdulla Sport City
By Six Costruct
In Saudi Arabia
– 60,000 seat stadium with 500 person
Mosque and a minaret plus 8 km asphalted
road and 2 km pedestrian walkways
– BIM used in structural design and detailing
of the frame and foundations, modeling
precast and cast in place concrete
– Drawing and bills of materials
extracted from the Tekla model
33