Tekla Global BIM Awards 2013
TeklaGlobalBIMAwards2013
2
Tekla Global BIM Awards Overview
First organized in 2009
Competitors are winners of regional Tekla BIM Awards
Five categories:
– Total BIM
– Cast in place
– Engineering
– Precast
– Steel
Winners chosen by jury and public vote
TeklaGlobalBIMAwards2013
3
Tekla Global BIM Awards Jury
Leading international BIM experts
TeklaGlobalBIMAwards2013
John Bacus
Product Management
Director, Trimble
SketchUp
Ashwin
Mahalingam
Assistant Professor,
Indian Institute of
Technology Madras
Richard Ogden
Chairman, Buildoffsite
Director, acumen7
Risto Räty
Executive Vice President,
Tekla Corporation
General Manager,
Trimble Buildings
Structures Division
Viktor Várkonyi
CEO, Graphisoft
4
Contents
Project Company Category
Puuvilla Shopping Centre Project group of multiple companies Total BIM
BB&T Ballpark Wayne Brothers Inc. & Harris Steel Cast in place
Kalasatama Fiskari and Fregatti Insinööritoimisto Mäkeläinen Oy Precast
Gap Ice-skating Rink Sarl Patrick Millet Steel
Tesco Sheringham Pinnacle Engineering
Baku Olympic Stadium Tekfen & Sdeng Total BIM
Sengenthal Biomass Heat and Max Bögl Total BIM
Power Plant
Pantin – Terralia Vinci, CBC, BET Le Joncour & Cast in place
Atelier d’Architecture Téqui
Knislinge Power Plant WSP Bridge & Civil Engineering Cast in place
Jepua Waste-to-Energy Plant Wise Group Finland Oy Steel
Kapelanka 42 Consolis Polska Precast
Nye Gand Videregåend School Constravia Precast
SAFI SAP – Sidi Rosia Plant OCP / JESA / JACOBS France Engineering
King Abdulla Sports City Six Construct Engineering
5
TeklaGlobalBIMAwards2013
Puuvilla Shopping Center
TeklaGlobalBIMAwards2013
By Puuvilla Shopping Center project
group
In Pori, Finland
– Mixes 100-year-old and contemporary structures for
creating 100,00m2 of retail space
– A true product of collaboration: 13 companies teamed
up for modeling
– BIM used in structural
design, precast
detailing, steel roof
structures and façade
elements to
architectural, MEP and
sprinkler design
6
Puuvilla Shopping Center
TeklaGlobalBIMAwards2013
7
BB&T Ballpark
TeklaGlobalBIMAwards2013
Concrete and coordination by Wayne
Brothers Inc., Rebar by Harris Steel
In Charlotte, USA
– 10,000 seat stadium used for baseball games, concerts,
festivals and community events
– Wayne Brothers modeled cast in place and sitework, and
planned pours, tracked progress and coordinated
sequences with other trades
– Layout managed with points created
in Tekla and placed with Trimble
Robotic Total Station
8
BB&T Ballpark
TeklaGlobalBIMAwards2013
9
Kalasataman Fiskari and Fregatti
TeklaGlobalBIMAwards2013
By Engineering Office Mäkeläinen Oy
In Helsinki, Finland
– Two 6-7 story residential building with yard deck
– Modeling from conceptual design to construction site
– Challenging facade with 30 structure types
– Model includes the piled foundations, detailed and
reinforced concrete elements, load-bearing structures and
thermal insulation and brickwork
10
TeklaGlobalBIMAwards2013
Kalasataman Fiskari and Fregatti
11
Gap Ice-skating Rink
TeklaGlobalBIMAwards2013
By Sarl Patrick Millet
In Gap, France
– 1970s ice-skating rink updated to match today´s
seismological and other norms
– Original timber trusses had to be preserved
– Timber and steel structures in the model
12
Gap Ice-skating Rink
TeklaGlobalBIMAwards2013
13
Tesco Sheringham
TeklaGlobalBIMAwards2013
By Pinnacle
In Sheringham, UK
– Everyday yet bespoke Tesco supermarket with a complex
timber roof structure
– BIM used for structural design and detailing of
foundations and concrete and steel
frame, facade, prefabrication, and creating drawings and
bills of materials
– Thanks to modeling, the client could
visualize the complete
shopping experience
14
Tesco Sheringham
TeklaGlobalBIMAwards2013
15
Baku Olympic Stadium
TeklaGlobalBIMAwards2013
By Tekfen Engineering and Sdeng
Steel & Structural Detail Engineering
In Baku, Azerbaijan
– 68,000 seats
– Designers working in several countries and limited
time demanded lot from communication tools
– Team modeled precast, reinforced concrete, steel
structures and extracted fabrication drawings for
fabrication facility in Turkey
– 3D animation of the complex roof installation
developed using Tekla
16
Baku Olympic Stadium
TeklaGlobalBIMAwards2013
17
18
Tekla Global BIM Awards 2013
Finalists
TeklaGlobalBIMAwards2013
Sengenthal
Biomass Heat and Power Plant
TeklaGlobalBIMAwards2013
By Max Bögl
In Sengenthal, Germany
– Supplies heat from biomass
combustion and gasification to the
headquarters of Max Bögl
– Includes a main hall, carburetor
building and a wood chip store
– A Max Bögl project from planning
to assembly
19
TeklaGlobalBIMAwards2013
Sengenthal
Biomass Heat and Power Plant
20
Pantin - Terralia
TeklaGlobalBIMAwards2013
By Vinci, CBC, BET Le Joncour
& Atelier d’Architecture Téqui
In Paris
– Residential cast in place building project with
41 apartments and a canal-side brasserie
– The team modeled the concrete frame and
planned the pour program
– Documents on planning and structures
including daily formwork created from the
model
21
TeklaGlobalBIMAwards2013
Pantin - Terralia
22
Knislinge Power Plant
TeklaGlobalBIMAwards2013
By WSP Bridge & Civil Engineering
In Skåne, Sweden
– Hydropower plant producing 4GWh
– Tricky geometry around the waterway made modeling concrete
and reinforcement challenging
– WSP modeled parts that supplement the frame, including wood
battens, furring, isolation and facade materials, plus extracted
drawings from the Tekla model
23
TeklaGlobalBIMAwards2013
Knislinge Power Plant
24
Jepua Waste-To-Energy Plant
TeklaGlobalBIMAwards2013
By Wise Ground Finland Oy
In Jepua, Finland
– Several buildings including gas
processing, reception and 24-meter high
boiler buildings
– Structural designer Wise and general
contractor Fira collaborated extensively
– Models of process equipment and
structures combined to
avoid clashes
25
TeklaGlobalBIMAwards2013
Jepua Waste-To-Energy Plant
26
Kapelanka 42
TeklaGlobalBIMAwards2013
By Consolis Polska
In Cracow, Poland
– 25,000m2 of office space in two
buildings
– Tekla utilized for designing and
detailing the precast concrete elements
plus monolithic and steel parts
– Creating the model in the tendering
phase allowed the team to make
quantity takeoffs and present structural
changes to the client understandably
27
TeklaGlobalBIMAwards2013
Kapelanka 42
28
Nye Gand Videregåend Skole
TeklaGlobalBIMAwards2013
By Costravia
In Stavanger, Norway
– A school building designed to last seismic
activity
– Constravia modeled precast concrete
structures including
columns, beams, hollow-core slabs and
internal walls, and cast in place concrete
foundations & steel parts of frame
– Very tight schedule and simultaneous
work on design and construction on site
29
TeklaGlobalBIMAwards2013
Nye Gand Videregåend Skole
30
SAFI SAP - Sidi Rosia Plant
TeklaGlobalBIMAwards2013
By OCP / JESA / JACOBS France
In Sidi Rosia, Morocco
– Two production units for sulfuric acid, both producing 3,400 tons of acid per day
– Effective design process: The units are designed 80% alike although differently
integrated
– Interoperability crucial: PDMS reference
models of initial process design and
piping were exported into Tekla, and
further exported from Tekla to Tekla
BIMsight and Navisworks
31
TeklaGlobalBIMAwards2013
SAFI SAP - Sidi Rosia Plant
32
TeklaGlobalBIMAwards2013
King Abdulla Sport City
By Six Costruct
In Saudi Arabia
– 60,000 seat stadium with 500 person
Mosque and a minaret plus 8 km asphalted
road and 2 km pedestrian walkways
– BIM used in structural design and detailing
of the frame and foundations, modeling
precast and cast in place concrete
– Drawing and bills of materials
extracted from the Tekla model
33
King Abdulla Sport City
TeklaGlobalBIMAwards2013
34

Tekla Global BIM Awards 2013

  • 1.
    Tekla Global BIMAwards 2013
  • 2.
  • 3.
    Tekla Global BIMAwards Overview First organized in 2009 Competitors are winners of regional Tekla BIM Awards Five categories: – Total BIM – Cast in place – Engineering – Precast – Steel Winners chosen by jury and public vote TeklaGlobalBIMAwards2013 3
  • 4.
    Tekla Global BIMAwards Jury Leading international BIM experts TeklaGlobalBIMAwards2013 John Bacus Product Management Director, Trimble SketchUp Ashwin Mahalingam Assistant Professor, Indian Institute of Technology Madras Richard Ogden Chairman, Buildoffsite Director, acumen7 Risto Räty Executive Vice President, Tekla Corporation General Manager, Trimble Buildings Structures Division Viktor Várkonyi CEO, Graphisoft 4
  • 5.
    Contents Project Company Category PuuvillaShopping Centre Project group of multiple companies Total BIM BB&T Ballpark Wayne Brothers Inc. & Harris Steel Cast in place Kalasatama Fiskari and Fregatti Insinööritoimisto Mäkeläinen Oy Precast Gap Ice-skating Rink Sarl Patrick Millet Steel Tesco Sheringham Pinnacle Engineering Baku Olympic Stadium Tekfen & Sdeng Total BIM Sengenthal Biomass Heat and Max Bögl Total BIM Power Plant Pantin – Terralia Vinci, CBC, BET Le Joncour & Cast in place Atelier d’Architecture Téqui Knislinge Power Plant WSP Bridge & Civil Engineering Cast in place Jepua Waste-to-Energy Plant Wise Group Finland Oy Steel Kapelanka 42 Consolis Polska Precast Nye Gand Videregåend School Constravia Precast SAFI SAP – Sidi Rosia Plant OCP / JESA / JACOBS France Engineering King Abdulla Sports City Six Construct Engineering 5 TeklaGlobalBIMAwards2013
  • 6.
    Puuvilla Shopping Center TeklaGlobalBIMAwards2013 ByPuuvilla Shopping Center project group In Pori, Finland – Mixes 100-year-old and contemporary structures for creating 100,00m2 of retail space – A true product of collaboration: 13 companies teamed up for modeling – BIM used in structural design, precast detailing, steel roof structures and façade elements to architectural, MEP and sprinkler design 6
  • 7.
  • 8.
    BB&T Ballpark TeklaGlobalBIMAwards2013 Concrete andcoordination by Wayne Brothers Inc., Rebar by Harris Steel In Charlotte, USA – 10,000 seat stadium used for baseball games, concerts, festivals and community events – Wayne Brothers modeled cast in place and sitework, and planned pours, tracked progress and coordinated sequences with other trades – Layout managed with points created in Tekla and placed with Trimble Robotic Total Station 8
  • 9.
  • 10.
    Kalasataman Fiskari andFregatti TeklaGlobalBIMAwards2013 By Engineering Office Mäkeläinen Oy In Helsinki, Finland – Two 6-7 story residential building with yard deck – Modeling from conceptual design to construction site – Challenging facade with 30 structure types – Model includes the piled foundations, detailed and reinforced concrete elements, load-bearing structures and thermal insulation and brickwork 10
  • 11.
  • 12.
    Gap Ice-skating Rink TeklaGlobalBIMAwards2013 BySarl Patrick Millet In Gap, France – 1970s ice-skating rink updated to match today´s seismological and other norms – Original timber trusses had to be preserved – Timber and steel structures in the model 12
  • 13.
  • 14.
    Tesco Sheringham TeklaGlobalBIMAwards2013 By Pinnacle InSheringham, UK – Everyday yet bespoke Tesco supermarket with a complex timber roof structure – BIM used for structural design and detailing of foundations and concrete and steel frame, facade, prefabrication, and creating drawings and bills of materials – Thanks to modeling, the client could visualize the complete shopping experience 14
  • 15.
  • 16.
    Baku Olympic Stadium TeklaGlobalBIMAwards2013 ByTekfen Engineering and Sdeng Steel & Structural Detail Engineering In Baku, Azerbaijan – 68,000 seats – Designers working in several countries and limited time demanded lot from communication tools – Team modeled precast, reinforced concrete, steel structures and extracted fabrication drawings for fabrication facility in Turkey – 3D animation of the complex roof installation developed using Tekla 16
  • 17.
  • 18.
    18 Tekla Global BIMAwards 2013 Finalists TeklaGlobalBIMAwards2013
  • 19.
    Sengenthal Biomass Heat andPower Plant TeklaGlobalBIMAwards2013 By Max Bögl In Sengenthal, Germany – Supplies heat from biomass combustion and gasification to the headquarters of Max Bögl – Includes a main hall, carburetor building and a wood chip store – A Max Bögl project from planning to assembly 19
  • 20.
  • 21.
    Pantin - Terralia TeklaGlobalBIMAwards2013 ByVinci, CBC, BET Le Joncour & Atelier d’Architecture Téqui In Paris – Residential cast in place building project with 41 apartments and a canal-side brasserie – The team modeled the concrete frame and planned the pour program – Documents on planning and structures including daily formwork created from the model 21
  • 22.
  • 23.
    Knislinge Power Plant TeklaGlobalBIMAwards2013 ByWSP Bridge & Civil Engineering In Skåne, Sweden – Hydropower plant producing 4GWh – Tricky geometry around the waterway made modeling concrete and reinforcement challenging – WSP modeled parts that supplement the frame, including wood battens, furring, isolation and facade materials, plus extracted drawings from the Tekla model 23
  • 24.
  • 25.
    Jepua Waste-To-Energy Plant TeklaGlobalBIMAwards2013 ByWise Ground Finland Oy In Jepua, Finland – Several buildings including gas processing, reception and 24-meter high boiler buildings – Structural designer Wise and general contractor Fira collaborated extensively – Models of process equipment and structures combined to avoid clashes 25
  • 26.
  • 27.
    Kapelanka 42 TeklaGlobalBIMAwards2013 By ConsolisPolska In Cracow, Poland – 25,000m2 of office space in two buildings – Tekla utilized for designing and detailing the precast concrete elements plus monolithic and steel parts – Creating the model in the tendering phase allowed the team to make quantity takeoffs and present structural changes to the client understandably 27
  • 28.
  • 29.
    Nye Gand VideregåendSkole TeklaGlobalBIMAwards2013 By Costravia In Stavanger, Norway – A school building designed to last seismic activity – Constravia modeled precast concrete structures including columns, beams, hollow-core slabs and internal walls, and cast in place concrete foundations & steel parts of frame – Very tight schedule and simultaneous work on design and construction on site 29
  • 30.
  • 31.
    SAFI SAP -Sidi Rosia Plant TeklaGlobalBIMAwards2013 By OCP / JESA / JACOBS France In Sidi Rosia, Morocco – Two production units for sulfuric acid, both producing 3,400 tons of acid per day – Effective design process: The units are designed 80% alike although differently integrated – Interoperability crucial: PDMS reference models of initial process design and piping were exported into Tekla, and further exported from Tekla to Tekla BIMsight and Navisworks 31
  • 32.
  • 33.
    TeklaGlobalBIMAwards2013 King Abdulla SportCity By Six Costruct In Saudi Arabia – 60,000 seat stadium with 500 person Mosque and a minaret plus 8 km asphalted road and 2 km pedestrian walkways – BIM used in structural design and detailing of the frame and foundations, modeling precast and cast in place concrete – Drawing and bills of materials extracted from the Tekla model 33
  • 34.
    King Abdulla SportCity TeklaGlobalBIMAwards2013 34