TEAM BASICS
Learning Objective
Participant will be able to –
How to develop TEAM
Types of TEAM
Stages of Development
Decision Making Techniques.
Decision making Model.
Communication methods for the project
Content
 Why TEAM is Required??
 Types of TEAM
 Project TEAM
 Continuous Improvement TEAM
 Virtual TEAM
 Self- Managed TEAM
 Mechanism for TEAM Success
 Decision Making
 Decision Making Techniques
 Communication
 Communication Method
MORE Brain  MORE Thoughts  MORE Ideas  MORE Solution
 Improved Creativity & Innovation
 Factual Approach in Decision Making.
 Involvement of Employees
 Better Control & Work Discipline
 Commitment for timely completion.
 Provide Expertise
“Talent wins Games, but teamwork and Intelligence wins
Championships”.
- Michael Jordan
WHY Team is Required??
Types of teams
Project Team
 Team made for specific purpose, specific task and dissolve after deliverables of
specific task.
 Project Team consists of –
 Project Leader
 Project member
 Project Contributor
 Project Team is formed with cross functional members i.e. across different
departments.
 Contributing to overall project objectives.
 Provide expertise.
 Perform task within the timelines and quality expectations.
 Complete individual deliverables.
Continuous Improvement
What is Continuous Improvement ???
 Continuous Improvement means an ongoing efforts to improve
product, service or process.
 It can achieved through problem solving or improvement in
process.
We require TEAM for continuous improvement.
 Problem Solving Team
 Process Improvement Team
MAKE
THINGS
BETTER
Problem Solving Team
 Cross Functional Team is formed for solve problem
associated with process.
 Follow 7QC problem solving tools.
 Establish ground rules for team.
Define Investigate Solution
Action
Plan
Implement
Check
Effectiveness
Solving Methodology:
Process Improvement Team
 Process Improvement team solve problem associated with process.–
 SIX SIGMA: Improvement in process by reduction in variation in
process.
 LEAN: Improvement in process by reduction of wastes.
Define Investigate Solution Action Plan Implement
Check
Effectiveness
Solving Methodology:
Self Managed Team
 A Self organized small group of people who plan, manage
day to day activities under minimal or no supervision.
HIGHLIGHTS:
 Define its own goals.
 Focus on overall process.
 Control daily activities.
 Complete individual task.
 Create stronger sense of commitment to work efforts.
Virtual Team
Sit Differently, connect Virtual  to achieve Common Goals.
 Use technology for connection.
 Difference between Virtual team & physically Team-
 Absence of verbal and non- verbal cues.
 Limited social context.
 Ability to overcome time and space constraints.
 BENEFITS:
 Good Relationship Skills.
 Clear Roles
 Accountable
Mechanism for TEAM Success..!!!
 EQUIPMENT – Team need meeting space, computer hardware,
software, presentation materials.
 TRAINING –Training for required Tools.
 MANAGEMENT SPONSOR – Sponsor role is vital leadership
function beyond simply launching team. Provide facility to team for
the decision implementation.
How to Develop TEAM ???
STORMING
NORMING
PERFORMING
ADJOURNING
FORMING
1
3
4
5
2
Stages of Development-
FORMING –
 Selection of team based on expertise.
 Member become familiar with each other.
 Clarifies objective and define roles &
responsibilities.
 Define ground rules.
Stages of Development-
STORMING –
Team members finally realize the size of task before think.
Think primarily as an individual and take decision as per
their advantages rather consider impact on other members.
Typical Behaviour shown - Arguments, testing leader’s
authority, self decision
Disagreement & Tension among members.
Interpersonal conflicts
Stages of Development-
NORMING –
 Decision begins to shift their focus from personal concerns
to that of helping the team.
 Start willing to discuss difference of opinion for the risk
assess and might impact to success.
 Cohesive and roles developed.
PERFORMING-
 Team become mature.
 Team member have good understanding of each other’s
strength and weakness.
 Great appreciation of importance of team’s process.
 Significant progress towards achieving its goals.
 High Task & goal orientation.
Stages of Development-
ADJOURNING –
 Team complete their activities as per
timeline.
 Deliverable result of implemented activities.
 Team dissolve after completion of project.
Stages of Development-
Decision Making
 A Decision is a judgement. It is a choice of alternatives.
 It is rarely a choice between Wrong & Right.
 Decision gap between existing situation and desired situation.
 Right decision commit the total organization towards particular
course of actions.
 Decision made by lower management implement the strategic
decision of top management.
“Decision – Making is the selection based on certain criteria from two/more alternatives”.
- George R Terry
Design Making Process
Identifying
Problem
Collection of
Data
Formulation
of Model
Evaluation
of Model
Selecting a
Decision
Follow- up
of Decision
Decision Making Techniques
 Nominal Group Technique (NGT)
 Brainstorming
 Multivoting
 Pareto Analysis
 Fish Bone Diagram
 SWOT Analysis
Nominal Group Technique
 Ideas are written one at a time until all ideas are listed.
 Discussion is permitted only to clarify ideas.
 No criticism is allowed.
 Silently generating ideas in written.
 Discussion each recorded ideas and evaluate.
 Voting individually on priority ideas with group solution being derived
mathematically through rank ordering.
Team
Formation
Start
Discussion
Brainstorm
Ideas
Record
Ideas
Clarify &
Prioritize
Ideas
Brain Storming
Problem  Creative Thinking..!!!!
 A Group technique by which efforts are made to find a conclusion for conclusion
for a specific problem by gathering a list of ideas spontaneously by its members.
 Generate as much as ideas , suspending evaluation until all ideas have been
suggested.
Multivoting
 A group decision making technique used to reduce a long list
of items to a manageable number by means of structured
series of votes.
 Review the list from brainstorming activities.
 Participant vote for ideas.
An Idea..!!!
Reduce a list
Prioritize a list
List Of
Ideas
Pareto Analysis
 Also called as 80- 20 rules.
 We are trying to find 20 % of work
that will generate 80% of result that
doing all works would deliver.
 A formal technique useful where
many possible course of action are
competing for attention.
Fishbone Diagram
 Central problem is visualized as head of the fish
with skeleton divided into branches showing
contributing causes of different parts of the
problem.
 Identify Probable Causes.
 Identify Root causes by verify each cause.
 Identify Communication Challenges
 Prioritize Communication Challenges
SWOT Analysis
 S- Strength – Characteristics which add value to organization.
 W- Weakness – Characteristics which don’t add value to organization.
 O- Opportunities
 T – Threats
 A technique which helps to convert traditional strategies to fresh
perspective by categorize into Strength, Weakness, Opportunities and
Threats.
Communication..!!!
 Communication – Exchange of intended information
by means of Speaking, writing, sharing knowledge,
articles etc.
 Elements of communication –
 Sender
 Receiver
 Message
 Medium
“The Art of Communication is the language of LEADERSHIP”.
- James Humes
Communication Management Plan
 A communication management plan documents how the
project manager manages and controls communication.

 All stakeholder needs must be addressed.
 Communication management plan becomes a part of
project management plan.
Planning
Input
Identify
Stakeholders
& their Needs
Identify
Communicati
on Method
Prepare
Communicati
on Plan
Finalize
Communicati
on Plan
Communication Methods
 Interactive Communication
 Push Communication .
 Pull Communication
Interactive
Communication
 Stakeholders involved in the communication can
respond to each other in real-time.
 Nature of communication is Sensitive.
 These methods of communication are often used in
projects.
 Most Effective way to gain consensus between parties.
 Examples -
 Minutes of meeting
 Face-to-Face meetings,
 Video conferencing,
 Phone calls, and messenger chats.
Push Communication
 Information flow without any feedback from the recipients.
 Can reach large audience.
 Some barrier exist in between communicators.
 Example –
 Email
 Project Status Report
 Notification to stakeholders through Press release.
 Town Hall meeting.
 Corporate Newsletter
 Advertising
Pull Communication
 It is Informal communication.
 It doesn’t affect the work.
 Large audience that needs to access information at their
discretion.
 When need arises, the user can use data / information.
 Examples-
 Websites
 Knowledge – Blogs, Articles.
 Dashboards
Key Points for Communication
 Advance plan for reoccurring meeting.
 Specific Agenda and Purpose
 Agenda shall be known in advance for preparation.
 Keep in mind that all members attend meeting.
 Appoint a Time – Keeper in team for utilize time
Team basics

Team basics

  • 1.
  • 2.
    Learning Objective Participant willbe able to – How to develop TEAM Types of TEAM Stages of Development Decision Making Techniques. Decision making Model. Communication methods for the project
  • 3.
    Content  Why TEAMis Required??  Types of TEAM  Project TEAM  Continuous Improvement TEAM  Virtual TEAM  Self- Managed TEAM  Mechanism for TEAM Success  Decision Making  Decision Making Techniques  Communication  Communication Method
  • 4.
    MORE Brain MORE Thoughts  MORE Ideas  MORE Solution  Improved Creativity & Innovation  Factual Approach in Decision Making.  Involvement of Employees  Better Control & Work Discipline  Commitment for timely completion.  Provide Expertise “Talent wins Games, but teamwork and Intelligence wins Championships”. - Michael Jordan WHY Team is Required??
  • 5.
  • 6.
    Project Team  Teammade for specific purpose, specific task and dissolve after deliverables of specific task.  Project Team consists of –  Project Leader  Project member  Project Contributor  Project Team is formed with cross functional members i.e. across different departments.  Contributing to overall project objectives.  Provide expertise.  Perform task within the timelines and quality expectations.  Complete individual deliverables.
  • 7.
    Continuous Improvement What isContinuous Improvement ???  Continuous Improvement means an ongoing efforts to improve product, service or process.  It can achieved through problem solving or improvement in process. We require TEAM for continuous improvement.  Problem Solving Team  Process Improvement Team MAKE THINGS BETTER
  • 8.
    Problem Solving Team Cross Functional Team is formed for solve problem associated with process.  Follow 7QC problem solving tools.  Establish ground rules for team. Define Investigate Solution Action Plan Implement Check Effectiveness Solving Methodology:
  • 9.
    Process Improvement Team Process Improvement team solve problem associated with process.–  SIX SIGMA: Improvement in process by reduction in variation in process.  LEAN: Improvement in process by reduction of wastes. Define Investigate Solution Action Plan Implement Check Effectiveness Solving Methodology:
  • 10.
    Self Managed Team A Self organized small group of people who plan, manage day to day activities under minimal or no supervision. HIGHLIGHTS:  Define its own goals.  Focus on overall process.  Control daily activities.  Complete individual task.  Create stronger sense of commitment to work efforts.
  • 11.
    Virtual Team Sit Differently,connect Virtual  to achieve Common Goals.  Use technology for connection.  Difference between Virtual team & physically Team-  Absence of verbal and non- verbal cues.  Limited social context.  Ability to overcome time and space constraints.  BENEFITS:  Good Relationship Skills.  Clear Roles  Accountable
  • 12.
    Mechanism for TEAMSuccess..!!!  EQUIPMENT – Team need meeting space, computer hardware, software, presentation materials.  TRAINING –Training for required Tools.  MANAGEMENT SPONSOR – Sponsor role is vital leadership function beyond simply launching team. Provide facility to team for the decision implementation.
  • 13.
    How to DevelopTEAM ??? STORMING NORMING PERFORMING ADJOURNING FORMING 1 3 4 5 2
  • 14.
    Stages of Development- FORMING–  Selection of team based on expertise.  Member become familiar with each other.  Clarifies objective and define roles & responsibilities.  Define ground rules.
  • 15.
    Stages of Development- STORMING– Team members finally realize the size of task before think. Think primarily as an individual and take decision as per their advantages rather consider impact on other members. Typical Behaviour shown - Arguments, testing leader’s authority, self decision Disagreement & Tension among members. Interpersonal conflicts
  • 16.
    Stages of Development- NORMING–  Decision begins to shift their focus from personal concerns to that of helping the team.  Start willing to discuss difference of opinion for the risk assess and might impact to success.  Cohesive and roles developed.
  • 17.
    PERFORMING-  Team becomemature.  Team member have good understanding of each other’s strength and weakness.  Great appreciation of importance of team’s process.  Significant progress towards achieving its goals.  High Task & goal orientation. Stages of Development-
  • 18.
    ADJOURNING –  Teamcomplete their activities as per timeline.  Deliverable result of implemented activities.  Team dissolve after completion of project. Stages of Development-
  • 19.
    Decision Making  ADecision is a judgement. It is a choice of alternatives.  It is rarely a choice between Wrong & Right.  Decision gap between existing situation and desired situation.  Right decision commit the total organization towards particular course of actions.  Decision made by lower management implement the strategic decision of top management. “Decision – Making is the selection based on certain criteria from two/more alternatives”. - George R Terry
  • 20.
    Design Making Process Identifying Problem Collectionof Data Formulation of Model Evaluation of Model Selecting a Decision Follow- up of Decision
  • 21.
    Decision Making Techniques Nominal Group Technique (NGT)  Brainstorming  Multivoting  Pareto Analysis  Fish Bone Diagram  SWOT Analysis
  • 22.
    Nominal Group Technique Ideas are written one at a time until all ideas are listed.  Discussion is permitted only to clarify ideas.  No criticism is allowed.  Silently generating ideas in written.  Discussion each recorded ideas and evaluate.  Voting individually on priority ideas with group solution being derived mathematically through rank ordering. Team Formation Start Discussion Brainstorm Ideas Record Ideas Clarify & Prioritize Ideas
  • 23.
    Brain Storming Problem Creative Thinking..!!!!  A Group technique by which efforts are made to find a conclusion for conclusion for a specific problem by gathering a list of ideas spontaneously by its members.  Generate as much as ideas , suspending evaluation until all ideas have been suggested.
  • 24.
    Multivoting  A groupdecision making technique used to reduce a long list of items to a manageable number by means of structured series of votes.  Review the list from brainstorming activities.  Participant vote for ideas. An Idea..!!! Reduce a list Prioritize a list List Of Ideas
  • 25.
    Pareto Analysis  Alsocalled as 80- 20 rules.  We are trying to find 20 % of work that will generate 80% of result that doing all works would deliver.  A formal technique useful where many possible course of action are competing for attention.
  • 26.
    Fishbone Diagram  Centralproblem is visualized as head of the fish with skeleton divided into branches showing contributing causes of different parts of the problem.  Identify Probable Causes.  Identify Root causes by verify each cause.  Identify Communication Challenges  Prioritize Communication Challenges
  • 27.
    SWOT Analysis  S-Strength – Characteristics which add value to organization.  W- Weakness – Characteristics which don’t add value to organization.  O- Opportunities  T – Threats  A technique which helps to convert traditional strategies to fresh perspective by categorize into Strength, Weakness, Opportunities and Threats.
  • 28.
    Communication..!!!  Communication –Exchange of intended information by means of Speaking, writing, sharing knowledge, articles etc.  Elements of communication –  Sender  Receiver  Message  Medium “The Art of Communication is the language of LEADERSHIP”. - James Humes
  • 29.
    Communication Management Plan A communication management plan documents how the project manager manages and controls communication.   All stakeholder needs must be addressed.  Communication management plan becomes a part of project management plan. Planning Input Identify Stakeholders & their Needs Identify Communicati on Method Prepare Communicati on Plan Finalize Communicati on Plan
  • 30.
    Communication Methods  InteractiveCommunication  Push Communication .  Pull Communication
  • 31.
    Interactive Communication  Stakeholders involvedin the communication can respond to each other in real-time.  Nature of communication is Sensitive.  These methods of communication are often used in projects.  Most Effective way to gain consensus between parties.  Examples -  Minutes of meeting  Face-to-Face meetings,  Video conferencing,  Phone calls, and messenger chats.
  • 32.
    Push Communication  Informationflow without any feedback from the recipients.  Can reach large audience.  Some barrier exist in between communicators.  Example –  Email  Project Status Report  Notification to stakeholders through Press release.  Town Hall meeting.  Corporate Newsletter  Advertising
  • 33.
    Pull Communication  Itis Informal communication.  It doesn’t affect the work.  Large audience that needs to access information at their discretion.  When need arises, the user can use data / information.  Examples-  Websites  Knowledge – Blogs, Articles.  Dashboards
  • 34.
    Key Points forCommunication  Advance plan for reoccurring meeting.  Specific Agenda and Purpose  Agenda shall be known in advance for preparation.  Keep in mind that all members attend meeting.  Appoint a Time – Keeper in team for utilize time

Editor's Notes

  • #5 Team refers to “Together Everyone Achieves More”. Number of people formed a TEAM. More Brain bring more thoughts, more ideas which converts into more solution. More innovation and improved creativity will come up through brainstorming. Involvement of employees show their responsibility and ownership. Better control and work discipline. Completion will be completed timely.
  • #6 There are four types of Team – Project team Continuous Improvement Team Process improvement Team Problem Solving Team Self management Team Virtual Team
  • #7 Project Team is formed for resolution of specific task. ( Customer complaint, Improved task). Project Leader – Who provide leadership, and guide team. Project member –Person who actually execute the assigned task. Project Contributor – Person who help in execution of task by providing suggestion, expert opinion, and judgement. Cross Functional team is formed to capture different phases of activities for the project completion.( Manufacturing – related to process, Engineering – Related to Machines, Quality – related to Quality requirement etc,) Involve expertise from different department contribute completion of project successfully. Roles & Responsibility will be defined more clearly. Individual task completion with quality will be completed timely. Example – Manufacturing, Quality, Procurement, Finance, Engineering, Supply Chain.
  • #8 Continuous improvement means positive growth of improvement. The objective is to make things better. It can be achieved through – Problem solving (Problem received from customer complaint, non –conformance, significant issue arises). Process improvement ( Improvement in process, reduction in rejection, improve technology, etc).
  • #9 Problem solving team is formed with cross functional department. Team from different department provide expertise and valuable knowledge. It helps in smooth resolution. The team follows mainly 7 QC tools for solving problems. Solving methodology of problem solving are as follows: Define problem Investigate cause Find solution Develop an action plan Implement plan Evaluate the effectiveness of action implementation
  • #10 Process improvement team is formed with cross functional department. The objective mainly to improve the process or reduce variation in process. Tools like SIX SIGMA, LEAN methodology is used for process improvement. SIX SIGMA – mainly used for reduction in variation in process. LEAN - Methodology used for reduction in wastes. (7 types of wastes – Transportation, Inventory, Motion of workers, Waiting, Overproduction, Over-processing, Delay). Solving Methodology used for process improvement- Define problem Investigate cause Find solution Develop an action plan Implement plan Evaluate the effectiveness of action implementation.
  • #11 Self manage team – a small group of people who can plan, manage day to day activities under minimal or no supervision. Highlights – Define its own goals. Focus on overall process. Control daily activities. Complete individual task. Create stronger sense of commitment to work efforts
  • #12 Virtual team – small group of people which sit in different location., connect with technology. Role & responsibility are clearly defined. They are accountable for each task which they performed. Perform independently.
  • #13 Team Success – Mechanism are required for team success. It ensure and facilitate for the successful execution and completion of team success. Equipment – Meeting Space, technology, computer hardware software facilitate in improvement. Training – Training for required tools helps in move in particular direction. Management sponsor – Management provide special attention and provide direction to team for resolution.
  • #14 How to develop Team – Here are stages of development of team – building – Forming Storming Norming Performing Adjourning
  • #15 Forming is the first stage of development of team building. Team is formed and identify team members based on expertise. The objective is formed that why team is formed. What is the motto of formation of team. Roles & responsibilities are clearly defined. Identified team meet at meeting hall and introduce each other. Team discussed and form ground rules for the team execution.
  • #16 Storming – It is 2nd stage of development of team building. Team brainstorm and decide action plan. In this phase, individual think as an individual action plan and take decision as per their advantages rather consider impact on other members. It leads to disagreement and tension among members. Trust does not build up among team members. Typical Behaviour are shown by team members - Arguments, testing leader’s authority, self decision.
  • #17 In Norming Stages – Decision begins to shift their focus from personal concerns to that of helping the team. Start willing to discuss difference of opinion for the risk assess and might impact to success. Cohesive and roles developed.
  • #21 Design making process - It is divided into elements as follows: Identify problem – Problem shall be clearly defined. Collection of Data – Data collection is very important for the current status and for the comparison between current and future state. Formulation of Model – Identified model will be used for decision making. Selecting a Decision – Select a decision for the event. Follow up Decision – Check effectiveness of selected decision taken.
  • #23 Nominal Group Technique- Group of people assembled at a point and start discussion on topic. Team brainstorm ideas for the resolution of problem. Record ideas on sticky notes. Collect all ideas and categorize into groups. Voting conducted on ideas and prioritize ideas and make decision for the problem.
  • #24 Brainstorming Convert problem into Creative thinking..!!! Team sit together and think creatively and brought ideas on paper.
  • #25 Multivoting – group decision technique to reduce or prioritize list of ideas by collection of majority of people. Team vote for ideas. Count Votes. Ideas are put in order to number of votes. THAT HOW, IDEAS ARE IDENTIIFIED AND DECISION ARE TAKEN FOR THE PROBLEM.
  • #26 Pareto Analysis is also called as 80-20 rule. 80% of the improvement can be achieve with 20 % efforts. Possible ideas are accumulated and prioritize in number of ideas.
  • #27 Fish bone is also called as Ishikawa Diagram.
  • #32 Within interactive communication, face-to-face meetings are the most effective because they enable you to view the body language and facial expressions of the communicating stakeholders.