IMPORTANCEOF TECHNICAL
REPORT WRITING
Efforts By : -
Mr Manoj Singh
AssistantProfessor
Technical Communication
TECHNICAL REPORT WRITING
Definition:
A Technical Report writing is a specialized, structured way of
writing, where information is presented in a format and
manner that best suits the psychological needs of the
readers & is used to convey the information for technical or
business purpose.
Technical Report Writing is NOT used to :
 Entertain
 Create suspense
WHYTECHNICAL REPORTWRITING??
 Build on existing knowledge
 Propagate the knowledge
 Co-workers/Team members
 Sales/Marketing personnel
 Customers
IMPORTANCEOF TECHNICAL
REPORT WRITING
Engineers perform Technical
Writing to communicate pertinent
information that is needed by
upper management to make
intelligent decisions that will
effect a company’s future.
Decision
ControlProject
Engineer
Detailed
Knowledge
Upper
Management
IMPORTANCEOF
TECHNICAL REPORT WRITING
Many engineers spend between 1/3 and 1/2 of their
work time engaged in Technical Writing.
Example: Inputs
•Proposals
•Regulations
•Manuals
Technical Reports
•Progress reports
•Emails
•Memos
•Procedures
TECHNICAL REPORT
A Technical Report follows a specific layout and
format as specified by the American National
Standards Institute (ANSI).
LAYOUT & DESIGN
Analogy:
Think of the layout and format of
a newspaper. Stock market
information is found in a specific
location in a newspaper (layout), and is
presented in a table format.
Back
Cover
Appendixes
List of Symbols,
Abbreviations,
and Acronyms
References
Results and Discussion
Conclusion
Summary
Introduction
Methods
Assumption,
Procedures
List of Tables
and Figures
Abstract
Table of
Contents
Title Page
Front Cover
LAYOUT&DESIGN
TIPSFORWRITING
•Create an outline of your report before you write it.
•Write the body of the report first. Then write the
front and back matter.
•Have someone proofread your report.
Technical report

Technical report

  • 1.
    IMPORTANCEOF TECHNICAL REPORT WRITING EffortsBy : - Mr Manoj Singh AssistantProfessor Technical Communication
  • 2.
    TECHNICAL REPORT WRITING Definition: ATechnical Report writing is a specialized, structured way of writing, where information is presented in a format and manner that best suits the psychological needs of the readers & is used to convey the information for technical or business purpose. Technical Report Writing is NOT used to :  Entertain  Create suspense
  • 3.
    WHYTECHNICAL REPORTWRITING??  Buildon existing knowledge  Propagate the knowledge  Co-workers/Team members  Sales/Marketing personnel  Customers
  • 4.
    IMPORTANCEOF TECHNICAL REPORT WRITING Engineersperform Technical Writing to communicate pertinent information that is needed by upper management to make intelligent decisions that will effect a company’s future. Decision ControlProject Engineer Detailed Knowledge Upper Management
  • 5.
    IMPORTANCEOF TECHNICAL REPORT WRITING Manyengineers spend between 1/3 and 1/2 of their work time engaged in Technical Writing. Example: Inputs •Proposals •Regulations •Manuals Technical Reports •Progress reports •Emails •Memos •Procedures
  • 6.
    TECHNICAL REPORT A TechnicalReport follows a specific layout and format as specified by the American National Standards Institute (ANSI). LAYOUT & DESIGN Analogy: Think of the layout and format of a newspaper. Stock market information is found in a specific location in a newspaper (layout), and is presented in a table format.
  • 7.
    Back Cover Appendixes List of Symbols, Abbreviations, andAcronyms References Results and Discussion Conclusion Summary Introduction Methods Assumption, Procedures List of Tables and Figures Abstract Table of Contents Title Page Front Cover LAYOUT&DESIGN
  • 8.
    TIPSFORWRITING •Create an outlineof your report before you write it. •Write the body of the report first. Then write the front and back matter. •Have someone proofread your report.