The document is a scorecard and presentation for the Swindon Distribution Centre that outlines key performance indicators (KPIs) and targets to measure success. It includes 4 sections - People, Customer, Performance, and Finance - that contain metrics such as accidents, sick absence, customer service levels, and staff costs. Charts in the presentation show the centre's actual performance against targets for each period and year-to-date, identifying underperformance through color coding. The scorecard is intended to help review performance and identify ways to improve efficiency and quality of services.
The document is a scorecard for Swindon Walk Bundling Centre summarizing their performance against key performance indicators (KPIs) for 2012/2013. It shows that in the area of people, the centre achieved their target of zero lost time accidents by implementing proactive safety management practices like weekly safety audits, safety walk rounds, and daily safety huddles to raise awareness and remove hazards before accidents occurred. Their sick absence rate was also lower than the previous year.
Process Flow Chart of Garments Manufacturing | Sequence of Garments Production Process/ Process Flow Chart of Garments Manufacturing | Sequence of Garments Production Process/ Knit Garments factory
Garments Manufacturing Flow chart
How to make garments ?
RMG Flow Chart
Overview of Lean and in Supply chain management and Warehouse distribution, identifying the value and NVA steps, streamlining the supply-distribution network to reduce warehouse storage, inventory and lead time
The document presents recommendations from a review of Abbott's Hong Kong distribution processes, including taking orders, order processing, and warehouse operations, with the goals of improving customer service through reduced order cycle times and better distribution of Abbott products through incorporation of technology. It identifies strengths of the current operation and provides recommendations to reduce order cycle times through staggered shifts and extending sales hours, as well as other process improvements for field sales, office administration, and warehouse operations.
The document describes the steps to construct a value stream map (VSM). It involves defining the current state map by gathering information on physical and information flows, cycle times, bottlenecks and defects. The future state map is then created by mapping an improved process and an implementation plan is made to achieve this. Key steps include identifying the product family, start/end points, gathering data on times, flows, inspections and linking this to create a current state map with production lead times. Future state suggestions aim to reduce changeovers and level production.
Project business Case :
PDI is package pickup and delivery company which OUTSOURCES its ground operations to a third party
Inefficiency in processes and miscommunication at PDI -> rebates and idle time costs
Gross margin needs to be improved to sustain operations and for growth in future
Problem Statement :
Identify causes behind current inefficiencies (rebate and idle cost) impacting gross margin.
The document discusses operations management concerns surrounding inward goods receipt at Gilmours. It identifies issues such as suppliers providing incorrect order numbers, trucks arriving at unintended times, products not matching purchase orders, and scanning devices freezing. Recommendations are provided to address these issues, including automating booking procedures, monitoring arrival times, improving maintenance of scanning devices, and exchanging staff between branches to share best practices. Numerical data shows the Mt Roskill branch has lower pallet volumes and space utilization per worker compared to the Manukau branch.
The document is a scorecard for Swindon Walk Bundling Centre summarizing their performance against key performance indicators (KPIs) for 2012/2013. It shows that in the area of people, the centre achieved their target of zero lost time accidents by implementing proactive safety management practices like weekly safety audits, safety walk rounds, and daily safety huddles to raise awareness and remove hazards before accidents occurred. Their sick absence rate was also lower than the previous year.
Process Flow Chart of Garments Manufacturing | Sequence of Garments Production Process/ Process Flow Chart of Garments Manufacturing | Sequence of Garments Production Process/ Knit Garments factory
Garments Manufacturing Flow chart
How to make garments ?
RMG Flow Chart
Overview of Lean and in Supply chain management and Warehouse distribution, identifying the value and NVA steps, streamlining the supply-distribution network to reduce warehouse storage, inventory and lead time
The document presents recommendations from a review of Abbott's Hong Kong distribution processes, including taking orders, order processing, and warehouse operations, with the goals of improving customer service through reduced order cycle times and better distribution of Abbott products through incorporation of technology. It identifies strengths of the current operation and provides recommendations to reduce order cycle times through staggered shifts and extending sales hours, as well as other process improvements for field sales, office administration, and warehouse operations.
The document describes the steps to construct a value stream map (VSM). It involves defining the current state map by gathering information on physical and information flows, cycle times, bottlenecks and defects. The future state map is then created by mapping an improved process and an implementation plan is made to achieve this. Key steps include identifying the product family, start/end points, gathering data on times, flows, inspections and linking this to create a current state map with production lead times. Future state suggestions aim to reduce changeovers and level production.
Project business Case :
PDI is package pickup and delivery company which OUTSOURCES its ground operations to a third party
Inefficiency in processes and miscommunication at PDI -> rebates and idle time costs
Gross margin needs to be improved to sustain operations and for growth in future
Problem Statement :
Identify causes behind current inefficiencies (rebate and idle cost) impacting gross margin.
The document discusses operations management concerns surrounding inward goods receipt at Gilmours. It identifies issues such as suppliers providing incorrect order numbers, trucks arriving at unintended times, products not matching purchase orders, and scanning devices freezing. Recommendations are provided to address these issues, including automating booking procedures, monitoring arrival times, improving maintenance of scanning devices, and exchanging staff between branches to share best practices. Numerical data shows the Mt Roskill branch has lower pallet volumes and space utilization per worker compared to the Manukau branch.
The document provides a summary report from the Stores Manager at Suez Canal Container Terminal covering the period from November 2014 to December 2015. It discusses achievements in warehousing and inventory management, including implementing 5S practices, improving data quality and analysis through new reporting and serial tracking, and various inventory optimization projects. People and performance management initiatives included toolkeeper and storekeeper assistant rotation and shifts swapping. Key performance indicators showed improvements in areas like auctions/requests for quotes held, critical spare part availability, and reduced air shipping. The report demonstrates efforts to enhance operations and processes at the stores department.
This document provides an overview of Mahindra & Mahindra's Transport Solutions Group (TSG) and its operations. TSG offers supply chain and logistics solutions across various industries, with a network of over 245 crores in annual turnover. The document highlights TSG's business model, key clients and sectors served, operational strategies and case studies of TSG's work with companies like Mahindra & Mahindra, Ashok Leyland, Tata Chemicals, and DHL.
This document discusses networking and warehousing concepts for a course. It provides an overview of topics to be covered, including basic network concepts, supporting warehousing methods, order profiles, layouts, and case studies. Specific retailers like Sainsbury's and Tesco will be examined through case studies. Key issues in network planning and different network structures for grocery retailers are also summarized.
Sachin Kokare has over 14 years of experience in logistics and supply chain management. He currently works as an Assistant Manager of Logistics at GEA Ecoflex India Pvt. Ltd. Previously he has worked for companies like Seco Tools and Emdet Engineers in logistics roles. He has expertise in areas like material management, inventory management, audits, and implementing SAP modules. He holds an MBA degree and professional certifications in import-export procedures and logistics management.
This document discusses establishing a distribution network to provide warehousing and logistics services. It outlines customer expectations of short-term cross docking and labeling services and long-term cost reduction and optimized networks. The scope of operations includes warehouse management, distribution management, and customer care. Key activities are described for warehouse operations, transportation management, and order fulfillment. Recommendations are provided for site selection, network design, warehouse layout and processes, IT systems, performance metrics, and commercial pricing.
The document provides a curriculum vitae for Desigan Pillay, outlining his personal details, areas of expertise, education history, and employment history working in cargo operations, logistics, production planning, and security roles in South Africa and the UK over the past 20 years. It also lists software skills, qualifications, and references.
Value stream mapping is a tool that visually maps the flow of material and information through a production process from raw materials to the customer. It is used to understand sources of waste, highlight decision points, and blueprint improvements. The process involves mapping the current state, then drawing a future state map with proposed changes to eliminate waste. Key steps are selecting a product family, mapping the current state flow including process data, then creating a future state map and work plan.
Application of lean kaizen to drilling services department in design and qual...Abdulkadir Tekin
KAIZEN methodology is the most powerful tool in designing/redesigning a company or department.
Lean kaizen can be apply any organization so time to renew yours.
The document outlines a Six Sigma project to address high shorted percentages at a cable manufacturing company. It defines the problem as shorted percentages being over 2% for the past two months instead of the target of 1.3%. The project goals are to decrease the shorted percentage to the target and avoid business losses. Key steps include defining CTQs, collecting data on shorted drums, analyzing potential causes using hypothesis testing and Ishikawa diagrams, and improving and controlling the process.
This document provides an overview of warehousing concepts including:
1) The need for warehouses to balance supply and demand and facilitate distribution.
2) Key considerations for warehouse setup such as site selection, management processes, and typical material flow.
3) The general workflow within warehouses including receipt of goods, putaway, storage, order picking, packing and dispatch.
4) Different types of material flows like "U flow" where receipt and dispatch are located at the same end to optimize dock resources.
This document outlines the scope of work and key performance indicators (KPIs) for several logistics service providers. It describes tasks like warehouse management, transportation of goods from distribution centers to stores, and home deliveries. All companies listed have KPI targets of 100% for timely deliveries, accurate documentation/reporting, vehicle cleanliness and safety, and other metrics.
Mohammed Bawazeer is seeking a career in manufacturing, logistics, or people management. He has over 20 years of experience in operations management, logistics, project management, and quality auditing. He holds an MBA and a bachelor's degree in mechanical engineering, and is a certified quality management auditor.
The document provides highlights about warehouses and distribution centers in Bangalore and Hyderabad. The Bangalore warehouse is 50,000 square feet and processes 1500-2000 boxes daily. It offers delivery within Bangalore city within 4-6 hours. The Hyderabad distribution center is 84,000 square feet and processes 2000 boxes daily. It has features like barcoding, truck parking, and insulation. It also discusses logistics solutions for Café Coffee Day and TI Cycles distribution networks that allow for consolidated shipping and on-time deliveries.
Service revamp lean six sigma black belt projectSumit K Jha
Project- Service revamp
Type- Lean Six Sigma Black Belt Project
Outline- To improve the entire process of getting purchase orders, purchasing, manufacturing, warehousing and installation
Tools/Framework- Six Sigma concepts such as SIPOC, fish bone analysis, control charts and hypothesis testing; statistical tools, Microsoft Dynamic AX
Role- Project manager
Outcome- The successful completion of the project yielded in cost savings of INR 1.61 crores
The CV summarizes Thea De Villiers' work experience spanning from 1997 to present. She has 20 years of experience in logistics and supply chain operations management. Her roles have included process analysis, customer relationship management, cycle counting management, and operations controller roles. She has worked for several logistics and automotive companies managing distribution centers, implementing lean practices, and ensuring adherence to processes and procedures.
Some of the case studies of our implementation as Lean, TQM, TPM, Six Sigma consultants in sites across India, Sri Lanka, Dubai, Saudi Arabia.
Case 1 – Industry: Material Handling equipment Manufacturing
Business Case : Not able to meet Customer demand on delivery time, due to constraint in fabrication. This resulted in adopting build to stock policy which added to inventory, last minute design corrections and rework costs
Lead times are critical to managing inventory levels and supply chains effectively. Total supply lead time involves both internal and external times from deciding to order to an item being available. Analyzing individual item lead times and their variability is important to understand where improvements can be made. Reducing lead time variability is more impactful than just reducing lead times. Collaboration both internally and with suppliers is needed to achieve fixed, known, and reliable lead times. Unclear or unmeasured lead times can lead to excessive inventory levels and other issues.
Best Practices of Inventory & Warehouse Management at CAIRN INDIA LTDHari Shankar
Here are the key points about recent trends in the oil and gas industry:
- The industry is consolidating, with large oil companies acquiring smaller competitors to gain economies of scale. This increases barriers to entry for new companies.
- Oil production is shifting from the Middle East to other regions like North America, Africa, and Latin America due to new extraction technologies unlocking previously inaccessible reserves.
- Renewable energy is gaining ground, posing a long-term threat to fossil fuels. However, oil and gas will still be needed for decades to fuel industries like transportation and manufacturing.
- Energy companies are focusing more on integrated operations across the entire supply chain from production to refining to distribution to boost efficiencies and margins.
The document describes a case study about an employee, Mr. Ockwell, who had an accident at work. It provides context about the accident and outlines the steps the manager took to investigate it. These include sealing off the accident area, taking photos/sketches, reporting it on the ERICA system within 24 hours, establishing the root cause within 48 hours using a Root Cause Analysis form, and interviewing witnesses immediately. The manager used evidence like witness statements and safe operating procedures to determine that the root cause was Mr. Ockwell pulling a pallet truck instead of pushing it as he had been trained.
La Ley de Dependencia de 2006 define la dependencia como necesitar ayuda importante de otra persona para realizar actividades básicas de la vida diaria. La autonomía personal es la capacidad de tomar decisiones por uno mismo. La dependencia no es lo mismo que discapacidad, ya que una persona con discapacidad puede no necesitar ayuda. La ley provee servicios como ayuda a domicilio, centros de día y residencias para personas declaradas dependientes que sean españoles y residan en España. Las prestaciones pueden ser modificadas si cambia la situación de la persona.
The document provides a summary report from the Stores Manager at Suez Canal Container Terminal covering the period from November 2014 to December 2015. It discusses achievements in warehousing and inventory management, including implementing 5S practices, improving data quality and analysis through new reporting and serial tracking, and various inventory optimization projects. People and performance management initiatives included toolkeeper and storekeeper assistant rotation and shifts swapping. Key performance indicators showed improvements in areas like auctions/requests for quotes held, critical spare part availability, and reduced air shipping. The report demonstrates efforts to enhance operations and processes at the stores department.
This document provides an overview of Mahindra & Mahindra's Transport Solutions Group (TSG) and its operations. TSG offers supply chain and logistics solutions across various industries, with a network of over 245 crores in annual turnover. The document highlights TSG's business model, key clients and sectors served, operational strategies and case studies of TSG's work with companies like Mahindra & Mahindra, Ashok Leyland, Tata Chemicals, and DHL.
This document discusses networking and warehousing concepts for a course. It provides an overview of topics to be covered, including basic network concepts, supporting warehousing methods, order profiles, layouts, and case studies. Specific retailers like Sainsbury's and Tesco will be examined through case studies. Key issues in network planning and different network structures for grocery retailers are also summarized.
Sachin Kokare has over 14 years of experience in logistics and supply chain management. He currently works as an Assistant Manager of Logistics at GEA Ecoflex India Pvt. Ltd. Previously he has worked for companies like Seco Tools and Emdet Engineers in logistics roles. He has expertise in areas like material management, inventory management, audits, and implementing SAP modules. He holds an MBA degree and professional certifications in import-export procedures and logistics management.
This document discusses establishing a distribution network to provide warehousing and logistics services. It outlines customer expectations of short-term cross docking and labeling services and long-term cost reduction and optimized networks. The scope of operations includes warehouse management, distribution management, and customer care. Key activities are described for warehouse operations, transportation management, and order fulfillment. Recommendations are provided for site selection, network design, warehouse layout and processes, IT systems, performance metrics, and commercial pricing.
The document provides a curriculum vitae for Desigan Pillay, outlining his personal details, areas of expertise, education history, and employment history working in cargo operations, logistics, production planning, and security roles in South Africa and the UK over the past 20 years. It also lists software skills, qualifications, and references.
Value stream mapping is a tool that visually maps the flow of material and information through a production process from raw materials to the customer. It is used to understand sources of waste, highlight decision points, and blueprint improvements. The process involves mapping the current state, then drawing a future state map with proposed changes to eliminate waste. Key steps are selecting a product family, mapping the current state flow including process data, then creating a future state map and work plan.
Application of lean kaizen to drilling services department in design and qual...Abdulkadir Tekin
KAIZEN methodology is the most powerful tool in designing/redesigning a company or department.
Lean kaizen can be apply any organization so time to renew yours.
The document outlines a Six Sigma project to address high shorted percentages at a cable manufacturing company. It defines the problem as shorted percentages being over 2% for the past two months instead of the target of 1.3%. The project goals are to decrease the shorted percentage to the target and avoid business losses. Key steps include defining CTQs, collecting data on shorted drums, analyzing potential causes using hypothesis testing and Ishikawa diagrams, and improving and controlling the process.
This document provides an overview of warehousing concepts including:
1) The need for warehouses to balance supply and demand and facilitate distribution.
2) Key considerations for warehouse setup such as site selection, management processes, and typical material flow.
3) The general workflow within warehouses including receipt of goods, putaway, storage, order picking, packing and dispatch.
4) Different types of material flows like "U flow" where receipt and dispatch are located at the same end to optimize dock resources.
This document outlines the scope of work and key performance indicators (KPIs) for several logistics service providers. It describes tasks like warehouse management, transportation of goods from distribution centers to stores, and home deliveries. All companies listed have KPI targets of 100% for timely deliveries, accurate documentation/reporting, vehicle cleanliness and safety, and other metrics.
Mohammed Bawazeer is seeking a career in manufacturing, logistics, or people management. He has over 20 years of experience in operations management, logistics, project management, and quality auditing. He holds an MBA and a bachelor's degree in mechanical engineering, and is a certified quality management auditor.
The document provides highlights about warehouses and distribution centers in Bangalore and Hyderabad. The Bangalore warehouse is 50,000 square feet and processes 1500-2000 boxes daily. It offers delivery within Bangalore city within 4-6 hours. The Hyderabad distribution center is 84,000 square feet and processes 2000 boxes daily. It has features like barcoding, truck parking, and insulation. It also discusses logistics solutions for Café Coffee Day and TI Cycles distribution networks that allow for consolidated shipping and on-time deliveries.
Service revamp lean six sigma black belt projectSumit K Jha
Project- Service revamp
Type- Lean Six Sigma Black Belt Project
Outline- To improve the entire process of getting purchase orders, purchasing, manufacturing, warehousing and installation
Tools/Framework- Six Sigma concepts such as SIPOC, fish bone analysis, control charts and hypothesis testing; statistical tools, Microsoft Dynamic AX
Role- Project manager
Outcome- The successful completion of the project yielded in cost savings of INR 1.61 crores
The CV summarizes Thea De Villiers' work experience spanning from 1997 to present. She has 20 years of experience in logistics and supply chain operations management. Her roles have included process analysis, customer relationship management, cycle counting management, and operations controller roles. She has worked for several logistics and automotive companies managing distribution centers, implementing lean practices, and ensuring adherence to processes and procedures.
Some of the case studies of our implementation as Lean, TQM, TPM, Six Sigma consultants in sites across India, Sri Lanka, Dubai, Saudi Arabia.
Case 1 – Industry: Material Handling equipment Manufacturing
Business Case : Not able to meet Customer demand on delivery time, due to constraint in fabrication. This resulted in adopting build to stock policy which added to inventory, last minute design corrections and rework costs
Lead times are critical to managing inventory levels and supply chains effectively. Total supply lead time involves both internal and external times from deciding to order to an item being available. Analyzing individual item lead times and their variability is important to understand where improvements can be made. Reducing lead time variability is more impactful than just reducing lead times. Collaboration both internally and with suppliers is needed to achieve fixed, known, and reliable lead times. Unclear or unmeasured lead times can lead to excessive inventory levels and other issues.
Best Practices of Inventory & Warehouse Management at CAIRN INDIA LTDHari Shankar
Here are the key points about recent trends in the oil and gas industry:
- The industry is consolidating, with large oil companies acquiring smaller competitors to gain economies of scale. This increases barriers to entry for new companies.
- Oil production is shifting from the Middle East to other regions like North America, Africa, and Latin America due to new extraction technologies unlocking previously inaccessible reserves.
- Renewable energy is gaining ground, posing a long-term threat to fossil fuels. However, oil and gas will still be needed for decades to fuel industries like transportation and manufacturing.
- Energy companies are focusing more on integrated operations across the entire supply chain from production to refining to distribution to boost efficiencies and margins.
The document describes a case study about an employee, Mr. Ockwell, who had an accident at work. It provides context about the accident and outlines the steps the manager took to investigate it. These include sealing off the accident area, taking photos/sketches, reporting it on the ERICA system within 24 hours, establishing the root cause within 48 hours using a Root Cause Analysis form, and interviewing witnesses immediately. The manager used evidence like witness statements and safe operating procedures to determine that the root cause was Mr. Ockwell pulling a pallet truck instead of pushing it as he had been trained.
La Ley de Dependencia de 2006 define la dependencia como necesitar ayuda importante de otra persona para realizar actividades básicas de la vida diaria. La autonomía personal es la capacidad de tomar decisiones por uno mismo. La dependencia no es lo mismo que discapacidad, ya que una persona con discapacidad puede no necesitar ayuda. La ley provee servicios como ayuda a domicilio, centros de día y residencias para personas declaradas dependientes que sean españoles y residan en España. Las prestaciones pueden ser modificadas si cambia la situación de la persona.
The document discusses improving workplace organization at a mail processing facility through a 7 step model area approach. It begins with initial cleaning using 5S principles to organize the workstation. Measurement found average productivity increased by 250 items per work hour after implementing 5S. Further steps involve analyzing processing tasks to identify difficult motions, standardizing work procedures, and establishing just-in-time parts supply to optimize the workflow. The overall goal is to continuously enhance productivity by reducing waste and improving ergonomics through employee involvement in transformation of the model area.
El documento describe varios modelos y técnicas de planificación de la producción como la planificación agregada de la producción, el plan maestro de producción, la planificación y control de inventarios, los sistemas MRP I, JIT y MRP II. Explica que la planificación permite adecuar la oferta y la demanda a corto y medio plazo considerando factores como la capacidad, los inventarios y la optimización de márgenes. También resume las técnicas más utilizadas para la gestión de inventarios como la cantidad económica
Logistics WCM Presentation Final - Converted (2)Ashley Smith
The document discusses improving logistics processes at a mail centre through implementing World Class techniques. It identifies key areas of waste and inefficiency through cost deployment analysis, including long cycle times for reach trucks and time lost to transportation between areas. The logistics team will take a 3G approach to analyze current processes, identify issues like double handling of materials and downtime, and implement steps like rearranging internal logistics and standardizing work to reduce waste and meet productivity targets.
Este documento presenta una carta de servicios de Yellow19o, una agencia de publicidad y marketing. Describe los servicios que ofrece la agencia, como desarrollo de conceptos creativos para campañas de comunicación aplicables a diferentes medios. También describe los diferenciales de la agencia, como ofrecer soluciones integrales de creatividad, producción y contenido. Finalmente, detalla los servicios específicos que ofrece la agencia en áreas como publicidad, producción audiovisual, producción de eventos y consultoría.
Este documento explora cómo la estabilidad en la planificación de producción puede apoyar los sistemas Lean mediante la eliminación de residuos como inventario innecesario y sobreproducción. Propone el uso del Perfil de Requisitos Flexible (FRP) para mitigar cambios frecuentes en los planes de producción al tiempo que mantiene flexibilidad. Presenta un modelo matemático de planificación agregada integrado con FRP y muestra que puede reducir inventarios y niveles de producción bajos/altos en comparación con planes de producción congel
El mrp i (material requierement planning)Hector Manuel
El documento describe los sistemas MRP I y MRP II. MRP I se utiliza para planificar las necesidades de materiales y gestionar inventarios mediante la anticipación de las necesidades futuras. MRP II es un sistema más avanzado que planifica todos los recursos de producción, incluida la capacidad de mano de obra y maquinaria, para garantizar la eficiencia y cumplimiento de los objetivos de producción. Ambos sistemas buscan mejorar la satisfacción del cliente y reducir costos a través de una planificación anticipada de la producción y los recursos.
El documento describe el sistema MPR (Material Requirements Planning) que planea las adquisiciones de materiales necesarios para satisfacer la demanda de producción. El sistema calcula las cantidades de productos terminados, componentes y materias primas requeridas basado en el plan de producción y parámetros como tiempos y capacidades. El objetivo es satisfacer al cliente de manera eficiente minimizando costos e inventarios.
Este documento describe el proceso de planificación de la oferta y la demanda (S&OP). El proceso implica revisar pronósticos de demanda, planificar la demanda y la oferta teniendo en cuenta las restricciones de capacidad, realizar reuniones para alinear la oferta y la demanda y establecer un plan de acción único para la compañía.
El documento describe los diferentes tipos de fabricación en SAP, incluyendo la fabricación contra pedido, la subcontratación PP, la fabricación de procesos, la fabricación repetitiva y la fabricación contra stock en la industria de procesos. La fabricación contra pedido sigue los procesos requeridos por las ventas contra pedido de clientes. La subcontratación PP involucra la planificación de órdenes donde una operación se realiza en un proveedor externo. La fabricación de procesos y la fabricación contra stock se aplican a industrias orientadas
Introducción a Business Process Integration with SAP ( BPI II) o Integración de Procesos de negocio. Curso desarrollado para aplicar en una empresa con procesos de fabricación utilizando modulos de SAP como Controlling CO, Production Planning PP, Quality Management entre otros.
Diagrama Gantt de carga de maquinas de un "caso" simple para determinación de las fechas de inicio de mecanizado.
Datos de entrada:
piezas, tiempos de elaboración, máquinas, mano de obra, prioridades de carga.
En esta presentación se resume brévemente los conceptos a tener en cuenta en la: Planificación Agregada, Plan Maestro de Producción (PMP) y Planificación de Materiales, dentro de la Dirección de Operaciones en una organización. Presentación realizada por Juan Antonio Marco Montes De Oca para Creando Valor para su Organización
Este documento presenta información sobre estándares de mano de obra indirecta y general. Discute el crecimiento de trabajadores en estas áreas debido a factores como la mecanización e incremento de papeleo. Explica métodos para establecer estándares como MTM, MOST y datos históricos. También cubre cómo medir el desempeño de trabajadores profesionales y las ventajas de tener estándares para la mano de obra indirecta y general.
Este documento presenta diferentes técnicas de mejoramiento de la productividad basadas en la mano de obra, incluyendo incentivos financieros individuales y grupales, promoción de empleados, enriquecimiento del trabajo, rotación del trabajo, participación del trabajador, enriquecimiento de habilidades, administración por objetivos, curvas de aprendizaje, comunicación, mejoramiento de condiciones de trabajo, capacitación, educación, percepción de funciones, calidad de supervisión, reconocimiento, penalización, círculos de calidad, equipos
Este documento describe los conceptos clave de la planificación de las necesidades de materiales (MRP). En primer lugar, explica los requisitos para utilizar modelos de inventario para la demanda dependiente, incluido el programa marco de producción y las especificaciones de materiales. Luego, describe el proceso de planificación MRP, incluida la generación de necesidades brutas y netas de materiales. Por último, explica algunas ampliaciones de MRP como la planificación de capacidad y los recursos de la empresa.
El documento habla sobre la planeación y control de la producción a través de sistemas ERP. Los sistemas ERP permiten integrar todos los procesos de una empresa en una base de datos única, lo que optimiza la producción y compartir información. El ERP también puede adaptarse a las necesidades específicas de cada empresa y controlar procesos como pedidos, producción, inventario y distribución.
The document discusses World Class Manufacturing (WCM) and its 10 pillars and 10 technical steps. It outlines approaches to identify losses at various levels including plant, logistics, and yard management. Specific cases show optimizing finished goods inventory and automating invoicing processes to reduce space, inventory levels, and processing time. A second case demonstrates deploying improvements horizontally by changing body transportation to increase carrying capacity and reduce costs. The key is to measure losses, prioritize high impact projects, apply WCM tools to resolve issues, track results and horizontally expand successes.
KPI's - the fundamental navigation tools to stay on track or getting off target - don't stand on their own and are not only for Multi Nationals
makeadifference@stratcap.org www.stratcap.org
This complete presentation has PPT slides on wide range of topics highlighting the core areas of your business needs. It has professionally designed templates with relevant visuals and subject driven content. This presentation deck has total of fourty five slides. Get access to the customizable templates. Our designers have created editable templates for your convenience. You can edit the colour, text and font size as per your need. You can add or delete the content if required. You are just a click to away to have this ready-made presentation. Click the download button now. https://bit.ly/3goZGY8
- The presentation discusses forward-looking statements which are subject to risks and uncertainties that could cause actual results to differ from expectations.
- It provides key facts about the company's history of dividends, awards, customers and financial performance.
- The company's vision is to lead the global cleaning industry in sustainable innovation to empower customers to create a cleaner world.
- The document discusses Tennant Company's strategy to achieve $1 billion in revenue by 2017 through organic growth. It plans to focus on reaching new customers and markets, continuing product innovation, and maintaining financial discipline.
- Tennant reported 2014 revenues of $822 million and plans to achieve revenue growth through GDP expansion, improving go-to-market strategies, new product introductions, and growth in emerging markets.
- The company will balance growth investments while maintaining its target 12% operating profit margin through standardized global processes and financial discipline.
TCS reported financial results for the first quarter of fiscal year 2015, ending June 30, 2014. Revenue grew 2.6% quarter-over-quarter and 22.9% year-over-year in Indian Rupees. Operating margin was 26.3% and net income margin was 22.9%. Key highlights included strong growth in telecom, retail, and life sciences industries as well as an increase in large clients with over $50 million in annual revenues from TCS. The company added over 15,000 employees during the quarter.
Enhance your audiences knowledge with this well researched complete deck. Showcase all the important features of the deck with perfect visuals. This deck comprises of total of forty four slides with each slide explained in detail. Each template comprises of professional diagrams and layouts. Our professional PowerPoint experts have also included icons, graphs and charts for your convenience. All you have to do is DOWNLOAD the deck. Make changes as per the requirement. Yes, these PPT slides are completely customizable. Edit the colour, text and font size. Add or delete the content from the slide. And leave your audience awestruck with the professionally designed Synergy Assessment Powerpoint Presentation Slides complete deck. https://bit.ly/3fqCpqv
SiriusDecisions Advanced Waterfall Use Cases - Circulate 2016Full Circle Insights
www.fullcircleinsights.com
Jon Donlon discusses the Demand Waterfall and explores the best practices to unlocking sales and marketing performance in world class organizations.
April 11, 2016 @ the Circulate 2016 conference hosted by Full Circle Insights, a B2B marketing analytics and funnel metrics solution provider.
This presentation contains forward-looking statements, including our expectations for churn improvement in the fourth quarter of 2015, our expectations for revenue, adjusted EBITDA and capital expenditures in 2015 and our ability to accelerate profitable growth from our new performance-based product offerings and greatly improved execution.
The document provides an earnings summary and financial review for Trinseo for Q4 and full year 2013. It discusses key metrics such as revenue, adjusted EBITDA, volume and pricing trends on a quarterly and year-over-year basis for each of Trinseo's business segments. It also reviews liquidity, cash flow, balance sheet and debt maturity. The presentation focuses on improving operating rates and profitability in 2014 through productivity gains, cost management and selling out synthetic rubber capacity.
The document is an investor presentation from Intuit given in March 2015 that provides an overview of the company's strategy, priorities, financial metrics and outlook. Some of the key points include:
- Intuit's mission is to improve customers' financial lives so profoundly that they can't imagine going back to the old way.
- The company's strategic priorities are to win online/mobile, grow globally, create a unified SMB profile, accelerate its "taxes are done" goal, and make everything a service.
- Intuit expects QuickBooks Online subscribers to grow to around 1 million in FY2015 and around 2 million in FY2017, with total revenue reaching approximately $5.8 billion.
- The presentation
- SAP is acquiring Qualtrics for $8 billion to accelerate its experience management (XM) category and cloud business.
- Qualtrics will continue to operate independently within SAP's cloud unit and be headquartered in Provo, Utah and Seattle.
- The acquisition will enhance SAP's intelligent enterprise suite by adding experience data across customers, employees, products, and brands.
This document discusses best practices for procurement and supplier management. It recommends minimizing risks from suppliers by having stable, reliable suppliers with clear terms, and alternatives for critical suppliers. It also suggests maximizing value by utilizing supplier knowledge, conducting cost analyses, and ensuring efficiency. The document emphasizes that the business environment is dynamic and procurement must have a holistic view. It provides a framework for assessing and approving suppliers based on the type of goods/services. Key performance indicators like approval rates, cash flow forecasts, and purchase order status reports are also presented. The goal is to achieve lower lead times for customers and cash through an organized procurement process.
Altran reported its 2015 annual results on 10 March 2016. Key highlights included:
- Revenues increased 10.7% to €1.945 billion, with 4.1% organic growth.
- EBITA grew 13.1% to €186 million.
- Net income increased 22% to €100.5 million.
- Free cash flow was €91.9 million, or 4.7% of revenues.
- Four strategic acquisitions added over 1,600 employees.
- German operations returned to breakeven in Q4 after aggressive cost-cutting measures.
In IT, we love to measure and report. We just can’t help ourselves. But in our efforts to track every statistic possible, we often lose focus.
So let's change that. Let's start asking questions like... Who will use the metrics? Why do we need them? Are we setting the right performance goals to reinforce the goals of our business–or could we even be working against them?
People often say "what gets measured gets improved," but they rarely say what, exactly, should be measured. With the recent developments in the reporting capabilities of IT help desk software, hundreds of KPIs and help desk metrics can be measured and monitored. But that doesn't mean you should measure them all. Only the KPIs and metrics that are critical to your IT help desk need to be measured to improve service delivery.
We'll look very practical guidelines for measuring and reporting on IT performance, and for setting the right goals from the start.
This document summarizes key points from Broadwind's Q3 2015 earnings conference call:
- Broadwind discussed challenges in ramping up full tower production capacity and solutions being implemented around procurement processes and capital investments.
- The wind market continues to be driven by a large pipeline of projects under construction, particularly in Texas and the Midwest.
- Tower orders and backlog were down compared to Q3 2014 but are expected to increase in Q4 2015 with significant order announcements.
- Financial results showed declines in revenue and margins compared to Q3 2014 due to unfavorable tower mix. Liquidity improved with declining working capital and inventory levels projected to decrease further.
1. The document discusses workforce analytics and strategic workforce planning, including defining different levels of maturity for HR analytics processes.
2. A case study is presented analyzing headcount, compensation ratio, and attrition data across different job levels and locations. Teams were asked to interpret the data and provide observations and recommendations.
3. Key observations from the high cost location data included a shift to higher job levels year-over-year, increased compensation ratios, decreased attrition, and dense tenure between 2-5 years. Recommendations were not fully summarized.
Geometric reported financial results for the third quarter of FY2016.
- Revenues increased 2.1% quarter-over-quarter in INR terms and 2.3% year-over-year in USD terms.
- Net income increased 25.7% quarter-over-quarter to INR 289.43 million, with EPS of INR 4.48.
- EBITDA increased 18.2% quarter-over-quarter to INR 632.09 million, with an EBITDA margin of 20.1% of revenues.
Probably most of us have heard the joke about the driver who stops to ask directions to a particular town only to be told, ‘If that’s where you want to go I wouldn’t start from here.’ But, of course, we always start from here! The art of leadership is not just having a vision of where you want to be in the future, but also understanding how to get there from where you are now. In other words, leadership is about understanding and giving effective directions.
This document discusses key performance indicators (KPIs) and service level agreements (SLAs) for testing as a managed service. It provides examples of SLAs for metrics such as defect removal effectiveness, process compliance, and incident management response times. It also shows snapshots of SLA metric performance for items like automated regression testing and review of root cause analyses. The document aims to demonstrate how SLAs and KPIs can be used to govern a vendor's testing services.
This presentation summarizes Internap's 3rd quarter 2016 earnings results. Revenue declined year-over-year primarily due to lower IP connectivity pricing and customer churn. The company reported a large net loss that included a non-cash goodwill impairment charge. Looking forward, the new CEO plans to improve operations, cut costs, and explore ways to recapitalize the business in order to focus on growth. Financial guidance for 2016 was reaffirmed with some minor adjustments to revenue and adjusted EBITDA expectations.
2. ONTARGET
Why we need a Scorecard?
Understanding your performance measures
Royal Mail is going through a period of major transformation......but it's
transformation for the good.
Our goal is to build a higher quality, efficient and profitable service that
focuses on the needs of our customers. Central to this goal is the role of
our function in reviewing our own performance and developing ways to
improve the efficiency and quality of services we offer.
To help you achieve this we have put in place some clearly defined
performance measures. Following a strategic review, which included
consultation with unions and your peers, this presentation provides an
overview of the new KPIs.
3. ONTARGET
Understanding KPI’s (Key Performance Indicators)
KPI PERFORMANCE
Measures
PEOPLE
CUSTOMER
PERFORMANCE
FINANCE
The scorecard is
made up of four
Key performance
indicators used to
measure the
performance of
the office and are
key to measuring
success
4. ONTARGET
So what are KAI’s (Key Activity Indicators)?
KPI PERFORMANCE
Measures
PEOPLE
Loss time accidents (LTA's)
Road traffic collisions (RTC's) Blameworthy
Road traffic collisions (RTC's) Non Blameworthy
Accidents/Personal Injury
Sick Absence
SMATS
E.O.S - Engagement score
Training (DCPC5)
CUSTOMER
Delivery of Special Events
MTT (Move to time)
Adherence to SLA's
Quality Reporting
PERFORMANCE
Compliance (Zero risk 3's)
Monitoring of drivers hours
2014/2015 Business plan
FINANCE
Staff Costs
The scorecards
key activity
indicators (KAI’s)
are the key
activities that the
office is
measured on.
Its is the
activities behind
the KAI’s that
drives success
6. ONTARGET
Understanding your PEOPLE 2014/2015 targets
What our performance measurements are for 2014/2015
KPI PERFORMANCE
Measures
PEOPLE
Loss time accidents (LTA's)
Target
0
Road Traffic Collisions (RTC’s) 12
Accidents/Personal Injury 2
Sick Absence 3.6%
SMATS 208
E.O.S – Employee Engagement 80
Training (DCPC5) 100%
7. ONTARGET
Understanding your CUSTOMER 2014/2015 targets
What our performance measurements are for 2014/2015
KPI PERFORMANCE
Measures
CUSTOMER
Delivery of special events
Target
100%
Move to time (MTT) 100%
Adherence to SLA’s 100%
Quality Reporting 100%
8. ONTARGET
Understanding your PERFORMANCE 2014/2015 targets
KPI PERFORMANCE
Measures
PERFORMANCE
Compliance (Zero risk 3’s)
Target
95%
Monitoring of driving hours 100%
2014/2015 Business plan TBC