South end of The I-35W Bridge North end of The I-35W Bridge
The I-35W Bridge The 10th Avenue Bridge
Long Section
Cross Section
(Deck Slab)
Slab Concrete
(t=3,8cm)
REALIZATION
ORIGINAL DESIGN
Additional Layer
of Concrete
Additional LOAD to
the Steel Structure
Central Barrier
Outside Railings
ADDITIONAL
STATIC LOADS:
+ 512,56 kg โ‰ˆ
+ 6,1 %
โ€ข
โ€ข
โ€ข
โ€ข
โ€ข
โ€ข
โ€ข
โ€ข
โ€ข
โ€ข
โ€ข
ADDITIONAL STATIC LOADS
(at Construction Process):
+ 262.176,40 kg = 262 tons
โ€œThinโ€ 1,25 cm
Gusset Plates
โ€ข
โ€ข
โ€ข
Cracks
DESIGN 1ST REFUBRISHMENT
The bridge, officially designated
"Bridge 9340", was designed by
Sverdrup & Parcel to 1961 by
standard specifications of AASHTO
(American Association of State
Highway Officials).
โ€ข Rennovation &
Reparation of
Structure (1970)
โ€ข Start annual
Inspection (1971)
1961
APPROVAL of MDOT
and US DOT*
Two options of design:
โ€ข 4-Truss System
โ€ข 2-Truss System (cheaper)
MDOT Approved the cheapest
one, using steel of fy 186 MPa
1963
OPERATIONAL
Structure was completed and
open to traffic, during an era
of large-scale projects to
build the Twin Cities freeway
system.
1967
CONSTRUCTION
The construction contracts, worth
in total more than $5.2 million at
the time, were done by HurCon Inc.
and Industrial Construction
Company.
1964
1970-1971
*MDOT = Minessota Departement of Transportation
US DOT = United State Departement of Transportation
DEFECTS
Some of โ€œGussetโ€™s Platesโ€ have
been corroded
1993
2nd REFUBRISHMENT
1970-1971
โ€ข Central Barriers
โ€ข Outside Railings
DEFECTS
โ€ข Cracking was discovered on steel
structureโ€™s plates
โ€ข Structure was drilled out &
reinforced
โ€ข Monthly Inspection (6 months)
Early
2000โ€™s
3rd REFUBRISHMENT
โ€ข Final Rennovation
โ€ข Four (4) lanes of road were
closed due to rennovation
2007
COLLAPSE ACCIDENT
The Accident occurred when
stockage of construction material
(sands, aggregates, cements)
placed alongside with heavy
equipments, without concern
July
2007
*MDOT = Minessota Departement of Transportation
US DOT = United State Departement of Transportation
August 1st 2007, 18:05
The Bridge Collapsed
โ€ข
โ€ข
โ€ข
โ€ข
Containment & Control :
โ€ข Continuous Maintenance
โ€ข Careful Handling of Material
UNSTABLE STRUCTURE
regarding to cracks on
steel plates
Deviation
Cracks on Steel Structures
Initiating Cause
Overload stockage
of material
Steel Structure Collapse
Preventive Safeguards
Structure Re-design & Rework
Loss Event
Structural Defects
(Cracks, etc.)
Mitigative Safeguards
Alternating equipment & sequence of
structure reparation work
Impacts
Safe Reparation Construction
Safely Operating Bridge
โ€ข
โ€ข
โ€ข
โ€ข
Bridge
Collapsed
OR
Fractured
Connections
Fractured
Beam
Fractured
Column / Pier
OR
OR
Overloaded
Structure
Excessive
Equipment
Placement
Excessive
Material
Stockage
AND
Design
Error
Lack of
Mainten-
-ance
Construction
Method Error
Defects of
Structure
โ€ข
โ€ข
โ€ข
Defects of Steel
Structure
Construction
Method Error
Design Error
Potential
Causes
Potential
Outcomes
BEFORE AFTER
Hazard:
Normal Operating Structural-
Defected Bridge
Structural
Failure
Traffic Jam
Human
Casualties
Tb Naufal Dzaki_2306195871_The I 35W Bridge Collapse.pptx
Tb Naufal Dzaki_2306195871_The I 35W Bridge Collapse.pptx
Tb Naufal Dzaki_2306195871_The I 35W Bridge Collapse.pptx
Tb Naufal Dzaki_2306195871_The I 35W Bridge Collapse.pptx

More Related Content

Similar to Tb Naufal Dzaki_2306195871_The I 35W Bridge Collapse.pptx

ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONatchitect and design
ย 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge ReportYvonne Chin
ย 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridgejupallipavan2911
ย 
Tony
TonyTony
TonyTONY ROSE
ย 
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)AISC/NSBA
ย 
Introduction to Bridges.pdf
Introduction to Bridges.pdfIntroduction to Bridges.pdf
Introduction to Bridges.pdfkarthik sampath
ย 
1926 tunneling safety 2015
1926 tunneling safety 20151926 tunneling safety 2015
1926 tunneling safety 2015John Newquist
ย 
highway engineering study materials.pptx
highway engineering study materials.pptxhighway engineering study materials.pptx
highway engineering study materials.pptxkiruba684732
ย 
Bridge Alternate Type Study - Railroad Grade Separation (04-17-14)
Bridge Alternate Type Study - Railroad Grade Separation (04-17-14)Bridge Alternate Type Study - Railroad Grade Separation (04-17-14)
Bridge Alternate Type Study - Railroad Grade Separation (04-17-14)dgonano
ย 
1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs632k18BilalAhmad
ย 
SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)dgonano
ย 
Details of RCC Building
Details of RCC BuildingDetails of RCC Building
Details of RCC Buildingppt_master
ย 
Structural design of tunnel lining
Structural design of tunnel liningStructural design of tunnel lining
Structural design of tunnel liningMahesh Raj Bhatt
ย 
Introduction to Hydraulics "Engineering is your job"
Introduction to Hydraulics "Engineering is your job"Introduction to Hydraulics "Engineering is your job"
Introduction to Hydraulics "Engineering is your job"Dr. Ezzat Elsayed Gomaa
ย 
IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006Manuj Ray
ย 
Bridge Alternate Type Study - Stream Crossing (09-04-12)v2
Bridge Alternate Type Study - Stream Crossing (09-04-12)v2Bridge Alternate Type Study - Stream Crossing (09-04-12)v2
Bridge Alternate Type Study - Stream Crossing (09-04-12)v2dgonano
ย 
Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...mecocca5
ย 
CROSTI_IABMAS-ITALY
CROSTI_IABMAS-ITALYCROSTI_IABMAS-ITALY
CROSTI_IABMAS-ITALYStroNGER2012
ย 
Unit 1 Class Notes-2019 pat..pptx
Unit 1 Class Notes-2019 pat..pptxUnit 1 Class Notes-2019 pat..pptx
Unit 1 Class Notes-2019 pat..pptxRESHMAFEGADE
ย 

Similar to Tb Naufal Dzaki_2306195871_The I 35W Bridge Collapse.pptx (20)

ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ย 
Truss Bridge Report
Truss Bridge ReportTruss Bridge Report
Truss Bridge Report
ย 
Design of Foot Over Bridge
Design of Foot Over BridgeDesign of Foot Over Bridge
Design of Foot Over Bridge
ย 
Tony
TonyTony
Tony
ย 
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
ย 
Introduction to Bridges.pdf
Introduction to Bridges.pdfIntroduction to Bridges.pdf
Introduction to Bridges.pdf
ย 
1926 tunneling safety 2015
1926 tunneling safety 20151926 tunneling safety 2015
1926 tunneling safety 2015
ย 
highway engineering study materials.pptx
highway engineering study materials.pptxhighway engineering study materials.pptx
highway engineering study materials.pptx
ย 
Bridge Alternate Type Study - Railroad Grade Separation (04-17-14)
Bridge Alternate Type Study - Railroad Grade Separation (04-17-14)Bridge Alternate Type Study - Railroad Grade Separation (04-17-14)
Bridge Alternate Type Study - Railroad Grade Separation (04-17-14)
ย 
1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs1-Basics of Prestressed Concrete.pdforgs
1-Basics of Prestressed Concrete.pdforgs
ย 
SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)SynTerra / US Bridge Presentation (10 24 11)
SynTerra / US Bridge Presentation (10 24 11)
ย 
Details of RCC Building
Details of RCC BuildingDetails of RCC Building
Details of RCC Building
ย 
Structural design of tunnel lining
Structural design of tunnel liningStructural design of tunnel lining
Structural design of tunnel lining
ย 
Introduction to Hydraulics "Engineering is your job"
Introduction to Hydraulics "Engineering is your job"Introduction to Hydraulics "Engineering is your job"
Introduction to Hydraulics "Engineering is your job"
ย 
IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006
ย 
Bridge Alternate Type Study - Stream Crossing (09-04-12)v2
Bridge Alternate Type Study - Stream Crossing (09-04-12)v2Bridge Alternate Type Study - Stream Crossing (09-04-12)v2
Bridge Alternate Type Study - Stream Crossing (09-04-12)v2
ย 
Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...
ย 
CROSTI_IABMAS-ITALY
CROSTI_IABMAS-ITALYCROSTI_IABMAS-ITALY
CROSTI_IABMAS-ITALY
ย 
Unit 1 Class Notes-2019 pat..pptx
Unit 1 Class Notes-2019 pat..pptxUnit 1 Class Notes-2019 pat..pptx
Unit 1 Class Notes-2019 pat..pptx
ย 
Rcc
RccRcc
Rcc
ย 

Recently uploaded

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
ย 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
ย 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .DerechoLaboralIndivi
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Call Girls in Nagpur High Profile
ย 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
ย 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7Call Girls in Nagpur High Profile Call Girls
ย 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
ย 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
ย 

Recently uploaded (20)

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
ย 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
ย 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
ย 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth โŸŸ 6297143586 โŸŸ Call Me For Genuine Se...
ย 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
ย 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
ย 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
ย 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
ย 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
ย 

Tb Naufal Dzaki_2306195871_The I 35W Bridge Collapse.pptx

  • 1.
  • 2.
  • 3.
  • 4. South end of The I-35W Bridge North end of The I-35W Bridge The I-35W Bridge The 10th Avenue Bridge
  • 5.
  • 7. Cross Section (Deck Slab) Slab Concrete (t=3,8cm)
  • 9.
  • 10. Additional Layer of Concrete Additional LOAD to the Steel Structure
  • 11. Central Barrier Outside Railings ADDITIONAL STATIC LOADS: + 512,56 kg โ‰ˆ + 6,1 % โ€ข โ€ข โ€ข โ€ข โ€ข โ€ข โ€ข โ€ข โ€ข โ€ข โ€ข ADDITIONAL STATIC LOADS (at Construction Process): + 262.176,40 kg = 262 tons
  • 12. โ€œThinโ€ 1,25 cm Gusset Plates โ€ข โ€ข โ€ข Cracks
  • 13.
  • 14. DESIGN 1ST REFUBRISHMENT The bridge, officially designated "Bridge 9340", was designed by Sverdrup & Parcel to 1961 by standard specifications of AASHTO (American Association of State Highway Officials). โ€ข Rennovation & Reparation of Structure (1970) โ€ข Start annual Inspection (1971) 1961 APPROVAL of MDOT and US DOT* Two options of design: โ€ข 4-Truss System โ€ข 2-Truss System (cheaper) MDOT Approved the cheapest one, using steel of fy 186 MPa 1963 OPERATIONAL Structure was completed and open to traffic, during an era of large-scale projects to build the Twin Cities freeway system. 1967 CONSTRUCTION The construction contracts, worth in total more than $5.2 million at the time, were done by HurCon Inc. and Industrial Construction Company. 1964 1970-1971 *MDOT = Minessota Departement of Transportation US DOT = United State Departement of Transportation DEFECTS Some of โ€œGussetโ€™s Platesโ€ have been corroded 1993 2nd REFUBRISHMENT 1970-1971 โ€ข Central Barriers โ€ข Outside Railings
  • 15. DEFECTS โ€ข Cracking was discovered on steel structureโ€™s plates โ€ข Structure was drilled out & reinforced โ€ข Monthly Inspection (6 months) Early 2000โ€™s 3rd REFUBRISHMENT โ€ข Final Rennovation โ€ข Four (4) lanes of road were closed due to rennovation 2007 COLLAPSE ACCIDENT The Accident occurred when stockage of construction material (sands, aggregates, cements) placed alongside with heavy equipments, without concern July 2007 *MDOT = Minessota Departement of Transportation US DOT = United State Departement of Transportation August 1st 2007, 18:05 The Bridge Collapsed
  • 17. Containment & Control : โ€ข Continuous Maintenance โ€ข Careful Handling of Material UNSTABLE STRUCTURE regarding to cracks on steel plates Deviation Cracks on Steel Structures Initiating Cause Overload stockage of material Steel Structure Collapse Preventive Safeguards Structure Re-design & Rework Loss Event Structural Defects (Cracks, etc.) Mitigative Safeguards Alternating equipment & sequence of structure reparation work Impacts Safe Reparation Construction Safely Operating Bridge
  • 18.
  • 21.
  • 23. Defects of Steel Structure Construction Method Error Design Error Potential Causes Potential Outcomes BEFORE AFTER Hazard: Normal Operating Structural- Defected Bridge Structural Failure Traffic Jam Human Casualties